Line 3: Line 3:
| issue date = 06/13/2013
| issue date = 06/13/2013
| title = Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Clinton Power Station
| title = Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Clinton Power Station
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DRP/B1
| author affiliation = NRC/RGN-III/DRP/B1
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000461
| docket = 05000461
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 13, 2013  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 13, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
 
Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear  
 
4300 Winfield Road  
 
Warrenville, IL 60555  


==SUBJECT:==
==SUBJECT:==
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT CLINTON POWER STATION  
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT CLINTON POWER STATION


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==


This letter is to request information to support our biennial PI&R inspection beginning August 12, 2013, at the Clinton Power Station. This inspection will be performed in accordance  
This letter is to request information to support our biennial PI&R inspection beginning August 12, 2013, at the Clinton Power Station. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Baseline Inspection Procedure 71152.
 
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.
with the U.S. Nuclear Regulatory Commission (NRC) Baseline Inspection Procedure 71152.  
The documents requested are copies of performance reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The documents should be ready for NRC review by July 29, 2013. Mr. Lucas Haeg, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.
 
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Haeg at (319) 851-5121 or Lucas.Haeg@nrc.gov.
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.  
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.
 
The documents requested are copies of performance reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The documents should be ready for NRC review by July 29, 2013. Mr. Lucas Haeg, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.  
 
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Haeg at (319) 851-5121 or Lucas.Haeg@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
M. Pacilio   
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,  /RA/  Christine Lipa, Chief Branch 1 Division of Reactor Projects


Docket No. 50-461 License No. NPF-62  
M. Pacilio                                    In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                              /RA/
Christine Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62


==Enclosure:==
==Enclosure:==


Requested Information to Support PI&R Inspection  
Requested Information to Support PI&R Inspection cc w/encl: Distribution via ListServTM


cc w/encl:  Distribution via ListServ TM 1 Enclosure Requested Information for a Problem Identification and Resolution (PI&R) Inspection Please provide the information on a compact disc (one for each team member), if possible. Unless otherwise specified, the time frame for requested information is two years. 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to: 1) corrective action process; 2) operating experience program; 3) employee concerns program; 4) self-assessment program; 5) maintenance rule program and implementing procedures; 6) operability determination process; 7) Degraded/non-conforming condition process (e.g., RIS 2005-20); 8) System Health process or equivalent equipment reliability improvement programs; 9) Operational Decision Making (ODMI) process.
Requested Information for a Problem Identification and Resolution (PI&R) Inspection Please provide the information on a compact disc (one for each team member), if possible. Unless otherwise specified, the time frame for requested information is two years.
: 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to: 1) corrective action process; 2) operating experience program; 3) employee concerns program; 4) self-assessment program; 5) maintenance rule program and implementing procedures; 6) operability determination process; 7) Degraded/non-conforming condition process (e.g., RIS 2005-20); 8) System Health process or equivalent equipment reliability improvement programs; 9) Operational Decision Making (ODMI) process.
: 2. A listing of the top 10 risk-significant systems, components, and operator manual actions.
: 2. A listing of the top 10 risk-significant systems, components, and operator manual actions.
: 3. Scheduled date/time/location of all meetings associated with implementation of the corrective action program, such as Action report (AR) screening meetings, corrective action review board meetings, etc.
: 3. Scheduled date/time/location of all meetings associated with implementation of the corrective action program, such as Action report (AR) screening meetings, corrective action review board meetings, etc.
Line 60: Line 50:
: 10. All assessments or evaluations (internal or external) regarding station or department safety-culture. This should include minutes from any departmental or station safety-culture meetings.
: 10. All assessments or evaluations (internal or external) regarding station or department safety-culture. This should include minutes from any departmental or station safety-culture meetings.
: 11. A list of all operability determinations and ODMIs performed since August 2011, with the following information: date initiated, initiating AR and status (open or closed).
: 11. A list of all operability determinations and ODMIs performed since August 2011, with the following information: date initiated, initiating AR and status (open or closed).
: 12. A copy of all root, apparent, and common cause evaluations performed since August 2011.  
: 12. A copy of all root, apparent, and common cause evaluations performed since August 2011.
 
1                                      Enclosure
2 Enclosure
: 13. A list of maintenance preventable functional failures (MPFFs) of risk-significant systems (include actions completed and current status). A list of current Maintenance Rule a(1) systems and a list of those systems that entered a(1) within the last two years, but which were returned to a(2) status. Include a copy of the current system health report for those systems now in a(1).
: 13. A list of maintenance preventable functional failures (MPFFs) of risk-significant systems (include actions completed and current status). A list of current Maintenance Rule a(1) systems and a list of those systems that entered a(1) within the last two years, but which were returned to a(2) status. Include a copy of the current system health report for those systems now in a(1).
: 14. Copy of the latest corrective action program statistics such as the number initiated by department, human performance errors by department, backlog, corrective action timeliness and others as may be available.
: 14. Copy of the latest corrective action program statistics such as the number initiated by department, human performance errors by department, backlog, corrective action timeliness and others as may be available.
Line 74: Line 63:
: 22. A list of the current engineering backlog. Include the date initiated, a brief description, and priority of each item.
: 22. A list of the current engineering backlog. Include the date initiated, a brief description, and priority of each item.
: 23. A list of the procedural change request backlog. Include the date initiated, a brief description, and priority of each item.
: 23. A list of the procedural change request backlog. Include the date initiated, a brief description, and priority of each item.
Documents requested to be available as printed copies on-site during the inspection
Documents requested to be available as printed copies on-site during the inspection:
: a. Updated Final Safety Analysis Report.
: a. Updated Final Safety Analysis Report.
: b. Technical Specifications.
: b. Technical Specifications.
: c. The QA manual.
: c. The QA manual.
: d. A list of issues brought to the ECP/Ombudsman and the actions taken for resolution. e. The latest organization chart and phone listing. f. Self-assessments and associated condition reports generated in preparation for this inspection.
: d. A list of issues brought to the ECP/Ombudsman and the actions taken for resolution.
M. Pacilio   
: e. The latest organization chart and phone listing.
 
: f. Self-assessments and associated condition reports generated in preparation for this inspection.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
2                                       Enclosure
Sincerely,  /RA/  Christine Lipa, Chief Branch 1 Division of Reactor Projects


Docket No. 50-461 License No. NPF-62  
M. Pacilio                                                                In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                                          /RA/
Christine Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62


==Enclosure:==
==Enclosure:==


Requested Information to Support PI&R Inspection  
Requested Information to Support PI&R Inspection cc w/encl: Distribution via ListServTM DISTRIBUTION:
 
See next page DOCUMENT NAME: Clinton 2013 PIR Letter Publicly Available                           Non-Publicly Available                             Sensitive                   Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                               RIII NAME               LHaeg:rj CLipa for                 CLipa DATE               06/13/13                           06/13/13 OFFICIAL RECORD COPY
cc w/encl: Distribution via ListServ TM  DISTRIBUTION
: See next page  
 
DOCUMENT NAME: Clinton 2013 PIR Letter   Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII   RIII       NAME LHaeg:rj CLipa for CLipa     DATE 06/13/13 06/13/13 OFFICIAL RECORD COPY  


Letter to M. Pacilio from C. Lipa dated June 13, 3013  
Letter to M. Pacilio from C. Lipa dated June 13, 3013


==SUBJECT:==
==SUBJECT:==
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT CLINTON POWER STATION  
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT CLINTON POWER STATION DISTRIBUTION:
 
Doug Huyck RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPreports Resource}}
DISTRIBUTION:
Doug Huyck RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource  
 
RidsNrrDirsIrib Resource  
 
Chuck Casto Cynthia Pederson Steven Orth Allan Barker  
 
Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPreports Resource}}

Latest revision as of 17:57, 4 November 2019

Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Clinton Power Station
ML13165A095
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/13/2013
From: Christine Lipa
NRC/RGN-III/DRP/B1
To: Pacilio M
Exelon Generation Co
References
Download: ML13165A095 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 13, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT CLINTON POWER STATION

Dear Mr. Pacilio:

This letter is to request information to support our biennial PI&R inspection beginning August 12, 2013, at the Clinton Power Station. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Baseline Inspection Procedure 71152.

Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.

The documents requested are copies of performance reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The documents should be ready for NRC review by July 29, 2013. Mr. Lucas Haeg, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.

If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Haeg at (319) 851-5121 or Lucas.Haeg@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

M. Pacilio In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Christine Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl: Distribution via ListServTM

Requested Information for a Problem Identification and Resolution (PI&R) Inspection Please provide the information on a compact disc (one for each team member), if possible. Unless otherwise specified, the time frame for requested information is two years.

