| issue date = 07/21/2014
| issue date = 07/21/2014
| title = Ltr 07/21/14 Dresden Units 2 and 3 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000237/2014005; 05000249/2014005
| title = Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000237/2014005; 05000249/2014005
| author name = Stone A
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                            NUCLEAR REGULATORY COMMISSION
REGION III 2443 WARRENVILLE RD. SUIT
                                                REGION III
E 210 LISLE, IL 60532
                                      2443 WARRENVILLE RD. SUITE 210
-4352 July 21, 2014
                                            LISLE, IL 60532-4352
  Mr. Michael J. Pacilio
                                              July 21, 2014
Senior VP, Exelon Generation Co., LLC
Mr. Michael J. Pacilio
  President and CNO, Exelon Nuclear  
Senior VP, Exelon Generation Co., LLC
4300 Winfield Road
  President and CNO, Exelon Nuclear
Warrenville, IL 60555
4300 Winfield Road
SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION OF AN NRC  
Warrenville, IL 60555
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
SUBJECT:       DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION
AND REQUEST FOR INFORMATION
                OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND
INSPECTION
                REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;
REPORT 05000237/2014005; 05000249/2014005 Dear Mr. Pacilio
                05000249/2014005
: On December 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) will begin the on
Dear Mr. Pacilio:
-site portion of the  
On December 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site
Triennial Heat Sink Performance Inspection at your Dresden Nuclear Power Station, Units 2 and 3. This inspection will be performed in accordance with NRC baseline inspection procedure (IP) 71111.
portion of the Triennial Heat Sink Performance Inspection at your Dresden Nuclear Power
07, "Heat Sink Performance."
Station, Units 2 and 3. This inspection will be performed in accordance with NRC baseline
In order to minimize the impact that the inspection has on the site and to ensure a productive  
inspection procedure (IP) 71111.07, Heat Sink Performance.
inspection, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups.
In order to minimize the impact that the inspection has on the site and to ensure a productive
   The first group lists information necessary for our initial inspection scoping activities. This  
inspection, we have enclosed a request for documents needed for the inspection. The
information should be available to the lead
documents have been divided into three groups.
inspector no later than October 6, 2014. By October 17, 2014, the inspector will communicate the initial selected set of approximately  
*   The first group lists information necessary for our initial inspection scoping activities. This
    information should be available to the lead inspector no later than October 6, 2014. By
    October 17, 2014, the inspector will communicate the initial selected set of approximately
    2-3 risk significant heat exchangers.
*  The second group is needed to support our in-office preparation activities. This set of
    documents, including the calculations associated with the selected heat exchangers,
    should be available at the Regional Office no later than November 17, 2014. This
    information should be separated for each selected component, especially if provided
    electronically (e.g., folder with component name that includes calculations, condition
    reports, maintenance history, etc.). During the in-office preparation activities, the inspector
    may identify additional information needed to support the inspection.
*  The last group includes the additional information above as well as plant specific
    reference material. This information should be available onsite to the inspector on
    December 1, 2014. It is also requested that corrective action documents and/or questions
    developed during the inspection be provided to the inspector as the documents are
    generated.


2-3 risk significant heat exchangers.
M. Pacilio                                      -2-
  The second group
All requested documents are to be for the time period from the onsite inspection period back to
is needed to support our in
the documents that were provided in response to the previous heat sink performance
-office preparation activities.  This
inspection. If no activities were accomplished in that time period, then the request applies to
set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than November 17, 2014. This information should be separated for each selected component, especially if provide
the last applicable document in the previous time period. It is important that these documents
d electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc
be as complete as possible, in order to minimize the number of documents requested during
.).  During the in
the preparation week or during the on-site inspection.
-office preparation activities, the inspector may identify additional information needed to support the inspection.
The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our
  The last group includes the additional information above as well as plant specific reference material.  This information should be available onsite to the inspector
regulatory contact for this inspection is G. Graff of your organization. If there are questions
on December 1, 2014.  It is also requested that corrective action documents and/or question
about the material requested, or the inspection, please call Néstor J. Féliz Adorno at
s developed during the inspection be provided to the inspector as the documents are generated.
(630) 829-9739. Please send the information to the following e-mail address
 
nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc (CD) with the required information
M. Pacilio
is also an acceptable option.
    -2- All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous
This letter does not contain new or amended information collection requirements subject to the
heat sink performance
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
inspection. If no activities were accomplished
requirements were approved by the Office of Management and Budget Control Number 3150-
in that time period, then the request applies to the last applicable document in the previous time period.
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the on
request for information or an information collection requirement unless the requesting
-site inspection.
document displays a currently valid Office of Management and Budget Control Number.
The lead inspector for this inspection is Néstor J. Féliz Adorno.  We understand that our
In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's
regulatory contact for this inspection is
"Rules of Practice," a copy of this letter and its enclosure will be available electronically for public
G. Graff of your organization.  
inspection in the NRC Public Document Room or from the Publicly Available Records System
If there are questions about the material requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739.  Please send the information to the following e
(PARS) component of NRC's Agencywide Documents Access and Management System
-mail address nestor.feliz
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
-adorno@nrc.gov.  A hard-copy or compact disc (CD) with the required information is also an acceptable option.
Public Electronic Reading Room).
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of
                                                Sincerely,
1995 (44 U.S.C. 3501 et seq.).
                                                /RA Stuart Sheldon Acting For/
Existing information collection requirements were approved by the Office of Management and Budget Control Number
                                                Ann Marie Stone, Chief
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
                                                Engineering Branch 2
" In accordance with Title 10, Code of Federal Regulations
                                                Division of Reactor Safety
(CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Docket Nos. 50-237; 50-249
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
License Nos. DPR-19; DPR-25
-rm/adams.html
Enclosure:
(the Public Electronic Reading Room).
Triennial Heat Sink Performance
Sincerely,
Inspection Document Request
/RA Stuart Sheldon Acting For/
cc w/encl: Distribution via LISTSERV
 
 
Ann Marie Stone, Chie f Engineering Branch 2
      TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Division of
Inspection Report:             05000237/2014005; 05000249/2014005
Reactor Safety  
Inspection Dates:              December 1 - 5, 2014
Docket Nos. 50
Inspection Procedure:          Inspection Procedure 71111.07, Heat Sink Performance
-237; 50-249 License Nos. DPR
Lead Inspector:                Néstor J. Féliz Adorno
-19; DPR-25 Enclosure:
                                (630) 829-9739
Triennial Heat Sink Performance
                                nestor.feliz-adorno@nrc.gov
Inspection Document Request
I.    Information Requested By October 6, 2014
cc w/encl:  Distribution via LISTSERV
      1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
 
          Safety-Related Equipment, heat exchangers in order of risk significance.
TRIENNIAL HEAT
      2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
SINK PERFORMANCE INSPECTION
          exchanger.
DOCUMENT REQUEST
      3. List of Corrective Action Program documents (with a short description) associated
Enclosure Inspection Report:
          with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
  05000237/2014005; 05000249/2014005
          exchanger testing, ultimate heat sink (UHS), and safety-related service and closed
Inspection Dates:
          cooling water systems for the previous three years or since the last Corrective Action
  December 1
          Program document list was sent to the NRC for the previous heat sink performance
- 5, 2014 Inspection
          inspection. The list should include all Corrective Action Program documents not on
Procedure:
          the last Corrective Action Program document list.
I n spection Procedure 71111.07, "Heat Sink Performance"
      4. Copy of any self-assessment done on any of GL 89-13 heat exchangers, UHS, and
Lead Inspector:
          safety-related service and closed cooling water systems since the last heat sink
  Néstor J. Féliz Adorno
          performance inspection.
(630) 829-9739  nestor.feliz
      5. Last two System Health Report(s) and maintenance rule system notebooks for all the
-adorno@nrc.gov
          GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
I. Information Requested By October 6, 2014
          water systems.
1. List of the Generic Letter (GL) 89
      6. List of engineering-related operator workarounds (with a short description)
-13, "Service Water System Problems Affecting Safety-Related Equipment,"
          associated with GL 89-13 heat exchangers, UHS, and safety-related service and
heat exchangers in order of risk significance.
          closed cooling water systems. The requested documents are to be for the time
2. Copy of heat exchanger performance trending data tracked for each GL 89
          period from the onsite inspection period back to the documents that were provided in
-13 heat exchanger.
          response to the previous heat sink performance inspection.
3. List of Corrective Action Program
      7. List of permanent and temporary modifications (with a short description) associated
documents (with a short description) associated with GL 89
          with GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat exchanger testing, ultimate heat sink (UHS), and safety
          water systems. The requested documents are to be for the time period from the
-related service and closed cooling water systems
          onsite inspection period back to the documents that were provided in response to the
for the previous three
          previous heat sink performance inspection.
years or since the last Corrective Action Program document list was sent to the NRC for the previous heat sink performance inspection. The list should include all Corrective Action Program
      8. List of risk significant non-safety-related functions (with a short description) of the
documents not on the last Corrective Action Program
          service water system and UHS.
document list.
                                                                                          Enclosure
4. Copy of any self
 
-assessment done on any of GL 89
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
-13 heat exchangers, UHS , and safety-related service and closed cooling water systems
II. Information Requested By November 17, 2014
since the last heat sink performance inspection.
    1. Copies of the GL 89-13 responses and commitments.
5. Last two System Health Report(s) and maintenance rule system notebooks for all the GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling water systems.
    2. Copies of procedures developed to implement the recommendations of GL 89-13
6. List of engineering
        (e.g., the GL 89-13 Heat Exchanger Program description).
-related operator workarounds
    3. Copies of the selected Corrective Action Program documents.
  (with a short description)
    4. For the specific heat exchangers selected:
associated with GL 89-13 heat exchangers , UHS, and safety-related service and closed cooling water systems.
        a. Copy of system description and design basis document for the heat exchangers
  The requested documents are to be for the time period from the onsite inspection period back to the
              (as applicable).
documents that were provided in response to the previous
        b. Provide a list of calculations (with a short description), which currently apply to
h eat sink performance
              each heat exchanger.
inspectio n. 7. List of permanent and temporary modifications
        c. Provide the calculations or evaluations that:
(with a short description)
              i. establish the limiting design basis heat load required to be removed by each
associated with GL 89
                  of these heat exchangers;
-13 heat exchangers , UHS, and safety-related service and closed cooling water systems.
              ii. demonstrate the heat exchangers capacity to remove the limiting heat load;
  The requested documents are to be for the time period from the onsite inspection period back to the
            iii. correlate surveillance testing and/or inspection results from these heat
documents that were provided in response to the previous heat sink performance
                  exchangers with design basis heat removal capability (e.g., basis for
inspectio n. 8. List of risk significant non
                  surveillance test and/or inspection acceptance criteria);
-safety-related functions (with a short description) of the service water system and UHS.  
            iv. evaluate the potential for water hammer in each heat exchanger or
TRIENNIAL HEAT
                  associated piping; and
SINK PERFORMANCE INSPECTION
              v. evaluate excessive tube vibration in each heat exchanger.
DOCUMENT REQUEST
        d. Copy of any operability determinations or other documentation of degradation
  2 II. Information Requested By November 17, 2014
              associated with the heat exchangers or the systems that support the operation
1. Copies of the GL 89
              for the selected heat exchangers.
-13 responses
        e. Copy of the design specification, heat exchanger data sheets, and vendor
and commitments. 2. Copies of procedures developed to implement the recommendations of GL 89
              documents including component drawings applicable for the selected heat
-13 (e.g., the GL 89-13 Heat Exchanger Program description).
              exchangers.
  3. Copies of the selected Corrective Action Program
        f.   Copies of normal, abnormal, and emergency operating procedures associated
documents.
              with the selected heat exchangers.
4. For the specific heat exchangers selected:
    5. For the UHS and the safety-related service and closed cooling water systems (or
a. Copy of system description and design basis document for the heat exchangers (as applicable).
        equivalent):
b. Provide a list of calculations
        a. Copy of system description and design basis document (as applicable).
(with a short description
                                                2
), which currently apply to each heat exchanger
 
. c. Provide the calculations or evaluations that:
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
i. establish the limiting design basis heat load required to be removed by each
          a. Copy of any operability determinations or other documentation of degradation
of these heat exchangers;
              associated with the UHS and the safety-related service and closed cooling water
ii. demonstrate the heat exchangers capacity to remove the limiting heat load;
              systems.
iii. correlate surveillance testing and/or inspection results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test and/or inspection acceptance criteria);
          b. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that
iv. evaluate the potential for water hammer in each heat exchanger or associated piping; and  
              states the maximum cooling water system inlet temperature limit that still allows
  v. evaluate excessive tube vibration in each heat exchanger.
              full licensed power operation of the nuclear reactor.
d. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers.
          c. Copy of the construction code and Design Specification.
e. Copy of the design specification, heat exchanger data sheets, and vendor documents including component drawings applicable for the selected heat exchangers.
          d. Copies of normal, abnormal, and emergency operating procedures associated
  f. Copies of normal, abnormal, and emergency operating procedures associated with the selected heat exchangers.
              with the UHS and safety-related service water systems including procedures for
  5. For the UHS and the safety
              loss of these systems.
-related service
          e. Copies of the procedures associated with in-service test of the safety-related
and closed cooling
              service and closed cooling water pumps.
water system
          f. Copies of corrective action documents associated with waterhammer or hydraulic
s (or equivalent):
              transients in the service water system since the last heat sink inspection.
a. Copy of system description and design basis document (as applicable).
          g. If available, provide an electronic copy of piping and instrumentation diagrams
   
