{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125July 10, 2009  
{{#Wiki_filter:UNITED STATES
   
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
Kevin Walsh, Vice President, Operations Entergy Operations, Inc. Arkansas Nuclear One 1448 S.R. 333  
                                                    R E GI ON I V
Russellville, AR 72802  
                                        612 EAST LAMAR BLVD , SU I TE 400
  SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 050000368/2009004) AND REQUEST FOR INFORMATION  
                                        AR LI N GTON , TEXAS 76011-4125
                                              July 10, 2009
Dear Mr. Walsh:  
Kevin Walsh, Vice President, Operations
From September 3 through September 17, 2009, reactor inspectors from the U.S. Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline inservice inspection at Arkansas Nuclear One, Unit 2, using NRC Inspection Procedure 71111.08, "Inservice Inspection Activities," and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds." Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of  
Entergy Operations, Inc.
the enclosure) identified information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
Arkansas Nuclear One
1448 S.R. 333
Russellville, AR 72802
SUBJECT:       ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION (NRC
                INSPECTION REPORT 050000368/2009004) AND REQUEST FOR
                INFORMATION
Dear Mr. Walsh:
From September 3 through September 17, 2009, reactor inspectors from the U.S. Nuclear
Regulatory Commissions (NRC) Region IV office will perform the baseline inservice inspection
at Arkansas Nuclear One, Unit 2, using NRC Inspection Procedure 71111.08, "Inservice
Inspection Activities," and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds."
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. In order to minimize the impact to your onsite resources and to
ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into two groups. The first group (Section A of
the enclosure) identified information to be provided prior to the inspection to ensure that the
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies
the information the inspectors will need upon arrival at the site. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Van Buskirk of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
outage activities. If there are any questions about this inspection or the material requested,
please contact the lead inspector Michael Bloodgood at (817) 276-6544
(Michael.Bloodgood@nrc.gov) or Jeffrey Josey at (479) 968-3290 (Jeffrey.Josey@nrc.gov).
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).


We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Van Buskirk of your licensing organization.  Our inspection dates are subject to change based on your updated schedule of outage activities.  If there are any questions about this inspection or the material requested, please contact the lead inspector Michael Bloodgood at (817) 276-6544
Entergy Operations, Inc.               -2-
(Michael.Bloodgood@nrc.gov) or Jeffrey Josey at (479) 968-3290 (Jeffrey.Josey@nrc.gov).  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
                                            Sincerely,
Entergy Operations, Inc. - 2 -  
                                                  /RA/
  Sincerely,   /RA/  
                                            Thomas Farnholtz, Chief
  Thomas Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety  
                                            Engineering Branch 1
                                            Division of Reactor Safety
Docket:   50-368 License: NPF-6  
Docket: 50-368
Enclosure: Inservice Inspection Document Request  
License: NPF-6
Senior Vice President  
Enclosure:
   & Chief Operating Officer Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995  
Inservice Inspection Document Request
Senior Vice President
Vice President, Oversight Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995  
   & Chief Operating Officer
Entergy Operations, Inc.
Manager, Licensing Entergy Operations, Inc. Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802  
P.O. Box 31995
Jackson, MS 39286-1995
Vice President, Oversight
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Manager, Licensing
Entergy Operations, Inc.
Arkansas Nuclear One
1448 SR 333
Russellville, AR 72802
Associate General Counsel
Entergy Nuclear Operations
P.O. Box 31995
Jackson, MS 39286-1995
Senior Manager, Nuclear Safety & Licensing
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Chief, Radiation Control Section
Arkansas Department of Health
4815 West Markham Street, Slot 30
Little Rock, AR 72205-3867


Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Entergy Operations, Inc.         -3-
Section Chief, Division of Health
Emergency Management Section
Arkansas Department of Health
4815 West Markham Street, Slot 30
Little Rock, AR 72205-3867
David E. Maxwell, Director
Arkansas Department of Emergency
  Management, Bldg. 9501
Camp Joseph T. Robinson
North Little Rock, AR 72199
Pope County Judge
Pope County Courthouse
100 West Main Street
Russellville, AR 72801
Chief, Technological Hazards
  Branch
FEMA Region VI
800 North Loop 288
Federal Regional Center
Denton, TX 76209


Senior Manager, Nuclear Safety & Licensing Entergy Operations, Inc. P.O. Box 31995 Jackson, MS  39286-1995
Entergy Operations, Inc.                   -4-
Chief, Radiation Control Section
Electronic distribution by RIV:
Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR  72205-3867
Regional Administrator (Elmo.Collins@nrc.gov )
 
