IR 05000440/2015406: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/16/2015
| issue date = 11/16/2015
| title = IR 05000440/2015406; on 10/19/2015 - 10/20/2015; Perry Nuclear Power Plant, Unit 1; Routine Security Baseline Inspection. - Cover Letter Only
| title = IR 05000440/2015406; on 10/19/2015 - 10/20/2015; Perry Nuclear Power Plant, Unit 1; Routine Security Baseline Inspection. - Cover Letter Only
| author name = Orth S K
| author name = Orth S
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Harkness E
| addressee name = Harkness E
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 16, 2015
-4352 November 16, 2015 Mr. Ernest Harkness Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A
 
-PY-A 290 Perry, OH 44081
==SUBJECT:==
-0097 SUBJECT: PERRY NUCLEAR POWER PLANT, UNIT 1  
PERRY NUCLEAR POWER PLANT, UNIT 1 - NRC SECURITY BASELINE INSPECTION REPORT 05000440/2015406
- NRC SECURITY BASELINE INSPECTION REPORT 05000440/2015406


==Dear Mr. Harkness:==
==Dear Mr. Harkness:==
On October 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Perry Nuclear Power Plant, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection reports documents the inspection results which were discussed on October 20, 2015, with you and other members of your staff.
On October 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Perry Nuclear Power Plant, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection reports documents the inspection results which were discussed on October 20, 2015, with you and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector s reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings were identified during this inspection
No findings were identified during this inspection.
. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


However, the material enclosed herewith contains Security
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-Related Information in accordance wit h 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you choose to provide a response and Security
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
-Related Information
- Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Should you have any questions concerning this inspection, we will be pleased to discuss the m with you.
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.


Sincerely,
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -
/RA/ Steven K. Orth
Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)
, Branch Chief Plant Support Branch
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Division of Reactor Safety Docket No.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


50-440 License No. NPF
Sincerely,
-58 Nonpublic Enclosure:
/RA/
Steven K. Orth, Branch Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Nonpublic Enclosure:
Inspection Report 05000440/2015406 w/Attachment: Supplemental Information cc w/encl: M. Bear, Radiological Branch Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV
Inspection Report 05000440/2015406 w/Attachment: Supplemental Information cc w/encl: M. Bear, Radiological Branch Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV
}}
}}

Latest revision as of 04:24, 31 October 2019

IR 05000440/2015406; on 10/19/2015 - 10/20/2015; Perry Nuclear Power Plant, Unit 1; Routine Security Baseline Inspection. - Cover Letter Only
ML15320A365
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/16/2015
From: Steven Orth
Plant Support Branch II
To: Harkness E
FirstEnergy Nuclear Operating Co
References
IR 2015406
Download: ML15320A365 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 16, 2015

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 - NRC SECURITY BASELINE INSPECTION REPORT 05000440/2015406

Dear Mr. Harkness:

On October 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Perry Nuclear Power Plant, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection reports documents the inspection results which were discussed on October 20, 2015, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -

Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven K. Orth, Branch Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Nonpublic Enclosure:

Inspection Report 05000440/2015406 w/Attachment: Supplemental Information cc w/encl: M. Bear, Radiological Branch Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV