ML16188A233: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 07/05/2016
| issue date = 07/05/2016
| title = NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
| title = NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
| author name = Silk D M
| author name = Silk D
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name =  
| addressee name =  
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:Calvert Cliffs Operating Exam Comments:
{{#Wiki_filter:Calvert Cliffs Operating Exam Comments:
Admin JPMs: R01-appears to be a typo regarding Tavg. JPM says "and Tavg is less than 250°F" Initial condition states 100% power. R0-2 -Removed 2-CD-277 as a Critical task when reviewing tagout Added mechanical tagging points for 11/12 AFW Mini-Flow lines to critical task R04-Determine the best place (classroom or simulator) to conduct this JPM. SR01-Classroom checked, but simulator setup information is given. Typo. Corrected reference in Component Cooling Water cue SR02-Removed 2-CD-277 as a Critical task when reviewing tagout Added mechanical tagging points for 11/12 AFW Mini-Flow lines to critical task Moved cue for Technical Specification from body of JPM to Examinee's Cue Sheet SR03-Revised Critical Task values for dose calculations to include conservative calculation of highest dose rate (i.e. highest dose rate for entire duration)
Admin JPMs:
SR04-Increased Containment Radiation Monitors readings on Examinee's Cue Sheet Transferred cue information from the body of the JPM to the Examinee's Cue Sheet Added that a Hostile Action is not in progress to the Examinee's Cue Sheet Downgraded two Critical Tasks due to adding information to the Examinee's Cue Sheet SR05-same typo as R01. Put page 7 cues into the initial conditions.
R01- appears to be a typo regarding Tavg. JPM says "and Tavg is less than 250°F" Initial condition states 100% power.
In-Plant JPMs: ln-Plant1  
R0 Removed 2-CD-277 as a Critical task when reviewing tagout Added mechanical tagging points for 11/12 AFW Mini-Flow lines to critical task R04- Determine the best place (classroom or simulator) to conduct this JPM.
-Added panel name of 2C43 to cue. ln-Plant2  
SR01- Classroom checked, but simulator setup information is given. Typo.
-Added Off position to standard in steps N.1 and N.2. Added panel name of 1 C43 to cue. Page 1of3 Simulator JPMs: Sim1 -Added cue regarding Chemistry surveillance to Examiner's Cue Sheet Revised standard for step 6.2.A Revised standard for step 6.2.1 for CEA position Removed duplicate cue prior to AOP-1 B Sim2 -Changed details of Task Standard Changed standard from Step Q to Step R for EOP-5 Step R Changed standard to 12 LPSI in Step S.1.a.1 ( 1) Added band of 450-600 GPM to standard for Step S.1.a.1 (2)(b) Sim3 -Deleted redundant portion of element in Step Vl.B.4 Added information to Examinee's Cue Sheet regarding ERPIP Personnel Emergency Attachment Sim4 -Added Simulator setup instruction to ensure PZR level is -160" at start of JPM Copied Initial conditions to Examinee's Cue Sheet Sim5 -Revised standard for Step 1.1.a to reflect power condition of CACs Revised standard for Step 1.2 SIAS to reflect MOV indications Added Evaluator Note prior to Step 3.1 stating 01-58 may also be referenced during execution of the step Added Cues for ESFAS verification reports Sim6 -Revised Examinee's Cue Sheet instructions to use the normal breaker to repower the 21 4Kv bus and removed cue from JPM Revised Standards on Steps 1, 2, and 3 for only the busses required to support the normal breaker as the power supply Added Simulator Setup instructions to ensure Unit-2 EOP Attachments are available Sim? -Removed Sim Setup instructions to chain RPS Cabinets A,C, & D and CCV tags on breakers Added Evaluator Note for Simulator Driver to leave Annunciator Horn unacknowledged following the loss of 1 Y02 Page 2 of 3 Scenarios:
Corrected reference in Component Cooling Water cue SR02- Removed 2-CD-277 as a Critical task when reviewing tagout Added mechanical tagging points for 11/12 AFW Mini-Flow lines to critical task Moved cue for Technical Specification from body of JPM to Examinee's Cue Sheet SR03- Revised Critical Task values for dose calculations to include conservative calculation of highest dose rate (i.e. highest dose rate for entire duration)
SR04- Increased Containment Radiation Monitors readings on Examinee's Cue Sheet Transferred cue information from the body of the JPM to the Examinee's Cue Sheet Added that a Hostile Action is not in progress to the Examinee's Cue Sheet Downgraded two Critical Tasks due to adding information to the Examinee's Cue Sheet SR05- same typo as R01.
Put page 7 cues into the initial conditions.
In-Plant JPMs:
ln-Plant1 - Added panel name of 2C43 to cue.
ln-Plant2 - Added Off position to standard in steps N.1 and N.2.
Added panel name of 1C43 to cue.
Page 1of3
 
Simulator JPMs:
Sim1 - Added cue regarding Chemistry surveillance to Examiner's Cue Sheet Revised standard for step 6.2.A Revised standard for step 6.2.1 for CEA position Removed duplicate cue prior to AOP-1 B Sim2 - Changed details of Task Standard Changed standard from Step Q to Step R for EOP-5 Step R Changed standard to 12 LPSI in Step S.1.a.1 ( 1)
Added band of 450-600 GPM to standard for Step S.1.a.1 (2)(b)
Sim3 - Deleted redundant portion of element in Step Vl.B.4 Added information to Examinee's Cue Sheet regarding ERPIP Personnel Emergency Attachment Sim4 - Added Simulator setup instruction to ensure PZR level is -160" at start of JPM Copied Initial conditions to Examinee's Cue Sheet Sim5 - Revised standard for Step 1.1.a to reflect power condition of CACs Revised standard for Step 1.2 SIAS to reflect MOV indications Added Evaluator Note prior to Step 3.1 stating 01-58 may also be referenced during execution of the step Added Cues for ESFAS verification reports Sim6 - Revised Examinee's Cue Sheet instructions to use the normal breaker to repower the 21 4Kv bus and removed cue from JPM Revised Standards on Steps 1, 2, and 3 for only the busses required to support the normal breaker as the power supply Added Simulator Setup instructions to ensure Unit-2 EOP Attachments are available Sim? - Removed Sim Setup instructions to chain RPS Cabinets A,C, & D and CCV tags on breakers Added Evaluator Note for Simulator Driver to leave Annunciator Horn unacknowledged following the loss of 1Y02 Page 2 of 3
 
Scenarios:
Scenario 1
Scenario 1
* Changed to 23 AFW pump OOS to match equipment OOS in other scenarios
* Changed to 23 AFW pump OOS to match equipment OOS in other scenarios
Line 32: Line 46:
* Added potential EOP-5 actions to Event 8 Examiner Notes Scenario 2
* Added potential EOP-5 actions to Event 8 Examiner Notes Scenario 2
* Added summer conditions to turnover
* Added summer conditions to turnover
* Changed timeline of 1 A DG STP to indicate that 30 minutes are left on test
* Changed timeline of 1A DG STP to indicate that 30 minutes are left on test
* Corrected typo on Event #1 regarding 11 Charging Pump
* Corrected typo on Event #1 regarding 11 Charging Pump
* Provided options in Event #4 using boration and/or CEAs
* Provided options in Event #4 using boration and/or CEAs

Latest revision as of 17:00, 30 October 2019

NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML16188A233
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/05/2016
From: David Silk
Operations Branch I
To:
Operations Branch I
Shared Package
ML15308A607 List:
References
U01923
Download: ML16188A233 (3)


Text

Calvert Cliffs Operating Exam Comments:

Admin JPMs:

R01- appears to be a typo regarding Tavg. JPM says "and Tavg is less than 250°F" Initial condition states 100% power.

R0 Removed 2-CD-277 as a Critical task when reviewing tagout Added mechanical tagging points for 11/12 AFW Mini-Flow lines to critical task R04- Determine the best place (classroom or simulator) to conduct this JPM.

SR01- Classroom checked, but simulator setup information is given. Typo.

Corrected reference in Component Cooling Water cue SR02- Removed 2-CD-277 as a Critical task when reviewing tagout Added mechanical tagging points for 11/12 AFW Mini-Flow lines to critical task Moved cue for Technical Specification from body of JPM to Examinee's Cue Sheet SR03- Revised Critical Task values for dose calculations to include conservative calculation of highest dose rate (i.e. highest dose rate for entire duration)

SR04- Increased Containment Radiation Monitors readings on Examinee's Cue Sheet Transferred cue information from the body of the JPM to the Examinee's Cue Sheet Added that a Hostile Action is not in progress to the Examinee's Cue Sheet Downgraded two Critical Tasks due to adding information to the Examinee's Cue Sheet SR05- same typo as R01.

Put page 7 cues into the initial conditions.

In-Plant JPMs:

ln-Plant1 - Added panel name of 2C43 to cue.

ln-Plant2 - Added Off position to standard in steps N.1 and N.2.

Added panel name of 1C43 to cue.

Page 1of3

Simulator JPMs:

Sim1 - Added cue regarding Chemistry surveillance to Examiner's Cue Sheet Revised standard for step 6.2.A Revised standard for step 6.2.1 for CEA position Removed duplicate cue prior to AOP-1 B Sim2 - Changed details of Task Standard Changed standard from Step Q to Step R for EOP-5 Step R Changed standard to 12 LPSI in Step S.1.a.1 ( 1)

Added band of 450-600 GPM to standard for Step S.1.a.1 (2)(b)

Sim3 - Deleted redundant portion of element in Step Vl.B.4 Added information to Examinee's Cue Sheet regarding ERPIP Personnel Emergency Attachment Sim4 - Added Simulator setup instruction to ensure PZR level is -160" at start of JPM Copied Initial conditions to Examinee's Cue Sheet Sim5 - Revised standard for Step 1.1.a to reflect power condition of CACs Revised standard for Step 1.2 SIAS to reflect MOV indications Added Evaluator Note prior to Step 3.1 stating 01-58 may also be referenced during execution of the step Added Cues for ESFAS verification reports Sim6 - Revised Examinee's Cue Sheet instructions to use the normal breaker to repower the 21 4Kv bus and removed cue from JPM Revised Standards on Steps 1, 2, and 3 for only the busses required to support the normal breaker as the power supply Added Simulator Setup instructions to ensure Unit-2 EOP Attachments are available Sim? - Removed Sim Setup instructions to chain RPS Cabinets A,C, & D and CCV tags on breakers Added Evaluator Note for Simulator Driver to leave Annunciator Horn unacknowledged following the loss of 1Y02 Page 2 of 3

Scenarios:

Scenario 1

  • Changed to 23 AFW pump OOS to match equipment OOS in other scenarios
  • Added time trigger to insertion of Event 9
  • Enhanced Responses to Crew Requests
  • Removed required action, Increases Charging flow, from Event #5
  • Changed HR-2 to met in Event 9 and ensured CE-1 met
  • Added directions to shut 12 MSIV based on scenario trigger
  • Added potential EOP-5 actions to Event 8 Examiner Notes Scenario 2
  • Added summer conditions to turnover
  • Changed timeline of 1A DG STP to indicate that 30 minutes are left on test
  • Corrected typo on Event #1 regarding 11 Charging Pump
  • Provided options in Event #4 using boration and/or CEAs
  • Removed Shuts CVC-501-MOV from Event #5 due to power loss
  • Enhanced Responses to Crew Requests
  • Added briefing requirement for loss of MCC 101 AT/BT as part of turnover
  • Enhanced MCC-104/114 guidance to the Examiner Scenario 3
  • Changed to 23 AFW pump OOS to match equipment OOS in other scenarios
  • Changed wisping ADV to 12 ADV
  • Corrected typo on Event #8 Critical Task AFW Block valves
  • Enhanced Responses to Crew Requests Page 3 of 3