ML17087A091: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/01/2017 | | issue date = 03/01/2017 | ||
| title = Unit - Final Outlines (Folder 3) | | title = Unit - Final Outlines (Folder 3) | ||
| author name = Silk D | | author name = Silk D | ||
| author affiliation = NRC/RGN-I/DRS/OB | | author affiliation = NRC/RGN-I/DRS/OB | ||
| addressee name = | | addressee name = | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 Facility: | {{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 Facility: Millstone Unit 2 Date of Examination: 02/28/2017 Examination Level: RO jZJ SRO D Operating Test Number: ES1 ?LI . | ||
Millstone Unit 2 Date of Examination: | Administrative Topic (see Note) Type Describe activity to be performed Code* | ||
02/28/2017 Examination Level: RO jZJ SRO D Operating Test Number: ES1 ?LI . Administrative Topic (see Note) Type Describe activity to be performed Code* | KlA 2.1. 7 Ability to evaluate plant performance and make operational judgments based on A 1 .1-RO Conduct of Operations R, D operating characteristics, reactor behavior, and instrument interpretation. (RO 4.4) | ||
KIA 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (RO 3.5) A3-RO Radiation Control R,M For the task of venting a CTMT Spray pump, determine RWP clothing requirements, maximum dose and contamination levels in the area and adjacent to the valves being manipulated. | Evaluate an RCP Seal Failure KIA 2.1.37 Knowledge of procedures, guidelines, or limitations associated with A 1 .2-RO Conduct of Operations R,M reactivity management. (RO 4.3) | ||
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items). *Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (:s; 3 for ROs;::; 4 for SROs & RO retakes) (N)ew or (M)odified from bank 1) (P)revious 2 exams (:s; 1; randomly selected) | I Determine Shutdown Margin with one CEA not inserted and crediting xenon reactivity worth. | ||
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: | KIA 2.2.12 Knowledge of surveillance A2-RO Equipment Control procedures. (RO 3.7) | ||
Millstone Unit 2 Date of Examination: | R,N Complete "A" Service Water Pump Operability Surveillance, SP 2612A-003. | ||
02/28/2017 Exam Level: RO SRO-I D SRO-U D Operating Test No.: ES1 ?LI Control Room Systems:* | KIA 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (RO 3.5) | ||
8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System I JPM Title Type Code* | A3-RO Radiation Control R,M For the task of venting a CTMT Spray pump, determine RWP clothing requirements, maximum dose and contamination levels in the area and adjacent to the valves being manipulated. | ||
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. *Type Codes Criteria for RO I SRO-I I SRO-U A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank :S9/:58/:54 (E)mergency or abnormal in-plant :?:1/<::1/<::1 (EN)gineered safety feature :?:1 I <::1 I<:: 1 (control room system) (L)ow-Power I Shutdown :?:1/<::1/<::1 (N)ew or (M)odified from bank including 1 (A) :?:2/<::2/<::1 (P)revious 2 exams :S 3 I :5 3 I :5 2 (randomly selected) (R)CA :?:1/<::1/<::1 (S)imulator}} | NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items). | ||
*Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (:s; 3 for ROs;::; 4 for SROs & RO retakes) | |||
(N)ew or (M)odified from bank (~ 1) | |||
(P)revious 2 exams (:s; 1; randomly selected) | |||
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Millstone Unit 2 Date of Examination: 02/28/2017 Exam Level: RO ~ SRO-I D SRO-U D Operating Test No.: ES1 ?LI Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Safety System I JPM Title Type Code* | |||
Function CVCS I Emergency Boration S-1 D,L,S l 004/A2.14 Emergency boration (RO 3.8) | |||
LPSI I Verify adequate Safety Injection Flow IAW EOP 2532, LOCA S-2 A,L,N,S 2 006/A3.03 ESFAS-operated valves (RO 4.1) | |||
PZR Pressure Control I Force Pressurizer Sprays S-3 A,M,S 3 010/Al.07 RCS Pressure (RO 3.7) | |||
Auxiliary Feedwater I Operate TDAFP IAW EOP 2541, App 6 S-4 A,L,N,S 4(S) 061/A2.04 Pump failure or improper operation (RO 3.4) | |||
CTMT Spray I Restore from inadvertent CTMT Spray actuation S-5 EN,N,S 5 026/A4.05 Containment spray reset switches (RO 3.5) | |||
Emergency Diesel Generators I Unload and secure a EDG S-6 A,D,S 6 064/A.4.06 Manual start, loading, and stopping of the ED/G (RO 3.9) | |||
Mitigating a Reactor Regulating System Failed T cow Input S-7 N,S 7 016/A,4.01 NNI channel select controls (RO 2.9*) | |||
Circ~lating Water I Respond to the loss of a 2°ct CW pump S-8 A,N,S 8 075/A2.02 Loss of circulating water pumps (RO 2.5) | |||
In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | |||
AC Electrical (Instrument Power) I Transfer PPC Power Supply P-1 D 6 062/A4.01 All breakers (including available switchyard) (RO 3.3) | |||
Service Water I On a loss of 22E, swap the "B" SW Pump Strainer P-2 power supply to 22F to restore Facility 1 SW to operation E,M 4(S) 076/A2.01 Loss of SWS (RO 3.5) | |||
Waste Gas Disposal I Shift In-Service Waste Gas Decay Tank P-3 071/A4.05 Gas decay tanks, including valves, indicators, and sample D,R 9 line (RO 2.6) | |||
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
*Type Codes Criteria for RO I SRO-I I SRO-U A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank :S9/:58/:54 (E)mergency or abnormal in-plant :?:1/<::1/<::1 (EN)gineered safety feature :?:1 I <::1 I<:: 1 (control room system) | |||
(L)ow-Power I Shutdown :?:1/<::1/<::1 (N)ew or (M)odified from bank including 1(A) :?:2/<::2/<::1 (P)revious 2 exams :S 3 I :5 3 I :5 2 (randomly selected) | |||
(R)CA :?:1/<::1/<::1 (S)imulator}} |
Latest revision as of 06:21, 30 October 2019
ML17087A091 | |
Person / Time | |
---|---|
Site: | Millstone ![]() |
Issue date: | 03/01/2017 |
From: | David Silk Operations Branch I |
To: | Dominion Nuclear Connecticut |
Shared Package | |
ML16337A097 | List: |
References | |
U01968 | |
Download: ML17087A091 (2) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Millstone Unit 2 Date of Examination: 02/28/2017 Examination Level: RO jZJ SRO D Operating Test Number: ES1 ?LI .
Administrative Topic (see Note) Type Describe activity to be performed Code*
KlA 2.1. 7 Ability to evaluate plant performance and make operational judgments based on A 1 .1-RO Conduct of Operations R, D operating characteristics, reactor behavior, and instrument interpretation. (RO 4.4)
Evaluate an RCP Seal Failure KIA 2.1.37 Knowledge of procedures, guidelines, or limitations associated with A 1 .2-RO Conduct of Operations R,M reactivity management. (RO 4.3)
I Determine Shutdown Margin with one CEA not inserted and crediting xenon reactivity worth.
KIA 2.2.12 Knowledge of surveillance A2-RO Equipment Control procedures. (RO 3.7)
R,N Complete "A" Service Water Pump Operability Surveillance, SP 2612A-003.
KIA 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (RO 3.5)
A3-RO Radiation Control R,M For the task of venting a CTMT Spray pump, determine RWP clothing requirements, maximum dose and contamination levels in the area and adjacent to the valves being manipulated.
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (:s; 3 for ROs;::; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (~ 1)
(P)revious 2 exams (:s; 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Millstone Unit 2 Date of Examination: 02/28/2017 Exam Level: RO ~ SRO-I D SRO-U D Operating Test No.: ES1 ?LI Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Safety System I JPM Title Type Code*
Function CVCS I Emergency Boration S-1 D,L,S l 004/A2.14 Emergency boration (RO 3.8)
LPSI I Verify adequate Safety Injection Flow IAW EOP 2532, LOCA S-2 A,L,N,S 2 006/A3.03 ESFAS-operated valves (RO 4.1)
PZR Pressure Control I Force Pressurizer Sprays S-3 A,M,S 3 010/Al.07 RCS Pressure (RO 3.7)
Auxiliary Feedwater I Operate TDAFP IAW EOP 2541, App 6 S-4 A,L,N,S 4(S) 061/A2.04 Pump failure or improper operation (RO 3.4)
CTMT Spray I Restore from inadvertent CTMT Spray actuation S-5 EN,N,S 5 026/A4.05 Containment spray reset switches (RO 3.5)
Emergency Diesel Generators I Unload and secure a EDG S-6 A,D,S 6 064/A.4.06 Manual start, loading, and stopping of the ED/G (RO 3.9)
Mitigating a Reactor Regulating System Failed T cow Input S-7 N,S 7 016/A,4.01 NNI channel select controls (RO 2.9*)
Circ~lating Water I Respond to the loss of a 2°ct CW pump S-8 A,N,S 8 075/A2.02 Loss of circulating water pumps (RO 2.5)
In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
AC Electrical (Instrument Power) I Transfer PPC Power Supply P-1 D 6 062/A4.01 All breakers (including available switchyard) (RO 3.3)
Service Water I On a loss of 22E, swap the "B" SW Pump Strainer P-2 power supply to 22F to restore Facility 1 SW to operation E,M 4(S) 076/A2.01 Loss of SWS (RO 3.5)
Waste Gas Disposal I Shift In-Service Waste Gas Decay Tank P-3 071/A4.05 Gas decay tanks, including valves, indicators, and sample D,R 9 line (RO 2.6)
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO I SRO-I I SRO-U A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank :S9/:58/:54 (E)mergency or abnormal in-plant :?:1/<::1/<::1 (EN)gineered safety feature :?:1 I <::1 I<:: 1 (control room system)
(L)ow-Power I Shutdown :?:1/<::1/<::1 (N)ew or (M)odified from bank including 1(A) :?:2/<::2/<::1 (P)revious 2 exams :S 3 I :5 3 I :5 2 (randomly selected)
(R)CA :?:1/<::1/<::1 (S)imulator