| number = ML17265A509
| number = ML17265A509
| issue date = 01/11/1999
| issue date = 01/11/1999
| title = Requests Relief Per 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section Xi of ASME B&PV Code for ISI Program.Relief Request 41 Encl
| title = Requests Relief Per 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME B&PV Code for ISI Program.Relief Request 41 Encl
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = VISSING G S
| addressee name = Vissing G
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000244
| docket = 05000244
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULA'1 RY INFORMATION DISTRIBUTI w SYSTEM (RIDS)ACCESSION NBR:9901200387 DOC.DATE: 99/01/11 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULA'1 RY INFORMATION       DISTRIBUTI     w SYSTEM (RIDS)
NO DOCKET¹FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
ACCESSION NBR:9901200387           DOC.DATE: 99/01/11 NOTARIZED: NO                     DOCKET   ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                     G 05000244 AUTH. NAME           AUTHOR AFFILIATION MECREDY,R.C.         Rochester Gas E Electric Corp.
Rochester Gas E Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.
RECIP.NAME           RECIPIENT AFFILIATION VISSING,G.S.


==SUBJECT:==
==SUBJECT:==
Requests relief per 10CFR50.55a(a)(3)(ii) from certain requirements of Section XI of ASME BSPV Code for ISI program.Relief request 41 encl.DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENC SIZE: TITLE: OR Submittal:
Requests     relief per 10CFR50.55a(a)(3)(ii) from certain requirements of Section XI of ASME BSPV Code for ISI program. Relief request 41 encl.
Inservice/Testing/Relief from ASME Code-GL-89-04 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DISTRIBUTION CODE: A047D         COPIES RECEIVED:LTR         ENC         SIZE:
0500024k Q RECIPIENT ID CODE/NAME PD1-1 LA VISSING,G.
TITLE: OR Submittal: Inservice/Testing/Relief from             ASME Code - GL-89-04 NOTES:License Exp date       in   accordance with 10CFR2,2.109(9/19/72).               0500024k Q
INTERNAL: AEOD/SPD/RAB NRR/DE/ECGB NUDOCS-ABSTRACT RES/DET/EIB EXTERNAL: LITCO ANDERSON NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-1 PD FILE CENTER 0 NRR DE EMEB OGC/HDS3 RES/DET/EMMEB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 0 1 1 1 1 R D N NOTE TO ALL"RZDSn RECZPZENTS, PLEASE HELP US TO REDUCE WASTE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 4ND 0 ROCHESTER GAS AND ELECTRIC CORPORATION
RECIPIENT            COPIES              RECIPIENT             COPIES ID CODE/NAME          LTTR ENCL          ID CODE/NAME         LTTR ENCL PD1-1 LA                 1      1      PD1-1  PD                1      1 VISSING,G.                 1      1                                                      R INTERNAL: AEOD/SPD/RAB               1      1      FILE CENTER      0        1      1 NRR/DE/ECGB               1      1      NRR DE EMEB              1      1 NUDOCS-ABSTRACT           1      1      OGC/HDS3                  1      0 RES/DET/EIB               1     1       RES/DET/EMMEB             1     1 EXTERNAL: LITCO ANDERSON              1     1       NOAC                      1     1 NRC PDR                    1     1 D
~89 FASTAVENUf, ROCHESTER, N.Y Id&f9-0001 AREA CODE716 5'-2700 ROBERT C.MECREDY Vice President Nvctear Operations January 11, 1999 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555  
N NOTE TO ALL "RZDSn RECZPZENTS, PLEASE HELP US TO REDUCE WASTE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               14   ENCL     13
 
4ND 0
ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 FASTAVENUf, ROCHESTER, N. Y Id&f9-0001   AREA CODE716 5'-2700 ROBERT C. MECREDY Vice President Nvctear Operations                         January 11, 1999 U.S. Nuclear Regulatory Commission Document       Control Desk Attn:           Guy S. Vissing Project Directorate I-1 Washington, D.C. 20555


==Subject:==
==Subject:==
Inservice Inspection Program                  ASME  Section XI Required Examinations for First 10-Year                      Interval for Containment (IWE and IWL)
Request for Relief No. 41 R.E. Ginna Nuclear Power Plant Docket No. 50/244


==References:==
==References:==
EPRI "Containment          Inspection Program Guide"              GC-110698, September 1998, and selected Relief Request:
(1)    Calvert    Cliffs Relief            Request L-1
==Dear Mr.      Vissing:==
In the Federal Register, dated August 8, 1996 (61 FR 41303), the NRC amended its regulations to incorporate by reference the 1992 Edition and Addenda of Subsections IWE and IWL of Section XI of the ASME Code. Subsections IWE and IWL give the requirements for inservice inspection (ISI) of Class MC (metallic containment) and Class CC (concrete containment). These requirements are now applicable for R. E. Ginna Nuclear Power Plant.
The purpose of this letter is to request relief pursuant to 10 CFR 50.55a(a)(3)(ii) from certain requirements of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. Rochester Gas and Electric is a participant in the Electric Power Research Institute (EPRI) project for the'reparation of a Generic IWE/IWL Program and Industry Guide. This program was described to the NRC in a meeting on October 23, 1997r between the NRC, EPRI, and NEI, and several utilities. As a result from these meetings as well as the publication of the EPRI "Containment Inspection Program Guide" GC-110698, dated September 1998, Rochester Gas and Electric is submitting this relief request. Relief Request Number 41 is based on a generic relief request contained in the EPRI "Containment Inspection Program Guide".
tt l 990i200387 9'ttOi PDR    ADQCK ii 05000244 q
6                '"'DR        I,g*''
I
Relief Request    Number 41 requests relief  from Section XI of the ASME  Code,  1992  Edition, 1992 Addenda,  Subarticle IWA-2210, "Visual Examination," which lists requirements for minimum illumination and maximum direct examination distance of Class CC components under paragraph IWL-2310, "Visual Examination and Personnel Qualification." When remotely performing the visual examinations required by Subsection IWL, Paragraph IWL-2510, the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased provided that the techniques are qualified to detect the required conditions and indications.
The Relief Request, justification, and the proposed alternatives are included in the attachment to this letter. This relief request will be included in the Inservice Inspection Program for R.E. Ginna Nuclear Power Plant, for the Third Interval Program (which ends December 31, 1999) and the Fourth Interval Program (which begins January 1, 2000). NRC approval of this relief request is desired before the end of June, 1999, to ensure these programs are in compliance with NRC requirements before the end of the Third Interval.
Very  truly yours, Robert C. Mecr Attachment xc:  Mr. Guy S. Vissing (Mail Stop 14B2)
Project Directorate I-1 Division of Reactor Projects  I/II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475  Allendale  Road King of Prussia,  PA 19406 U.S. NRC Ginna Senior Resident Inspector


Inservice Inspection Program ASME Section XI Required Examinations for First 10-Year Interval for Containment (IWE and IWL)Request for Relief No.41 R.E.Ginna Nuclear Power Plant Docket No.50/244 EPRI"Containment Inspection Program Guide" GC-110698, September 1998, and selected Relief Request: (1)Calvert Cliffs Relief Request L-1  
ATTACHMENT Rochester Gas and  Electric Corporation Ginna Station Docket No. 50/244 First 10-Year Interval for Containment Inspection    Program Request for Relief No. 41 Containment Inspection Remote VT of Class    CC System/Component(s)    for Which Relief is Requested:
All components subject to the rules and requirements for Inservice Inspection of Class CC Concrete Components, Examination Category L-A, Concrete, Item L. l. 11 as applicable to IWL-2310, Visual Examination and Personnel Qualification and IWA-2210, Visual Examinations.
II. Code Requirement:
ASME Section XI, 1992 Edition, 1992 Addenda, IWL-2310, Visual Examination and Personnel Qualification and IWA-2210, Visual Examinations requires specific minimum illumination and maximum direct examination distance for all concrete surfaces.
III. Code  Requirement from Which Relief    is Requested:
Relief is requested from Paragraph    IWA-2210, Visual Examination Requirements for minimum illumination and maximum direct examination distance of Class CC components under Paragraph IWL-2310.
IV. Basis for Relief:
10 CFR  50.55a was amended in the Federal Register (61 FR 41303)  to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. In addition to the requirements of Subsection IWL, the rulemaking also imposes the requirements of Subsection IWA of the 1992 Edition, 1992 Addendum, of ASME Section XI for minimum illumination and maximum direct examination distance of Class CC components, specifically for the examination of concrete under Paragraph IWL-2510. When remotely performing the visual examinations required by Subsection IWL Paragraph IWL-2510, the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased.
Request  for Relief No. 41                    Attachment Page    1 of 3


