ML081910241: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 07/02/2008 | | issue date = 07/02/2008 | ||
| title = Acceptance of La to Revise TS 3.12 (Control Rods) | | title = Acceptance of La to Revise TS 3.12 (Control Rods) | ||
| author name = Lingam S | | author name = Lingam S | ||
| author affiliation = NRC/NRR/ADRO/DORL/LPLB | | author affiliation = NRC/NRR/ADRO/DORL/LPLB | ||
| addressee name = Miller G | | addressee name = Miller G | ||
| addressee affiliation = Virginia Electric & Power Co (VEPCO) | | addressee affiliation = Virginia Electric & Power Co (VEPCO) | ||
| docket = 05000280, 05000281 | | docket = 05000280, 05000281 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:From: Siva Lingam Sent: Wednesday, July 02, 2008 3:32 PM To: 'Gary.D.Miller@dom.com' Cc: Melanie Wong; Samuel Miranda; Ravinder Grover | {{#Wiki_filter:From: Siva Lingam Sent: Wednesday, July 02, 2008 3:32 PM To: 'Gary.D.Miller@dom.com' Cc: Melanie Wong; Samuel Miranda; Ravinder Grover | ||
==Subject:== | ==Subject:== | ||
Surry 1 and 2 License Amendment to revise TS 3.12 (Control Rods) - TAC Nos. MD8925/8926 By letter dated June 9, 2008 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081630307), Virginia Electric and Power Company submitted a license amendment for Surry Power Station, Unit Nos. 1 and 2 (Surry 1 and 2). The proposed amendment would revise action statements in Technical Specification (TS) 3.12 for insertion limit and shutdown margin requirements, revises the applicability for the operability of the rod position indication and bank demand position indication systems, revises/adds action statements for rod position indication, and adds action statements for group step demand counters. These revisions enhance completeness of the Surry 1 and 2 TSs and are consistent with NUREG-1431, Revision 3.0, | Surry 1 and 2 License Amendment to revise TS 3.12 (Control Rods) - TAC Nos. | ||
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff | MD8925/8926 By letter dated June 9, 2008 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081630307), Virginia Electric and Power Company submitted a license amendment for Surry Power Station, Unit Nos. 1 and 2 (Surry 1 and 2). The proposed amendment would revise action statements in Technical Specification (TS) 3.12 for insertion limit and shutdown margin requirements, revises the applicability for the operability of the rod position indication and bank demand position indication systems, revises/adds action statements for rod position indication, and adds action statements for group step demand counters. These revisions enhance completeness of the Surry 1 and 2 TSs and are consistent with NUREG-1431, Revision 3.0, Standard Technical Specifications, Westinghouse Plants. | ||
=s acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. | ||
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | |||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. | |||
If you have any questions, please contact me. | |||
Siva P. Lingam Project Manager (NRR/DORL/LPL2-1) | |||
Surry and North Anna Nuclear Power Stations Location: O8-D5 Mail Stop: O8-G9 Telephone: 301-415-1564 Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov E-mail Properties | |||
Mail Envelope Properties () | |||
==Subject:== | ==Subject:== | ||
Surry 1 and 2 License Amendment to revise TS 3.12 (Control Rods) - TAC Nos. MD8925/8926 | Surry 1 and 2 License Amendment to revise TS 3.12 (Control Rods) - TAC Nos. MD8925/8926 Sent Date: 7/2/2008 1:47:49 PM Received Date: 7/2/2008 3:32:00 PM From: Siva Lingam Created By: Siva.Lingam@nrc.gov Recipients: | ||
Sent Date: | |||
Created By: | |||
Recipients: | |||
Gary.D.Miller@dom.com ('Gary.D.Miller@dom.com') | Gary.D.Miller@dom.com ('Gary.D.Miller@dom.com') | ||
Tracking Status: None Melanie.Wong@nrc.gov (Melanie Wong) | Tracking Status: None Melanie.Wong@nrc.gov (Melanie Wong) | ||
Tracking Status: None | Tracking Status: None Samuel.Miranda@nrc.gov (Samuel Miranda) | ||
Tracking Status: None Ravinder.Grover@nrc.gov (Ravinder Grover) | |||
Samuel.Miranda@nrc.gov (Samuel Miranda) | Tracking Status: None Post Office: | ||
Tracking Status: None | Files Size Date & Time MESSAGE 10524 7/2/2008 Options Expiration Date: | ||
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} | |||
Post Office: | |||
Files | |||
MESSAGE | |||
Options Expiration Date: | |||
Priority: | |||
Sensitivity: |
Latest revision as of 16:04, 14 November 2019
ML081910241 | |
Person / Time | |
---|---|
Site: | Surry ![]() |
Issue date: | 07/02/2008 |
From: | Siva Lingam NRC/NRR/ADRO/DORL/LPLB |
To: | Geoffrey Miller Virginia Electric & Power Co (VEPCO) |
Lingam, Siva NRR/DORL 415-1564 | |
References | |
TAC MD8925, TAC MD8926 | |
Download: ML081910241 (1) | |
Text
From: Siva Lingam Sent: Wednesday, July 02, 2008 3:32 PM To: 'Gary.D.Miller@dom.com' Cc: Melanie Wong; Samuel Miranda; Ravinder Grover
Subject:
Surry 1 and 2 License Amendment to revise TS 3.12 (Control Rods) - TAC Nos.
MD8925/8926 By letter dated June 9, 2008 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081630307), Virginia Electric and Power Company submitted a license amendment for Surry Power Station, Unit Nos. 1 and 2 (Surry 1 and 2). The proposed amendment would revise action statements in Technical Specification (TS) 3.12 for insertion limit and shutdown margin requirements, revises the applicability for the operability of the rod position indication and bank demand position indication systems, revises/adds action statements for rod position indication, and adds action statements for group step demand counters. These revisions enhance completeness of the Surry 1 and 2 TSs and are consistent with NUREG-1431, Revision 3.0, Standard Technical Specifications, Westinghouse Plants.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me.
Siva P. Lingam Project Manager (NRR/DORL/LPL2-1)
Surry and North Anna Nuclear Power Stations Location: O8-D5 Mail Stop: O8-G9 Telephone: 301-415-1564 Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov E-mail Properties
Mail Envelope Properties ()
Subject:
Surry 1 and 2 License Amendment to revise TS 3.12 (Control Rods) - TAC Nos. MD8925/8926 Sent Date: 7/2/2008 1:47:49 PM Received Date: 7/2/2008 3:32:00 PM From: Siva Lingam Created By: Siva.Lingam@nrc.gov Recipients:
Gary.D.Miller@dom.com ('Gary.D.Miller@dom.com')
Tracking Status: None Melanie.Wong@nrc.gov (Melanie Wong)
Tracking Status: None Samuel.Miranda@nrc.gov (Samuel Miranda)
Tracking Status: None Ravinder.Grover@nrc.gov (Ravinder Grover)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 10524 7/2/2008 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: