| {{#Wiki_filter:November 22, 2016 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 22, 2016 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 24: |
Line 24: |
|
| |
|
| ==Dear Mr. Mitchell:== | | ==Dear Mr. Mitchell:== |
| On August 3 and October 27, 2016, John Nicholson of this office conducted a safety inspection at the above address of activities authorized by the above listed NRC license. The inspection was limited to an observation of emergency exercises. The inspection consisted of observations by the inspector, interviews with personnel, and a review of plans and procedures. The findings of the inspection were discussed with you at the conclusion of the inspection. The enclosed report presents the results of this inspection. | | On August 3 and October 27, 2016, John Nicholson of this office conducted a safety inspection at the above address of activities authorized by the above listed NRC license. The inspection was limited to an observation of emergency exercises. The inspection consisted of observations by the inspector, interviews with personnel, and a review of plans and procedures. |
| | |
| | The findings of the inspection were discussed with you at the conclusion of the inspection. The enclosed report presents the results of this inspection. |
|
| |
|
| Within the scope of this inspection, no violations were identified. | | Within the scope of this inspection, no violations were identified. |
|
| |
|
| Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov | | Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact John Nicholson at 610-337-5236 if you have any questions regarding this matter. |
| ; select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov | |
| ; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). | |
| You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). | |
| | |
| UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 No reply to this letter is required. Please contact John Nicholson at 610-337-5236 if you have any questions regarding this matter.
| |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ | | /RA/ |
| Raymond J. Powell, Chief Decommissioning and Technical | | Raymond J. Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety Enclosure: |
| | |
| Support Branch Division of Nuclear Materials Safety | |
| | |
| Enclosure: | |
| Inspection Report No. 05000213/2016002 and 07200039/2016002 cc: Jeffery Semancik, Director/State Liaison Officer, State of Connecticut | | Inspection Report No. 05000213/2016002 and 07200039/2016002 cc: Jeffery Semancik, Director/State Liaison Officer, State of Connecticut |
|
| |
|
| =EXECUTIVE SUMMARY= | | =EXECUTIVE SUMMARY= |
| Connecticut Yankee Atomic Power Company NRC Inspection Report No. 05000213/2016002 and 07200039/2016002 | | Connecticut Yankee Atomic Power Company |
| | |
| | NRC Inspection Report No. 05000213/2016002 and 07200039/2016002 An announced safety inspection was conducted on August 3 and October 27, 2016, at the Connecticut Yankee Atomic Power Company (Connecticut Yankee) Independent Spent Fuel Storage Installation (ISFSI). The inspector assessed whether Connecticut Yankee personnel were conducting an exercise every two years at an away-from-reactor (AFR) ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan. The inspectors review was directed toward confirming the adequacy of the exercises, emergency preparedness, and training. The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and the 2016 Biennial Exercise Plans. |
|
| |
|
| An announced safety inspection was conducted on August 3 and October 27, 2016, at the Connecticut Yankee Atomic Power Company (Connecticut Yankee) Independent Spent Fuel Storage Installation (ISFSI). The inspector assessed whether Connecticut Yankee personnel were conducting an exercise every two years at an away-from-reactor (AFR) ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan. The inspector's review was directed toward confirming the adequacy of the exercises, emergency preparedness, and training. The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and the 2016 Biennial Exercise Plans. Based on the results of this inspection, no findings of significance were identified.
| | Based on the results of this inspection, no findings of significance were identified. |
|
| |
|
| 1 Inspection Report No. 05000213/2016002
| | ii Inspection Report No. 05000213/2016002 |
|
| |
|
| =REPORT DETAILS= | | =REPORT DETAILS= |
Line 58: |
Line 53: |
| The inspector assessed whether Connecticut Yankee personnel were performing exercises at an AFR ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan. | | The inspector assessed whether Connecticut Yankee personnel were performing exercises at an AFR ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan. |
|
| |
|
| AFR ISFSI facilities, located at sites where loading operations have been completed, are essentially passive operating facilities. The inspector's review was directed towards confirming the ongoing adequacy of the emergency preparedness program. | | AFR ISFSI facilities, located at sites where loading operations have been completed, are essentially passive operating facilities. The inspectors review was directed towards confirming the ongoing adequacy of the emergency preparedness program. |
|
| |
|
| The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and 2016 Biennial Exercise Plans. | | The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and 2016 Biennial Exercise Plans. |
|
| |
|
| b. Observations The inspector determined that Connecticut Yankee's plans and preparations for the 2016 Biennial Emergency Plan Exercise were effective at meeting the Emergency Plan | | b. Observations The inspector determined that Connecticut Yankees plans and preparations for the 2016 Biennial Emergency Plan Exercise were effective at meeting the Emergency Plan requirements. |
|
| |
|
| requirements.
| | Connecticut Yankees emergency preparedness program properly coordinated with the appropriate offsite support groups, agencies, and local law enforcement agencies. The licensee invited several off-site response organizations to participate in the exercise as participants or observers including the FBI and State of Connecticut. The emergency call list was current and is checked periodically for accuracy. All revisions to the emergency plan have been submitted to the NRC and reviewed by the Office of Nuclear Security and Incident Response. |
| | |
| Connecticut Yankee's emergency preparedness program properly coordinated with the appropriate offsite support groups, agencies, and local law enforcement agencies. The licensee invited several off-site response organizations to participate in the exercise as participants or observers including the FBI and State of Connecticut. The emergency call list was current and is checked periodically for accuracy. All revisions to the emergency plan have been submitted to the NRC and reviewed by the Office of Nuclear Security and Incident Response. | |
|
| |
|
| The licensee personnel assigned for incident detection properly recognized the event and initiated a timely response. The licensee had additional personnel on hand to handle the routine site monitoring while selected personnel were participating in the exercise. Onsite and offsite personnel were notified regarding the situation and status updates provided. Communication with the Connecticut State Police and fire and ambulance crews was constant throughout the exercises. Site security granted access to offsite emergency responders in a timely manner | | The licensee personnel assigned for incident detection properly recognized the event and initiated a timely response. The licensee had additional personnel on hand to handle the routine site monitoring while selected personnel were participating in the exercise. Onsite and offsite personnel were notified regarding the situation and status updates provided. Communication with the Connecticut State Police and fire and ambulance crews was constant throughout the exercises. Site security granted access to offsite emergency responders in a timely manner |
Line 72: |
Line 65: |
| ====c. Findings==== | | ====c. Findings==== |
| Based on the results of this inspection, no findings of significance were identified. | | Based on the results of this inspection, no findings of significance were identified. |
|
| |
| II. | | II. |
|
| |
|
Line 78: |
Line 70: |
| On October 27, 2016, the inspector presented the inspection results to Robert Mitchell, Connecticut Yankee ISFSI Manager, and other Connecticut Yankee personnel during the exercise debrief. | | On October 27, 2016, the inspector presented the inspection results to Robert Mitchell, Connecticut Yankee ISFSI Manager, and other Connecticut Yankee personnel during the exercise debrief. |
|
| |
|
| 2 Inspection Report No. 05000213/2016002
| | Inspection Report No. 05000213/2016002 |
|
| |
|
| =SUPPLEMENTAL INFORMATION= | | =SUPPLEMENTAL INFORMATION= |
|
| |
|
| PARTIAL LIST OF PERSONS CONTACTED | | PARTIAL LIST OF PERSONS CONTACTED |
| : [[contact::M. Arsenault]], ISFSI Manager | | : [[contact::M. Arsenault]], ISFSI Manager |
| : [[contact::J. Beauchemin]], Assistant Project Manager G4S | | : [[contact::J. Beauchemin]], Assistant Project Manager G4S |
| : [[contact::S. Day]], Licensing Engineer | | : [[contact::S. Day]], Licensing Engineer |
| : [[contact::F. DeBuono]], Maintenance Supervisor | | : [[contact::F. DeBuono]], Maintenance Supervisor |
| : [[contact::R. Desmarais]], ISFSI Technical Specialist | | : [[contact::R. Desmarais]], ISFSI Technical Specialist |
| : [[contact::S. Hemingway]], ISFSI Ops Specialist | | : [[contact::S. Hemingway]], ISFSI Ops Specialist |
| : [[contact::J. Lenois]], 3 Yankee Security Program Manager | | : [[contact::J. Lenois]], 3 Yankee Security Program Manager |
| : [[contact::A. Marino]], ISFSI Shift Supervisor | | : [[contact::A. Marino]], ISFSI Shift Supervisor |
| : [[contact::R. Mitchell]], ISFSI Manager | | : [[contact::R. Mitchell]], ISFSI Manager |
| : [[contact::S. Ostrowski]], Connecticut State Police Controller | | : [[contact::S. Ostrowski]], Connecticut State Police Controller |
| : [[contact::J. Williams]], IFSFI Shift Supervisor | | : [[contact::J. Williams]], IFSFI Shift Supervisor |
| : [[contact::J. Wilson]], ISFSI Shift Supervisor | | : [[contact::J. Wilson]], ISFSI Shift Supervisor |
| | |
| INSPECTION PROCEDURES USED | | INSPECTION PROCEDURES USED |
| 60858 Away-From-Reactor ISFSI Inspection Guidance | | 60858 Away-From-Reactor ISFSI Inspection Guidance |
| 88051 Evaluation of Exercises and Drills | | 88051 Evaluation of Exercises and Drills |
| ITEMS OPEN, CLOSED, AND DISCUSSED | | ITEMS OPEN, CLOSED, AND DISCUSSED |
| None LIST OF DOCUMENTS REVIEWED | | None |
| Connecticut Yankee Atomic Power Company, Haddam Neck ISFSI, Emergency Plan, Revision 13, 12/01/2015 | | LIST OF DOCUMENTS REVIEWED |
| | Connecticut Yankee Atomic Power Company, Haddam Neck ISFSI, Emergency Plan, |
| | Revision 13, 12/01/2015 |
| Emergency Plan Exercise Event Tracker 2016 | | Emergency Plan Exercise Event Tracker 2016 |
| 2016 Connecticut Yankee Biennial Emergency Plan Exercise | | 2016 Connecticut Yankee Biennial Emergency Plan Exercise |
| 2016 Connecticut Yankee Biennial Emergency Plan Exercise Phase 2 Fire/Medical | | 2016 Connecticut Yankee Biennial Emergency Plan Exercise Phase 2 Fire/Medical |
| | |
| LIST OF ACRONYMS USED | | LIST OF ACRONYMS USED |
| AFR Away-From-Reactor Connecticut Yankee Connecticut Yankee Atomic Power Company | | AFR Away-From-Reactor |
| ISFSI Independent Spent Fuel Storage Installation | | Connecticut Yankee Connecticut Yankee Atomic Power Company |
| | ISFSI Independent Spent Fuel Storage Installation |
| | Inspection Report No. 05000213/2016002 |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) IR 05000213/20180012018-05-31031 May 2018 NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2018001 and 05000213/2018001, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 07200039/20184012018-05-17017 May 2018 Connecticut Yankee Atomic Power Company Independent Spent Fuel Storage Security Inspection Report No. 07200039/2018401 - (Cover Letter Only) IR 05000213/20160022016-11-22022 November 2016 NRC Inspection Report No. 05000213/2016002 and 07200039/2016002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20160012016-05-18018 May 2016 IR 05000213-16-001 and 07200039-16-001 on 4/21/16, Connecticut Yankee Atomic Power Company, East Hampton, CT Site IR 07200039/20140012014-05-0606 May 2014 IR 07200039-14-001, on 04/17-18/14, Independent Spent Fuel Installation Inspection, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 07200039/20100012010-12-22022 December 2010 IR 07200039-10-001, on 11/29/10, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 05000213/20070012007-11-20020 November 2007 IR 05000213-07-001, on 04/23-26/07, 06/06-07/07, 07/17/07, 09/04/07, 10/29/07, 10/31/07, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut IR 05000213/20060032007-04-11011 April 2007 IR 05000213-06-003, on 10/01/2006 - 03/30/2007, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060022006-09-19019 September 2006 IR 05000213-06-002, on 06/26-29/2006, 07/24-28/2006, and 08/21-25/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060012006-07-14014 July 2006 IR 05000213-06-001, on 01/27/06 - 06/15/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050032006-02-0707 February 2006 IR 05000213-05-003; Connecticut Yankee Atomic Power Company; on 10/01/2006 - 01/26/2006; Connecticut Yankee Atomic Power Company IR 05000213/20050022005-11-10010 November 2005 IR 05000213-05-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050012005-08-0505 August 2005 IR 05000213-05-001, on 01/01/2005 - 03/31/2005, Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Office of Investigations Report No. 1-2004-032 and Notice of Violation IR 05000213/20040022005-02-0808 February 2005 IR 05000213-04-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site and Notice of Violation IR 05000213/20040012004-09-20020 September 2004 IR 05000213-04-001, on 02/07/04 to 06/08/04, Connecticut Yankee Atomic Power Company IR 05000213/20030012003-07-0303 July 2003 IR 05000213-03-001 on 02/18/03 - 06/11/03 for Haddam Neck, Regarding Dismantlement and Decommissioning of Facility ML0320401272003-06-24024 June 2003 Powerpoint Presentation at Yankee Rowe Connecticut Yankee Management Meeting with the NRC, June 23, 2003 IR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility IR 05000213/19960121999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl IR 05000213/19980061999-02-26026 February 1999 Insp Rept 50-213/98-06 on 981103-990118.Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility. Security Program Was Also Inspected IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19980041998-11-27027 November 1998 Forwards Special Insp Rept 50-213/98-04 of Licensee Performance During Reactor Coolant Sys Chemical Decontamination IR 05000213/19980031998-08-21021 August 1998 Insp Rept 50-213/98-03 on 980414-0803 & 13.Violations Noted. Major Areas Inspected:Operations,Maint,Sf Safety, Decommissioning Activities & Radiological Controls IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support IR 05000213/19970101998-02-0202 February 1998 Discusses Inspection Rept 50-213/97-10 & Forwards Worker Dose Assessment.Insp Rept Provides Analysis of Occupational Dose Assessment for Workers Involved in 961102 Airborne Radioactivity Event.No Exposures in Excess Identified IR 05000213/19970081998-01-29029 January 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-08 on 970703 & 0811-0919.Violation Involved Failure to Follow Radiation Protection Procedures IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support IR 05000213/19970031997-10-0909 October 1997 Insp Rept 50-213/97-03 on 970408-0707 & 0805.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000213/19970071997-08-18018 August 1997 Insp Rept 50-213/97-07 on 970715-30.No Violations Noted. Major Areas Inspected:Plant Support Area IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct IR 05000213/19970011997-07-31031 July 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-01 IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures IR 05000213/19950271997-05-12012 May 1997 Discusses Insp Repts 50-213/95-27,50-213/96-06,50-213/96-07, 50-213/96-08,50-213/96-11,50-213/96-80 & 50-213/96-201 on 951121-961122 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $650,000 IR 05000213/19960071997-04-0909 April 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/96-07 IR 05000245/19960121997-03-27027 March 1997 Informs That Info Will Be Withheld from Public Disclosure Per Licensee 970303 Request.Licensee Re Exam Rept 50-245/96-12,dtd 970207 Also Discussed IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation IR 05000213/19960111997-03-0707 March 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/96-11.Exam of Actions Will Be Done During Future Insp IR 05000213/19962011996-11-0505 November 1996 Ack Receipt of Requesting Schedule Change for pre-decisional EC Re Plant Insp Repts 50-213/96-201, 50-213/96-06,50-213/96-08.Originally Scheduled EC for 961018 Requested to Be Delayed Until Dec 1996 IR 05000213/19960101996-11-0505 November 1996 Insp Rept 50-213/96-10 on 960811-0920.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000213/19960801996-10-30030 October 1996 Insp Rept 50-213/96-80 on 960903-1002.Violation Noted. Major Areas Inspected:Operations,Maint,Engineering & Mgt Oversight & Controls IR 05000213/19960091996-10-10010 October 1996 NRC Operator Licensing Exam Rept 50-213/96-09 During Wk of 960819-24.Exam Results:Six RO & Six SRO Candidates Passed Written & Operating Exams IR 05000213/19960041996-09-18018 September 1996 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/96-04 2022-10-05
[Table view] Category:Letter
MONTHYEARML23342A0972024-01-0909 January 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2023-12-0404 December 2023 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI ML23124A2012023-04-20020 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2022 CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4922023-02-24024 February 2023 Closeout Letter to Connecticut Yankee Regarding 2018 and 2021 Updated DFPs for Haddam Neck Plant ISFSI CY-23-003, Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage CY-23-004, Independent Spent Fuel Storage Installation, Property Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Property Insurance Coverage CY-23-001, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments CY-23-002, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-010, Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager2022-05-25025 May 2022 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager CY-22-006, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20212022-04-25025 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2021 CY-22-003, and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22011A1352022-01-31031 January 2022 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-22-002, Independent Spent Fuel Storage Installation - Property Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-22-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-011, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2021-12-0101 December 2021 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-21-013, Biennial Update to the Haddam Neck Plant License Termination Plan2021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant License Termination Plan ML22075A2382021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant Updated Final Safety Analysis Report CY-21-014, Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration2021-11-18018 November 2021 Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 ML21144A2512021-04-13013 April 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2020 CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-21-003, Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage CY-21-004, Independent Spent Fuel Storage Installation - Property Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21012A3192021-01-13013 January 2021 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) ML20150A3352020-06-19019 June 2020 COVID-19 Exemption for Haddam Neck CY-20-011, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement2020-05-14014 May 2020 Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement ML20143A0972020-04-16016 April 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2019 CY-20-007, Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager2020-03-31031 March 2020 Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-20-002, Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 20202020-01-22022 January 2020 Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 2020 ML20015A5262020-01-15015 January 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML19269C4642019-10-11011 October 2019 Letter to B. Mitchell Exemption from 10 CFR 72.212 and 72.214 for Dry Spent Fuel Storage Activities - Haddam Neck Plant Independent Spent Fuel Storage Installation CY-19-014, Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return2019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return CY-19-012, Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report2019-04-23023 April 2019 Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report ML19070A0332019-02-20020 February 2019 Letter to C. Pizzella Nuclear Regulatory Commission'S Analysis of Connecticut Yankee Atomic Power Company'S Initial and Updated Decommissioning Funding Plans for the Haddam Neck Plant Independent Spent Fuel Storage Installation CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000213/20180012018-05-31031 May 2018 NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2018001 and 05000213/2018001, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 07200039/20184012018-05-17017 May 2018 Connecticut Yankee Atomic Power Company Independent Spent Fuel Storage Security Inspection Report No. 07200039/2018401 - (Cover Letter Only) CY-18-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-18-005, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-17-021, Independent Spent Fuel Storage Installation Formal Announcement of Change in HNP ISFSI Manager2017-09-0505 September 2017 Independent Spent Fuel Storage Installation Formal Announcement of Change in HNP ISFSI Manager 2024-01-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ber 22, 2016
SUBJECT:
NRC INSPECTION REPORT NO. 05000213/2016002 AND 07200039/2016002, CONNECTICUT YANKEE ATOMIC POWER COMPANY, EAST HAMPTON, CONNECTICUT SITE
Dear Mr. Mitchell:
On August 3 and October 27, 2016, John Nicholson of this office conducted a safety inspection at the above address of activities authorized by the above listed NRC license. The inspection was limited to an observation of emergency exercises. The inspection consisted of observations by the inspector, interviews with personnel, and a review of plans and procedures.
The findings of the inspection were discussed with you at the conclusion of the inspection. The enclosed report presents the results of this inspection.
Within the scope of this inspection, no violations were identified.
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact John Nicholson at 610-337-5236 if you have any questions regarding this matter.
Sincerely,
/RA/
Raymond J. Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety Enclosure:
Inspection Report No. 05000213/2016002 and 07200039/2016002 cc: Jeffery Semancik, Director/State Liaison Officer, State of Connecticut
EXECUTIVE SUMMARY
Connecticut Yankee Atomic Power Company
NRC Inspection Report No. 05000213/2016002 and 07200039/2016002 An announced safety inspection was conducted on August 3 and October 27, 2016, at the Connecticut Yankee Atomic Power Company (Connecticut Yankee) Independent Spent Fuel Storage Installation (ISFSI). The inspector assessed whether Connecticut Yankee personnel were conducting an exercise every two years at an away-from-reactor (AFR) ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan. The inspectors review was directed toward confirming the adequacy of the exercises, emergency preparedness, and training. The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and the 2016 Biennial Exercise Plans.
Based on the results of this inspection, no findings of significance were identified.
ii Inspection Report No. 05000213/2016002
REPORT DETAILS
I. Organization and Scope of the Program
a. Inspection Scope
The inspector assessed whether Connecticut Yankee personnel were performing exercises at an AFR ISFSI in conformance with the commitments and requirements contained in the Connecticut Yankee Emergency Plan.
AFR ISFSI facilities, located at sites where loading operations have been completed, are essentially passive operating facilities. The inspectors review was directed towards confirming the ongoing adequacy of the emergency preparedness program.
The inspector observed the exercises, interviewed personnel, and reviewed the Emergency and 2016 Biennial Exercise Plans.
b. Observations The inspector determined that Connecticut Yankees plans and preparations for the 2016 Biennial Emergency Plan Exercise were effective at meeting the Emergency Plan requirements.
Connecticut Yankees emergency preparedness program properly coordinated with the appropriate offsite support groups, agencies, and local law enforcement agencies. The licensee invited several off-site response organizations to participate in the exercise as participants or observers including the FBI and State of Connecticut. The emergency call list was current and is checked periodically for accuracy. All revisions to the emergency plan have been submitted to the NRC and reviewed by the Office of Nuclear Security and Incident Response.
The licensee personnel assigned for incident detection properly recognized the event and initiated a timely response. The licensee had additional personnel on hand to handle the routine site monitoring while selected personnel were participating in the exercise. Onsite and offsite personnel were notified regarding the situation and status updates provided. Communication with the Connecticut State Police and fire and ambulance crews was constant throughout the exercises. Site security granted access to offsite emergency responders in a timely manner
c. Findings
Based on the results of this inspection, no findings of significance were identified.
II.
Exit Meeting Summary
On October 27, 2016, the inspector presented the inspection results to Robert Mitchell, Connecticut Yankee ISFSI Manager, and other Connecticut Yankee personnel during the exercise debrief.
Inspection Report No. 05000213/2016002
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
- M. Arsenault, ISFSI Manager
- J. Beauchemin, Assistant Project Manager G4S
- S. Day, Licensing Engineer
- F. DeBuono, Maintenance Supervisor
- R. Desmarais, ISFSI Technical Specialist
- S. Hemingway, ISFSI Ops Specialist
- J. Lenois, 3 Yankee Security Program Manager
- A. Marino, ISFSI Shift Supervisor
- R. Mitchell, ISFSI Manager
- S. Ostrowski, Connecticut State Police Controller
- J. Williams, IFSFI Shift Supervisor
- J. Wilson, ISFSI Shift Supervisor
INSPECTION PROCEDURES USED
60858 Away-From-Reactor ISFSI Inspection Guidance
88051 Evaluation of Exercises and Drills
ITEMS OPEN, CLOSED, AND DISCUSSED
None
LIST OF DOCUMENTS REVIEWED
Connecticut Yankee Atomic Power Company, Haddam Neck ISFSI, Emergency Plan,
Revision 13, 12/01/2015
Emergency Plan Exercise Event Tracker 2016
2016 Connecticut Yankee Biennial Emergency Plan Exercise
2016 Connecticut Yankee Biennial Emergency Plan Exercise Phase 2 Fire/Medical
LIST OF ACRONYMS USED
AFR Away-From-Reactor
Connecticut Yankee Connecticut Yankee Atomic Power Company
ISFSI Independent Spent Fuel Storage Installation
Inspection Report No. 05000213/2016002