|
|
(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 01/24/2017 | | | issue date = 01/24/2017 |
| | title = U.S. Nuclear Regulatory Commission Emergency Preparedness Annual Inspection Report 05000325/2016501 and 05000324/2016501 | | | title = U.S. Nuclear Regulatory Commission Emergency Preparedness Annual Inspection Report 05000325/2016501 and 05000324/2016501 |
| | author name = Bonser B R | | | author name = Bonser B |
| | author affiliation = NRC/RGN-II/DRS/PSB1 | | | author affiliation = NRC/RGN-II/DRS/PSB1 |
| | addressee name = Gideon W R | | | addressee name = Gideon W |
| | addressee affiliation = Duke Energy Progress, LLC | | | addressee affiliation = Duke Energy Progress, LLC |
| | docket = 05000324, 05000325 | | | docket = 05000324, 05000325 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 24, 2017 Mr. William Site Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461 SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000325/2016501 AND 05000324/2016501 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ary 24, 2017 |
| | |
| | ==SUBJECT:== |
| | BRUNSWICK STEAM ELECTRIC PLANT - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000325/2016501 AND 05000324/2016501 |
|
| |
|
| ==Dear Mr. Gideon:== | | ==Dear Mr. Gideon:== |
| On December 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Brunswick Steam Electric Plant. This inspection began on January 1, 2016. Issuance of this letter closes Inspection Report Number 2016501. Inspection activities charged to these reports include conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, in some cases, performing traditional enforcement activities. Any observations and findings in these areas were provided to you via separate correspondence. | | On December 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Brunswick Steam Electric Plant. This inspection began on January 1, 2016. Issuance of this letter closes Inspection Report Number 2016501. Inspection activities charged to these reports include conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, in some cases, performing traditional enforcement activities. |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC "Agency Rules of Practice and Procedure," a copy of this letter, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | Any observations and findings in these areas were provided to you via separate correspondence. |
| | |
| | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC Agency Rules of Practice and Procedure, a copy of this letter, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA: Wade T. Loo for/ | | /RA: Wade T. Loo for/ |
| Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62 cc: Distribution via Listserv | | Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62 cc: Distribution via Listserv |
| | |
| SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRP/BR4 RII:DRS/PSB1 SIGNATURE CAF2 FOR SPS SDR2 WTL FOR BRB1 NAME S. Sanchez S. Rose B. Bonser DATE 1/23/2017 1/24/2017 1/24/2017 E-MAIL COPY YES NO YES NO YES NO Letter to William from Brian R. Bonser dated January 24, 2017 SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000325/2016501 AND 05000324/2016501 DISTRIBUTION
| |
| : S. Rose, RII, DRP J. Dodson, RII, SR PE D. Jackson, RII, PE M. Catts, RII, SRI
| |
|
| |
|
| M. Schwieg, RII, RI S. Price, RII, ORA/RC
| | SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRP/BR4 RII:DRS/PSB1 SIGNATURE CAF2 FOR SPS SDR2 WTL FOR BRB1 NAME S. Sanchez S. Rose B. Bonser DATE 1/23/2017 1/24/2017 1/24/2017 E-MAIL COPY YES NO YES NO YES NO |
|
| |
|
| K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC | | Letter to William from Brian R. Bonser dated January 24, 2017 SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000325/2016501 AND 05000324/2016501 DISTRIBUTION: |
| | S. Rose, RII, DRP J. Dodson, RII, SR PE D. Jackson, RII, PE M. Catts, RII, SRI M. Schwieg, RII, RI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 ML24297A6262024-10-11011 October 2024 PCA Letter to NRC Brunswick Potential Tropical Storm Eight IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 05000325/LER-2024-001, Primary Containment Penetration Local Leak Rate Testing Failure2024-04-10010 April 2024 Primary Containment Penetration Local Leak Rate Testing Failure 05000325/LER-2024-002, Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization2024-04-10010 April 2024 Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization IR 05000324/20243012024-04-0303 April 2024 NRC Operator License Examination Report 05000325/2024301 and 05000324/2024301 ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 2024-09-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ary 24, 2017
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000325/2016501 AND 05000324/2016501
Dear Mr. Gideon:
On December 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Brunswick Steam Electric Plant. This inspection began on January 1, 2016. Issuance of this letter closes Inspection Report Number 2016501. Inspection activities charged to these reports include conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, in some cases, performing traditional enforcement activities.
Any observations and findings in these areas were provided to you via separate correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC Agency Rules of Practice and Procedure, a copy of this letter, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA: Wade T. Loo for/
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62 cc: Distribution via Listserv
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRP/BR4 RII:DRS/PSB1 SIGNATURE CAF2 FOR SPS SDR2 WTL FOR BRB1 NAME S. Sanchez S. Rose B. Bonser DATE 1/23/2017 1/24/2017 1/24/2017 E-MAIL COPY YES NO YES NO YES NO
Letter to William from Brian R. Bonser dated January 24, 2017 SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000325/2016501 AND 05000324/2016501 DISTRIBUTION:
S. Rose, RII, DRP J. Dodson, RII, SR PE D. Jackson, RII, PE M. Catts, RII, SRI M. Schwieg, RII, RI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC