ML14024A607: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
| author name = Flake S | | author name = Flake S | ||
| author affiliation = Sacramento Municipal Utility District (SMUD) | | author affiliation = Sacramento Municipal Utility District (SMUD) | ||
| addressee name = Allen W | | addressee name = Allen W, Hickman J | ||
| addressee affiliation = NRC/Document Control Desk, NRC/FSME, NRC/NMSS, NRC/NRR | | addressee affiliation = NRC/Document Control Desk, NRC/FSME, NRC/NMSS, NRC/NRR | ||
| docket = 05000312, 07200011 | | docket = 05000312, 07200011 | ||
Line 13: | Line 13: | ||
| document type = Letter | | document type = Letter | ||
| page count = 2 | | page count = 2 | ||
| project = | |||
| stage = Response to RAI | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Powering forward. Together.-DPG 14-006 Page 1 of 2*SMUD.m DPG 14-006 January 13, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 Docket No. 72-11 Rancho Seco Spent Fuel Storage Installation License No. SNM-2510 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION ON DECOMMISSIONING FUNDING STATUS Attention: | {{#Wiki_filter:Powering forward. Together. | ||
John Hickman Attention: | - DPG 14-006 Page 1 of 2 | ||
William Allen The Sacramento Municipal Utility District (SMUD) is providing the information in this correspondence in response to the Nuclear Regulatory Commission's (NRC) request for additional information (RAI) as received in correspondence dated December 16, 2013.A summary of each RAI is included below, along with SMUD's response.RAI # 1 Decommissioning Costs NRC Request: Provide the difference between actual and estimated costs for decommissioning work performed during the previous year.SMUD Response: | *SMUD. m DPG 14-006 January 13, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 Docket No. 72-11 Rancho Seco Spent Fuel Storage Installation License No. SNM-2510 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION ON DECOMMISSIONING FUNDING STATUS Attention: John Hickman Attention: William Allen The Sacramento Municipal Utility District (SMUD) is providing the information in this correspondence in response to the Nuclear Regulatory Commission's (NRC) request for additional information (RAI) as received in correspondence dated December 16, 2013. | ||
SMUD's remaining facilities licensed under 10 CFR 50 are currently in a mode similar to SAFSTOR, in which the facilities are being safely maintained but no active decommissioning work is taking place. The estimated and actual costs for 2012 maintenance activities are provided below.Estimated Cost of Decommissioning Activities for 2012: $150,000 Actual Cost of Decommissioning Activities for 2012: $82,950 Difference in Actual vs. Estimated Costs for 2012: ($67,050)Rancho Seco Nuclear Generating Station 114440 Twin Cities Road I Herald, CA 95638-9799 I 1.209.333.2935 I smud.org W IPY°d | A summary of each RAI is included below, along with SMUD's response. | ||
RAI # 1 Decommissioning Costs NRC Request: Provide the difference between actual and estimated costs for decommissioning work performed during the previous year. | |||
On December 6, 2012, the SMUD Board of Directors approved annual funding in the amount of $4,699,627 for management of irradiated fuel for 2013.SMUD approved these funds through the annual budgeting process. Therefore, at the end of 2012 SMUD had committed and accumulated | SMUD Response: SMUD's remaining facilities licensed under 10 CFR 50 are currently in a mode similar to SAFSTOR, in which the facilities are being safely maintained but no active decommissioning work is taking place. The estimated and actual costs for 2012 maintenance activities are provided below. | ||
$4,699,627 for the management of irradiated fuel for 2013.If you or members of your staff have questions or require additional information, please contact Einar Ronningen by email at einar.ronninqen(Dsmud.orq or by phone at (916)732-4817.Sincerely, Scott Flake Director, Power Generation and Project Development}} | Estimated Cost of Decommissioning Activities for 2012: $150,000 Actual Cost of Decommissioning Activities for 2012: $82,950 Difference in Actual vs. Estimated Costs for 2012: ($67,050) | ||
Rancho Seco Nuclear Generating Station 114440 Twin Cities Road I Herald, CA 95638-9799 I 1.209.333.2935 I smud.org W IPY°d | |||
DPG 14-006 Page 2 of 2 RAI # 2 Managing Irradiated Fuel NRC Request: Provide the total amount of dollars accumulated at the end of the appropriate year designated for managing irradiated fuel. | |||
SMUD Response: On December 6, 2012, the SMUD Board of Directors approved annual funding in the amount of $4,699,627 for management of irradiated fuel for 2013. | |||
SMUD approved these funds through the annual budgeting process. Therefore, at the end of 2012 SMUD had committed and accumulated $4,699,627 for the management of irradiated fuel for 2013. | |||
If you or members of your staff have questions or require additional information, please contact Einar Ronningen by email at einar.ronninqen(Dsmud.orq or by phone at (916) 732-4817. | |||
Sincerely, Scott Flake Director, Power Generation and Project Development}} |
Latest revision as of 22:48, 5 February 2020
ML14024A607 | |
Person / Time | |
---|---|
Site: | Rancho Seco, 07200011 |
Issue date: | 01/13/2014 |
From: | Flake S Sacramento Municipal Utility District (SMUD) |
To: | William Allen, John Hickman Document Control Desk, NRC/FSME, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
References | |
DPG 14-006 | |
Download: ML14024A607 (2) | |
Text
Powering forward. Together.
- DPG 14-006 Page 1 of 2
- SMUD. m DPG 14-006 January 13, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 Docket No. 72-11 Rancho Seco Spent Fuel Storage Installation License No. SNM-2510 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION ON DECOMMISSIONING FUNDING STATUS Attention: John Hickman Attention: William Allen The Sacramento Municipal Utility District (SMUD) is providing the information in this correspondence in response to the Nuclear Regulatory Commission's (NRC) request for additional information (RAI) as received in correspondence dated December 16, 2013.
A summary of each RAI is included below, along with SMUD's response.
RAI # 1 Decommissioning Costs NRC Request: Provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
SMUD Response: SMUD's remaining facilities licensed under 10 CFR 50 are currently in a mode similar to SAFSTOR, in which the facilities are being safely maintained but no active decommissioning work is taking place. The estimated and actual costs for 2012 maintenance activities are provided below.
Estimated Cost of Decommissioning Activities for 2012: $150,000 Actual Cost of Decommissioning Activities for 2012: $82,950 Difference in Actual vs. Estimated Costs for 2012: ($67,050)
Rancho Seco Nuclear Generating Station 114440 Twin Cities Road I Herald, CA 95638-9799 I 1.209.333.2935 I smud.org W IPY°d
DPG 14-006 Page 2 of 2 RAI # 2 Managing Irradiated Fuel NRC Request: Provide the total amount of dollars accumulated at the end of the appropriate year designated for managing irradiated fuel.
SMUD Response: On December 6, 2012, the SMUD Board of Directors approved annual funding in the amount of $4,699,627 for management of irradiated fuel for 2013.
SMUD approved these funds through the annual budgeting process. Therefore, at the end of 2012 SMUD had committed and accumulated $4,699,627 for the management of irradiated fuel for 2013.
If you or members of your staff have questions or require additional information, please contact Einar Ronningen by email at einar.ronninqen(Dsmud.orq or by phone at (916) 732-4817.
Sincerely, Scott Flake Director, Power Generation and Project Development