ML061320150: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Unknown Sent: Tuesday, January 10, 2006 6:25 AM Summary sheets for January 9th 2006.From: Lavera, Ron Sent: Monday, January 09, 2006 4:50 PM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs;Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Ron Lavera; Ronald Sachatello; T. R. Jones  
{{#Wiki_filter:Unknown Sent:           Tuesday, January 10, 2006 6:25 AM Summary sheets for January 9th 2006.
From: Lavera, Ron Sent: Monday, January 09, 2006 4:50 PM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Ron Lavera; Ronald Sachatello; T. R.Jones


==Subject:==
==Subject:==
Sample Summary Sheets Please see the attached sample summary sheets for Jan. 91 2006.Thanks Ron FAR RLaVera@entergy.com  
Sample Summary Sheets Please see the attached sample summary sheets for Jan. 91 2006.
<mailto:RLaVera  
Thanks Ron FAR RLaVera@entergy.com <mailto:RLaVera @enterqy.com>
@ enterqy.com>
914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308
Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308
+4l Page 1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th Man-holes (Storm Drains)ID Date Location Sample Results MH-1 12/21/2005 North of IP-2 Turb. Too dry to sample_ 1-4-06 Bldg. by Water ND/HTO MH-2 12/16/2005 River Front 651 pCiAi MH-2A 1/4/2006.
                                                                                            +4l Page 1
y IP-2 EDG3Y ND/HTO MH-3 11/10/2005 North of IP-2 Turbine 1,950 pCi/A 12/8/2005 Building 894 pCi/I 12/16/05 651 pCi/A 12/20/2005 2,330 pcin_ 1/4/2006 3,450 pCiAi MH-4 12/16/2005 Transformer Yard 4,370 pCi/A 1/4/2006 3,070 pCiAi M:FH-4A 12/21/2005 IP-2 Condenser Tube 2,730 pCi/l 1/4/2006 removal pit 3,380 pCi/A M:H-5 11/10/2005' ux Feed Bldg) 2,390 pCi/l 12/8/2005 2,020 pCiA 12/20/2005 6,920 pCiAl 1/4/2006 _ 3,480 pCi/A M:H-6 11/10/2005 Transformer Yard 51,300 pCi/l 12/8/2005 37,100 pCi/l 12/16/2005 12,200 pCiA_ 1/4/2006' 13,100 pCiAl M:H-7 12/19/2005 Transformer Yard 5,340 pCi/l 1/4/2006 8,140 pCiA MJH-8 12/16/2005 Transformer Yard 4,510 pCi/l 1/4/2006 5,740 pCiA MEI-9 12/16/2005 MOB Hill -80' 2,140 pCiA MEI-10 12/16/2005 MOB Hill -80' 2,940 pCi/i MEI-12 1-4-06 West of IP-2 Turb.Bldg. by river NDJHTO MHI-14 1/4/06 ND/HTO ME-I-17 12/16/2005 Transformer Yard 1,710 pCiA M]IH-18 12/16/2005 Transfonner Yard 854 pCiA MEI-19 12/16/2005 Transformer Yard 1,800 pCiA MEI-A4 10/18/2005 IP-3 Manhole Located east of the.IP-3 Monitor Tank ND/HTO M:H-B8 10/18/2005 IP-3 Manhole located west of the north end 959 pCi/A I~rct Stacy Page 1 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th of the IP-3 turbine hall over the discharge canal CB-4 1/4/2006 By IP-2 RWST 39 1,010 pCi/l CI3-24 1/4/2006 By IP-2 Sec. Bldg 822 pCi/l ID Date Location Sample Results M7W-30 11/22/2005 FSB Leakage Area -464, 000 to 600, 000 pCi/l.Note: Well developmen HTO%DT completed MW-31 12/30/2005 Outside MOB 4,060 pCi/l HTO 1/5/2006 3,050 pCi/l HTO MIW-33 12/15/2005 Transforner Yard 142,000 pCi/l HTO 12/19/2005 199,000 pCi/l HTO 12/29/2005 220,000 pCi/Q HTO 01/06/2006 189,000 pCi/l HTO MTW-34 12/13/2005 Transformer Yard 63,900 pCi/l HTO 12/19/2005 121,000 pCi/l HTO 12/29/2005 147,000 pCi/l HTO 1/06/2006 159,000 pCi/I HTO MW-35 12/13/2005 Transformer Yard 42,300 pCi/l HTO 12/19/2005 76,000 pCi/l HTO 12/29/2005 80,500 pCi/l HTO 1 1/6/2006 1 1 95,400 pCi/l HTO ID Date Location Sample Results MW-38 12/2/2005 End of IP-3 15000 pCi/l HTO -False Discharge Canal Positive due to sample Concrete contamination.
 
12/5/2005 ND/HTO 12/6/2005 ND/HTO 12/8/2005 985 pCi/l IPEC 12/8/2005 701 pCi/l NYSDEC 12-30-05 ND/HTO ebol Stacy Page 2 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID Date Location Sample Results MW-11l 9/28/2005 Transformer Yard 212,000 pCi/Q HTO 10/5/2005 188,000 pCi/Q HTO 10/14/2005 6820 pCi/l HTO(rain)10/14/2005 6320 pCi/Q HTO (back-up)10/21/2005 284,000 pCi/Q HTO 10/21/2005 267,000 pCi/l HTO DEC 10/28/2005 218,000 pCi/l HTO 11/4/2005 302,000 pCiQ HOT 11/10/2005 246,000 pCi/l HTO 11/18/2005 171,000 pCi/Q HTO 11/22/2005 180,000 pCiQ HTO 12/02/2005 125,000 pCiQ HTO 12/08/2005 270,000 pCiQ HTO 12/15/2005 296,000 pCi/l HTO 12/19/2005 192,000 pC/I HTO 12/29/2005 212,000 pC/I HTO 1/6/2006 113,000 pC/Q HTO ID Date Location Sample Results RVW-101 12/8/2005 U2 Warehouse ND/HTO 12/8/2005 ND/HTO DEC MW-l05 12/8/2005 Mtce. Training ND/HTO 12/8/2005 96 pCi/Q DEC MIW-107 9/28/2005 NEM ND/HTO 12/8/2005 ND/HTO 12/8/2005 ND/HTO DEC MW-108 9/29/2005 GT-1 ND/HTO 11/3/05 ND/HTO MV[W-109 9/28/2005 GT-1 ND/HTO 11/04/2005 ND/HTO Stacy Page 3 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID Date Location Sample Results U3-I 10/6/2005 U3 Discharge Canal 417 pCi/l HTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO 12-30-05 ND/HTO U3-2 10/6/2005 U3 Discharge Canal 960 pCi/I HTO 10/21/2005 ND/HTO 10/21/2005 512 pCi/l HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO 12-30-05 ND/HTO U3-3 10/6/2005 U3 Discharge Canal 439 pCiA HTO 10/21/2005 ND/HTO 10/21/2005 ND/HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 471 pCi/I HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO_ 12-30-05 ND/HTO U3-4 10/16/2005 U3 Condensate 406 pCi/I HTO 10/21/2005 Polisher 399 pCi/I HTO 10/21/2005 344 pCi/I HTO DEC 10/28/2005 405 pCi/Q HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 399 pCiAIHTO_, 12-30-05 442 pCiA/HTO U3-T1 10/6/2005 U3 South Turbine 703 pCiA HTO_ 10/21/2005 ND/HTO Stacy Page 4 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th 10/28/2005 ND/HTO 11/4/2005 NDJHTO 11/10/2005 563 pCi/I HTO 11/18/2005 ND/HTO 12/2/05 498 pCi/i HTO 12/15/2005 ND/HTO 12-30-05 529 pCi/i HTO U3-T2 10/7/2005 U3 North Turbine 1,590 pCi/i HTO 10/21/2005 1,470 pCi/I HTO 10/21/2005 1,420 pCi/l HTO DEC 10/28/2005 1,280 pCiII HTO 11/4/2005 1,190 pCi/l HTO 11/10/2005 1,640 pCi/i HTO 11/18/2005 1,130 pCi/I HTO 12/2/05 1,329 pCi/l HTO 12/15/05 1,290 pCi/l HTO_ 12-30-05 1,685 pCi/i HTO ID Date Location Sample Results 12/06/2005 Lafarge Property.
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th Man-holes (Storm   Drains)
ND/HTO Well-I 12/06/2005 North East Well -ND/HTO DEC Farthest from river 12/06/2005 Lafarge Property.
ID     Date             Location                 Sample Results MH-1       12/21/2005 North of IP-2 Turb.       Too dry to sample
N/TO Well-3 12/06/2005 North West Well -ND DEC closest to river ND/HTO DEC Stacy Page 5 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th MW-111, MW-33, MW-34 & MW-35 Tritium 350,000 300,000 250,000 ZI:-S&deg; 200,000.2= 150,000._-100,000 50,000 0 A II__ -__ I A_T_ .#O N_Pr.0 U r!, .-rf,*j *.0 n i I I I I I I I I i i I I* MW-111 pCi/I HTO--MW-33 pCi/l HTO-U- MW-34 pCi/I HTO-1 -MW-35 pCi/l HTO l to oo o t to o o o o O oa 0 0 0 0 0) 0 0) 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 ) ' o 0 0 0 Date 0 C'!uz g5 0 to to to o o o 0 0 0 0 o 0 0 0 0! N! Q C C'!7 c ,-i _q Stacy Page 6 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Date ID Location Sample Results 9/28-29/2005 MW-107 NEM ND/HTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO MW- 11 Transformer Yard 212,000 pCi/l HTO 10/5/2005 MW-111 Transformer Yard 188,000 pCi/l HTO 10/6/2005 U3-1 U3 Discharge Canal 417 pCi/l HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCi/l HTO 10/7/2005 U3-T1 U3 South Turbine 703 pCi/l HTO U3-T2 U3 North Turbine 1,590 pCi/I HTO MW-1Il Transformer Yard 188,000 pCi/I HTO 10/14/2005 MW-111 Transformer Yard 6,820 pCi/Il HTO (rain)MW-111 Transformer Yard 6,320 pCi/I HTO (back-up)10/16/2005 U3-4 U3 Condensate Polisher 406 pCi/I HTO 10/18/2005 MH-B8 IP-3 Manhole IP-3 Disch 959 pCi/l HTO Canal MH-A4 East of IP-3 Monitor ND/HTO Tank 10/21/2005 MW-111 Transformer Yard 284,000 pCi/l HTO 267,000 pCi/l HTO DEC 10/21/2005 U3-1 U3 Discharge Canal ND/HTO U3-1 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal 512 pCi/l HTO DEC U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 399 pCi/l HTO U3-4 U3 Condensate Polisher 344 pCi/l HTO DEC U3-T1 U3 South Turbine ND/HTO U3-T1 U3 South Turbine ND/HTO DEC U3-T2 U3 North Turbine 1,470 pCi/l HTO U3-T2 U3 North Turbine 1,420 pCi/I HTO DEC 10128/2005 MW-111 Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO Stacy Page 1 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/2005 MW-111 Transformner Yard 302,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO Date ID Location Sample Results 1113-4/2005 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/2005 MW-1il Transformer Yard 246,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/l HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/l HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO MH-6 Transformer Yard 51,300 pCi/l HTO 11/18/2005 MW-ll1 Transformer Yard 171,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,130 pCi/l HTO 11/22/2005 MW-I 11 Transformer Yard 180,000 pCi/I HTO 12/02/2005 MW-111 Transformer Yard 125,000 pCi/I HTO MW-38 End of IP-3 Discharge ND/HTO Canal Concrete U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO Stacy Page 2 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCiQI HTO U3-T2 U3 North Turbine 1,130 pCi/I HTO 12/5/2005 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/6/2005 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/8/2005 MW-101 U2 Warehouse ND/HTO MW-105 Maintenance Training ND/HTO MW-107 NEM ND/HTO MW-38 End of IP-3 Discharge 985 pCi/Q HTO MW-38 Canal Concrete 701 pCi/l HTODEC 12/08/2005 MW- 11 Transformer Yard 270,000 pCi/l HTO MH-3 North of IP-2 Turb. 894 pCi/i HTO MH-5 Transformer Yard 2,020 pCi/A HTO MH-6 Transformer Yard 37,100 pCi/Q HTO MW-38 End of IP-3 Discharge 985 pCi/l HTO Canal Concrete 701 pCiQ HTO DEC MW-101 EOF ND/HTO MW-101 EOF ND/HTO DEC MW-105 Maint. Train. Facil ND/HTO MW-105 Maint. Train. Facil 96 pCi/Q HTO DEC MW-107 NEM Well ND/HTO MW-107 NEM Well ND/HTO 12/13/2005 MW-34 Transformer Yard 63,900 pCi/l HTO MW-35 Transformner Yard 42,300 pCi/l HTO 12/15/2005 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 399 pCiQ HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,290 pCi/l HTO MW-33 Transformer Yard 142,000 pCi/I HTO MW-111 Transformer Yard 296,000 pCi/l HTO 12/16/2005 MH-19 Transformer Yard 1,800 pCi/l HTO MH-18 Transforrner Yard 854 pCi/l HTO MH-17 Transformer Yard 1,710 pCi/l HTO MH-10 Transformer Yard 2,940 pCi/l HTO MH-9 Transformer Yard 2,140 pCi/I HTO MH-8 Transformer Yard 4,510 pCi/l HTO MH-6 Transformer Yard 12,200 pCi/I HTO Stacy Page 3 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th MH-4 Transformer Yard 4,320 pCi/I HTO MH-3 North of IP-2 Turb 651 pCi/l HTO 12/19/2005 MW-33 Transformer Yard 199,000 pCi/l HTO MW-34 Transformer Yard 121,000 pCi/l HTO MW-35 Transformer Yard 76,000 pCi/I HTO MW-111 Transformer Yard 192,000 pCi/l HTO MH-3 North of IP-2 Turb. 2,330 pCi/I HTO MH-5 CIn ABFP Bldg._ 6,920 pCi/I HTO MH-7 Transformer Yard 5,340 pCi/l HTO 12/19/2005 Discharge Hudson River <MDA pCi/l HTO Canal 12,/20/2005 MH-3 /Outside of Turbine BldI 2,330 pCi/I HTO MH-5 EAux Feed Bldg. -t 6,920 pCi/I HTO 12/21/2005 MH-4A Condensor Tube Pull Pit 2,730 pCi/l HTO MH-i River Front Dry -No Sample Taken.12/29/2005 MW-111 MOB 212,000 pCi/l HTO MW-33 Transformer Yard 220,000 pCi/I HTO MW-34 Transformer Yard 147,000 pCi/i HTO MW-35 Transformer Yard 80,500 pCi/l HTO 12/30/2005 MW-31 MOB 4,060 pCi/l HTO U3-1 U3 Discharge Canal 651 pCi/l HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 442 pCi/l HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,690 pCi/l HTO MW-31 Outside MOB 4,060 pCi/l HTO MW-38 End of IP-3 Discharge ND/HTO Canal Concrete al$F eove 1/4/2006 MH-2A CB-4 CB-24 MH-I MH-2 MH-3 MH-4 MH-4A MH-5 MH-6 MH-7 MH-8 MH-12 MH-14)Ty IP-2 EDGIb Wy IP-2 RWST3a 1 3y IP-2 Security Bldg, North of IP-2 Turb. Bldg.North of IP-2 Turb. Bldg.North of IP-2 Turb. Bldg Between Turb. & ABFP IP-2 Cond. Tube Pit EP-2 ABFP Bldg IP-2 TransformetrYard IP-2 Transformer Yard IP-2 Transformer Yard North End IP-2 Turb.North End IP-2 Turb.ND/HTO 1,010 pCi/l HTO 651 pCi/l HTO ND/HTO ND/HTO\3,070 pCi/l HTO 3,380 pCi/I HTO 3,480 pCi/l HTO 13,100 pCi/l HTO 8,140 pCi/I HTO 5,740 pCi/l HTO ND/HTO ND/HTO Stacy Page 4 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th 1/5/2006 MW-31 MOB 3,050 pCi/I HTO 1/6/2006 MW-111 Transformer Yard 113,740 pCi/I HTO MW-33 Transformer Yard 189,000 pCi/i HTO MW-34 Transformer Yard 159,000 pCi/I HTO MW-3_ .Transfo __erYard95,4000pCi/I HTO Stacy Page 5 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Monitoring Wells / Locations Off-Site Date Location Results 10/18/2005 Croton Reservoir ND/HTO -Gamma Camp Field Reservoir ND/HTO -Gamma 10/20/2005 Gypsum Outfall ND/HTO -Gamma Algonquin ND/HTO- Gamma 5 th Street Well ND/HTO -Gamma 10/25/2005 Rock Quarry ND/HTO -Gamma 1.1/8/2005 5 th Street Well ND/HTO -Gamma 11/30/2005 Gypsum Outfall ND/HTO 11/30/2005 Algonquin ND/HTO 5 th Street Well ND/HTO Rock Quarry ND/HTO Croton Reservoir ND/HTO Camp Field Reservoir ND/HTO 1'2/6/2005 Gypsum Plant Well #1 ND/HTO Gypsum Plant Well #2 ND/HTO 12/13/2005 Algonquin Outfall ND/HTO Gypsum Outfall ND/HTO= Rock Quarry ND/HTO Stacy Page 6 of 6}}
_          1-4-06 Bldg. by Water                     ND/HTO MH-2       12/16/2005 River Front                   651 pCiAi MH-2A       1/4/2006. y IP-2 EDG3Y                     ND/HTO     I~rct MH-3       11/10/2005   North of IP-2 Turbine   1,950 pCi/A 12/8/2005   Building                   894 pCi/I 12/16/05                               651 pCi/A 12/20/2005                           2,330 pcin
_    1/4/2006                           3,450 pCiAi MH-4       12/16/2005   Transformer Yard         4,370 pCi/A 1/4/2006                           3,070 pCiAi M:FH-4A   12/21/2005   IP-2 Condenser Tube     2,730 pCi/l 1/4/2006   removal pit             3,380 pCi/A M:H-5     11/10/2005'     ux Feed Bldg)         2,390 pCi/l 12/8/2005                           2,020 pCiA 12/20/2005                             6,920 pCiAl 1/4/2006                         _ 3,480 pCi/A M:H-6     11/10/2005   Transformer Yard       51,300 pCi/l 12/8/2005                         37,100 pCi/l 12/16/2005                           12,200 pCiA
_      1/4/2006'                         13,100 pCiAl M:H-7     12/19/2005   Transformer Yard         5,340 pCi/l 1/4/2006                           8,140 pCiA MJH-8     12/16/2005   Transformer Yard         4,510 pCi/l 1/4/2006                           5,740 pCiA MEI-9     12/16/2005   MOB Hill - 80'           2,140 pCiA MEI-10   12/16/2005   MOB Hill - 80'           2,940 pCi/i MEI-12         1-4-06 West of IP-2 Turb.
Bldg. by river                     NDJHTO MHI-14         1/4/06                                     ND/HTO ME-I-17   12/16/2005   Transformer Yard         1,710 pCiA M]IH-18   12/16/2005   Transfonner Yard           854 pCiA MEI-19   12/16/2005   Transformer Yard         1,800 pCiA MEI-A4   10/18/2005   IP-3 Manhole Located east of the
  .                   IP-3 Monitor Tank                 ND/HTO M:H-B8   10/18/2005 IP-3 Manhole located west of the north end       959 pCi/A Stacy                                 Page 1 of 6
 
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th of the IP-3 turbine hall over the discharge canal CB-4       1/4/2006 By IP-2 RWST       39     1,010 pCi/l CI3-24     1/4/2006   By IP-2 Sec. Bldg           822 pCi/l ID     Date             Location               Sample Results M7W-30   11/22/2005   FSB Leakage Area     - 464, 000 to 600, 000 pCi/l
                      .Note: Well developmen
                      %DT completed HTO                        ebol MW-31   12/30/2005   Outside MOB               4,060 pCi/l HTO 1/5/2006                             3,050 pCi/l HTO MIW-33   12/15/2005   Transforner Yard       142,000 pCi/l HTO 12/19/2005                           199,000 pCi/l HTO 12/29/2005                           220,000 pCi/Q HTO 01/06/2006                           189,000 pCi/l HTO MTW-34   12/13/2005   Transformer Yard         63,900 pCi/l HTO 12/19/2005                           121,000 pCi/l HTO 12/29/2005                           147,000 pCi/l HTO 1/06/2006                           159,000 pCi/I HTO MW-35   12/13/2005 Transformer Yard           42,300 pCi/l HTO 12/19/2005                             76,000 pCi/l HTO 12/29/2005                             80,500 pCi/l HTO 1   1/6/2006 1                       1 95,400 pCi/l HTO ID     Date             Location                 Sample Results MW-38     12/2/2005   End of IP-3             15000 pCi/l HTO - False Discharge Canal         Positive due to sample Concrete               contamination.
12/5/2005                                     ND/HTO 12/6/2005                                     ND/HTO 12/8/2005                             985 pCi/l IPEC 12/8/2005                             701 pCi/l NYSDEC 12-30-05                                     ND/HTO Stacy                                 Page 2 of 6
 
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID       Date         Location             Sample Results MW-11l   9/28/2005   Transformer Yard   212,000 pCi/Q HTO 10/5/2005                       188,000 pCi/Q HTO 10/14/2005                         6820 pCi/l HTO(rain) 10/14/2005                         6320 pCi/Q HTO (back-up) 10/21/2005                       284,000 pCi/Q HTO 10/21/2005                       267,000 pCi/l HTO DEC 10/28/2005                       218,000 pCi/l HTO 11/4/2005                       302,000 pCiQ HOT 11/10/2005                       246,000 pCi/l HTO 11/18/2005                       171,000 pCi/Q HTO 11/22/2005                       180,000 pCiQ HTO 12/02/2005                       125,000 pCiQ HTO 12/08/2005                       270,000 pCiQ HTO 12/15/2005                       296,000 pCi/l HTO 12/19/2005                       192,000 pC/I HTO 12/29/2005                       212,000 pC/I HTO 1/6/2006                       113,000 pC/Q HTO ID       Date         Location             Sample Results RVW-101 12/8/2005     U2 Warehouse               ND/HTO 12/8/2005                             ND/HTO DEC MW-l05   12/8/2005     Mtce. Training             ND/HTO 12/8/2005                             96 pCi/Q DEC MIW-107   9/28/2005         NEM                     ND/HTO 12/8/2005                                 ND/HTO 12/8/2005                             ND/HTO DEC MW-108   9/29/2005         GT-1                   ND/HTO 11/3/05                                 ND/HTO MV[W-109 9/28/2005         GT-1                   ND/HTO 11/04/2005                               ND/HTO Stacy                           Page 3 of 6
 
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID     Date           Location           Sample Results U3-I     10/6/2005 U3 Discharge Canal   417 pCi/lHTO 10/21/2005                               ND/HTO 10/28/2005                               ND/HTO 11/4/2005                               ND/HTO 11/10/2005                               ND/HTO 11/18/2005                               ND/HTO 12/2/05                               ND/HTO 12/15/2005                               ND/HTO 12-30-05                             ND/HTO U3-2     10/6/2005 U3 Discharge Canal   960 pCi/I HTO 10/21/2005                               ND/HTO 10/21/2005                       512 pCi/l HTO DEC 10/28/2005                               ND/HTO 11/4/2005                               ND/HTO 11/10/2005                               ND/HTO 11/18/2005                               ND/HTO 12/2/05                             ND/HTO 12/15/2005                               ND/HTO 12-30-05                               ND/HTO U3-3     10/6/2005 U3 Discharge Canal   439 pCiA HTO 10/21/2005                               ND/HTO 10/21/2005                             ND/HTO DEC 10/28/2005                               ND/HTO 11/4/2005                               ND/HTO 11/10/2005                       471 pCi/I HTO 11/18/2005                               ND/HTO 12/2/05                             ND/HTO 12/15/2005                               ND/HTO
_    12-30-05                               ND/HTO U3-4   10/16/2005 U3 Condensate       406 pCi/I HTO 10/21/2005 Polisher             399 pCi/I HTO 10/21/2005                       344 pCi/I HTO DEC 10/28/2005                       405 pCi/QHTO 11/4/2005                               ND/HTO 11/10/2005                               ND/HTO 11/18/2005                               ND/HTO 12/2/05                                 ND/HTO 12/15/2005                       399 pCiAIHTO
_,   12-30-05                         442 pCiA/HTO U3-T1   10/6/2005 U3 South Turbine     703 pCiA HTO
10/21/2005                               ND/HTO Stacy                         Page 4 of 6
 
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th 10/28/2005                                 ND/HTO 11/4/2005                                 NDJHTO 11/10/2005                         563 pCi/I HTO 11/18/2005                                 ND/HTO 12/2/05                         498 pCi/i HTO 12/15/2005                                 ND/HTO 12-30-05                         529 pCi/i HTO U3-T2   10/7/2005 U3 North Turbine       1,590 pCi/i HTO 10/21/2005                       1,470 pCi/I HTO 10/21/2005                       1,420 pCi/lHTO DEC 10/28/2005                       1,280 pCiII HTO 11/4/2005                       1,190 pCi/l HTO 11/10/2005                       1,640 pCi/i HTO 11/18/2005                       1,130 pCi/I HTO 12/2/05                       1,329 pCi/lHTO 12/15/05                       1,290 pCi/l HTO
_    12-30-05                       1,685 pCi/i HTO ID     Date           Location             Sample Results 12/06/2005 Lafarge Property. ND/HTO Well-I 12/06/2005 North East Well -   ND/HTO DEC Farthest from river 12/06/2005 Lafarge Property. N/TO Well-3 12/06/2005 North West Well -   ND       DEC closest to river     ND/HTO DEC Stacy                           Page 5 of 6
 
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th MW-111, MW-33, MW-34 & MW-35 Tritium 350,000 A
300,000 250,000 ZI
:-S
&deg; 200,000                                                                                             I
* MW-111 pCi/I HTO
.2                                                                                           li
                                                                                                            -- MW-33 pCi/l HTO I
                                                                                                          -U-  MW-34 pCi/I HTO
  = 150,000                                                     __ - __ I                     A
_T_ .#O N_                        MW-35 pCi/l HTO Pr 100,000
                                                                                            .0U r!, . -rf,*
j
* 50,000                                                            .0 n
0            i         I   I   I         I   I I     I     I       i     i       I   I l
o  tooo      t    to  o  o    o    o  O    0        o      0to 0to      0o  0o oa       0   0   0   0     0) 0     0) 0   0           to o     o 0   0   0     0   0   0   0     0 0 C'!      o     0   0         0   0 uz g5
                                                                            !      N! Q          C  C'!
0 7    c      ,-
0 0) '  o     0   0     0                                 i     _q Date Stacy                                         Page 6 of 6
 
On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Date         ID               Location                 Sample Results 9/28-29/2005 MW-107         NEM                                   ND/HTO MW-108         GT-1                                   ND/HTO MW-109         GT-1                                   ND/HTO MW- 11         Transformer Yard         212,000 pCi/l HTO 10/5/2005 MW-111         Transformer Yard         188,000 pCi/l HTO 10/6/2005 U3-1           U3 Discharge Canal           417 pCi/l HTO U3-2           U3 Discharge Canal           960 pCi/l HTO U3-3           U3 Discharge Canal           439 pCi/l HTO 10/7/2005 U3-T1         U3 South Turbine             703 pCi/l HTO U3-T2         U3 North Turbine           1,590 pCi/I HTO MW-1Il         Transformer Yard         188,000 pCi/I HTO 10/14/2005 MW-111         Transformer Yard           6,820 pCi/Il HTO (rain)
MW-111         Transformer Yard           6,320 pCi/I HTO (back-up) 10/16/2005 U3-4           U3 Condensate Polisher         406 pCi/I HTO 10/18/2005 MH-B8         IP-3 Manhole IP-3 Disch       959 pCi/l HTO Canal MH-A4         East of IP-3 Monitor                   ND/HTO Tank 10/21/2005 MW-111         Transformer Yard         284,000 pCi/l HTO 267,000 pCi/l HTO DEC 10/21/2005 U3-1           U3 Discharge Canal                     ND/HTO U3-1           U3 Discharge Canal                 ND/HTO DEC U3-2           U3 Discharge Canal                 ND/HTO DEC U3-2           U3 Discharge Canal             512 pCi/l HTO DEC U3-3           U3 Discharge Canal                     ND/HTO U3-4           U3 Condensate Polisher         399 pCi/l HTO U3-4           U3 Condensate Polisher         344 pCi/l HTO DEC U3-T1         U3 South Turbine                       ND/HTO U3-T1         U3 South Turbine                   ND/HTO DEC U3-T2         U3 North Turbine             1,470 pCi/l HTO U3-T2         U3 North Turbine             1,420 pCi/I HTO DEC 10128/2005 MW-111         Transformer Yard         218,000 pCi/l HTO U3-1           U3 Discharge Canal                     ND/HTO U3-2           U3 Discharge Canal                     ND/HTO Stacy                                       Page 1 of 6
 
On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3         U3 Discharge Canal                     ND/HTO U3-4         U3 Condensate Polisher         405 pCi/i HTO U3-TI         U3 South Turbine                       ND/HTO U3-T2         U3 North Turbine             1,280 pCi/l HTO 11/4/2005   MW-111       Transformner Yard         302,000 pCi/l HTO U3-1         U3 Discharge Canal                     ND/HTO U3-2         U3 Discharge Canal                     ND/HTO U3-3         U3 Discharge Canal                     ND/HTO U3-4           U3 Condensate Polisher                 ND/HTO U3-T1         U3 South Turbine                       ND/HTO U3-T2         U3 North Turbine           1,190 pCi/I HTO Date           ID               Location                   Sample Results 1113-4/2005 MW-108         GT-1                     ND/HTO MW-109         GT-1                     ND/HTO 11/10/2005 MW-1il         Transformer Yard         246,000 pCi/I HTO U3-1           U3 Discharge Canal                     ND/HTO U3-2           U3 Discharge Canal                     ND/HTO U3-3           U3 Discharge Canal             471 pCi/l HTO U3-4           U3 Condensate Polisher                 ND/HTO U3-T1         U3 South Turbine               563 pCi/l HTO U3-T2         U3 North Turbine           1,640 pCi/l HTO MH-6           Transformer Yard           51,300 pCi/l HTO 11/18/2005 MW-ll1         Transformer Yard         171,000 pCi/I HTO U3-1           U3 Discharge Canal                     ND/HTO U3-2           U3 Discharge Canal                     ND/HTO U3-3           U3 Discharge Canal                     ND/HTO U3-4           U3 Condensate Polisher                 ND/HTO U3-T1         U3 South Turbine                       ND/HTO U3-T2         U3 North Turbine             1,130 pCi/l HTO 11/22/2005 MW-I 11       Transformer Yard         180,000 pCi/I HTO 12/02/2005 MW-111         Transformer Yard         125,000 pCi/I HTO MW-38         End of IP-3 Discharge                 ND/HTO Canal Concrete U3-1           U3 Discharge Canal                     ND/HTO U3-2           U3 Discharge Canal                     ND/HTO Stacy                                       Page 2 of 6
 
On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3       U3 Discharge Canal                       ND/HTO U3-4       U3 Condensate Polisher                   ND/HTO U3-T1       U3 South Turbine               498 pCiQI HTO U3-T2       U3 North Turbine             1,130 pCi/I HTO 12/5/2005 MW-38       End of IP-3 Discharge                   ND/HTO Canal Concrete 12/6/2005 MW-38       End of IP-3 Discharge                   ND/HTO Canal Concrete 12/8/2005 MW-101       U2 Warehouse                             ND/HTO MW-105       Maintenance Training                     ND/HTO MW-107       NEM                                     ND/HTO MW-38       End of IP-3 Discharge         985 pCi/Q HTO MW-38       Canal Concrete                 701 pCi/l HTODEC 12/08/2005 MW- 11       Transformer Yard         270,000 pCi/l HTO MH-3         North of IP-2 Turb.           894 pCi/i HTO MH-5         Transformer Yard           2,020 pCi/AHTO MH-6         Transformer Yard         37,100 pCi/Q HTO MW-38       End of IP-3 Discharge         985 pCi/l HTO Canal Concrete               701 pCiQ HTO DEC MW-101       EOF                                     ND/HTO MW-101       EOF                                 ND/HTO DEC MW-105       Maint. Train. Facil                     ND/HTO MW-105       Maint. Train. Facil             96 pCi/Q HTO DEC MW-107       NEM Well                                 ND/HTO MW-107       NEM Well                                 ND/HTO 12/13/2005 MW-34       Transformer Yard         63,900 pCi/l HTO MW-35       Transformner Yard         42,300 pCi/l HTO 12/15/2005 U3-1         U3 Discharge Canal                     ND/HTO U3-2         U3 Discharge Canal                       ND/HTO U3-3         U3 Discharge Canal                       ND/HTO U3-4         U3 Discharge Canal           399 pCiQ HTO U3-TI       U3 South Turbine                         ND/HTO U3-T2       U3 North Turbine           1,290 pCi/l HTO MW-33       Transformer Yard         142,000 pCi/I HTO MW-111       Transformer Yard         296,000 pCi/l HTO 12/16/2005 MH-19       Transformer Yard           1,800 pCi/l HTO MH-18       Transforrner Yard             854 pCi/l HTO MH-17       Transformer Yard           1,710 pCi/l HTO MH-10       Transformer Yard           2,940 pCi/l HTO MH-9         Transformer Yard           2,140 pCi/I HTO MH-8         Transformer Yard           4,510 pCi/l HTO MH-6         Transformer Yard         12,200 pCi/I HTO Stacy                                       Page 3 of 6
 
