{{#Wiki_filter:ber 22, 2016
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 22, 2016


==SUBJECT:==
==SUBJECT:==
Line 24: Line 24:


==Dear Mr. Mitchell:==
==Dear Mr. Mitchell:==
On August 3 and October 27, 2016, John Nicholson of this office conducted a safety inspection at the above address of activities authorized by the above listed NRC license. The inspection was limited to an observation of emergency exercises. The inspection consisted of observations by the inspector, interviews with personnel, and a review of plans and procedures. The findings of the inspection were discussed with you at the conclusion of the inspection. The enclosed report presents the results of this inspection.
On August 3 and October 27, 2016, John Nicholson of this office conducted a safety inspection at the above address of activities authorized by the above listed NRC license. The inspection was limited to an observation of emergency exercises. The inspection consisted of observations by the inspector, interviews with personnel, and a review of plans and procedures.
 
The findings of the inspection were discussed with you at the conclusion of the inspection. The enclosed report presents the results of this inspection.


Within the scope of this inspection, no violations were identified.
Within the scope of this inspection, no violations were identified.


Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact John Nicholson at 610-337-5236 if you have any questions regarding this matter.
; select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov
; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information').
You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 No reply to this letter is required. Please contact John Nicholson at 610-337-5236 if you have any questions regarding this matter.


Sincerely,
Sincerely,
/RA/
/RA/
Raymond J. Powell, Chief Decommissioning and Technical  
Raymond J. Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety Enclosure:
 
Support Branch Division of Nuclear Materials Safety  
 
Enclosure:
Inspection Report No. 05000213/2016002 and 07200039/2016002 cc: Jeffery Semancik, Director/State Liaison Officer, State of Connecticut
Inspection Report No. 05000213/2016002 and 07200039/2016002 cc: Jeffery Semancik, Director/State Liaison Officer, State of Connecticut


=EXECUTIVE SUMMARY=
=EXECUTIVE SUMMARY=
Connecticut Yankee Atomic Power Company NRC Inspection Report No. 05000213/2016002 and 07200039/2016002  
Connecticut Yankee Atomic Power Company
 
NRC Inspection Report No. 05000213/2016002 and 07200039/2016002 An announced safety inspection was conducted on August 3 and October 27, 2016, at the Connecticut Yankee Atomic Power Company (Connecticut Yankee) Independent Spent Fuel Storage Installation (ISFSI). The inspector assessed whether Connecticut Yankee personnel were conducting an exercise every two years at an away-from-reactor (AFR) ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan. The inspectors review was directed toward confirming the adequacy of the exercises, emergency preparedness, and training. The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and the 2016 Biennial Exercise Plans.


An announced safety inspection was conducted on August 3 and October 27, 2016, at the Connecticut Yankee Atomic Power Company (Connecticut Yankee) Independent Spent Fuel Storage Installation (ISFSI). The inspector assessed whether Connecticut Yankee personnel were conducting an exercise every two years at an away-from-reactor (AFR) ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan. The inspector's review was directed toward confirming the adequacy of the exercises, emergency preparedness, and training. The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and the 2016 Biennial Exercise Plans. Based on the results of this inspection, no findings of significance were identified.
Based on the results of this inspection, no findings of significance were identified.


1 Inspection Report No. 05000213/2016002
ii    Inspection Report No. 05000213/2016002


=REPORT DETAILS=
=REPORT DETAILS=
Line 58: Line 53:
The inspector assessed whether Connecticut Yankee personnel were performing exercises at an AFR ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan.
The inspector assessed whether Connecticut Yankee personnel were performing exercises at an AFR ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan.


AFR ISFSI facilities, located at sites where loading operations have been completed, are essentially passive operating facilities. The inspector's review was directed towards confirming the ongoing adequacy of the emergency preparedness program.
AFR ISFSI facilities, located at sites where loading operations have been completed, are essentially passive operating facilities. The inspectors review was directed towards confirming the ongoing adequacy of the emergency preparedness program.


The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and 2016 Biennial Exercise Plans.
The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and 2016 Biennial Exercise Plans.


b. Observations The inspector determined that Connecticut Yankee's plans and preparations for the 2016 Biennial Emergency Plan Exercise were effective at meeting the Emergency Plan  
b. Observations The inspector determined that Connecticut Yankees plans and preparations for the 2016 Biennial Emergency Plan Exercise were effective at meeting the Emergency Plan requirements.


requirements.
Connecticut Yankees emergency preparedness program properly coordinated with the appropriate offsite support groups, agencies, and local law enforcement agencies. The licensee invited several off-site response organizations to participate in the exercise as participants or observers including the FBI and State of Connecticut. The emergency call list was current and is checked periodically for accuracy. All revisions to the emergency plan have been submitted to the NRC and reviewed by the Office of Nuclear Security and Incident Response.
 
Connecticut Yankee's emergency preparedness program properly coordinated with the appropriate offsite support groups, agencies, and local law enforcement agencies. The licensee invited several off-site response organizations to participate in the exercise as participants or observers including the FBI and State of Connecticut. The emergency call list was current and is checked periodically for accuracy. All revisions to the emergency plan have been submitted to the NRC and reviewed by the Office of Nuclear Security and Incident Response.


The licensee personnel assigned for incident detection properly recognized the event and initiated a timely response. The licensee had additional personnel on hand to handle the routine site monitoring while selected personnel were participating in the exercise. Onsite and offsite personnel were notified regarding the situation and status updates provided. Communication with the Connecticut State Police and fire and ambulance crews was constant throughout the exercises. Site security granted access to offsite emergency responders in a timely manner
The licensee personnel assigned for incident detection properly recognized the event and initiated a timely response. The licensee had additional personnel on hand to handle the routine site monitoring while selected personnel were participating in the exercise. Onsite and offsite personnel were notified regarding the situation and status updates provided. Communication with the Connecticut State Police and fire and ambulance crews was constant throughout the exercises. Site security granted access to offsite emergency responders in a timely manner
Line 72: Line 65:
====c. Findings====
====c. Findings====
Based on the results of this inspection, no findings of significance were identified.
Based on the results of this inspection, no findings of significance were identified.
II.  
II.  


Line 78: Line 70:
On October 27, 2016, the inspector presented the inspection results to Robert Mitchell, Connecticut Yankee ISFSI Manager, and other Connecticut Yankee personnel during the exercise debrief.
On October 27, 2016, the inspector presented the inspection results to Robert Mitchell, Connecticut Yankee ISFSI Manager, and other Connecticut Yankee personnel during the exercise debrief.


2 Inspection Report No. 05000213/2016002  
Inspection Report No. 05000213/2016002


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


PARTIAL LIST OF PERSONS CONTACTED
PARTIAL LIST OF PERSONS CONTACTED
: [[contact::M. Arsenault]], ISFSI Manager  
: [[contact::M. Arsenault]], ISFSI Manager
: [[contact::J. Beauchemin]], Assistant Project Manager G4S  
: [[contact::J. Beauchemin]], Assistant Project Manager G4S
: [[contact::S. Day]], Licensing Engineer  
: [[contact::S. Day]], Licensing Engineer
: [[contact::F. DeBuono]], Maintenance Supervisor  
: [[contact::F. DeBuono]], Maintenance Supervisor
: [[contact::R. Desmarais]], ISFSI Technical Specialist  
: [[contact::R. Desmarais]], ISFSI Technical Specialist
: [[contact::S. Hemingway]], ISFSI Ops Specialist  
: [[contact::S. Hemingway]], ISFSI Ops Specialist
: [[contact::J. Lenois]], 3 Yankee Security Program Manager  
: [[contact::J. Lenois]], 3 Yankee Security Program Manager
: [[contact::A. Marino]], ISFSI Shift Supervisor  
: [[contact::A. Marino]], ISFSI Shift Supervisor
: [[contact::R. Mitchell]], ISFSI Manager  
: [[contact::R. Mitchell]], ISFSI Manager
: [[contact::S. Ostrowski]], Connecticut State Police Controller  
: [[contact::S. Ostrowski]], Connecticut State Police Controller
: [[contact::J. Williams]], IFSFI Shift Supervisor  
: [[contact::J. Williams]], IFSFI Shift Supervisor
: [[contact::J. Wilson]], ISFSI Shift Supervisor  
: [[contact::J. Wilson]], ISFSI Shift Supervisor
 
INSPECTION PROCEDURES USED
INSPECTION PROCEDURES USED
60858 Away-From-Reactor ISFSI Inspection Guidance
60858 Away-From-Reactor ISFSI Inspection Guidance
88051 Evaluation of Exercises and Drills
88051 Evaluation of Exercises and Drills
ITEMS OPEN, CLOSED, AND DISCUSSED
ITEMS OPEN, CLOSED, AND DISCUSSED
None LIST OF DOCUMENTS REVIEWED
None
Connecticut Yankee Atomic Power Company, Haddam Neck ISFSI, Emergency Plan,   Revision 13, 12/01/2015
LIST OF DOCUMENTS REVIEWED
Connecticut Yankee Atomic Power Company, Haddam Neck ISFSI, Emergency Plan,
Revision 13, 12/01/2015
Emergency Plan Exercise Event Tracker 2016
Emergency Plan Exercise Event Tracker 2016
2016 Connecticut Yankee Biennial Emergency Plan Exercise
2016 Connecticut Yankee Biennial Emergency Plan Exercise
2016 Connecticut Yankee Biennial Emergency Plan Exercise Phase 2 Fire/Medical  
2016 Connecticut Yankee Biennial Emergency Plan Exercise Phase 2 Fire/Medical
 
LIST OF ACRONYMS USED
LIST OF ACRONYMS USED
AFR   Away-From-Reactor Connecticut Yankee Connecticut Yankee Atomic Power Company
AFR                           Away-From-Reactor
ISFSI   Independent Spent Fuel Storage Installation
Connecticut Yankee           Connecticut Yankee Atomic Power Company
ISFSI                         Independent Spent Fuel Storage Installation
Inspection Report No. 05000213/2016002
}}
}}

Latest revision as of 19:03, 19 December 2019

NRC Inspection Report No. 05000213/2016002 and 07200039/2016002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site
ML16328A385
Person / Time
Site: Haddam Neck  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/22/2016
From: Racquel Powell
Division of Nuclear Materials Safety I
To: Recasha Mitchell
Connecticut Yankee Atomic Power Co
References
IR 2016002
Download: ML16328A385 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 22, 2016

SUBJECT:

NRC INSPECTION REPORT NO. 05000213/2016002 AND 07200039/2016002, CONNECTICUT YANKEE ATOMIC POWER COMPANY, EAST HAMPTON, CONNECTICUT SITE

Dear Mr. Mitchell:

On August 3 and October 27, 2016, John Nicholson of this office conducted a safety inspection at the above address of activities authorized by the above listed NRC license. The inspection was limited to an observation of emergency exercises. The inspection consisted of observations by the inspector, interviews with personnel, and a review of plans and procedures.

The findings of the inspection were discussed with you at the conclusion of the inspection. The enclosed report presents the results of this inspection.

Within the scope of this inspection, no violations were identified.

Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact John Nicholson at 610-337-5236 if you have any questions regarding this matter.

Sincerely,

/RA/

Raymond J. Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety Enclosure:

Inspection Report No. 05000213/2016002 and 07200039/2016002 cc: Jeffery Semancik, Director/State Liaison Officer, State of Connecticut

EXECUTIVE SUMMARY

Connecticut Yankee Atomic Power Company

NRC Inspection Report No. 05000213/2016002 and 07200039/2016002 An announced safety inspection was conducted on August 3 and October 27, 2016, at the Connecticut Yankee Atomic Power Company (Connecticut Yankee) Independent Spent Fuel Storage Installation (ISFSI). The inspector assessed whether Connecticut Yankee personnel were conducting an exercise every two years at an away-from-reactor (AFR) ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan. The inspectors review was directed toward confirming the adequacy of the exercises, emergency preparedness, and training. The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and the 2016 Biennial Exercise Plans.

Based on the results of this inspection, no findings of significance were identified.

ii Inspection Report No. 05000213/2016002

REPORT DETAILS

I. Organization and Scope of the Program

a. Inspection Scope

The inspector assessed whether Connecticut Yankee personnel were performing exercises at an AFR ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan.

AFR ISFSI facilities, located at sites where loading operations have been completed, are essentially passive operating facilities. The inspectors review was directed towards confirming the ongoing adequacy of the emergency preparedness program.

The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and 2016 Biennial Exercise Plans.

b. Observations The inspector determined that Connecticut Yankees plans and preparations for the 2016 Biennial Emergency Plan Exercise were effective at meeting the Emergency Plan requirements.

Connecticut Yankees emergency preparedness program properly coordinated with the appropriate offsite support groups, agencies, and local law enforcement agencies. The licensee invited several off-site response organizations to participate in the exercise as participants or observers including the FBI and State of Connecticut. The emergency call list was current and is checked periodically for accuracy. All revisions to the emergency plan have been submitted to the NRC and reviewed by the Office of Nuclear Security and Incident Response.

The licensee personnel assigned for incident detection properly recognized the event and initiated a timely response. The licensee had additional personnel on hand to handle the routine site monitoring while selected personnel were participating in the exercise. Onsite and offsite personnel were notified regarding the situation and status updates provided. Communication with the Connecticut State Police and fire and ambulance crews was constant throughout the exercises. Site security granted access to offsite emergency responders in a timely manner

c. Findings

Based on the results of this inspection, no findings of significance were identified.

II.

Exit Meeting Summary

On October 27, 2016, the inspector presented the inspection results to Robert Mitchell, Connecticut Yankee ISFSI Manager, and other Connecticut Yankee personnel during the exercise debrief.

Inspection Report No. 05000213/2016002

SUPPLEMENTAL INFORMATION

PARTIAL LIST OF PERSONS CONTACTED

M. Arsenault, ISFSI Manager
J. Beauchemin, Assistant Project Manager G4S
S. Day, Licensing Engineer
F. DeBuono, Maintenance Supervisor
R. Desmarais, ISFSI Technical Specialist
S. Hemingway, ISFSI Ops Specialist
J. Lenois, 3 Yankee Security Program Manager
A. Marino, ISFSI Shift Supervisor
R. Mitchell, ISFSI Manager
S. Ostrowski, Connecticut State Police Controller
J. Williams, IFSFI Shift Supervisor
J. Wilson, ISFSI Shift Supervisor

INSPECTION PROCEDURES USED

60858 Away-From-Reactor ISFSI Inspection Guidance

88051 Evaluation of Exercises and Drills

ITEMS OPEN, CLOSED, AND DISCUSSED

None

LIST OF DOCUMENTS REVIEWED

Connecticut Yankee Atomic Power Company, Haddam Neck ISFSI, Emergency Plan,

Revision 13, 12/01/2015

Emergency Plan Exercise Event Tracker 2016

2016 Connecticut Yankee Biennial Emergency Plan Exercise

2016 Connecticut Yankee Biennial Emergency Plan Exercise Phase 2 Fire/Medical

LIST OF ACRONYMS USED

AFR Away-From-Reactor

Connecticut Yankee Connecticut Yankee Atomic Power Company

ISFSI Independent Spent Fuel Storage Installation

Inspection Report No. 05000213/2016002