              (P&IDs) for the service and closed cooling water systems, including the intake
TRIENNIAL HEAT
              structure.
SINK PERFORMANCE INSPECTION
          h. Provide a list of calculations (with a short description), which currently apply to
DOCUMENT REQUEST
              UHS, service and closed cooling water systems.
  3 a. Copy of any operability determinations or other documentation of degradation associated with the UHS and the safety
          i.  Copies of calculations and surveillances that determine the UHS reservoir
-related service
              capacity and heat transfer capability.
and closed cooling
          j. Copy of calculation addressing safety-related service and closed cooling water
water system s. b. Copy of the document (e.g.
              systems flow balance.
, UFSAR or Technical Requirements Manual) that states the maximum cooling water system inlet temperature limit that still allows full licensed power operation of the nuclear reactor.
          k. Provide a list of instruments (with a short description) associated with automatic
c. Copy of the construction code and Design Specification. d. Copies of normal, abnormal, and emergency operating procedures associated
              or alarm functions for the safety-related service and closed cooling water
with the UHS and safety
              systems and/or UHS.
-related service water systems including procedures for loss of these systems.
      6. A schedule of all inspections, cleanings, maintenance, or testing of any
e. Copies of the procedures associated with in
          safety-related heat exchanger to be performed during the on-site portion of the
-service test of the safety
          inspection.
-related service and closed cooling water pumps.
      7. Electronic copies of the current Final Safety Analysis Report, Technical
f. Copies of corrective
          Specifications, Technical Specifications Basis, and Technical Report Manual.
action documents associated with waterhammer or hydraulic transients in the service water system since the last heat sink inspection
III. Information Requested to be Available on First Day of Inspection, December 1, 2014
. g. If available, provide an electronic copy of piping and instrumentation diagrams (P&IDs) for the service
      1. For the specific heat exchangers selected:
and closed cooling
          a. Copies of the two most recent completed tests and evaluation data confirming
water system
              thermal performance for those heat exchangers, which are performance tested.
s, including the intake structure.
          b. Documentation and procedures that identify the types, accuracy, and location of
h. Provide a list of calculations (with a short description), which currently apply to
              any special instrumentation used for the two most recently completed thermal
UHS, service and closed cooling
                                                3
water system
 
s. i. Copies of calculations and surveillances that determine the UHS reservoir capacity and heat transfer capability.
  TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
j. Copy of calculation addressing safety
          performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow
-related service and closed cooling water systems flow balance.
          instruments or temperature instruments). Include calibration records for the
k. Provide a list of instruments (with a short description) associated with automatic or alarm functions for the safety
          instruments used during these tests.
-related service
      c. Information regarding any alarms, which monitor on-line performance.
and closed cooling
      d. Copy of the document describing the inspection results of each heat exchanger.
water system s and/or UHS.
          The requested documents are to be for the time period from the onsite inspection
6. A schedule of all inspections, cleanings, maintenance, or testing of
          period back to the documents that were provided in response to the previous
any safety-related heat exchanger to be performed during the  
          heat sink performance inspection.
on-site portion of
      e. The cleaning and inspection maintenance schedule for each heat exchanger for
the inspection
          the next 5 years.
. 7. Electronic
      f. Copy of the operating procedure that ensures that the maximum cooling water
copies of the current Final Safety Analysis Report, Technical Specifications, Technical Specifications Basis, and Technical Report Manual.
          system inlet temperature limit is not exceeded.
III. Information Requested to be Available on First Day of Inspection, December 1, 2014
      g. Copy of the periodic flow testing at or near maximum design flow. The requested
1. For the specific heat exchangers selected
          documents are to be for the time period from the onsite inspection period back to
: a. Copies of the two most recent completed tests and evaluation data confirming thermal performance for those heat exchangers
          the documents that were provided in response to the previous heat sink
, which are performance tested.
          performance inspection.
b. Documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for the two most recently completed thermal 
      h. Copy of the document which identifies the current number of tubes in service for
TRIENNIAL HEAT
          each heat exchanger and the supporting calculation which establishes the
SINK PERFORMANCE INSPECTION
          maximum number of tubes which can be plugged in each heat exchanger.
DOCUMENT REQUEST
      i. Copy of the document establishing the repair criteria (plugging limit) for degraded
  4 performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow instruments or temperature instruments). Include calibration records for the instruments used during these tests.
          tubes which are identified in each heat exchanger.
c. Information regarding any alarms
      j. Copies of the documents that verify the structural integrity of the heat exchanger
, which monitor on
          (e.g., eddy current summary sheets, ultrasonic testing results, and visual
-line performance.
          inspection results).
d. Copy of the document describing the inspection results
      k. Copies of those documents that describe the methods taken to control water
of each heat exchanger. The requested documents are to be for the time period from the onsite inspection period back to the
          chemistry in the heat exchangers.
documents that were provided in response to the previous
2.     For the review of the safety-related service and closed cooling water systems and
heat sink performance  
      UHS:
inspectio n. e. The cleaning and inspection maintenance schedule for each heat exchanger for the next 5 years. f. Copy of the operating procedure that ensures that the maximum cooling water system inlet temperature limit is not exceeded
      a. Copies of calculations and surveillances that determine the UHS reservoir
. g. Copy of the periodic flow testing at or near maximum design flow. The requested documents are to be for the time period from the onsite inspection period back t
          capacity and heat transfer capability.
o the documents that were provided in response to the previous
      b. Copies of surveillance procedures and testing results performed on the
heat sink performance
          instrumentation relied upon to determine UHS reservoir capability. The
inspectio n. h. Copy of the document which identifies the current number of tubes in service for
          requested documents are to be for the time period from the onsite inspection
each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger
          period back to the documents that were provided in response to the previous
. i. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger
          heat sink performance inspection.
. j. Copies of the documents that verify the structural integrity of the heat exchanger
      c. Copies of the last two performance tests, such as the ASME in-service test, for
(e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results
          the pumps, valves, and, if applicable, the towers fans in the safety-related service
). k. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers
          water system. If the components are not performance tested, please provide
. 2. For the review of t
          documentation verifying performance by the methods actually used.
he safety-related service and closed cooling water systems and
                                            4
UHS: a. Copies of calculations and surveillances that determine the UHS reservoir
 
capacity and heat transfer capability.
        TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
b. Copies of surveillance procedures and testing results performed
            d. Copies of the documents that demonstrate that flow balance testing of the
on the instrumentation relied upon to determine UHS reservoir capability. The requested documents are to be for the time period from the onsite inspection period back to the
                safety-related service water system was performed during the last three years.
documents that were provided in response to the previous
                If the last flow test was performed longer than three years, then provide the last
heat sink performance  
                test.
inspectio n. c. Copies of the last two performance tests, such as the ASME in
            e. Copies of the documents that demonstrate that flow balance testing will continue
-service test
                to be periodically done in the future.
, for the pumps, valves, and, if applicable, the towers
            f. Copies of procedures used to monitor interface valves between the
fans in the safety
                safety-related sections of the service and closed cooling water systems, the
-related service water system. If the components are not performance tested, please provide
                non-safety-related sections, and the associated results. The requested
documentation verifying performance by the methods actually used.
                documents are to be for the time period from the onsite inspection period back to
 
                the documents that were provided in response to the previous heat sink
TRIENNIAL HEAT
                performance inspection.
SINK PERFORMANCE INSPECTION
            g. Copies of the procedures that verify the performance of risk significant non-safety
DOCUMENT REQUEST
                functions of the safety-related service water system and the associated results.
  5 d. Copies of the documents that demonstrate that flow balance testing of the safety-related service water system
                The requested documents are to be for the time period from the onsite inspection
was performed
                period back to the documents that were provided in response to the previous
during the last three years. If the last flow test was performed longer than three years, then provide the last test. e. Copies of the documents that demonstrate that flow balance testing will continue to be periodically done in the future.
                heat sink performance inspection.
f. Copies of procedures used to monitor interface valves between the safety-related section s of the service
            h. Copies of the testing, inspection, or monitoring program procedures for buried or
and closed cooling
                inaccessible piping of the service and closed cooling water systems and the
water systems, the non-safety-related sections, and the associated results. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous
                associated results. The requested documents are to be for the time period from
heat sink performance  
                the onsite inspection period back to the documents that were provided in
inspectio n. g. Copies of the procedures that verify the performance of risk significant non-safety functions of the safety
                response to the previous heat sink performance inspection.
-related service water system
            i. Copies of the ultrasonic test results and/or visual inspections that verify the
and the associated results.  The requested documents are to be for the time period from the onsite inspection period back to the
                structural integrity of the service and closed cooling water systems piping.
documents that were provided in response to the previous
            j. Copies of the procedures to monitor, assess, and disposition active thru wall pipe
heat sink performance  
                leaks of the service and closed cooling water systems, including structural
inspectio n. h. Copies of the testing
                evaluations and/or planned corrective actions.
, inspection, or monitoring
            k. History of any thru wall pipe leak on the service and closed cooling water
program procedures
                systems. The requested documents are to be for the time period from the onsite
for buried or inaccessible piping
                inspection period back to the documents that were provided in response to the
of the service
                previous heat sink performance inspection.
and closed cooling
            l. Copies of the documents associated with the periodic inspection program used to
water system
                detect protective coating failure, corrosion, and erosion of the service and closed
s and the associated results
                cooling water systems.
.  The requested documents are to be for the time period from the onsite inspection period back to the
            m. Copies of the IST vibration monitoring results and operational history for deep
documents that were provided in response to the previous
                draft vertical pumps, if applicable. The requested documents are to be for the
heat sink performance  
                time period from the onsite inspection period back to the documents that were
inspectio n. i. Copies of the ultrasonic test results and/or visual inspections that verify
                provided in response to the previous heat sink performance inspection.
the structural integrity of the service and closed cooling
If the information requested above will not be available, please contact Néstor J. Féliz Adorno
water system
as soon as possible at (630) 829-9739 or email nestor.feliz-adorno@nrc.gov.
s piping. j. Copies of the procedures to monitor
                                                    5
, assess , and disposition active thru wall pipe leaks of the service
 
and closed cooling
M. Pacilio                                                                -2-
water system
All requested documents are to be for the time period from the onsite inspection period back to the
s, including structural evaluations and/or planned corrective actions.
documents that were provided in response to the previous heat sink performance inspection. If no
k. History of any thru wall pipe leak on
activities were accomplished in that time period, then the request applies to the last applicable document
the service
in the previous time period. It is important that these documents be as complete as possible, in order to
and closed cooling
minimize the number of documents requested during the preparation week or during the on-site
water system s.  The requested documents are to be for the time period from the onsite inspection period back to the
inspection.
documents that were provided in response to the previous heat sink performance inspectio n. l. Copies of the documents associated with the periodic inspection program used to detect protective coating failure, corrosion, and erosion
The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our regulatory
of the service
contact for this inspection is G. Graff of your organization. If there are questions about the material
and closed cooling water system
requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739. Please send the
s. m. Copies of the IST vibration monitoring results and
information to the following e-mail address nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc
operational history for deep draft vertical pumps, if applicable.  The requested documents are to be for the time period from the onsite inspection period back to the
(CD) with the required information is also an acceptable option.
documents that were provided in response to the previous
This letter does not contain new or amended information collection requirements subject to the
heat sink performance
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements
inspectio n. If the information requested above will not be available, please contact Néstor J. Féliz Adorno as soon as possible at (630) 829
were approved by the Office of Management and Budget Control Number 3150-0011. The NRC may not
-9739 or email nestor.feliz
conduct or sponsor, and a person is not required to respond to, a request for information or an
-adorno@nrc.gov
information collection requirement unless the requesting document displays a currently valid Office of
.  
Management and Budget Control Number.
  M. Pacilio
In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of
    -2- All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.
Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the
  If no activities were accomplished in that time period, then the
NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's
request applies to the last applicable document in the previous time period. It is important that these documents be as complete as possible, in order to
Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at
minimize the number of documents requested during the preparation week or during the on
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-site inspecti on. The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our regulatory contact for this inspection is G. Graff of your organization.  
                                                                          Sincerely,
If there are questions about the material requested, or the inspection, please call Néstor J. Féliz Adorno at (630)
                                                                          /RA Stuart Sheldon Acting For/
829-9739.  Please send the information to the following e
                                                                          Ann Marie Stone, Chief
-mail address nestor.feliz
                                                                          Engineering Branch 2
-adorno@nrc.gov.  A hard-copy or compact disc (CD) with the required information is also an acceptable option.
                                                                          Division of Reactor Safety
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements
Docket Nos. 50-237; 50-249
were approved by the Office of Management
License Nos. DPR-19; DPR-25
and Budget Control Number
Enclosure:
3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an
TRIENNIAL HEAT SINK PERFORMANCE
information collection requirement unless the requesting document displays a currently valid Office of
INSPECTION DOCUMENT REQUEST
Management and Budget
                                                         
Control Number
cc w/encl: Distribution via LISTSERV
. In accordance with Title 10, Code of Federal Regulations
DISTRIBUTION:
(CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
See next Page
  enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 072114 Dresden 2014 UHS RFI NFA.docx
-rm/adams.html
Publicly Available                        Non-Publicly Available                    Sensitive              Non-Sensitive
(the Public Electronic Reading Room).
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
Sincerely, 
  OFFICE                  RIII                                            RIII
/RA S t uart Sheldon Acting For/
NAME                    SSheldon for NAdorno:ls                          SSheldon for AMStone
  Ann Marie Stone, Chief
DATE                    07/11/14                                        07/21/14
Engineering Branch 2
                                                          OFFICIAL RECORD COPY
Division of
 
Reactor Safety
Letter to Michael J. Pacilio from Ann Marie Stone dated July 21, 2014.
Docket Nos. 50
SUBJECT:      DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION
-237; 50-249 License Nos. DPR
              OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND
-19; DPR-25 Enclosure:
              REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;
TRIENNIAL HEAT SINK PERFORMANCE
              05000249/2014005
INSPECTION DOCUMENT REQUEST
DISTRIBUTION:
cc w/encl:  Distribution via LISTSERV
Anthony Bowers
  DISTRIBUTION
RidsNrrDorlLpl3-2 Resource
: See next Page
RidsNrrPMDresden Resource
    DOCUMENT NAME:  G:\DRSIII\DRS\Work in Progress
RidsNrrDirsIrib Resource
\Ltr 07 2114 Dresden 2014 UHS RFI NFA.docx
Cynthia Pederson
  -Publicly Available
Darrell Roberts
  -Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
Steven Orth
OFFICE RIII  RIII    NAME SSheldon for NAdorno:ls
Allan Barker
SSheldon for AMStone
Carole Ariano
  DATE 07/11/14 07/21/14  OFFICIAL RECORD COPY
Linda Linn
  Letter to Michael J. Pacilio from Ann Marie Stone dated July
DRPIII
21, 2014. SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION OF AN NRC
DRSIII
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
Patricia Buckley
AND REQUEST FOR INFORMATION
Carmen Olteanu
INSPECTION
REPORT 05000237/2014005; 05000249/2014005
DISTRIBUTION
: Anthony Bowers
RidsNrrDorlLpl3
-2 Resource
RidsNrrPMDresden Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts
Steven Orth
Allan Barker
Carole Ariano
Linda Linn
DRPIII DRSIII Patricia Buckley
Carmen Olteanu
}}
}}

Latest revision as of 04:49, 17 November 2019

Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000237/2014005; 05000249/2014005
ML14204A755
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 07/21/2014
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Nestor Felix Adorno
References
IR-14-005
Download: ML14204A755 (9)


See also: IR 05000237/2014005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

July 21, 2014

Mr. Michael J. Pacilio

Senior VP, Exelon Generation Co., LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION

OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND

REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;

05000249/2014005

Dear Mr. Pacilio:

On December 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site

portion of the Triennial Heat Sink Performance Inspection at your Dresden Nuclear Power

Station, Units 2 and 3. This inspection will be performed in accordance with NRC baseline

inspection procedure (IP) 71111.07, Heat Sink Performance.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than October 6, 2014. By

October 17, 2014, the inspector will communicate the initial selected set of approximately

2-3 risk significant heat exchangers.

  • The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers,

should be available at the Regional Office no later than November 17, 2014. This

information should be separated for each selected component, especially if provided

electronically (e.g., folder with component name that includes calculations, condition

reports, maintenance history, etc.). During the in-office preparation activities, the inspector

may identify additional information needed to support the inspection.

  • The last group includes the additional information above as well as plant specific

reference material. This information should be available onsite to the inspector on

December 1, 2014. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

M. Pacilio -2-

All requested documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink performance

inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period. It is important that these documents

be as complete as possible, in order to minimize the number of documents requested during

the preparation week or during the on-site inspection.

The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our

regulatory contact for this inspection is G. Graff of your organization. If there are questions

about the material requested, or the inspection, please call Néstor J. Féliz Adorno at

(630) 829-9739. Please send the information to the following e-mail address

nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc (CD) with the required information

is also an acceptable option.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget Control Number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's

"Rules of Practice," a copy of this letter and its enclosure will be available electronically for public

inspection in the NRC Public Document Room or from the Publicly Available Records System

(PARS) component of NRC's Agencywide Documents Access and Management System

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA Stuart Sheldon Acting For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure:

Triennial Heat Sink Performance

Inspection Document Request

cc w/encl: Distribution via LISTSERV

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000237/2014005; 05000249/2014005

Inspection Dates: December 1 - 5, 2014

Inspection Procedure: Inspection Procedure 71111.07, Heat Sink Performance

Lead Inspector: Néstor J. Féliz Adorno

(630) 829-9739

nestor.feliz-adorno@nrc.gov

I. Information Requested By October 6, 2014

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of Corrective Action Program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat

exchanger testing, ultimate heat sink (UHS), and safety-related service and closed

cooling water systems for the previous three years or since the last Corrective Action

Program document list was sent to the NRC for the previous heat sink performance

inspection. The list should include all Corrective Action Program documents not on

the last Corrective Action Program document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers, UHS, and

safety-related service and closed cooling water systems since the last heat sink

performance inspection.

5. Last two System Health Report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling

water systems.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers, UHS, and safety-related service and

closed cooling water systems. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling

water systems. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in response to the

previous heat sink performance inspection.

8. List of risk significant non-safety-related functions (with a short description) of the

service water system and UHS.

Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

II. Information Requested By November 17, 2014

1. Copies of the GL 89-13 responses and commitments.

2. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3. Copies of the selected Corrective Action Program documents.

4. For the specific heat exchangers selected:

a. Copy of system description and design basis document for the heat exchangers

(as applicable).

b. Provide a list of calculations (with a short description), which currently apply to

each heat exchanger.

c. Provide the calculations or evaluations that:

i. establish the limiting design basis heat load required to be removed by each

of these heat exchangers;

ii. demonstrate the heat exchangers capacity to remove the limiting heat load;

iii. correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

e. Copy of the design specification, heat exchanger data sheets, and vendor

documents including component drawings applicable for the selected heat

exchangers.

f. Copies of normal, abnormal, and emergency operating procedures associated

with the selected heat exchangers.

5. For the UHS and the safety-related service and closed cooling water systems (or

equivalent):

a. Copy of system description and design basis document (as applicable).

2

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

a. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service and closed cooling water

systems.

b. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still allows

full licensed power operation of the nuclear reactor.

c. Copy of the construction code and Design Specification.

d. Copies of normal, abnormal, and emergency operating procedures associated

with the UHS and safety-related service water systems including procedures for

loss of these systems.

e. Copies of the procedures associated with in-service test of the safety-related

service and closed cooling water pumps.

f. Copies of corrective action documents associated with waterhammer or hydraulic

transients in the service water system since the last heat sink inspection.

g. If available, provide an electronic copy of piping and instrumentation diagrams

(P&IDs) for the service and closed cooling water systems, including the intake

structure.

h. Provide a list of calculations (with a short description), which currently apply to

UHS, service and closed cooling water systems.

i. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

j. Copy of calculation addressing safety-related service and closed cooling water

systems flow balance.

k. Provide a list of instruments (with a short description) associated with automatic

or alarm functions for the safety-related service and closed cooling water

systems and/or UHS.

6. A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related heat exchanger to be performed during the on-site portion of the

inspection.

7. Electronic copies of the current Final Safety Analysis Report, Technical

Specifications, Technical Specifications Basis, and Technical Report Manual.

III. Information Requested to be Available on First Day of Inspection, December 1, 2014

1. For the specific heat exchangers selected:

a. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers, which are performance tested.

b. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

3

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests.

c. Information regarding any alarms, which monitor on-line performance.

d. Copy of the document describing the inspection results of each heat exchanger.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

e. The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years.

f. Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded.

g. Copy of the periodic flow testing at or near maximum design flow. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink

performance inspection.

h. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

i. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger.

j. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

k. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

2. For the review of the safety-related service and closed cooling water systems and

UHS:

a. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

b. Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

c. Copies of the last two performance tests, such as the ASME in-service test, for

the pumps, valves, and, if applicable, the towers fans in the safety-related service

water system. If the components are not performance tested, please provide

documentation verifying performance by the methods actually used.

4

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

d. Copies of the documents that demonstrate that flow balance testing of the

safety-related service water system was performed during the last three years.

If the last flow test was performed longer than three years, then provide the last

test.

e. Copies of the documents that demonstrate that flow balance testing will continue

to be periodically done in the future.

f. Copies of procedures used to monitor interface valves between the

safety-related sections of the service and closed cooling water systems, the

non-safety-related sections, and the associated results. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink

performance inspection.

g. Copies of the procedures that verify the performance of risk significant non-safety

functions of the safety-related service water system and the associated results.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

h. Copies of the testing, inspection, or monitoring program procedures for buried or

inaccessible piping of the service and closed cooling water systems and the

associated results. The requested documents are to be for the time period from

the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

i. Copies of the ultrasonic test results and/or visual inspections that verify the

structural integrity of the service and closed cooling water systems piping.

j. Copies of the procedures to monitor, assess, and disposition active thru wall pipe

leaks of the service and closed cooling water systems, including structural

evaluations and/or planned corrective actions.

k. History of any thru wall pipe leak on the service and closed cooling water

systems. The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response to the

previous heat sink performance inspection.

l. Copies of the documents associated with the periodic inspection program used to

detect protective coating failure, corrosion, and erosion of the service and closed

cooling water systems.

m. Copies of the IST vibration monitoring results and operational history for deep

draft vertical pumps, if applicable. The requested documents are to be for the

time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

If the information requested above will not be available, please contact Néstor J. Féliz Adorno

as soon as possible at (630) 829-9739 or email nestor.feliz-adorno@nrc.gov.

5

M. Pacilio -2-

All requested documents are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink performance inspection. If no

activities were accomplished in that time period, then the request applies to the last applicable document

in the previous time period. It is important that these documents be as complete as possible, in order to

minimize the number of documents requested during the preparation week or during the on-site

inspection.

The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our regulatory

contact for this inspection is G. Graff of your organization. If there are questions about the material

requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739. Please send the

information to the following e-mail address nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc

(CD) with the required information is also an acceptable option.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget Control Number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget Control Number.

In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of

Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's

Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA Stuart Sheldon Acting For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure:

TRIENNIAL HEAT SINK PERFORMANCE

INSPECTION DOCUMENT REQUEST

cc w/encl: Distribution via LISTSERV

DISTRIBUTION:

See next Page

DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 072114 Dresden 2014 UHS RFI NFA.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII

NAME SSheldon for NAdorno:ls SSheldon for AMStone

DATE 07/11/14 07/21/14

OFFICIAL RECORD COPY

Letter to Michael J. Pacilio from Ann Marie Stone dated July 21, 2014.

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION

OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND

REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;

05000249/2014005

DISTRIBUTION:

Anthony Bowers

RidsNrrDorlLpl3-2 Resource

RidsNrrPMDresden Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Steven Orth

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Carmen Olteanu