On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th MH-4         Transformer Yard             4,320 pCi/I HTO MH-3         North of IP-2 Turb             651 pCi/l HTO 12/19/2005 MW-33         Transformer Yard           199,000 pCi/l HTO MW-34         Transformer Yard           121,000 pCi/l HTO MW-35         Transformer Yard           76,000 pCi/I HTO MW-111       Transformer Yard           192,000 pCi/l HTO MH-3         North of IP-2 Turb.         2,330 pCi/I HTO MH-5       CIn ABFP Bldg._               6,920 pCi/I HTO 12/19/2005 MH-7 Discharge Transformer Yard Hudson River 5,340 pCi/l HTO
                                                    <MDA pCi/l HTO al$F Canal 12,/20/2005 MH-3       /Outside of Turbine BldI       2,330 pCi/I HTO 12/21/2005 MH-5 MH-4A EAux Feed Bldg.
Condensor Tube Pull Pit
                                                  -t   6,920 pCi/I HTO 2,730 pCi/l HTO eove MH-i         River Front                     Dry - No Sample Taken.
12/29/2005 MW-111       MOB                         212,000 pCi/l HTO MW-33         Transformer Yard           220,000 pCi/I HTO MW-34         Transformer Yard           147,000 pCi/i HTO MW-35         Transformer Yard             80,500 pCi/l HTO 12/30/2005 MW-31         MOB                           4,060 pCi/l HTO U3-1         U3 Discharge Canal             651 pCi/l HTO U3-2         U3 Discharge Canal                     ND/HTO U3-3         U3 Discharge Canal                     ND/HTO U3-4         U3 Discharge Canal             442 pCi/l HTO U3-TI         U3 South Turbine                       ND/HTO U3-T2         U3 North Turbine             1,690 pCi/l HTO MW-31         Outside MOB                   4,060 pCi/l HTO MW-38       End of IP-3 Discharge                   ND/HTO Canal Concrete 1/4/2006   MH-2A       )Ty IP-2 EDGIb                            ND/HTO CB-4       Wy IP-2 RWST3a                  1,010 pCi/l HTO CB-24         1 3y IP-2 Security Bldg, 651 pCi/l HTO MH-I           North of IP-2 Turb. Bldg.              ND/HTO MH-2        North of IP-2 Turb. Bldg.
MH-3        North of IP-2 Turb. Bldg                ND/HTO\
MH-4        Between Turb. & ABFP          3,070 pCi/l HTO MH-4A        IP-2 Cond. Tube Pit            3,380 pCi/I HTO MH-5        EP-2 ABFP Bldg                 3,480 pCi/l HTO MH-6        IP-2 TransformetrYard        13,100 pCi/l HTO MH-7        IP-2 Transformer Yard          8,140 pCi/I HTO MH-8        IP-2 Transformer Yard         5,740 pCi/l HTO MH-12        North End IP-2 Turb.                     ND/HTO MH-14        North End IP-2 Turb.                     ND/HTO Stacy                                       Page 4 of 6
 
On-Site Monitoring Wells Sorted by Date Executive Summary January 9th 1/5/2006 MW-31       MOB                               3,050 pCi/I HTO 1/6/2006 MW-111       Transformer Yard               113,740 pCi/I HTO MW-33       Transformer Yard               189,000 pCi/i HTO MW-34       Transformer Yard               159,000 pCi/I HTO MW-3_       .Transfo   __erYard95,4000pCi/I                 HTO Stacy                                           Page 5 of 6
 
On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Monitoring Wells / Locations Off-Site Date                     Location                             Results 10/18/2005 Croton Reservoir                         ND/HTO - Gamma Camp Field Reservoir                     ND/HTO - Gamma 10/20/2005 Gypsum Outfall                           ND/HTO - Gamma Algonquin                                 ND/HTO- Gamma 5th Street Well                           ND/HTO - Gamma 10/25/2005 Rock Quarry                               ND/HTO - Gamma 1.1/8/2005 5th Street Well                           ND/HTO - Gamma 11/30/2005 Gypsum Outfall                           ND/HTO 11/30/2005 Algonquin                                 ND/HTO 5 th Street Well                         ND/HTO Rock Quarry                               ND/HTO Croton Reservoir                         ND/HTO Camp Field Reservoir                     ND/HTO 1'2/6/2005 Gypsum Plant Well #1                     ND/HTO Gypsum Plant Well #2                     ND/HTO 12/13/2005 Algonquin Outfall                       ND/HTO Gypsum Outfall                           ND/HTO
  =       Rock Quarry                             ND/HTO Stacy                                         Page 6 of 6}}

Latest revision as of 06:01, 23 March 2020

E-mail from R. Lavera of Entergy to Various, Regarding Sample Summary Sheets
ML061320150
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/10/2006
From: Ronald Lavera
Entergy Nuclear Northeast, Entergy Nuclear Operations
To: Colville R, Croulet D, Deeds P, Drake R, Durfee M, English C, Evers B, Hinrichs G, Jones T, Kulaga J, Ronald Lavera, Leach D, Mayer D, Mcmullin K, Morin K, Nuta D, Peters J, Rutkoske M, Sachatello R, Santis H, Skonieczny J, Danni Smith
NRC/FSME
References
FOIA/PA-2006-0140
Download: ML061320150 (13)


Text

Unknown Sent: Tuesday, January 10, 2006 6:25 AM Summary sheets for January 9th 2006.

From: Lavera, Ron Sent: Monday, January 09, 2006 4:50 PM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Ron Lavera; Ronald Sachatello; T. R.Jones

Subject:

Sample Summary Sheets Please see the attached sample summary sheets for Jan. 91 2006.

Thanks Ron FAR RLaVera@entergy.com <mailto:RLaVera @enterqy.com>

914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308

+4l Page 1

On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th Man-holes (Storm Drains)

ID Date Location Sample Results MH-1 12/21/2005 North of IP-2 Turb. Too dry to sample

_ 1-4-06 Bldg. by Water ND/HTO MH-2 12/16/2005 River Front 651 pCiAi MH-2A 1/4/2006. y IP-2 EDG3Y ND/HTO I~rct MH-3 11/10/2005 North of IP-2 Turbine 1,950 pCi/A 12/8/2005 Building 894 pCi/I 12/16/05 651 pCi/A 12/20/2005 2,330 pcin

_ 1/4/2006 3,450 pCiAi MH-4 12/16/2005 Transformer Yard 4,370 pCi/A 1/4/2006 3,070 pCiAi M:FH-4A 12/21/2005 IP-2 Condenser Tube 2,730 pCi/l 1/4/2006 removal pit 3,380 pCi/A M:H-5 11/10/2005' ux Feed Bldg) 2,390 pCi/l 12/8/2005 2,020 pCiA 12/20/2005 6,920 pCiAl 1/4/2006 _ 3,480 pCi/A M:H-6 11/10/2005 Transformer Yard 51,300 pCi/l 12/8/2005 37,100 pCi/l 12/16/2005 12,200 pCiA

_ 1/4/2006' 13,100 pCiAl M:H-7 12/19/2005 Transformer Yard 5,340 pCi/l 1/4/2006 8,140 pCiA MJH-8 12/16/2005 Transformer Yard 4,510 pCi/l 1/4/2006 5,740 pCiA MEI-9 12/16/2005 MOB Hill - 80' 2,140 pCiA MEI-10 12/16/2005 MOB Hill - 80' 2,940 pCi/i MEI-12 1-4-06 West of IP-2 Turb.