Deputy Regional Administrator (Chuck.Casto@nrc.gov )
Entergy Operations, Inc. - 3 -
DRP Director (Dwight.Chamberlain@nrc.gov )
Section Chief, Division of Health Emergency Management Section Arkansas Department of Health 4815 West Markham Street, Slot 30
DRP Deputy Director (Anton.Vegel@nrc.gov )
Little Rock, AR  72205-3867
DRS Director (Roy.Caniano@nrc.gov )
  David E. Maxwell, Director Arkansas Department of Emergency   Management, Bldg. 9501
DRS Deputy Director (Troy.Pruett@nrc.gov )
Camp Joseph T. Robinson North Little Rock, AR 72199
Senior Resident Inspector (Alfred.Sanchez@nrc.gov )
  Pope County Judge Pope County Courthouse 100 West Main Street Russellville, AR  72801
Resident Inspector (Jeffrey.Josey@nrc.gov )
Resident Inspector (Jeff.Rotton@nrc.gov )
Branch Chief, DRP/E (Jeff.Clark@nrc.gov )
Senior Project Engineer, DRP/E (George.Replogle@nrc.gov )
ANO Site Secretary (Vicki.High@nrc.gov )
Public Affairs Officer (Victor.Dricks@nrc.gov )
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
Regional Counsel (Karla.Fuller@nrc.gov )
Congressional Affairs Officer (Jenny.Weil@nrc.gov )
OEMail Resource
File located: S:\DRS\REPORTS\ANO IS RFI -MRB                  ML091910377
  SUNSI Rev Compl. Yes No                ADAMS      X Yes No      Reviewer Initials   TRF
Publicly Avail          X Yes No      Sensitive    Yes X No    Sens. Type Initials TRF
M. Bloodgood            T. Farnholtz
  /RA/                    /RA/
7/8/09                  7/10/09
OFFICIAL RECORD COPY                                  T=Telephone      E=E-mail      F=Fax


Chief, Technological Hazards    Branch FEMA Region VI 800 North Loop 288
                      INSERVICE INSPECTION DOCUMENT REQUEST
Federal Regional Center Denton, TX  76209 
Inspection Dates:           September 3 through September 17, 2009
Entergy Operations, Inc. - 4 -
Inspection Procedures:     IP 71111.08 "Inservice Inspection (ISI) Activities"
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) Deputy Regional Administrator (Chuck.Casto@nrc.gov ) DRP Director (Dwight.Chamberlain@nrc.gov ) DRP Deputy Director (Anton.Vegel@nrc.gov ) DRS Director (Roy.Caniano@nrc.gov ) DRS Deputy Director (Troy.Pruett@nrc.gov ) Senior Resident Inspector (Alfred.Sanchez@nrc.gov ) Resident Inspector (Jeffrey.Josey@nrc.gov ) Resident Inspector (Jeff.Rotton@nrc.gov ) Branch Chief, DRP/E (Jeff.Clark@nrc.gov ) Senior Project Engineer, DRP/E (George.Replogle@nrc.gov ) ANO Site Secretary (Vicki.High@nrc.gov ) Public Affairs Officer (Victor.Dricks@nrc.gov ) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov ) RITS Coordinator (Marisa.Herrera@nrc.gov ) Regional Counsel (Karla.Fuller@nrc.gov ) Congressional Affairs Officer (Jenny.Weil@nrc.gov ) OEMail Resource
                            TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"
 
Inspectors:                 Michael Bloodgood, Reactor Inspector (Lead Inspector - ISI)
   
                            Jeffrey Josey, Resident Inspector
   
A.     Information Requested for the In-Office Preparation Week
   
      The following information should be sent to the Region IV office in hard copy or
  File located:  S:\DRS\REPORTS\ANO IS RFI -MRB  ML091910377    SUNSI Rev Compl. Yes  No ADAMS X Yes  No Reviewer Initials TRF Publicly Avail X Yes  No Sensitive  Yes X No Sens. Type Initials TRF M. Bloodgood T. Farnholtz
      electronic format (ims.certrec.com preferred), in care of Michael Bloodgood, by August
  /RA/ /RA/    7/8/09 7/10/09    OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
      24, 2009, to facilitate the selection of specific items that will be reviewed during the
 
      onsite inspection week. The inspector will select specific items from the information
  - 1 - Enclosure INSERVICE INSPECTION DOCUMENT REQUEST  
      requested below and then request from your staff additional documents needed during
  Inspection Dates: September 3 through September 17, 2009  
      the onsite inspection week (Section B of this enclosure). We ask that the specific items
      selected from the lists be available and ready for review on the first day of inspection.
Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities" TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds" Inspectors: Michael Bloodgood, Reactor Inspector (Lead Inspector - ISI) Jeffrey Josey, Resident Inspector  
      *Please provide requested documentation electronically if possible. If requested
A. Information Requested for the In-Office Preparation Week  
      documents are large and only hard copy formats are available, please inform the
The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com preferred), in care of Michael Bloodgood, by August 24, 2009, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.  
      inspector(s), and provide subject documentation during the first day of the onsite
A.1 ISI/Welding Programs and Schedule Information
      inspection. If you have any questions regarding this information request, please call the
  a) A detailed schedule (including preliminary dates) of:  
      inspector as soon as possible.
i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, Risk  
A.1   ISI/Welding Programs and Schedule Information
Informed (if applicable), and augmented ISI programs during the upcoming outage.  
      a)     A detailed schedule (including preliminary dates) of:
Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per  
              i)     Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
ASME Section XI, IWX-2400. (Do not provide separately if other documentation requested contains this information)  
                      and containment, performed as part of your ASME Section XI, Risk
ii) Reactor pressure vessel head (RPVH) examinations planned for the upcoming outage.  
                      Informed (if applicable), and augmented ISI programs during the
iii) Examinations planned for Alloy 82/182/600 components that are not included in the Section XI scope. (If applicable)  
                      upcoming outage.
iv) Examinations planned as part of your Boric Acid Corrosion Control Program. (Mode 3 walkdowns, bolted connection walkdowns, etc.)
                      Provide a status summary of the NDE inspection activities vs. the
  - 2 - Enclosure  
                      required inspection period percentages for this Interval by category per
v) Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs))  
                      ASME Section XI, IWX-2400. (Do not provide separately if other
b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.
                      documentation requested contains this information)
  c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate, Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code Class 1 & 2 systems since the beginning of the last refueling outage. This should include the previous Section XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests. Also, include in the list the NDE reports with relevant conditions in the RPVH penetration nozzles which have been accepted for continued service. The list of NDE reports should include a brief description of the SSC where the relevant condition was identified.  
              ii)     Reactor pressure vessel head (RPVH) examinations planned for the
d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.  
                      upcoming outage.
e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.  
              iii)   Examinations planned for Alloy 82/182/600 components that are not
f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.  
                      included in the Section XI scope. (If applicable)
g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).  
              iv)     Examinations planned as part of your Boric Acid Corrosion Control
h) Please provide copies of the most recent self assessments for the ISI, Welding, and Alloy 600 Programs.
                      Program. (Mode 3 walkdowns, bolted connection walkdowns, etc.)
                                            -1-                                         Enclosure
 
          v)       Welding activities that are scheduled to be completed during the
                  upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
                  components (SSCs))
    b)   A copy of ASME Section XI Code Relief Requests and associated NRC Safety
          Evaluations applicable to the examinations identified above.
    c)   A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
          Class 1 & 2 systems since the beginning of the last refueling outage. This should
          include the previous Section XI pressure test(s) conducted during start up and
          any evaluations associated with the results of the pressure tests. Also, include in
          the list the NDE reports with relevant conditions in the RPVH penetration nozzles
          which have been accepted for continued service. The list of NDE reports should
          include a brief description of the SSC where the relevant condition was identified.
    d)   A list with a brief description (e.g., system, material, pipe size, weld number, and
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
          fabricated due to component repair/replacement activities since the beginning of
          the last refueling outage, or are planned to be fabricated this refueling outage.
    e)   If reactor vessel weld examinations required by the ASME Code are scheduled to
          occur during the upcoming outage, provide a detailed description of the welds to
          be examined and the extent of the planned examination. Please also provide
          reference numbers for applicable procedures that will be used to conduct these
          examinations.
    f)   Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
          Section XI of the ASME Code that have been identified since the beginning of the
          last refueling outage.
    g)   A list of any temporary non-code repairs in service (e.g., pinhole leaks).
    h)   Please provide copies of the most recent self assessments for the ISI, Welding,
          and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH)
A.2 Reactor Pressure Vessel Head (RPVH)
  a) Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the vessel head to fulfill commitments made in response to NRC Bulletin 2002-02 and NRC Order EA-03-009. Also, include examination scope expansion criteria and planned expansion sample sizes if relevant conditions are identified. (If  
    a)   Provide the detailed scope of the planned NDE of the reactor vessel head which
applicable)  
          identifies the types of NDE methods to be used on each specific part of the
b) A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
  - 3 - Enclosure industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).  
          and NRC Order EA-03-009. Also, include examination scope expansion criteria
A.3 Boric Acid Corrosion Control Program (BACCP)
          and planned expansion sample sizes if relevant conditions are identified. (If
  a) Copy of the procedures that govern the scope, equipment and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.  
          applicable)
b) Please provide a list of leaks (including Code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle, the Unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the BACCP. c) Please provide a copy of the most recent self-assessment performed for the BACCP. A.4 Steam Generator Tube (SGT) Inspections
    b)   A list of the standards and/or requirements that will be used to evaluate
  a) A detailed schedule of:  
          indications identified during NDE of the reactor vessel head (e.g., the specific
i) SGT inspection, data analyses, and repair activities for the upcoming outage. (If occurring)  
                                        -2-                                       Enclosure
ii) SG secondary side inspection activities for the upcoming outage. (If occurring)  
 
b) Please provide a copy of your SG ISI Inspection Program and Plan. Please include a copy of the Operational Assessment from last outage and a copy of the following documents as they become available:
          industry or procedural standards which will be used to evaluate potential leakage
i) Degradation Assessment ii) Condition Monitoring Assessment  
          and/or flaw indications).
c) If you are planning on modifying your Technical Specifications such that they are consistent with TSTF-449, please provide copies of your correspondence with  
A.3 Boric Acid Corrosion Control Program (BACCP)
the NRC regarding deviations from the STS.  
    a)     Copy of the procedures that govern the scope, equipment and implementation of
d) Copy of SG history documentation given to vendors performing eddy current (ET) testing of the SGs during the upcoming outage.  
          the inspections required to identify boric acid leakage and the procedures for
e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy Current Technique Specification Sheets (ETSS). Additionally, please provide a copy of EPRI Appendix H ETSS Qualification Records.  
          boric acid leakage/corrosion evaluation.
 
    b)     Please provide a list of leaks (including Code class of the components) that have
  - 4 - Enclosure f) Identify and quantify any SGT leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition (If applicable).  
          been identified since the last refueling outage and associated corrective action
g) Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube sheet condition, crud removal amounts, etc.)  
          documentation. If during the last cycle, the Unit was shutdown, please provide
h) Please provide copies of your most recent self assessments of the SG monitoring, loose parts monitoring, and secondary side water chemistry control  
          documentation of containment walkdown inspections performed as part of the
programs.  
          BACCP.
i) Please also indicate where the primary, secondary, and resolution analyses are scheduled to take place.  
    c)     Please provide a copy of the most recent self-assessment performed for the
j) Please provide a summary of the scope of the SGT examinations, including examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the  
          BACCP.
percentage of tubes to be examined. *Do not provide these documents separately if already included in other information requested.   A.5 Materials Reliability (MRP-139) Program Activities
A.4 Steam Generator Tube (SGT) Inspections
  a) A list of, with verification, that the baseline inspections of all applicable Dissimilar Metal Butt Welds (DMBWs) have been completed by July 31, 2009.  
    a)     A detailed schedule of:
b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs have been included in the inspection program and that the schedules for the  
          i)     SGT inspection, data analyses, and repair activities for the upcoming
baseline inspections are consistent with the baseline schedules in MRP-139.  
                  outage. (If occurring)
c) A list and schedule (examination dates) of all DMBW examinations planned for the upcoming refueling outage. If none are scheduled, then data from previous examinations should be available for review.  
          ii)     SG secondary side inspection activities for the upcoming outage. (If
d) A list and schedule for any welding to be performed on DMBWs in the upcoming outage. If no welding will be performed then records of previous welding on DMBWs and postweld NDE documentation.  
                  occurring)
e) A list and schedule of any stress improvement (SI) activities planned for the upcoming refueling outage. If none are scheduled then have qualification reports for any SIs previously performed.  
    b)     Please provide a copy of your SG ISI Inspection Program and Plan. Please
f) Documentation and description of how the baseline and inservice inspection specifications in MRP-139 are satisfied at your facility.  
          include a copy of the Operational Assessment from last outage and a copy of the
          following documents as they become available:
g) A list of weld locations controlled by MRP-139 which includes the MRP-139 weld category, pre-mitigation volumetric examination date, type of mitigation or stress improvement, post mitigation volumetric examination date, and plans for future MRP-139 required examinations.
          i)     Degradation Assessment
  - 5 - Enclosure  
          ii)     Condition Monitoring Assessment
A.6 Additional information related to all ISI activities
    c)     If you are planning on modifying your Technical Specifications such that they are
  a) A list with a brief description of ISI, BACCP, and SGT inspection related issues (e.g., condition reports) entered into your corrective action program since the  
          consistent with TSTF-449, please provide copies of your correspondence with
beginning of the last refueling outage (for Unit 2). For example, a list based upon data base searches using key words related to piping or SG tube degradation such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SGT examinations.  
          the NRC regarding deviations from the STS.
b) Please provide names and phone numbers for the following program leads:  
    d)     Copy of SG history documentation given to vendors performing eddy current (ET)
ISI contacts (Examination, planning) Containment Exams RPVH Exams Snubbers and Supports Repair and Replacement Program Manager  
          testing of the SGs during the upcoming outage.
Licensing Contact Site Welding Engineer Boric Acid Corrosion Control Program SG Inspection Activities (site lead and vendor contact)  
    e)     Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
          Current Technique Specification Sheets (ETSS). Additionally, please provide a
B. Information to be provided onsite to the inspector(s) at the entrance meeting (September 3, 2009):  
          copy of EPRI Appendix H ETSS Qualification Records.
B.1 ISI / Welding Programs and Schedule Information
                                        -3-                                       Enclosure
  a) Updated schedules for ISI/NDE activities, including SGT inspections, planned welding activities, and schedule showing contingency repair plans, if available.  
 
b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists provided from section A of this enclosure, please provide copies of the following  
    f)     Identify and quantify any SGT leakage experienced during the previous operating
documentation for each subject weld:  
          cycle. Also provide documentation identifying which SG was leaking and
i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment  
          corrective actions completed or planned for this condition (If applicable).
iv) Applicable Code Edition and Addenda for welding procedures v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above viii) Copies of the nonconformance reports for the selected welds (If applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed) x) Copies of the preservice examination records for the selected welds
    g)     Provide past history of the condition and issues pertaining to the secondary side
  - 6 - Enclosure xi) Copies of welder performance qualifications records applicable to the selected welds, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (at least six months prior to the date of subject work) xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable  
          of the steam generators (including items such as loose parts, fouling, top of tube
c) For the ISI related corrective action issues selected by the inspector(s) from section A of this enclosure, provide a copy of the corrective actions and supporting documentation.  
          sheet condition, crud removal amounts, etc.)
d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems selected by the inspector from section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.  
    h)     Please provide copies of your most recent self assessments of the SG
e) A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval.
          monitoring, loose parts monitoring, and secondary side water chemistry control
f) For the NDEs selected by the inspector from section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code, Section XI,  
          programs.
Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include qualification documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and NDE personnel qualification records.  
    i)     Please also indicate where the primary, secondary, and resolution analyses are
B.2 Reactor Pressure Vessel Head (RPVH)
          scheduled to take place.
  a) Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH.
    j)     Please provide a summary of the scope of the SGT examinations, including
b) Provide drawings showing the following: (If a visual examination is planned for the upcoming refueling outage)  
          examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
i) RPVH and CRDM nozzle configurations
          percentage of tubes to be examined. *Do not provide these documents
ii) RPVH insulation configuration
          separately if already included in other information requested.
The drawings listed above should include fabrication drawings for the nozzle attachment welds as applicable.
A.5 Materials Reliability (MRP-139) Program Activities
c) Copy of NDE reports from the last RPVH examination.  
    a)     A list of, with verification, that the baseline inspections of all applicable Dissimilar
          Metal Butt Welds (DMBWs) have been completed by July 31, 2009.
d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95 percent minimum coverage required by NRC Order EA-03-009 (If a visual examination is planned for the upcoming refueling outage).
    b)     Verification that baseline inspection of hot leg and cold leg temperature DMBWs
  - 7 - Enclosure  
          have been included in the inspection program and that the schedules for the
e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH. If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations.
          baseline inspections are consistent with the baseline schedules in MRP-139.
f) Provide a copy of the updated calculation of effective degradation years (EDY) for the RPVH susceptibility ranking.  
    c)     A list and schedule (examination dates) of all DMBW examinations planned for
g) Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations. Also, identify any changes in equipment configurations used for the RPVH examinations which differ from that used in the vendor qualification report(s).  
          the upcoming refueling outage. If none are scheduled, then data from previous
B.3 Boric Acid Corrosion Control Program (BACCP)
          examinations should be available for review.
  a) Please provide boric acid walkdown inspection results, an updated list of boric acid leaks identified so far this outage, associated corrective action documentation, and overall status of planned boric acid inspections.  
    d)     A list and schedule for any welding to be performed on DMBWs in the upcoming
b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage. Please include a status of  
          outage. If no welding will be performed then records of previous welding on
corrective actions to repair and/or clean these boric acid leaks. Please identify specifically which known leaks, if any, have remained in service or will remain in service as active leaks.
          DMBWs and postweld NDE documentation.
B.4 Steam Generator Tube (SGT) Inspections
    e)     A list and schedule of any stress improvement (SI) activities planned for the
  a) Copies of the Examination Technique Specification Sheets (ETSS) and associated justification for any revisions.  
          upcoming refueling outage. If none are scheduled then have qualification reports
b) Copy of the guidance to be followed if a loose part or foreign material is identified in the SGs.  
          for any SIs previously performed.
c) Please provide a copy of the ET procedures used to perform the SGT inspections (specifically calibration and flaw characterization/sizing procedures, etc.). Also include documentation for the specific equipment to be used.  
    f)     Documentation and description of how the baseline and inservice inspection
d) Please provide copies of your responses to NRC and industry operating experience communications such as Generic Letters, Information Notices, etc. (as applicable to SGT inspections) *Do not provide these documents separately if already included in other information requested such as the degradation assessment.  
          specifications in MRP-139 are satisfied at your facility.
    g)     A list of weld locations controlled by MRP-139 which includes the MRP-139 weld
e) List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities.  
          category, pre-mitigation volumetric examination date, type of mitigation or stress
 
          improvement, post mitigation volumetric examination date, and plans for future
  - 8 - Enclosure B.5 Codes and Standards
          MRP-139 required examinations.
  a) Ready access to (i.e., copies provided to the inspector(s) for use during the inspection at the onsite inspection location, or room number and location where available):  
                                          -4-                                         Enclosure
i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program.
 
