On April 23, a Special Inspection was completed at the Farley nuclear station concerning a service water pump failure. Reviews determined the pump failure resulted from pump journal bearing corrosion. One green finding was identified for failure to ensure procurement specifications were met. The inspection prompted a NRR Vendor Branch inspection of the vendor, Sulzer, which was also completed.
On April 23, a Special Inspection was completed at the Farley nuclear station concerning a service water pump failure. Reviews determined the pump failure resulted from pump journal bearing corrosion. One green finding was identified for failure to ensure procurement specifications were met. The inspection prompted a NRR Vendor Branch inspection of the vendor, Sulzer, which was also completed.
On April 23, high tritium levels were found in an underground cable bunker (pullbox) near the Hatch Unit 1 and Unit 2 condensate storage tanks (CST). The Licensee attributes the source of the tritium to a leaking condensate system valve. The Licensee is evaluating encapsulating the leaking valve to collect leakage until the valve can be repaired.
On April 23, high tritium levels were found in an underground cable bunker (pullbox) near the Hatch Unit 1 and Unit 2 condensate storage tanks (CST). The Licensee attributes the source of the tritium to a leaking condensate system valve. The Licensee is evaluating encapsulating the leaking valve to collect leakage until the valve can be repaired.
Points of Contact:
Points of
 
==Contact:==
1)Scott Shaeffer - RII DRP Special Considerations:
1)Scott Shaeffer - RII DRP Special Considerations:
1)N/A 1*}}
1)N/A 1*}}

Latest revision as of 19:27, 6 December 2019

E-mail from Webwork@Nrc.Gov to EDO Groupaccount; Cc: Pena, Alex, Mccree, Victor, Wert, Leonard, Munday, Joel, and Shaeffer, Scott; Subject: a New Daily Note Has Been Submitted by Rii
ML101930453
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/26/2010
From:
- No Known Affiliation
To:
NRC/RGN-II
References
FOIA/PA-2010-0209
Download: ML101930453 (1)


Text

Wert, Leonard From: webwork@nrc.gov Sent: Monday, April 26, 2010 1:07 PM To: EDO GroupAccount Cc: Pena, Alex; McCree, Victor; Wert, Leonard; Munday, Joel; Shaeffer, Scott

Subject:

A New Daily Note Has Been Submitted by R11 Pamela Lee of RII has submitted the following daily note(s):

(OUO-SII)

On April 23, a Special Inspection was completed at the Farley nuclear station concerning a service water pump failure. Reviews determined the pump failure resulted from pump journal bearing corrosion. One green finding was identified for failure to ensure procurement specifications were met. The inspection prompted a NRR Vendor Branch inspection of the vendor, Sulzer, which was also completed.

On April 23, high tritium levels were found in an underground cable bunker (pullbox) near the Hatch Unit 1 and Unit 2 condensate storage tanks (CST). The Licensee attributes the source of the tritium to a leaking condensate system valve. The Licensee is evaluating encapsulating the leaking valve to collect leakage until the valve can be repaired.

Points of

Contact:

1)Scott Shaeffer - RII DRP Special Considerations:

1)N/A 1*