Bldg. by river NDJHTO MHI-14 1/4/06 ND/HTO ME-I-17 12/16/2005 Transformer Yard 1,710 pCiA M]IH-18 12/16/2005 Transfonner Yard 854 pCiA MEI-19 12/16/2005 Transformer Yard 1,800 pCiA MEI-A4 10/18/2005 IP-3 Manhole Located east of the

. IP-3 Monitor Tank ND/HTO M:H-B8 10/18/2005 IP-3 Manhole located west of the north end 959 pCi/A Stacy Page 1 of 6

On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th of the IP-3 turbine hall over the discharge canal CB-4 1/4/2006 By IP-2 RWST 39 1,010 pCi/l CI3-24 1/4/2006 By IP-2 Sec. Bldg 822 pCi/l ID Date Location Sample Results M7W-30 11/22/2005 FSB Leakage Area - 464, 000 to 600, 000 pCi/l

.Note: Well developmen

%DT completed HTO ebol MW-31 12/30/2005 Outside MOB 4,060 pCi/l HTO 1/5/2006 3,050 pCi/l HTO MIW-33 12/15/2005 Transforner Yard 142,000 pCi/l HTO 12/19/2005 199,000 pCi/l HTO 12/29/2005 220,000 pCi/Q HTO 01/06/2006 189,000 pCi/l HTO MTW-34 12/13/2005 Transformer Yard 63,900 pCi/l HTO 12/19/2005 121,000 pCi/l HTO 12/29/2005 147,000 pCi/l HTO 1/06/2006 159,000 pCi/I HTO MW-35 12/13/2005 Transformer Yard 42,300 pCi/l HTO 12/19/2005 76,000 pCi/l HTO 12/29/2005 80,500 pCi/l HTO 1 1/6/2006 1 1 95,400 pCi/l HTO ID Date Location Sample Results MW-38 12/2/2005 End of IP-3 15000 pCi/l HTO - False Discharge Canal Positive due to sample Concrete contamination.

12/5/2005 ND/HTO 12/6/2005 ND/HTO 12/8/2005 985 pCi/l IPEC 12/8/2005 701 pCi/l NYSDEC 12-30-05 ND/HTO Stacy Page 2 of 6

On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID Date Location Sample Results MW-11l 9/28/2005 Transformer Yard 212,000 pCi/Q HTO 10/5/2005 188,000 pCi/Q HTO 10/14/2005 6820 pCi/l HTO(rain) 10/14/2005 6320 pCi/Q HTO (back-up) 10/21/2005 284,000 pCi/Q HTO 10/21/2005 267,000 pCi/l HTO DEC 10/28/2005 218,000 pCi/l HTO 11/4/2005 302,000 pCiQ HOT 11/10/2005 246,000 pCi/l HTO 11/18/2005 171,000 pCi/Q HTO 11/22/2005 180,000 pCiQ HTO 12/02/2005 125,000 pCiQ HTO 12/08/2005 270,000 pCiQ HTO 12/15/2005 296,000 pCi/l HTO 12/19/2005 192,000 pC/I HTO 12/29/2005 212,000 pC/I HTO 1/6/2006 113,000 pC/Q HTO ID Date Location Sample Results RVW-101 12/8/2005 U2 Warehouse ND/HTO 12/8/2005 ND/HTO DEC MW-l05 12/8/2005 Mtce. Training ND/HTO 12/8/2005 96 pCi/Q DEC MIW-107 9/28/2005 NEM ND/HTO 12/8/2005 ND/HTO 12/8/2005 ND/HTO DEC MW-108 9/29/2005 GT-1 ND/HTO 11/3/05 ND/HTO MV[W-109 9/28/2005 GT-1 ND/HTO 11/04/2005 ND/HTO Stacy Page 3 of 6

On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID Date Location Sample Results U3-I 10/6/2005 U3 Discharge Canal 417 pCi/lHTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO 12-30-05 ND/HTO U3-2 10/6/2005 U3 Discharge Canal 960 pCi/I HTO 10/21/2005 ND/HTO 10/21/2005 512 pCi/l HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO 12-30-05 ND/HTO U3-3 10/6/2005 U3 Discharge Canal 439 pCiA HTO 10/21/2005 ND/HTO 10/21/2005 ND/HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 471 pCi/I HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO

_ 12-30-05 ND/HTO U3-4 10/16/2005 U3 Condensate 406 pCi/I HTO 10/21/2005 Polisher 399 pCi/I HTO 10/21/2005 344 pCi/I HTO DEC 10/28/2005 405 pCi/QHTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 399 pCiAIHTO

_, 12-30-05 442 pCiA/HTO U3-T1 10/6/2005 U3 South Turbine 703 pCiA HTO

_ 10/21/2005 ND/HTO Stacy Page 4 of 6

On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th 10/28/2005 ND/HTO 11/4/2005 NDJHTO 11/10/2005 563 pCi/I HTO 11/18/2005 ND/HTO 12/2/05 498 pCi/i HTO 12/15/2005 ND/HTO 12-30-05 529 pCi/i HTO U3-T2 10/7/2005 U3 North Turbine 1,590 pCi/i HTO 10/21/2005 1,470 pCi/I HTO 10/21/2005 1,420 pCi/lHTO DEC 10/28/2005 1,280 pCiII HTO 11/4/2005 1,190 pCi/l HTO 11/10/2005 1,640 pCi/i HTO 11/18/2005 1,130 pCi/I HTO 12/2/05 1,329 pCi/lHTO 12/15/05 1,290 pCi/l HTO

_ 12-30-05 1,685 pCi/i HTO ID Date Location Sample Results 12/06/2005 Lafarge Property. ND/HTO Well-I 12/06/2005 North East Well - ND/HTO DEC Farthest from river 12/06/2005 Lafarge Property. N/TO Well-3 12/06/2005 North West Well - ND DEC closest to river ND/HTO DEC Stacy Page 5 of 6

On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th MW-111, MW-33, MW-34 & MW-35 Tritium 350,000 A

300,000 250,000 ZI

-S

° 200,000 I

  • MW-111 pCi/I HTO

.2 li

-- MW-33 pCi/l HTO I

-U- MW-34 pCi/I HTO

= 150,000 __ - __ I A

_T_ .#O N_ MW-35 pCi/l HTO Pr 100,000

.0U r!, . -rf,*

j

  • 50,000 .0 n

0 i I I I I I I I I i i I I l

o tooo t to o o o o O 0 o 0to 0to 0o 0o oa 0 0 0 0 0) 0 0) 0 0 to o o 0 0 0 0 0 0 0 0 0 C'! o 0 0 0 0 uz g5

! N! Q C C'!

0 7 c ,-

0 0) ' o 0 0 0 i _q Date Stacy Page 6 of 6

On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Date ID Location Sample Results 9/28-29/2005 MW-107 NEM ND/HTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO MW- 11 Transformer Yard 212,000 pCi/l HTO 10/5/2005 MW-111 Transformer Yard 188,000 pCi/l HTO 10/6/2005 U3-1 U3 Discharge Canal 417 pCi/l HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCi/l HTO 10/7/2005 U3-T1 U3 South Turbine 703 pCi/l HTO U3-T2 U3 North Turbine 1,590 pCi/I HTO MW-1Il Transformer Yard 188,000 pCi/I HTO 10/14/2005 MW-111 Transformer Yard 6,820 pCi/Il HTO (rain)

MW-111 Transformer Yard 6,320 pCi/I HTO (back-up) 10/16/2005 U3-4 U3 Condensate Polisher 406 pCi/I HTO 10/18/2005 MH-B8 IP-3 Manhole IP-3 Disch 959 pCi/l HTO Canal MH-A4 East of IP-3 Monitor ND/HTO Tank 10/21/2005 MW-111 Transformer Yard 284,000 pCi/l HTO 267,000 pCi/l HTO DEC 10/21/2005 U3-1 U3 Discharge Canal ND/HTO U3-1 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal 512 pCi/l HTO DEC U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 399 pCi/l HTO U3-4 U3 Condensate Polisher 344 pCi/l HTO DEC U3-T1 U3 South Turbine ND/HTO U3-T1 U3 South Turbine ND/HTO DEC U3-T2 U3 North Turbine 1,470 pCi/l HTO U3-T2 U3 North Turbine 1,420 pCi/I HTO DEC 10128/2005 MW-111 Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO Stacy Page 1 of 6

On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/2005 MW-111 Transformner Yard 302,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO Date ID Location Sample Results 1113-4/2005 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/2005 MW-1il Transformer Yard 246,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/l HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/l HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO MH-6 Transformer Yard 51,300 pCi/l HTO 11/18/2005 MW-ll1 Transformer Yard 171,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,130 pCi/l HTO 11/22/2005 MW-I 11 Transformer Yard 180,000 pCi/I HTO 12/02/2005 MW-111 Transformer Yard 125,000 pCi/I HTO MW-38 End of IP-3 Discharge ND/HTO Canal Concrete U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO Stacy Page 2 of 6

On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCiQI HTO U3-T2 U3 North Turbine 1,130 pCi/I HTO 12/5/2005 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/6/2005 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/8/2005 MW-101 U2 Warehouse ND/HTO MW-105 Maintenance Training ND/HTO MW-107 NEM ND/HTO MW-38 End of IP-3 Discharge 985 pCi/Q HTO MW-38 Canal Concrete 701 pCi/l HTODEC 12/08/2005 MW- 11 Transformer Yard 270,000 pCi/l HTO MH-3 North of IP-2 Turb. 894 pCi/i HTO MH-5 Transformer Yard 2,020 pCi/AHTO MH-6 Transformer Yard 37,100 pCi/Q HTO MW-38 End of IP-3 Discharge 985 pCi/l HTO Canal Concrete 701 pCiQ HTO DEC MW-101 EOF ND/HTO MW-101 EOF ND/HTO DEC MW-105 Maint. Train. Facil ND/HTO MW-105 Maint. Train. Facil 96 pCi/Q HTO DEC MW-107 NEM Well ND/HTO MW-107 NEM Well ND/HTO 12/13/2005 MW-34 Transformer Yard 63,900 pCi/l HTO MW-35 Transformner Yard 42,300 pCi/l HTO 12/15/2005 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 399 pCiQ HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,290 pCi/l HTO MW-33 Transformer Yard 142,000 pCi/I HTO MW-111 Transformer Yard 296,000 pCi/l HTO 12/16/2005 MH-19 Transformer Yard 1,800 pCi/l HTO MH-18 Transforrner Yard 854 pCi/l HTO MH-17 Transformer Yard 1,710 pCi/l HTO MH-10 Transformer Yard 2,940 pCi/l HTO MH-9 Transformer Yard 2,140 pCi/I HTO MH-8 Transformer Yard 4,510 pCi/l HTO MH-6 Transformer Yard 12,200 pCi/I HTO Stacy Page 3 of 6

On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th MH-4 Transformer Yard 4,320 pCi/I HTO MH-3 North of IP-2 Turb 651 pCi/l HTO 12/19/2005 MW-33 Transformer Yard 199,000 pCi/l HTO MW-34 Transformer Yard 121,000 pCi/l HTO MW-35 Transformer Yard 76,000 pCi/I HTO MW-111 Transformer Yard 192,000 pCi/l HTO MH-3 North of IP-2 Turb. 2,330 pCi/I HTO MH-5 CIn ABFP Bldg._ 6,920 pCi/I HTO 12/19/2005 MH-7 Discharge Transformer Yard Hudson River 5,340 pCi/l HTO

<MDA pCi/l HTO al$F Canal 12,/20/2005 MH-3 /Outside of Turbine BldI 2,330 pCi/I HTO 12/21/2005 MH-5 MH-4A EAux Feed Bldg.

Condensor Tube Pull Pit

-t 6,920 pCi/I HTO 2,730 pCi/l HTO eove MH-i River Front Dry - No Sample Taken.

12/29/2005 MW-111 MOB 212,000 pCi/l HTO MW-33 Transformer Yard 220,000 pCi/I HTO MW-34 Transformer Yard 147,000 pCi/i HTO MW-35 Transformer Yard 80,500 pCi/l HTO 12/30/2005 MW-31 MOB 4,060 pCi/l HTO U3-1 U3 Discharge Canal 651 pCi/l HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 442 pCi/l HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,690 pCi/l HTO MW-31 Outside MOB 4,060 pCi/l HTO MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 1/4/2006 MH-2A )Ty IP-2 EDGIb ND/HTO CB-4 Wy IP-2 RWST3a 1,010 pCi/l HTO CB-24 1 3y IP-2 Security Bldg, 651 pCi/l HTO MH-I North of IP-2 Turb. Bldg. ND/HTO MH-2 North of IP-2 Turb. Bldg.

MH-3 North of IP-2 Turb. Bldg ND/HTO\

MH-4 Between Turb. & ABFP 3,070 pCi/l HTO MH-4A IP-2 Cond. Tube Pit 3,380 pCi/I HTO MH-5 EP-2 ABFP Bldg 3,480 pCi/l HTO MH-6 IP-2 TransformetrYard 13,100 pCi/l HTO MH-7 IP-2 Transformer Yard 8,140 pCi/I HTO MH-8 IP-2 Transformer Yard 5,740 pCi/l HTO MH-12 North End IP-2 Turb. ND/HTO MH-14 North End IP-2 Turb. ND/HTO Stacy Page 4 of 6

On-Site Monitoring Wells Sorted by Date Executive Summary January 9th 1/5/2006 MW-31 MOB 3,050 pCi/I HTO 1/6/2006 MW-111 Transformer Yard 113,740 pCi/I HTO MW-33 Transformer Yard 189,000 pCi/i HTO MW-34 Transformer Yard 159,000 pCi/I HTO MW-3_ .Transfo __erYard95,4000pCi/I HTO Stacy Page 5 of 6

On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Monitoring Wells / Locations Off-Site Date Location Results 10/18/2005 Croton Reservoir ND/HTO - Gamma Camp Field Reservoir ND/HTO - Gamma 10/20/2005 Gypsum Outfall ND/HTO - Gamma Algonquin ND/HTO- Gamma 5th Street Well ND/HTO - Gamma 10/25/2005 Rock Quarry ND/HTO - Gamma 1.1/8/2005 5th Street Well ND/HTO - Gamma 11/30/2005 Gypsum Outfall ND/HTO 11/30/2005 Algonquin ND/HTO 5 th Street Well ND/HTO Rock Quarry ND/HTO Croton Reservoir ND/HTO Camp Field Reservoir ND/HTO 1'2/6/2005 Gypsum Plant Well #1 ND/HTO Gypsum Plant Well #2 ND/HTO 12/13/2005 Algonquin Outfall ND/HTO Gypsum Outfall ND/HTO

= Rock Quarry ND/HTO Stacy Page 6 of 6