{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 August 5, 2010 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760 DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: CYBER SECURITY PLAN (TAC NO. ME4341)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 5, 2010 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
 
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: CYBER SECURITY PLAN (TAC NO. ME4341)


==Dear Mr. Allen:==
==Dear Mr. Allen:==
By letter dated July 19, 2010 (Agencywide Documents Access and Management System Package Accession No. ML102020202, not publically available), FirstEnergy Nuclear Operating Company (the licensee), submitted a license amendment request (LAR) for Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). The proposed LAR includes the cyber security plan, proposed changes to Section 2.0 of the Facility Operating License, and a proposed Cyber Security Plan Implementation Schedule.
 
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications.
By letter dated July 19, 2010 (Agencywide Documents Access and Management System Package Accession No. ML102020202, not publically available), FirstEnergy Nuclear Operating Company (the licensee), submitted a license amendment request (LAR) for Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). The proposed LAR includes the cyber security plan, proposed changes to Section 2.0 of the Facility Operating License, and a proposed Cyber Security Plan Implementation Schedule. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Section 50.34 of 10 CFR addresses the content of technical information required.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
 
B. Allen -2 If you have any questions, please contact the DBNPS Project Manager, Michael Mahoney, at (301) 415-3867.
B. Allen                                     -2 If you have any questions, please contact the DBNPS Project Manager, Michael Mahoney, at (301) 415-3867.
in7JJ Michael Mahoney. Project Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: Distribution via Listserv B. Allen -If you have any questions, please contact the DBNPS Project Manager, Michael Mahoney, at (301) 415-3867.
in7JJ Michael Mahoney. Project Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: Distribution via Listserv
Docket No. 50-346 cc: Distribution via Listserv DISTRIBUTION:
 
PUBLIC LPL3-2 rlf RidsAcrsAcnw
B. Allen                                       - 2 If you have any questions, please contact the DBNPS Project Manager, Michael Mahoney, at (301) 415-3867.
_MaiICTR Resource RidsNrrDorl Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl3-2 Resource RidsNrrLA THarris Resource RidsNrrPMMMahoney Resource RidsOgcRp Resource RidsRgn3MailCenter Resource Sincerely, IRA! Michael Mahoney, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation CErlanger, NRR ADAMS A ccesslon N o. ML102090026 concurre db ,ye-mal NRR 106 '* '1 OFFICE DORULPL3-2/PM DORULPL3-21LA
Sincerely, IRA!
* DORULPL3-2/BC DORULPL3-2/PM NAME MMahoney THarris CGratton for RCarlson MMahoney DATE 7/27/10 7/29/10 8/5110 8/5/10 OFFICIAL RECORD}}
Michael Mahoney, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC                                       CErlanger, NRR LPL3-2 rlf RidsAcrsAcnw_MaiICTR Resource RidsNrrDorl Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl3-2 Resource RidsNrrLATHarris Resource RidsNrrPMMMahoney Resource RidsOgcRp Resource RidsRgn3MailCenter Resource ADAMS A ccesslon No. ML102090026           '*concurre db,ye-mal'1 NRR 106 OFFICE     DORULPL3-2/PM DORULPL3-21LA* DORULPL3-2/BC DORULPL3-2/PM CGratton for NAME       MMahoney           THarris               RCarlson             MMahoney DATE       7/27/10             7/29/10               8/5110               8/5/10 OFFICIAL RECORD COPY}}

Latest revision as of 15:34, 13 November 2019

Acceptance of Requested Licensing Action Cyber Security Plan
ML102090026
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/05/2010
From: Michael Mahoney
Plant Licensing Branch III
To: Allen B
FirstEnergy Nuclear Operating Co
mahoney, m NRR/DORL/LPLIII-2 415-3867
References
TAC ME4341
Download: ML102090026 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 5, 2010 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: CYBER SECURITY PLAN (TAC NO. ME4341)

Dear Mr. Allen:

By letter dated July 19, 2010 (Agencywide Documents Access and Management System Package Accession No. ML102020202, not publically available), FirstEnergy Nuclear Operating Company (the licensee), submitted a license amendment request (LAR) for Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). The proposed LAR includes the cyber security plan, proposed changes to Section 2.0 of the Facility Operating License, and a proposed Cyber Security Plan Implementation Schedule. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

B. Allen -2 If you have any questions, please contact the DBNPS Project Manager, Michael Mahoney, at (301) 415-3867.

in7JJ Michael Mahoney. Project Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: Distribution via Listserv

B. Allen - 2 If you have any questions, please contact the DBNPS Project Manager, Michael Mahoney, at (301) 415-3867.

Sincerely, IRA!

Michael Mahoney, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC CErlanger, NRR LPL3-2 rlf RidsAcrsAcnw_MaiICTR Resource RidsNrrDorl Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl3-2 Resource RidsNrrLATHarris Resource RidsNrrPMMMahoney Resource RidsOgcRp Resource RidsRgn3MailCenter Resource ADAMS A ccesslon No. ML102090026 '*concurre db,ye-mal'1 NRR 106 OFFICE DORULPL3-2/PM DORULPL3-21LA* DORULPL3-2/BC DORULPL3-2/PM CGratton for NAME MMahoney THarris RCarlson MMahoney DATE 7/27/10 7/29/10 8/5110 8/5/10 OFFICIAL RECORD COPY