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to: 1) corrective action process; 2) operating experience program; 3) employee concerns program; 4) self-assessment program; 5) maintenance rule program and implementing procedures; 6) operability determination process; 7) Degraded/non-conforming condition process (e.g., RIS 2005-20); 8) System Health process or equivalent equipment reliability improvement programs; 9) Operational Decision Making (ODMI) process.
2. A listing of the top 10 risk-significant systems, components, and operator manual actions.
3. Scheduled date/time/location of all meetings associated with implementation of the corrective action program, such as Action report (AR) screening meetings, corrective action review board meetings, etc.
4. List of all ARs generated sorted by priority, with the following information: number; priority; title; date initiated; and status (open or closed). The ARs should be grouped by the initiating department (operations, maintenance, engineering, radiation protection, emergency preparedness, and security).
5. Listing of the total number of ARs generated annually, sorted by the above departments.
6. A list of ARs generated as a result of identified trends. The list should be sorted by priority and have the following information: number, title, date initiated, status and initiating department.
7. A list of outstanding corrective actions, sorted by priority, with a brief description, initiating date and due date. Please also identify and list any associated due date extensions.
8. List of control room deficiencies and operator work-arounds, sorted by priority, with a brief description and corresponding AR and/or work order number.
9. A chronological list and copy of all nuclear quality assurance audits and department/station self-assessments. This should include copies of the Station and Departmental Performance Improvement Integrated Matrix reports for 2012 and 2013 if available.
10. All assessments or evaluations (internal or external) regarding station or department safety-culture. This should include minutes from any departmental or station safety-culture meetings.
11. A list of all operability determinations and ODMIs performed since August 2011, with the following information: date initiated, initiating AR and status (open or closed).
12. A copy of all root, apparent, and common cause evaluations performed since August 2011.

1 Enclosure

13. A list of maintenance preventable functional failures (MPFFs) of risk-significant systems (include actions completed and current status). A list of current Maintenance Rule a(1) systems and a list of those systems that entered a(1) within the last two years, but which were returned to a(2) status. Include a copy of the current system health report for those systems now in a(1).
14. Copy of the latest corrective action program statistics such as the number initiated by department, human performance errors by department, backlog, corrective action timeliness and others as may be available.
15. Any performance indicators associated with backlog of corrective maintenance items.
16. List of industry operating experience evaluated by the site. Additionally, list of all NRC generic communications (information notices, generic letters, etc.) evaluated by the site for applicability to the station regardless of the determination of applicability.
17. A list of condition reports issued since August 2011 where the NRC was the identifying organization. This list should include non-cited and minor violations, and findings, regardless of whether there was an associated violation. Please provide the AR number, title, date initiated and status.
18. A chronological list of all Licensee Event Reports generated since August 2011, with a brief description of the affected components or systems.
19. A chronological list of ARs, system audits, 50.59 screenings or evaluations, operability evaluations and ODMIs, maintenance rule, root or apparent cause evaluations, and permanent or temporary modifications associated with the Essential Service Water System (SX) since August 2008. Please indicate the status of the associated documents (i.e., open or closed) in the listing.
20. A list of open temporary modifications.
21. A list of the current maintenance backlog. Include the date initiated, a brief description, and a priority for each item sorted by system.
22. A list of the current engineering backlog. Include the date initiated, a brief description, and priority of each item.
23. A list of the procedural change request backlog. Include the date initiated, a brief description, and priority of each item.

Documents requested to be available as printed copies on-site during the inspection:

a. Updated Final Safety Analysis Report.
b. Technical Specifications.
c. The QA manual.
d. A list of issues brought to the ECP/Ombudsman and the actions taken for resolution.
e. The latest organization chart and phone listing.
f. Self-assessments and associated condition reports generated in preparation for this inspection.

2 Enclosure

M. Pacilio In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Christine Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl: Distribution via ListServTM DISTRIBUTION:

See next page DOCUMENT NAME: Clinton 2013 PIR Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME LHaeg:rj CLipa for CLipa DATE 06/13/13 06/13/13 OFFICIAL RECORD COPY

Letter to M. Pacilio from C. Lipa dated June 13, 3013

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT CLINTON POWER STATION DISTRIBUTION:

Doug Huyck RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPreports Resource