ii) EPRI and industry standards referenced in the procedures used to perform the SGT eddy current examination.  
A.6 Additional information related to all ISI activities
  Inspector Contact Information:  
    a)     A list with a brief description of ISI, BACCP, and SGT inspection related issues
Michael Bloodgood   Jeffrey Josey     Reactor Inspector   Resident Inspector  
          (e.g., condition reports) entered into your corrective action program since the
817-276-6544   479-968-3290     Michael.Bloodgood@nrc.gov            Jeffrey.Josey@nrc.gov                 Mailing Address: US NRC Region IV  
          beginning of the last refueling outage (for Unit 2). For example, a list based upon
Attn: Michael Bloodgood 612 E. Lamar Blvd, Suite 400 Arlington, TX 76011
          data base searches using key words related to piping or SG tube degradation
          such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust,
          corrosion, boric acid, or errors in piping/SGT examinations.
    b)     Please provide names and phone numbers for the following program leads:
          ISI contacts (Examination, planning)
          Containment Exams
          RPVH Exams
          Snubbers and Supports
          Repair and Replacement Program Manager
          Licensing Contact
          Site Welding Engineer
          Boric Acid Corrosion Control Program
          SG Inspection Activities (site lead and vendor contact)
B. Information to be provided onsite to the inspector(s) at the entrance meeting (September
    3, 2009):
B.1 ISI / Welding Programs and Schedule Information
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
          welding activities, and schedule showing contingency repair plans, if available.
    b)     For ASME Code Class 1 and 2 welds selected by the inspector from the lists
          provided from section A of this enclosure, please provide copies of the following
          documentation for each subject weld:
          i)       Weld data sheet (traveler)
          ii)     Weld configuration and system location
          iii)     Applicable Code Edition and Addenda for weldment
          iv)     Applicable Code Edition and Addenda for welding procedures
          v)       Applicable weld procedures (WPS) used to fabricate the welds
          vi)     Copies of procedure qualification records (PQRs) supporting the WPS
                    from B.1.b.v
          vii)     Copies of mechanical test reports identified in the PQRs above
          viii)   Copies of the nonconformance reports for the selected welds (If
                    applicable)
          ix)     Radiographs of the selected welds and access to equipment to allow
                    viewing radiographs (If RT was performed)
          x)       Copies of the preservice examination records for the selected welds
                                          -5-                                       Enclosure
 
          xi)     Copies of welder performance qualifications records applicable to the
                    selected welds, including documentation that welder maintained
                    proficiency in the applicable welding processes specified in the WPS (at
                    least six months prior to the date of subject work)
          xii)     Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
    c)     For the ISI related corrective action issues selected by the inspector(s) from
          section A of this enclosure, provide a copy of the corrective actions and
          supporting documentation.
    d)     For the NDE reports with relevant conditions on Code Class 1 & 2 systems
          selected by the inspector from section A above, provide a copy of the
          examination records, examiner qualification records, and associated corrective
          action documents.
    e)     A copy of (or ready access to) most current revision of the ISI Program Manual
          and Plan for the current Interval.
    f)     For the NDEs selected by the inspector from section A of this enclosure, provide
          copy of the NDE procedures used to perform the examinations (including
          calibration and flaw characterization/sizing procedures). For ultrasonic
          examination procedures qualified in accordance with ASME Code, Section XI,
          Appendix VIII, provide documentation supporting the procedure qualification
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
          include qualification documentation of the specific equipment to be used (e.g.,
          ultrasonic unit, cables, and transducers including serial numbers) and NDE
          personnel qualification records.
B.2 Reactor Pressure Vessel Head (RPVH)
    a)     Provide the NDE personnel qualification records for the examiners who will
          perform examinations of the RPVH.
    b)     Provide drawings showing the following: (If a visual examination is planned for
          the upcoming refueling outage)
          i)       RPVH and CRDM nozzle configurations
          ii)     RPVH insulation configuration
    The drawings listed above should include fabrication drawings for the nozzle attachment
    welds as applicable.
    c)     Copy of NDE reports from the last RPVH examination.
    d)     Copy of evaluation or calculation demonstrating that the scope of the visual
          examination of the upper head will meet the 95 percent minimum coverage
          required by NRC Order EA-03-009 (If a visual examination is planned for the
          upcoming refueling outage).
                                        -6-                                       Enclosure
 
    e)     Provide a copy of the procedures that will be used to identify the source of any
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
          govern this activity, provide a description of the process to be followed including
          personnel responsibilities and expectations.
    f)     Provide a copy of the updated calculation of effective degradation years (EDY)
          for the RPVH susceptibility ranking.
    g)     Provide copy of the vendor qualification report(s) that demonstrates the detection
          capability of the NDE equipment used for the RPVH examinations. Also, identify
          any changes in equipment configurations used for the RPVH examinations which
          differ from that used in the vendor qualification report(s).
B.3 Boric Acid Corrosion Control Program (BACCP)
    a)     Please provide boric acid walkdown inspection results, an updated list of boric
          acid leaks identified so far this outage, associated corrective action
          documentation, and overall status of planned boric acid inspections.
    b)     Please provide any engineering evaluations completed for boric acid leaks
          identified since the end of the last refueling outage. Please include a status of
          corrective actions to repair and/or clean these boric acid leaks. Please identify
          specifically which known leaks, if any, have remained in service or will remain in
          service as active leaks.
B.4 Steam Generator Tube (SGT) Inspections
    a)     Copies of the Examination Technique Specification Sheets (ETSS) and
          associated justification for any revisions.
    b)     Copy of the guidance to be followed if a loose part or foreign material is identified
          in the SGs.
    c)     Please provide a copy of the ET procedures used to perform the SGT
          inspections (specifically calibration and flaw characterization/sizing procedures,
          etc.). Also include documentation for the specific equipment to be used.
    d)     Please provide copies of your responses to NRC and industry operating
          experience communications such as Generic Letters, Information Notices, etc.
          (as applicable to SGT inspections) *Do not provide these documents separately if
          already included in other information requested such as the degradation
          assessment.
    e)     List of corrective action documents generated by the vendor and/or site with
          respect to SG inspection activities.
                                        -7-                                       Enclosure
 
B.5     Codes and Standards
        a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
              inspection at the onsite inspection location, or room number and location where
              available):
              i)     Applicable Editions of the ASME Code (Sections V, IX and XI) for the
                      inservice inspection program and the repair/replacement program.
              ii)     EPRI and industry standards referenced in the procedures used to
                      perform the SGT eddy current examination.
Inspector Contact Information:
Michael Bloodgood                     Jeffrey Josey
Reactor Inspector                     Resident Inspector
817-276-6544                         479-968-3290
Michael.Bloodgood@nrc.gov            Jeffrey.Josey@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Michael Bloodgood
612 E. Lamar Blvd, Suite 400
Arlington, TX 76011
                                            -8-                                      Enclosure
}}
}}

Latest revision as of 04:16, 14 November 2019

Notification of Inspection (NRC Inspection Report 05000368-09-004) and Request for Information
ML091910377
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/10/2009
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Walsh K
Entergy Operations
References
IR-09-004 IR-09-004
Download: ML091910377 (12)


See also: IR 05000368/2009004

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

July 10, 2009

Kevin Walsh, Vice President, Operations

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S.R. 333

Russellville, AR 72802

SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 050000368/2009004) AND REQUEST FOR

INFORMATION

Dear Mr. Walsh:

From September 3 through September 17, 2009, reactor inspectors from the U.S. Nuclear

Regulatory Commissions (NRC) Region IV office will perform the baseline inservice inspection

at Arkansas Nuclear One, Unit 2, using NRC Inspection Procedure 71111.08, "Inservice

Inspection Activities," and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds."

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. In order to minimize the impact to your onsite resources and to

ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. These documents have been divided into two groups. The first group (Section A of

the enclosure) identified information to be provided prior to the inspection to ensure that the

inspectors are adequately prepared. The second group (Section B of the enclosure) identifies

the information the inspectors will need upon arrival at the site. It is important that all of these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Van Buskirk of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector Michael Bloodgood at (817) 276-6544

(Michael.Bloodgood@nrc.gov) or Jeffrey Josey at (479) 968-3290 (Jeffrey.Josey@nrc.gov).

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Entergy Operations, Inc. -2-

Sincerely,

/RA/

Thomas Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-368

License: NPF-6

Enclosure:

Inservice Inspection Document Request

Senior Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President, Oversight

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Manager, Licensing

Entergy Operations, Inc.

Arkansas Nuclear One

1448 SR 333

Russellville, AR 72802

Associate General Counsel

Entergy Nuclear Operations

P.O. Box 31995

Jackson, MS 39286-1995

Senior Manager, Nuclear Safety & Licensing

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Chief, Radiation Control Section

Arkansas Department of Health

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Entergy Operations, Inc. -3-

Section Chief, Division of Health

Emergency Management Section

Arkansas Department of Health

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

David E. Maxwell, Director

Arkansas Department of Emergency

Management, Bldg. 9501

Camp Joseph T. Robinson

North Little Rock, AR 72199

Pope County Judge

Pope County Courthouse

100 West Main Street

Russellville, AR 72801

Chief, Technological Hazards

Branch

FEMA Region VI

800 North Loop 288

Federal Regional Center

Denton, TX 76209

Entergy Operations, Inc. -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Chuck.Casto@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov )

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov )

Senior Resident Inspector (Alfred.Sanchez@nrc.gov )

Resident Inspector (Jeffrey.Josey@nrc.gov )

Resident Inspector (Jeff.Rotton@nrc.gov )

Branch Chief, DRP/E (Jeff.Clark@nrc.gov )

Senior Project Engineer, DRP/E (George.Replogle@nrc.gov )

ANO Site Secretary (Vicki.High@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Regional Counsel (Karla.Fuller@nrc.gov )

Congressional Affairs Officer (Jenny.Weil@nrc.gov )

OEMail Resource

File located: S:\DRS\REPORTS\ANO IS RFI -MRB ML091910377

SUNSI Rev Compl. Yes No ADAMS X Yes No Reviewer Initials TRF

Publicly Avail X Yes No Sensitive Yes X No Sens. Type Initials TRF

M. Bloodgood T. Farnholtz

/RA/ /RA/

7/8/09 7/10/09

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates: September 3 through September 17, 2009

Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities"

TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"

Inspectors: Michael Bloodgood, Reactor Inspector (Lead Inspector - ISI)

Jeffrey Josey, Resident Inspector

A. Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of Michael Bloodgood, by August

24, 2009, to facilitate the selection of specific items that will be reviewed during the

onsite inspection week. The inspector will select specific items from the information

requested below and then request from your staff additional documents needed during

the onsite inspection week (Section B of this enclosure). We ask that the specific items

selected from the lists be available and ready for review on the first day of inspection.

  • Please provide requested documentation electronically if possible. If requested

documents are large and only hard copy formats are available, please inform the

inspector(s), and provide subject documentation during the first day of the onsite

inspection. If you have any questions regarding this information request, please call the

inspector as soon as possible.

A.1 ISI/Welding Programs and Schedule Information

a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400. (Do not provide separately if other

documentation requested contains this information)

ii) Reactor pressure vessel head (RPVH) examinations planned for the

upcoming outage.

iii) Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope. (If applicable)

iv) Examinations planned as part of your Boric Acid Corrosion Control

Program. (Mode 3 walkdowns, bolted connection walkdowns, etc.)

-1- Enclosure

v) Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs))

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. Also, include in

the list the NDE reports with relevant conditions in the RPVH penetration nozzles

which have been accepted for continued service. The list of NDE reports should

include a brief description of the SSC where the relevant condition was identified.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h) Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009. Also, include examination scope expansion criteria

and planned expansion sample sizes if relevant conditions are identified. (If

applicable)

b) A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

-2- Enclosure

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

A.3 Boric Acid Corrosion Control Program (BACCP)

a) Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c) Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4 Steam Generator Tube (SGT) Inspections

a) A detailed schedule of:

i) SGT inspection, data analyses, and repair activities for the upcoming

outage. (If occurring)

ii) SG secondary side inspection activities for the upcoming outage. (If

occurring)

b) Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the Operational Assessment from last outage and a copy of the

following documents as they become available:

i) Degradation Assessment

ii) Condition Monitoring Assessment

c) If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d) Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage.

e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI Appendix H ETSS Qualification Records.

-3- Enclosure

f) Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

g) Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.)

h) Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i) Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j) Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5 Materials Reliability (MRP-139) Program Activities

a) A list of, with verification, that the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by July 31, 2009.

b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c) A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d) A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then records of previous welding on

DMBWs and postweld NDE documentation.

e) A list and schedule of any stress improvement (SI) activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f) Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

g) A list of weld locations controlled by MRP-139 which includes the MRP-139 weld

category, pre-mitigation volumetric examination date, type of mitigation or stress

improvement, post mitigation volumetric examination date, and plans for future

MRP-139 required examinations.

-4- Enclosure

A.6 Additional information related to all ISI activities

a) A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage (for Unit 2). For example, a list based upon

data base searches using key words related to piping or SG tube degradation

such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust,

corrosion, boric acid, or errors in piping/SGT examinations.

b) Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B. Information to be provided onsite to the inspector(s) at the entrance meeting (September

3, 2009):

B.1 ISI / Welding Programs and Schedule Information

a) Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i) Weld data sheet (traveler)

ii) Weld configuration and system location

iii) Applicable Code Edition and Addenda for weldment

iv) Applicable Code Edition and Addenda for welding procedures

v) Applicable weld procedures (WPS) used to fabricate the welds

vi) Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii) Copies of mechanical test reports identified in the PQRs above

viii) Copies of the nonconformance reports for the selected welds (If

applicable)

ix) Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x) Copies of the preservice examination records for the selected welds

-5- Enclosure

xi) Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c) For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e) A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f) For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b) Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage)

i) RPVH and CRDM nozzle configurations

ii) RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

c) Copy of NDE reports from the last RPVH examination.

d) Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95 percent minimum coverage

required by NRC Order EA-03-009 (If a visual examination is planned for the

upcoming refueling outage).

-6- Enclosure

e) Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f) Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g) Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

B.3 Boric Acid Corrosion Control Program (BACCP)

a) Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b) Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4 Steam Generator Tube (SGT) Inspections

a) Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b) Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c) Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d) Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

e) List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

-7- Enclosure

B.5 Codes and Standards

a) Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii) EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

Inspector Contact Information:

Michael Bloodgood Jeffrey Josey

Reactor Inspector Resident Inspector

817-276-6544 479-968-3290

Michael.Bloodgood@nrc.gov Jeffrey.Josey@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Michael Bloodgood

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011

-8- Enclosure