==Dear Mr.Vissing:==
IWA-2210  allows for remote examination as long as the remote examination procedure is demonstrated to resolve the selected test chart characters.       The Registered Professional Engineer (RPE)     will  identify minimum  size of indications of interest. For  remote  visual examination,     the procedure and equipment  to  be  used  will be demonstrated    capable of resolving  these  minimum  indications  to the satisfaction of the RPE and the Authorized Nuclear Insurance Inspector (ANII)( as allowed in IWA-2240, "Alternative Examinations."
In the Federal Register, dated August 8, 1996 (61 FR 41303), the NRC amended its regulations to incorporate by reference the 1992 Edition and Addenda of Subsections IWE and IWL of Section XI of the ASME Code.Subsections IWE and IWL give the requirements for inservice inspection (ISI)of Class MC (metallic containment) and Class CC (concrete containment).
The record of demonstration will be available to Regulatory Authorities.
These requirements are now applicable for R.E.Ginna Nuclear Power Plant.The purpose of this letter is to request relief pursuant to 10 CFR 50.55a(a)(3)(ii) from certain requirements of Section XI of the American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel Code.Rochester Gas and Electric is a participant in the Electric Power Research Institute (EPRI)project for the'reparation of a Generic IWE/IWL Program and Industry Guide.This program was described to the NRC in a meeting on October 23, 1997r between the NRC, EPRI, and NEI, and several utilities.
Accessibility to higher portions of the dome and the containment building itself make it a hardship to obtain the maximum direct examination distance and minimum illumination requirements. The installation of extensive temporary scaffold systems or a climbing scaffold system to access these portions of the containment would be necessary. These scaffolds would provide limited access due to containment geometry restrictions as well as structural and equipment interferences. The installation and removal of these scaffolds would increase both worker radiation exposure and personnel safety in order to meet Paragraph IWA-2210 requirements.
As a result from these meetings as well as the publication of the EPRI"Containment Inspection Program Guide" GC-110698, dated September 1998, Rochester Gas and Electric is submitting this relief request.Relief Request Number 41 is based on a generic relief request contained in the EPRI"Containment Inspection Program Guide".990i200387 9'ttOi i i PDR ADQCK 05000244 I 6'"'DR I,g*''q tt l
staff received The NRC into Public Comment g 2.3 in Part      III that seven comments          were consolidated of Attachment 6A to SECY-96-080. The Staff response to these concerns is as follows:
          "Comments    received from ASME members on the containment committees indicate    that the newer, more stringent requirements of IWA-2210 were not intended to be used for the examination of containments and were inadvertently included in Subsection IWL. The NRC agrees that remote examinations are the only practica'l method for inspecting much of the containment surface area. g 50.55a(b) (2) (x) (B) has been added to the final rule which contains alternative lighting and resolution requirements which may be used in lieu of the requirements contained in IWA-2210-1."
However, as    specified within 10    CFR  50.55a(b)(2)(x)(B) of the final rule, this alternative applies only to          Subsection IWE, and   not to Subsection IWL.
Relief is requested in accordance with 10 CFR 50.55a(a)(3)
(ii). Compliance with the original requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Request  for Relief   No. 41                     Attachment Page  2  of 3


Relief Request Number 41 requests relief from Section XI of the ASME Code, 1992 Edition, 1992 Addenda, Subarticle IWA-2210,"Visual Examination," which lists requirements for minimum illumination and maximum direct examination distance of Class CC components under paragraph IWL-2310,"Visual Examination and Personnel Qualification." When remotely performing the visual examinations required by Subsection IWL, Paragraph IWL-2510, the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased provided that the techniques are qualified to detect the required conditions and indications.
V. Alternate Examinations:
The Relief Request, justification, and the proposed alternatives are included in the attachment to this letter.This relief request will be included in the Inservice Inspection Program for R.E.Ginna Nuclear Power Plant, for the Third Interval Program (which ends December 31, 1999)and the Fourth Interval Program (which begins January 1, 2000).NRC approval of this relief request is desired before the end of June, 1999, to ensure these programs are in compliance with NRC requirements before the end of the Third Interval.Very truly yours, Robert C.Mecr Attachment xc: Mr.Guy S.Vissing (Mail Stop 14B2)Project Directorate I-1 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 Regional Administrator, Region I U.S.Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector ATTACHMENT Rochester Gas and Electric Corporation Ginna Station Docket No.50/244 First 10-Year Interval for Containment Inspection Program Request for Relief No.41 Containment Inspection Remote VT of Class CC System/Component(s) for Which Relief is Requested:
When performing remotely the visual examinations required by Subsection IWL, Paragraph IWL-2510 , the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased provided that the conditions or indications for which the visual examination is performed can be detected at the chosen distance and illumination.
All components subject to the rules and requirements for Inservice Inspection of Class CC Concrete Components, Examination Category L-A, Concrete, Item L.l.11 as applicable to IWL-2310, Visual Examination and Personnel Qualification and IWA-2210, Visual Examinations.
VI. Justification for the Granting of Relief:
II.Code Requirement:
This Relief Request is similar to Relief Request L-1 submitted by Calvert Cliffs as one of the EPRI "Containment Inspection Program Guide" Pilot Plant Relief Requests.
ASME Section XI, 1992 Edition, 1992 Addenda, IWL-2310, Visual Examination and Personnel Qualification and IWA-2210, Visual Examinations requires specific minimum illumination and maximum direct examination distance for all concrete surfaces.III.Code Requirement from Which Relief is Requested:
Relief Request L-1 (for Calvert Cliffs) was subsequently approved by the NRC. Refer to a letter from the NRC (S.
Relief is requested from Paragraph IWA-2210, Visual Examination Requirements for minimum illumination and maximum direct examination distance of Class CC components under Paragraph IWL-2310.IV.Basis for Relief: 10 CFR 50.55a was amended in the Federal Register (61 FR 41303)to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations.
Bajwa) to Baltimore Gas and Electric (C. Cruse), dated November 16, 1998 (Docket No. 50-317/318). This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.
In addition to the requirements of Subsection IWL, the rulemaking also imposes the requirements of Subsection IWA of the 1992 Edition, 1992 Addendum, of ASME Section XI for minimum illumination and maximum direct examination distance of Class CC components, specifically for the examination of concrete under Paragraph IWL-2510.When remotely performing the visual examinations required by Subsection IWL Paragraph IWL-2510, the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased.
VII. Implementation Schedule:
Request for Relief No.41 Attachment Page 1 of 3 IWA-2210 allows for remote examination as long as the remote examination procedure is demonstrated to resolve the selected test chart characters.
Relief is requested for the first inspection interval for the IWL Containment Inspection Program (1996     2008). Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.
The Registered Professional Engineer (RPE)will identify minimum size of indications of interest.For remote visual examination, the procedure and equipment to be used will be demonstrated capable of resolving these minimum indications to the satisfaction of the RPE and the Authorized Nuclear Insurance Inspector (ANII)(as allowed in IWA-2240,"Alternative Examinations." The record of demonstration will be available to Regulatory Authorities.
Request for Relief No. 41                 Attachment Page 3 of 3}}
Accessibility to higher portions of the dome and the containment building itself make it a hardship to obtain the maximum direct examination distance and minimum illumination requirements.
The installation of extensive temporary scaffold systems or a climbing scaffold system to access these portions of the containment would be necessary.
These scaffolds would provide limited access due to containment geometry restrictions as well as structural and equipment interferences.
The installation and removal of these scaffolds would increase both worker radiation exposure and personnel safety in order to meet Paragraph IWA-2210 requirements.
The NRC staff received seven comments that were consolidated into Public Comment g 2.3 in Part III of Attachment 6A to SECY-96-080.
The Staff response to these concerns is as follows: "Comments received from ASME members on the containment committees indicate that the newer, more stringent requirements of IWA-2210 were not intended to be used for the examination of containments and were inadvertently included in Subsection IWL.The NRC agrees that remote examinations are the only practica'l method for inspecting much of the containment surface area.g 50.55a(b)(2)(x)(B)has been added to the final rule which contains alternative lighting and resolution requirements which may be used in lieu of the requirements contained in IWA-2210-1." However, as specified within 10 CFR 50.55a(b)(2)(x)(B) of the final rule, this alternative applies only to Subsection IWE, and not to Subsection IWL.Relief is requested in accordance with 10 CFR 50.55a(a)(3)(ii).Compliance with the original requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.Request for Relief No.41 Attachment Page 2 of 3 V.Alternate Examinations:
When performing remotely the visual examinations required by Subsection IWL, Paragraph IWL-2510 , the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased provided that the conditions or indications for which the visual examination is performed can be detected at the chosen distance and illumination.
VI.Justification for the Granting of Relief: This Relief Request is similar to Relief Request L-1 submitted by Calvert Cliffs as one of the EPRI"Containment Inspection Program Guide" Pilot Plant Relief Requests.Relief Request L-1 (for Calvert Cliffs)was subsequently approved by the NRC.Refer to a letter from the NRC (S.Bajwa)to Baltimore Gas and Electric (C.Cruse), dated November 16, 1998 (Docket No.50-317/318).
This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.VII.Implementation Schedule: Relief is requested for the first inspection interval for the IWL Containment Inspection Program (1996-2008).Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.Request for Relief No.41 Attachment Page 3 of 3}}

Latest revision as of 17:48, 29 October 2019

Requests Relief Per 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME B&PV Code for ISI Program.Relief Request 41 Encl
ML17265A509
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/11/1999
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9901200387
Download: ML17265A509 (7)


Text

CATEGORY 1 REGULA'1 RY INFORMATION DISTRIBUTI w SYSTEM (RIDS)

ACCESSION NBR:9901200387 DOC.DATE: 99/01/11 NOTARIZED: NO DOCKET ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas E Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

SUBJECT:

Requests relief per 10CFR50.55a(a)(3)(ii) from certain requirements of Section XI of ASME BSPV Code for ISI program. Relief request 41 encl.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENC SIZE:

TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code - GL-89-04 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 0500024k Q

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 LA 1 1 PD1-1 PD 1 1 VISSING,G. 1 1 R INTERNAL: AEOD/SPD/RAB 1 1 FILE CENTER 0 1 1 NRR/DE/ECGB 1 1 NRR DE EMEB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 RES/DET/EIB 1 1 RES/DET/EMMEB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RZDSn RECZPZENTS, PLEASE HELP US TO REDUCE WASTE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

4ND 0

ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 FASTAVENUf, ROCHESTER, N. Y Id&f9-0001 AREA CODE716 5'-2700 ROBERT C. MECREDY Vice President Nvctear Operations January 11, 1999 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, D.C. 20555

Subject:

Inservice Inspection Program ASME Section XI Required Examinations for First 10-Year Interval for Containment (IWE and IWL)

Request for Relief No. 41 R.E. Ginna Nuclear Power Plant Docket No. 50/244

References:

EPRI "Containment Inspection Program Guide" GC-110698, September 1998, and selected Relief Request:

(1) Calvert Cliffs Relief Request L-1

Dear Mr. Vissing:

In the Federal Register, dated August 8, 1996 (61 FR 41303), the NRC amended its regulations to incorporate by reference the 1992 Edition and Addenda of Subsections IWE and IWL of Section XI of the ASME Code. Subsections IWE and IWL give the requirements for inservice inspection (ISI) of Class MC (metallic containment) and Class CC (concrete containment). These requirements are now applicable for R. E. Ginna Nuclear Power Plant.

The purpose of this letter is to request relief pursuant to 10 CFR 50.55a(a)(3)(ii) from certain requirements of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. Rochester Gas and Electric is a participant in the Electric Power Research Institute (EPRI) project for the'reparation of a Generic IWE/IWL Program and Industry Guide. This program was described to the NRC in a meeting on October 23, 1997r between the NRC, EPRI, and NEI, and several utilities. As a result from these meetings as well as the publication of the EPRI "Containment Inspection Program Guide" GC-110698, dated September 1998, Rochester Gas and Electric is submitting this relief request. Relief Request Number 41 is based on a generic relief request contained in the EPRI "Containment Inspection Program Guide".

tt l 990i200387 9'ttOi PDR ADQCK ii 05000244 q

6 '"'DR I,g*

I

Relief Request Number 41 requests relief from Section XI of the ASME Code, 1992 Edition, 1992 Addenda, Subarticle IWA-2210, "Visual Examination," which lists requirements for minimum illumination and maximum direct examination distance of Class CC components under paragraph IWL-2310, "Visual Examination and Personnel Qualification." When remotely performing the visual examinations required by Subsection IWL, Paragraph IWL-2510, the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased provided that the techniques are qualified to detect the required conditions and indications.

The Relief Request, justification, and the proposed alternatives are included in the attachment to this letter. This relief request will be included in the Inservice Inspection Program for R.E. Ginna Nuclear Power Plant, for the Third Interval Program (which ends December 31, 1999) and the Fourth Interval Program (which begins January 1, 2000). NRC approval of this relief request is desired before the end of June, 1999, to ensure these programs are in compliance with NRC requirements before the end of the Third Interval.

Very truly yours, Robert C. Mecr Attachment xc: Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector

ATTACHMENT Rochester Gas and Electric Corporation Ginna Station Docket No. 50/244 First 10-Year Interval for Containment Inspection Program Request for Relief No. 41 Containment Inspection Remote VT of Class CC System/Component(s) for Which Relief is Requested:

All components subject to the rules and requirements for Inservice Inspection of Class CC Concrete Components, Examination Category L-A, Concrete, Item L. l. 11 as applicable to IWL-2310, Visual Examination and Personnel Qualification and IWA-2210, Visual Examinations.

II. Code Requirement:

ASME Section XI, 1992 Edition, 1992 Addenda, IWL-2310, Visual Examination and Personnel Qualification and IWA-2210, Visual Examinations requires specific minimum illumination and maximum direct examination distance for all concrete surfaces.

III. Code Requirement from Which Relief is Requested:

Relief is requested from Paragraph IWA-2210, Visual Examination Requirements for minimum illumination and maximum direct examination distance of Class CC components under Paragraph IWL-2310.

IV. Basis for Relief:

10 CFR 50.55a was amended in the Federal Register (61 FR 41303) to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations. In addition to the requirements of Subsection IWL, the rulemaking also imposes the requirements of Subsection IWA of the 1992 Edition, 1992 Addendum, of ASME Section XI for minimum illumination and maximum direct examination distance of Class CC components, specifically for the examination of concrete under Paragraph IWL-2510. When remotely performing the visual examinations required by Subsection IWL Paragraph IWL-2510, the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased.

Request for Relief No. 41 Attachment Page 1 of 3

IWA-2210 allows for remote examination as long as the remote examination procedure is demonstrated to resolve the selected test chart characters. The Registered Professional Engineer (RPE) will identify minimum size of indications of interest. For remote visual examination, the procedure and equipment to be used will be demonstrated capable of resolving these minimum indications to the satisfaction of the RPE and the Authorized Nuclear Insurance Inspector (ANII)( as allowed in IWA-2240, "Alternative Examinations."

The record of demonstration will be available to Regulatory Authorities.

Accessibility to higher portions of the dome and the containment building itself make it a hardship to obtain the maximum direct examination distance and minimum illumination requirements. The installation of extensive temporary scaffold systems or a climbing scaffold system to access these portions of the containment would be necessary. These scaffolds would provide limited access due to containment geometry restrictions as well as structural and equipment interferences. The installation and removal of these scaffolds would increase both worker radiation exposure and personnel safety in order to meet Paragraph IWA-2210 requirements.

staff received The NRC into Public Comment g 2.3 in Part III that seven comments were consolidated of Attachment 6A to SECY-96-080. The Staff response to these concerns is as follows:

"Comments received from ASME members on the containment committees indicate that the newer, more stringent requirements of IWA-2210 were not intended to be used for the examination of containments and were inadvertently included in Subsection IWL. The NRC agrees that remote examinations are the only practica'l method for inspecting much of the containment surface area. g 50.55a(b) (2) (x) (B) has been added to the final rule which contains alternative lighting and resolution requirements which may be used in lieu of the requirements contained in IWA-2210-1."

However, as specified within 10 CFR 50.55a(b)(2)(x)(B) of the final rule, this alternative applies only to Subsection IWE, and not to Subsection IWL.

Relief is requested in accordance with 10 CFR 50.55a(a)(3)

(ii). Compliance with the original requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

Request for Relief No. 41 Attachment Page 2 of 3

V. Alternate Examinations:

When performing remotely the visual examinations required by Subsection IWL, Paragraph IWL-2510 , the maximum direct examination distance specified in Table IWA-2210-1 may be extended, and the minimum illumination requirements specified in Table IWA-2210-1 may be decreased provided that the conditions or indications for which the visual examination is performed can be detected at the chosen distance and illumination.

VI. Justification for the Granting of Relief:

This Relief Request is similar to Relief Request L-1 submitted by Calvert Cliffs as one of the EPRI "Containment Inspection Program Guide" Pilot Plant Relief Requests.

Relief Request L-1 (for Calvert Cliffs) was subsequently approved by the NRC. Refer to a letter from the NRC (S.

Bajwa) to Baltimore Gas and Electric (C. Cruse), dated November 16, 1998 (Docket No. 50-317/318). This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.

VII. Implementation Schedule:

Relief is requested for the first inspection interval for the IWL Containment Inspection Program (1996 2008). Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.

Request for Relief No. 41 Attachment Page 3 of 3