| issue date = 11/18/2011
| issue date = 11/18/2011
| title = Commitment Summary Report
| title = Commitment Summary Report
| author name = Shea J W
| author name = Shea J
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 November 18, 2011 10 CFR 50.4 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390  
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 November 18, 2011 10 CFR 50.4 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390


==Subject:==
==Subject:==
Commitment Summary Report The purpose of this letter is to provide the Watts Bar Nuclear Plant (WBN), Unit 1 Commitment Summary Report for December 5, 2009, through June 29, 2011. This report, which summarizes docketed commitments the Tennessee Valley Authority (TVA) has evaluated and revised using administrative controls during this time period, is provided in accordance with the Nuclear Energy Institute's "Guidelines for Managing NRC Commitment Changes," as endorsed in NRC Regulatory Issue Summary 2000-17.There are no regulatory commitments associated with this submittal.
Commitment Summary Report The purpose of this letter is to provide the Watts Bar Nuclear Plant (WBN), Unit 1 Commitment Summary Report for December 5, 2009, through June 29, 2011. This report, which summarizes docketed commitments the Tennessee Valley Authority (TVA) has evaluated and revised using administrative controls during this time period, is provided in accordance with the Nuclear Energy Institute's "Guidelines for Managing NRC Commitment Changes," as endorsed in NRC Regulatory Issue Summary 2000-17.
Please direct any questions concerning this submittal to Kara Stacy, Program Manager at (423) 751-3489.Respectfu[
There are no regulatory commitments associated with this submittal. Please direct any questions concerning this submittal to Kara Stacy, Program Manager at (423) 751-3489.
Respectfu[


==Enclosure:==
==Enclosure:==


WBN, Unit 1 Commitment Summary Report cc (Enclosure):
WBN, Unit 1 Commitment Summary Report cc (Enclosure):
NRC Regional Administrator  
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 1 NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 2 Dom Printedon recycledpaper
-Region II NRC Senior Resident Inspector  
 
-Watts Bar Nuclear Plant, Unit 1 NRC Senior Resident Inspector  
Enclosure WBN, Unit I Commitment Summary Report
-Watts Bar Nuclear Plant, Unit 2 Dom Printed on recycled paper Enclosure WBN, Unit I Commitment Summary Report Commitment Summary Report Commitment Summary of Evaluation No./ Source Document Summary of Original Commitment Basis/Justification For Commitment Commitment Changes Changes Tracking No.NCO960070003 TVA response to NRC RAI for A plant operating instruction will be revised to require The list of commitments NEI 99-004, "Guidelines for Managing License Amendment to Technical restrictions to ensure that the maximum design heat are not being revised but NRC Commitment Changes," states Specifications  
 
-Spent Fuel Pool load limits will not be exceeded.
Commitment Summary Report Commitment                                                                                                       Summary of Evaluation No./       Source Document                               Summary of Original                           Commitment               Basis/Justification For Commitment                                                               Commitment                                 Changes                         Changes Tracking No.
are being removed from that "Licensees who employ a formal Storage Capacity Increase dated TVA's formal commitment commitment tracking system may 02/10/1997.  
NCO960070003   TVA response to NRC RAI for         A plant operating instruction will be revised to require The list of commitments   NEI 99-004, "Guidelines for Managing License Amendment to Technical     restrictions to ensure that the maximum design heat       are not being revised but NRC Commitment Changes," states Specifications - Spent Fuel Pool   load limits will not be exceeded.                         are being removed from   that "Licensees who employ a formal Storage Capacity Increase dated                                                               TVA's formal commitment   commitment tracking system may 02/10/1997. ('04970210395)                                                                   tracking program         choose to remove items from their NC0960074003   TVA response to Notice of           In the long-term, TVA plans to implement a change to     because the               tracking systems upon placement of Violation - NRC Inspection         the security system software which will prevent multiple commitments are now       the information into another licensing Report 50-390/96-12 and 50-         tumstiles from being unlocked by a single individual,     embodied in the UFSAR. basis document (e.g., updated FSAR 391/96-12 dated 12/18/1996.         This includes written procedures and training the         Based on this, changes   and QA Program), to the extent that The protected area access           officers on this feature. These long term actions will be to the commitments are   controls and reporting requirements for control system needs               completed by January 31, 1997.                           now controlled under     subsequent changes are consistent management attention to ensure                                                               TVA's                     with expectations mutually agreed that personnel are not capable of                                                             10 CFR 50.59 program. upon by the licensee and NRC staff."
('04970210395) tracking program choose to remove items from their NC0960074003 TVA response to Notice of In the long-term, TVA plans to implement a change to because the tracking systems upon placement of Violation  
tailgating into the protected area.
-NRC Inspection the security system software which will prevent multiple commitments are now the information into another licensing Report 50-390/96-12 and 50- tumstiles from being unlocked by a single individual, embodied in the UFSAR. basis document (e.g., updated FSAR 391/96-12 dated 12/18/1996.
('1"04961216384)
This includes written procedures and training the Based on this, changes and QA Program), to the extent that The protected area access officers on this feature. These long term actions will be to the commitments are controls and reporting requirements for control system needs completed by January 31, 1997. now controlled under subsequent changes are consistent management attention to ensure TVA's with expectations mutually agreed that personnel are not capable of 10 CFR 50.59 program. upon by the licensee and NRC staff." tailgating into the protected area.('1"04961216384)
NC0970046004   TVA License Amendment to           TVA will revise the Emergency Operating Procedures to address Cycle 2 core design         reflect the new hot leg switchover time required to changes and provide operational     prevent boron precipitation.
NC0970046004 TVA License Amendment to TVA will revise the Emergency Operating Procedures to address Cycle 2 core design reflect the new hot leg switchover time required to changes and provide operational prevent boron precipitation.
enhancements for reactor trip setpoints dated 03/27/1997.
enhancements for reactor trip setpoints dated 03/27/1997.(T"04970327414)
(T"04970327414)
E-1 of 6 Commitment Summary Report Commitment Summary of Evaluation No./ Source Document Summary of Original Commitment Basis/Justification For Commitment Commitment Changes Changes Tracking No.NCO010008001 Technical Specification Change As discussed in the notice of availability published in The list of commitments NEI 99-004, "Guidelines for Managing No. WBN-TS-01  Application Federal Register on October 31, 2000, for this technical are not being revised but NRC Commitment Changes," states for Technical Specification specification improvement, plant-specific verifications are being removed from that "Licensees who employ a formal Improvement to Eliminate will be performed as described below TVA's formal commitment commitment tracking system may Requirements for Post Accident tracking program because choose to remove items from their System using the Consolidated  
E-1 of 6
: 1. TVA will develop contingency plans for obtaining the commitments are now tracking systems upon placement of Line Item Improvement Process and analyzing highly radioactive samples of embodied in the UFSAR. the information into another licensing (CLLIIP) -TVA letter to NRC reactor coolant, containment sump, and Based on this, changes to basis document (e.g., updated FSAR dated October 31, 2001. containment atmosphere.
 
The contingency plans the commitments are now and QA Program), to the extent that (T04011031839) will be contained in technical procedures and controlled under TVA's 10 controls and reporting requirements for implemented in accordance with the License CFR 50.59 program. subsequent changes are consistent amendment.
Commitment Summary Report Commitment                                                                                                         Summary of Evaluation No./       Source Document                           Summary of Original                               Commitment               Basis/Justification For Commitment                                                           Commitment                                     Changes                         Changes Tracking No.
with expectations mutually agreed Technical Specification Change upon by the licensee and NRC staff." WBN-TS-01-14 requested  
NCO010008001   Technical Specification Change   As discussed in the notice of availability published in     The list of commitments   NEI 99-004, "Guidelines for Managing No. WBN-TS-01 Application Federal Register on October 31, 2000, for this technical     are not being revised but NRC Commitment Changes," states for Technical Specification     specification improvement, plant-specific verifications     are being removed from   that "Licensees who employ a formal Improvement to Eliminate         will be performed as described below                         TVA's formal commitment   commitment tracking system may Requirements for Post Accident                                                               tracking program because choose to remove items from their System using the Consolidated   1. TVA will develop contingency plans for obtaining       the commitments are now   tracking systems upon placement of Line Item Improvement Process         and analyzing highly radioactive samples of           embodied in the UFSAR. the information into another licensing (CLLIIP) - TVA letter to NRC           reactor coolant, containment sump, and                 Based on this, changes to basis document (e.g., updated FSAR dated October 31, 2001.               containment atmosphere. The contingency plans         the commitments are now   and QA Program), to the extent that (T04011031839)                         will be contained in technical procedures and         controlled under TVA's 10 controls and reporting requirements for implemented in accordance with the License             CFR 50.59 program.       subsequent changes are consistent amendment.                                                                       with expectations mutually agreed Technical Specification Change                                                                                         upon by the licensee and NRC staff."
: 2. The capability for classifying fuel damage events approval to remove from the at the Alert level threshold will be established at Technical Specification, the radioactivity levels of greater than or equal to 300 program requirements for the pCi/gm dose equivalent iodine. This capability will post accident sampling system be described in emergency plan implementing (PASS). The administrative procedures.
WBN-TS-01-14 requested           2. The capability for classifying fuel damage events approval to remove from the           at the Alert level threshold will be established at Technical Specification, the           radioactivity levels of greater than or equal to 300 program requirements for the           pCi/gm dose equivalent iodine. This capability will post accident sampling system         be described in emergency plan implementing (PASS). The administrative             procedures.
requirements for this program were contained in Technical  
requirements for this program were contained in Technical     3. TVA will establish the capability to monitor Specification Section 5.7.2.6,         radioactive iodines that have been released to "PASS." The current post               offsite environs. This capability will be described in accident sampling and analysis         chemistry and radiation protection implementing capability through the PASS           procedures.
: 3. TVA will establish the capability to monitor Specification Section 5.7.2.6, radioactive iodines that have been released to"PASS." The current post offsite environs.
facility will continue until the design basis is changed through The procedures discussed above will be developed the formal design change         and/or revised as necessary in conjunction with process.                         implementation of the design change for eliminating PASS from the plant.
This capability will be described in accident sampling and analysis chemistry and radiation protection implementing capability through the PASS procedures.
E-2 of 6
facility will continue until the design basis is changed through The procedures discussed above will be developed the formal design change and/or revised as necessary in conjunction with process. implementation of the design change for eliminating PASS from the plant.E-2 of 6 Commitment Summary Report Commitment S Evaluation No./ Source Document Summary of Original Summaryiof Basis/Justification For Commitment Commitment Changes Changes Tracking No.NCO020053001 TVA request for amendment to the Technical Specifications for Diesel Generator (DG) Risk Informed Allowed Outage Time (AOT) extension dated 04/01/2002.
 
The amendment revises the AOT for one DG from 3 days to 14 days C104020401 TVA will develop appropriate revisions to affected site procedures to incorporate a cross-train alignment process for contingency purposes.
Commitment Summary Report Commitment                                                                                                     S Evaluation No./     Source Document                             Summary of Original                           Summaryiof             Basis/Justification For Commitment                                                           Commitment                                 Changes                       Changes Tracking No.
These procedures will ensure appropriate safe shutdown loads are available, and aligned or locked out to support availability of a complete train. The procedures will be formally approved and released for use in conjunction with the incorporation of the amendment into the Technical Soecifications.
NCO020053001   TVA request for amendment to     TVA will develop appropriate revisions to affected site  The list of commitments  NEI 99-004, "Guidelines for the Technical Specifications for procedures to incorporate a cross-train alignment        are not being revised but Managing NRC Commitment Diesel Generator (DG) Risk      process for contingency purposes. These procedures      are being removed from    Changes," states that "Licensees Informed Allowed Outage Time     will ensure appropriate safe shutdown loads are          TVA's formal commitment  who employ a formal commitment (AOT) extension dated           available, and aligned or locked out to support          tracking program because  tracking system may choose to 04/01/2002. The amendment       availability of a complete train. The procedures will be the commitments are now  remove items from their tracking revises the AOT for one DG from formally approved and released for use in conjunction    embodied in the UFSAR. systems upon placement of the 3 days to 14 days               with the incorporation of the amendment into the        Based on this, changes to information into another licensing C104020401 889*                  Technical Soecifications.                                the commitments are now  basis document (e.g., updated FSAR NCO030048005    TVA response to Bulletin 2003-  Revise 1-SI-304-2 before the upcoming Fall outage to     controlled under TVA's 10 and QA Program), to the extent that 01 - Potential Impact of Debris  inspect the drains in accumulator rooms 3 and 4 every    CFR 50.59 program.       controls and reporting requirements Blockage on Emergency Sump      outage.                                                                            for subsequent changes are Recirculation at Pressurized-                                                                                      consistent with expectations Water Reactors dated 08/08/03.                                                                                      mutually agreed upon by the
The list of commitments are not being revised but are being removed from TVA's formal commitment tracking program because the commitments are now embodied in the UFSAR.Based on this, changes to the commitments are now controlled under TVA's 10 CFR 50.59 program.NEI 99-004, "Guidelines for Managing NRC Commitment Changes," states that "Licensees who employ a formal commitment tracking system may choose to remove items from their tracking systems upon placement of the information into another licensing basis document (e.g., updated FSAR and QA Program), to the extent that controls and reporting requirements for subsequent changes are consistent with expectations mutually agreed upon by the licensee and NRC staff." NCO030048005 TVA response to Bulletin 2003- Revise 1-SI-304-2 before the upcoming Fall outage to 01 -Potential Impact of Debris inspect the drains in accumulator rooms 3 and 4 every Blockage on Emergency Sump outage.Recirculation at Pressurized-Water Reactors dated 08/08/03.('1"04030808327)
('1"04030808327)                                                                                                    licensee and NRC staff."
NCO040023001 Technical Specification Change Provide to NRC using an industry database the (WBN-TS-04-15) submitted to operating data (for each calendar month) that is NRC November 8, 2004 (T04 described in Generic Letter 97-02, "Revised Contents of 041108 870) and approved by the Monthly Operating Report," by the last day of the NRC 03/21/2005 (L44 050328 month following the end of each calendar quarter. The 001) committed to revise UFSAR regulatory commitment will be based on use of an to add this Regulatory industry database (e.g., the industry's Consolidated Commitment.
NCO040023001    Technical Specification Change  Provide to NRC using an industry database the (WBN-TS-04-15) submitted to      operating data (for each calendar month) that is NRC November 8, 2004 (T04        described in Generic Letter 97-02, "Revised Contents of 041108 870) and approved by      the Monthly Operating Report," by the last day of the NRC 03/21/2005 (L44 050328      month following the end of each calendar quarter. The 001) committed to revise UFSAR  regulatory commitment will be based on use of an to add this Regulatory          industry database (e.g., the industry's Consolidated Commitment.                      Data Entry [CDE] program, currently being developed and maintained by the Institute of Nuclear Power Operations [INPO]. This regulatory commitment will be implemented to prevent any gaps in the monthly operating statistics and shutdown experience provided to the NRC (i.e., data for all months will be provided using one or both systems [monthly operating reports and CDE]).
Data Entry [CDE] program, currently being developed and maintained by the Institute of Nuclear Power Operations
NCO06001 1001  As discussed in NUMARC 91-06    Assess current practices, using NUMARC 91-06, approved by the NUMARC Board    "Guidelines for Industry Actions to Assess Shutdown of Directors on November 20,     Management," to plan and conduct outages.
[INPO]. This regulatory commitment will be implemented to prevent any gaps in the monthly operating statistics and shutdown experience provided to the NRC (i.e., data for all months will be provided using one or both systems [monthly operating reports and CDE]).NCO06001 1001 As discussed in NUMARC 91-06 approved by the NUMARC Board of Directors on November 20, 1991.Assess current practices, using NUMARC 91-06,"Guidelines for Industry Actions to Assess Shutdown Management," to plan and conduct outages.Improvements adopted as a result of the assessment will be implemented for outages started after December 31.1992.E-3 of 6 Commitment Summary Report Commitment Evaluation No.) Source Document Summary of Original Commitmentary of Basis/Justification For Commitment Commitment Changes Changes Tracking No.NCO06001 9001 The commitment was made for Obsolescence
1991.                            Improvements adopted as a result of the assessment will be implemented for outages started after December 31.1992.
-If surplus market is used, ESTABLISH The list of commitments NEI 99-004, "Guidelines for Managing the nuclear industry in NEI 90- product performance through traceability to Original are not being revised but NRC Commitment Changes," states 13, "Nuclear Procurement Equipment Manufacturers, or performance of tests and are being removed from that "Licensees who employ a formal Program Initiatives:" inspections.
E-3 of 6
General Procurement
 
-When procuring TVA's formal commitment commitment tracking system may through other channels, ESTABLISH product tracking program because choose to remove items from their performance through traceability to Original Equipment the commitments are now tracking systems upon placement of Manufacturers, or performance of tests and inspections, embodied in the UFSAR. the information into another licensing Based on this, changes to basis document (e.g., updated FSAR NCO060020001 This commitment was made for Each licensee will endorse, support and meet the intent the commitments are now and QA Program), to the extent that the nuclear industry in NEI 03- of NEI 03-08, Guideline for the Management of controlled under TVA's 10 controls and reporting requirements 08, "Guideline for the Materials Issues. This initiative is effective January 2, CFR 50.59 program. for subsequent changes are Management of Materials 2004. consistent with expectations mutually Issues:" agreed upon by the licensee and NRC NCO070014001 These commitments were made WBN will include the SFP external makeup strategy and staff." in TVA's letter to NRC dated SFP external spray strategy as described in the general February 26, 2007. This letter description in Attachment 1 in plant addressed the implementation of procedures/guidelines (Tables A.2-1 -A.2-6).NCO070014002 a series of mitigation strategies WBN will include the command and control related to the spent fuel pool, the enhancement strategies as described in the general reactor and the containment, description in Attachment 1 in plant procedures/guidelines (Tables A.3-1).NCO070014003 WBN will fully implement the PWR mitigation strategies as described in the general description in Attachment 1 in plant procedures/guidelines (Tables A.4-1 -A.4-7).NCO070014004 WBN will list the viable site specific reactor/containment strategies described in Attachment 1 that could be used by emergency response organization or plant personnel in appropriate procedures/guidelines (Table A.6-1).NCO070014005 WBN will conduct training on the mitigation strategy procedures/guidelines.
Commitment Summary Report Commitment Evaluation No.)     Source Document                                Summary of Original                            Commitmentary of           Basis/Justification For Commitment                                                              Commitment                                   Changes                        Changes Tracking No.
Training on the procedures/guidelines will be commensurate with the level of training provided for Severe Accident Management Guidelines (SAMGs).E-4 of 6 Commitment Summary Report Commitment Summary of Evaluation No./ Source Document Summary of Original Commitment BasislJustification For Commitment Commitment Changes Changes Tracking No.NCO080001 001 As discussed in TVA's letter to Upon approval of the 1-RI-ISI-0-3 program, procedures The list of commitments NEI 99-004, "Guidelines for Managing NRC with a proposed Risk that comply with the guidelines described in EPRI TR- are not being revised but NRC Commitment Changes," states Informed Inservice Inspection 112657 will be prepared to implement and monitor the are being removed from that "Licensees who employ a formal Program dated December 04, program. The new program will be implemented for the TVA's formal commitment commitment tracking system may 2007. (104071204840) second inservice inspection interval, tracking program because choose to remove items from their NCO080030001 TVA License Amendment WBN Unit 1 will revise procedures to include the the commitments are now tracking systems upon placement of request TS-08-08 to revise ice requirements for ice condenser inspections within 24 embodied in the UFSAR. the information into another licensing condenser licensing basis dated hours following an OBE or greater that occurs within Based on this, changes to basis document (e.g., updated FSAR 09/19/2008. (C04080919899) five weeks of ice basket maintenance, the commitments are now and QA Program), to the extent that NCO080031 001 As discussed in the model SE 1. TVA has verified that a hydrogen monitoring system controlled under TVA's 10 controls and reporting requirements published in the Federal Register capable of diagnosing beyond design-basis accidents is CFR 50.59 program. for subsequent changes are on September 25, 2003 (68 FR installed at WBN and is making a regulatory consistent with expectations mutually 55416) for this TS improvement, commitment to maintain that capability.
NCO06001 9001  The commitment was made for        Obsolescence - If surplus market is used, ESTABLISH      The list of commitments  NEI 99-004, "Guidelines for Managing the nuclear industry in NEI 90-    product performance through traceability to Original      are not being revised but NRC Commitment Changes," states 13, "Nuclear Procurement            Equipment Manufacturers, or performance of tests and     are being removed from    that "Licensees who employ a formal Program Initiatives:"              inspections. General Procurement - When procuring        TVA's formal commitment  commitment tracking system may through other channels, ESTABLISH product                tracking program because  choose to remove items from their performance through traceability to Original Equipment    the commitments are now  tracking systems upon placement of Manufacturers, or performance of tests and inspections,  embodied in the UFSAR. the information into another licensing Based on this, changes to basis document (e.g., updated FSAR NCO060020001    This commitment was made for        Each licensee will endorse, support and meet the intent  the commitments are now  and QA Program), to the extent that the nuclear industry in NEI 03-    of NEI 03-08, Guideline for the Management of             controlled under TVA's 10 controls and reporting requirements 08, "Guideline for the              Materials Issues. This initiative is effective January 2, CFR 50.59 program.        for subsequent changes are Management of Materials            2004.                                                                              consistent with expectations mutually Issues:"                                                                                                               agreed upon by the licensee and NRC NCO070014001    These commitments were made        WBN will include the SFP external makeup strategy and                              staff."
The hydrogen agreed upon by the licensee and TVA is making the following monitoring function will be included in the WBN NRC staff." verifications and regulatory Technical Requirements Manual. This regulatory commitment.
in TVA's letter to NRC dated        SFP external spray strategy as described inthe general February 26, 2007. This letter      description in Attachment 1 in plant addressed the implementation of     procedures/guidelines (Tables A.2 A.2-6).
commitment will be implemented in conjunction with the implementation of the proposed TS revision.2. WBN does not have an inerted containment.
NCO070014002    a series of mitigation strategies  WBN will include the command and control related to the spent fuel pool, the enhancement strategies as described in the general reactor and the containment,       description in Attachment 1 in plant procedures/guidelines (Tables A.3-1).
NCO080004001 As discussed in TVA's response The component level criteria will be revised to be more to RAI for TS Change TS-07-04, consistent with the reliability assumptions in WCAPS.Reactor Trip system/Engineered The card failure criteria will be revised to no more than Safety Feature Logic, Reactor 1 card failure (universal, safeguards or undervoltage Trip Breaker Allowable Outage output) per 24 months. The relay failure criteria will be Time, and Surveillance Testing revised to not more than 1 relay failure per 24 months.Interval Relaxations dated 12/26/2007. (T04071226845)
NCO070014003                                        WBN will fully implement the PWR mitigation strategies as described in the general description in Attachment 1 in plant procedures/guidelines (Tables A.4 A.4-7).
E-5 of 6 Commitment Summary Report Commitment Evaluation No. Source Document Summary of Original Commitmentary of Basis/Justification For Commitment Commitment Changes Changes Tracking No.NCO080005001 As discussed in TVA's response The procedure governing the risk matrix will be revised The list of commitments NEI 99-004, "Guidelines for Managing to RAI for TS Change TS-07-04, to include the restrictions discussed in the WBN are not being revised but NRC Commitment Changes," states Reactor Trip system/Engineered submittal.
NCO070014004                                        WBN will list the viable site specific reactor/
This change will be implemented as part of are being removed from that "Licensees who employ a formal Safety Feature Logic, Reactor the license amendment.
containment strategies described in Attachment 1 that could be used by emergency response organization or plant personnel in appropriate procedures/guidelines (Table A.6-1).
TVA's formal commitment commitment tracking system may Trip Breaker Allowable Outage tracking program because choose to remove items from their Time, and Surveillance Testing the commitments are now tracking systems upon placement of Interval Relaxations dated embodied in the UFSAR. the information into another licensing 12/26/2007. (T04071226845)
NCO070014005                                        WBN will conduct training on the mitigation strategy procedures/guidelines. Training on the procedures/guidelines will be commensurate with the level of training provided for Severe Accident Management Guidelines (SAMGs).
Based on this, changes to basis document (e.g., updated FSAR 111952889 As discussed in IVA's corrected As an administrative control, TVA will revise WBN Unit the commitments are now and QA Program), to the extent that response to RAI for ASME Boiler 1 UFSAR Section 5.2.1.5 and UFSAR Table 5.2-2 to controlled under TVA's 10 controls and reporting requirements for and Pressure Vessel Code, prohibit the performance of a Turbine Roll Test or a CFR 50.59 program. subsequent changes are consistent Section XI -Reactor Pressure Hydrostatic Test transient.
E-4 of 6
In addition, site procedure 1- with expectations mutually agreed Vessel Head (RPVH) SI-0-8 will be revised to reflect that any additional upon by the licensee and NRC staff." Penetration Tube Remote Inner- performances of these tests will exceed the maximum Diameter Temper Bead (IDTB) -allowed by the plant's licensing basis. This Generic Request for Relief G- administrative control will be implemented only if an RR-2 dated February 07, 2008. IDTP repair is made under the purview of this request (T04080207853) for relief.112576642 This commitment was made for NEI 07-07 was developed to describe the industry's the nuclear industry in NEI 07- Ground Water Protection Initiative.
 
The Ground Water 07, Ground Water Protection Protection Initiative identifies actions to improve utilities' Initiative:" management and response to instances where the inadvertent release of radioactive substances may result in low but detectible levels of plant-related materials in subsurface soils and water.It is expected that this Initiative will be implemented by each member company currently operating or decommissioning a nuclear power plant and by each member company constructing a new plant after year 2006.E-6 of 6}}
Commitment Summary Report Commitment                                                                                                      Summary of Evaluation No./      Source Document                            Summary of Original                            Commitment              BasislJustification For Commitment                                                          Commitment                                  Changes                        Changes Tracking No.
NCO080001 001  As discussed in TVA's letter to Upon approval of the 1-RI-ISI-0-3 program, procedures    The list of commitments  NEI 99-004, "Guidelines for Managing NRC with a proposed Risk        that comply with the guidelines described in EPRI TR-    are not being revised but NRC Commitment Changes," states Informed Inservice Inspection    112657 will be prepared to implement and monitor the     are being removed from    that "Licensees who employ a formal Program dated December 04,      program. The new program will be implemented for the     TVA's formal commitment  commitment tracking system may 2007. (104071204840)             second inservice inspection interval,                    tracking program because  choose to remove items from their NCO080030001    TVA License Amendment            WBN Unit 1 will revise procedures to include the         the commitments are now  tracking systems upon placement of request TS-08-08 to revise ice  requirements for ice condenser inspections within 24      embodied in the UFSAR. the information into another licensing condenser licensing basis dated  hours following an OBE or greater that occurs within      Based on this, changes to basis document (e.g., updated FSAR 09/19/2008. (C04080919899)      five weeks of ice basket maintenance,                    the commitments are now  and QA Program), to the extent that NCO080031 001  As discussed in the model SE    1. TVA has verified that a hydrogen monitoring system     controlled under TVA's 10 controls and reporting requirements published in the FederalRegister capable of diagnosing beyond design-basis accidents is    CFR 50.59 program.        for subsequent changes are on September 25, 2003 (68 FR    installed at WBN and is making a regulatory                                        consistent with expectations mutually 55416) for this TS improvement, commitment to maintain that capability. The hydrogen                                agreed upon by the licensee and TVA is making the following      monitoring function will be included in the WBN                                    NRC staff."
verifications and regulatory    Technical Requirements Manual. This regulatory commitment.                     commitment will be implemented in conjunction with the implementation of the proposed TS revision.
: 2. WBN does not have an inerted containment.
NCO080004001   As discussed in TVA's response   The component level criteria will be revised to be more to RAI for TS Change TS-07-04,   consistent with the reliability assumptions in WCAPS.
Reactor Trip system/Engineered   The card failure criteria will be revised to no more than Safety Feature Logic, Reactor   1 card failure (universal, safeguards or undervoltage Trip Breaker Allowable Outage   output) per 24 months. The relay failure criteria will be Time, and Surveillance Testing   revised to not more than 1 relay failure per 24 months.
Interval Relaxations dated 12/26/2007. (T04071226845)
E-5 of 6
 
Commitment Summary Report Commitment Evaluation No.       Source Document                           Summary of Original                                 Commitmentary of         Basis/Justification For Commitment                                                         Commitment                                       Changes                       Changes Tracking No.
NCO080005001   As discussed in TVA's response The procedure governing the risk matrix will be revised       The list of commitments   NEI 99-004, "Guidelines for Managing to RAI for TS Change TS-07-04, to include the restrictions discussed in the WBN               are not being revised but NRC Commitment Changes," states Reactor Trip system/Engineered submittal. This change will be implemented as part of         are being removed from   that "Licensees who employ a formal Safety Feature Logic, Reactor   the license amendment.                                         TVA's formal commitment   commitment tracking system may Trip Breaker Allowable Outage                                                                 tracking program because choose to remove items from their Time, and Surveillance Testing                                                                 the commitments are now   tracking systems upon placement of Interval Relaxations dated                                                                     embodied in the UFSAR. the information into another licensing 12/26/2007. (T04071226845)                                                                     Based on this, changes to basis document (e.g., updated FSAR 111952889   As discussed in IVA's corrected As an administrative control, TVA will revise WBN Unit         the commitments are now   and QA Program), to the extent that response to RAI for ASME Boiler 1 UFSAR Section 5.2.1.5 and UFSAR Table 5.2-2 to               controlled under TVA's 10 controls and reporting requirements for and Pressure Vessel Code,       prohibit the performance of a Turbine Roll Test or a           CFR 50.59 program.       subsequent changes are consistent Section XI - Reactor Pressure   Hydrostatic Test transient. In addition, site procedure 1-                               with expectations mutually agreed Vessel Head (RPVH)             SI-0-8 will be revised to reflect that any additional                                   upon by the licensee and NRC staff."
Penetration Tube Remote Inner- performances of these tests will exceed the maximum Diameter Temper Bead (IDTB) -   allowed by the plant's licensing basis. This Generic Request for Relief G-   administrative control will be implemented only ifan RR-2 dated February 07, 2008. IDTP repair is made under the purview of this request (T04080207853)                 for relief.
112576642   This commitment was made for   NEI 07-07 was developed to describe the industry's the nuclear industry in NEI 07- Ground Water Protection Initiative. The Ground Water 07, Ground Water Protection     Protection Initiative identifies actions to improve utilities' Initiative:"                   management and response to instances where the inadvertent release of radioactive substances may result in low but detectible levels of plant-related materials in subsurface soils and water.
It is expected that this Initiative will be implemented by each member company currently operating or decommissioning a nuclear power plant and by each member company constructing a new plant after year 2006.
E-6 of 6}}

Latest revision as of 12:39, 12 November 2019

Commitment Summary Report
ML11326A284
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/18/2011
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11326A284 (8)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 November 18, 2011 10 CFR 50.4 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390

Subject:

Commitment Summary Report The purpose of this letter is to provide the Watts Bar Nuclear Plant (WBN), Unit 1 Commitment Summary Report for December 5, 2009, through June 29, 2011. This report, which summarizes docketed commitments the Tennessee Valley Authority (TVA) has evaluated and revised using administrative controls during this time period, is provided in accordance with the Nuclear Energy Institute's "Guidelines for Managing NRC Commitment Changes," as endorsed in NRC Regulatory Issue Summary 2000-17.

There are no regulatory commitments associated with this submittal. Please direct any questions concerning this submittal to Kara Stacy, Program Manager at (423) 751-3489.

Respectfu[

Enclosure:

WBN, Unit 1 Commitment Summary Report cc (Enclosure):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 1 NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 2 Dom Printedon recycledpaper

Enclosure WBN, Unit I Commitment Summary Report

Commitment Summary Report Commitment Summary of Evaluation No./ Source Document Summary of Original Commitment Basis/Justification For Commitment Commitment Changes Changes Tracking No.

NCO960070003 TVA response to NRC RAI for A plant operating instruction will be revised to require The list of commitments NEI 99-004, "Guidelines for Managing License Amendment to Technical restrictions to ensure that the maximum design heat are not being revised but NRC Commitment Changes," states Specifications - Spent Fuel Pool load limits will not be exceeded. are being removed from that "Licensees who employ a formal Storage Capacity Increase dated TVA's formal commitment commitment tracking system may 02/10/1997. ('04970210395) tracking program choose to remove items from their NC0960074003 TVA response to Notice of In the long-term, TVA plans to implement a change to because the tracking systems upon placement of Violation - NRC Inspection the security system software which will prevent multiple commitments are now the information into another licensing Report 50-390/96-12 and 50- tumstiles from being unlocked by a single individual, embodied in the UFSAR. basis document (e.g., updated FSAR 391/96-12 dated 12/18/1996. This includes written procedures and training the Based on this, changes and QA Program), to the extent that The protected area access officers on this feature. These long term actions will be to the commitments are controls and reporting requirements for control system needs completed by January 31, 1997. now controlled under subsequent changes are consistent management attention to ensure TVA's with expectations mutually agreed that personnel are not capable of 10 CFR 50.59 program. upon by the licensee and NRC staff."

tailgating into the protected area.

('1"04961216384)

NC0970046004 TVA License Amendment to TVA will revise the Emergency Operating Procedures to address Cycle 2 core design reflect the new hot leg switchover time required to changes and provide operational prevent boron precipitation.

enhancements for reactor trip setpoints dated 03/27/1997.

(T"04970327414)

E-1 of 6

Commitment Summary Report Commitment Summary of Evaluation No./ Source Document Summary of Original Commitment Basis/Justification For Commitment Commitment Changes Changes Tracking No.

NCO010008001 Technical Specification Change As discussed in the notice of availability published in The list of commitments NEI 99-004, "Guidelines for Managing No. WBN-TS-01 Application Federal Register on October 31, 2000, for this technical are not being revised but NRC Commitment Changes," states for Technical Specification specification improvement, plant-specific verifications are being removed from that "Licensees who employ a formal Improvement to Eliminate will be performed as described below TVA's formal commitment commitment tracking system may Requirements for Post Accident tracking program because choose to remove items from their System using the Consolidated 1. TVA will develop contingency plans for obtaining the commitments are now tracking systems upon placement of Line Item Improvement Process and analyzing highly radioactive samples of embodied in the UFSAR. the information into another licensing (CLLIIP) - TVA letter to NRC reactor coolant, containment sump, and Based on this, changes to basis document (e.g., updated FSAR dated October 31, 2001. containment atmosphere. The contingency plans the commitments are now and QA Program), to the extent that (T04011031839) will be contained in technical procedures and controlled under TVA's 10 controls and reporting requirements for implemented in accordance with the License CFR 50.59 program. subsequent changes are consistent amendment. with expectations mutually agreed Technical Specification Change upon by the licensee and NRC staff."

WBN-TS-01-14 requested 2. The capability for classifying fuel damage events approval to remove from the at the Alert level threshold will be established at Technical Specification, the radioactivity levels of greater than or equal to 300 program requirements for the pCi/gm dose equivalent iodine. This capability will post accident sampling system be described in emergency plan implementing (PASS). The administrative procedures.

requirements for this program were contained in Technical 3. TVA will establish the capability to monitor Specification Section 5.7.2.6, radioactive iodines that have been released to "PASS." The current post offsite environs. This capability will be described in accident sampling and analysis chemistry and radiation protection implementing capability through the PASS procedures.

facility will continue until the design basis is changed through The procedures discussed above will be developed the formal design change and/or revised as necessary in conjunction with process. implementation of the design change for eliminating PASS from the plant.

E-2 of 6

Commitment Summary Report Commitment S Evaluation No./ Source Document Summary of Original Summaryiof Basis/Justification For Commitment Commitment Changes Changes Tracking No.

NCO020053001 TVA request for amendment to TVA will develop appropriate revisions to affected site The list of commitments NEI 99-004, "Guidelines for the Technical Specifications for procedures to incorporate a cross-train alignment are not being revised but Managing NRC Commitment Diesel Generator (DG) Risk process for contingency purposes. These procedures are being removed from Changes," states that "Licensees Informed Allowed Outage Time will ensure appropriate safe shutdown loads are TVA's formal commitment who employ a formal commitment (AOT) extension dated available, and aligned or locked out to support tracking program because tracking system may choose to 04/01/2002. The amendment availability of a complete train. The procedures will be the commitments are now remove items from their tracking revises the AOT for one DG from formally approved and released for use in conjunction embodied in the UFSAR. systems upon placement of the 3 days to 14 days with the incorporation of the amendment into the Based on this, changes to information into another licensing C104020401 889* Technical Soecifications. the commitments are now basis document (e.g., updated FSAR NCO030048005 TVA response to Bulletin 2003- Revise 1-SI-304-2 before the upcoming Fall outage to controlled under TVA's 10 and QA Program), to the extent that 01 - Potential Impact of Debris inspect the drains in accumulator rooms 3 and 4 every CFR 50.59 program. controls and reporting requirements Blockage on Emergency Sump outage. for subsequent changes are Recirculation at Pressurized- consistent with expectations Water Reactors dated 08/08/03. mutually agreed upon by the

('1"04030808327) licensee and NRC staff."

NCO040023001 Technical Specification Change Provide to NRC using an industry database the (WBN-TS-04-15) submitted to operating data (for each calendar month) that is NRC November 8, 2004 (T04 described in Generic Letter 97-02, "Revised Contents of 041108 870) and approved by the Monthly Operating Report," by the last day of the NRC 03/21/2005 (L44 050328 month following the end of each calendar quarter. The 001) committed to revise UFSAR regulatory commitment will be based on use of an to add this Regulatory industry database (e.g., the industry's Consolidated Commitment. Data Entry [CDE] program, currently being developed and maintained by the Institute of Nuclear Power Operations [INPO]. This regulatory commitment will be implemented to prevent any gaps in the monthly operating statistics and shutdown experience provided to the NRC (i.e., data for all months will be provided using one or both systems [monthly operating reports and CDE]).

NCO06001 1001 As discussed in NUMARC 91-06 Assess current practices, using NUMARC 91-06, approved by the NUMARC Board "Guidelines for Industry Actions to Assess Shutdown of Directors on November 20, Management," to plan and conduct outages.

1991. Improvements adopted as a result of the assessment will be implemented for outages started after December 31.1992.

E-3 of 6

Commitment Summary Report Commitment Evaluation No.) Source Document Summary of Original Commitmentary of Basis/Justification For Commitment Commitment Changes Changes Tracking No.

NCO06001 9001 The commitment was made for Obsolescence - If surplus market is used, ESTABLISH The list of commitments NEI 99-004, "Guidelines for Managing the nuclear industry in NEI 90- product performance through traceability to Original are not being revised but NRC Commitment Changes," states 13, "Nuclear Procurement Equipment Manufacturers, or performance of tests and are being removed from that "Licensees who employ a formal Program Initiatives:" inspections. General Procurement - When procuring TVA's formal commitment commitment tracking system may through other channels, ESTABLISH product tracking program because choose to remove items from their performance through traceability to Original Equipment the commitments are now tracking systems upon placement of Manufacturers, or performance of tests and inspections, embodied in the UFSAR. the information into another licensing Based on this, changes to basis document (e.g., updated FSAR NCO060020001 This commitment was made for Each licensee will endorse, support and meet the intent the commitments are now and QA Program), to the extent that the nuclear industry in NEI 03- of NEI 03-08, Guideline for the Management of controlled under TVA's 10 controls and reporting requirements 08, "Guideline for the Materials Issues. This initiative is effective January 2, CFR 50.59 program. for subsequent changes are Management of Materials 2004. consistent with expectations mutually Issues:" agreed upon by the licensee and NRC NCO070014001 These commitments were made WBN will include the SFP external makeup strategy and staff."

in TVA's letter to NRC dated SFP external spray strategy as described inthe general February 26, 2007. This letter description in Attachment 1 in plant addressed the implementation of procedures/guidelines (Tables A.2 A.2-6).

NCO070014002 a series of mitigation strategies WBN will include the command and control related to the spent fuel pool, the enhancement strategies as described in the general reactor and the containment, description in Attachment 1 in plant procedures/guidelines (Tables A.3-1).

NCO070014003 WBN will fully implement the PWR mitigation strategies as described in the general description in Attachment 1 in plant procedures/guidelines (Tables A.4 A.4-7).

NCO070014004 WBN will list the viable site specific reactor/

containment strategies described in Attachment 1 that could be used by emergency response organization or plant personnel in appropriate procedures/guidelines (Table A.6-1).

NCO070014005 WBN will conduct training on the mitigation strategy procedures/guidelines. Training on the procedures/guidelines will be commensurate with the level of training provided for Severe Accident Management Guidelines (SAMGs).

E-4 of 6

Commitment Summary Report Commitment Summary of Evaluation No./ Source Document Summary of Original Commitment BasislJustification For Commitment Commitment Changes Changes Tracking No.

NCO080001 001 As discussed in TVA's letter to Upon approval of the 1-RI-ISI-0-3 program, procedures The list of commitments NEI 99-004, "Guidelines for Managing NRC with a proposed Risk that comply with the guidelines described in EPRI TR- are not being revised but NRC Commitment Changes," states Informed Inservice Inspection 112657 will be prepared to implement and monitor the are being removed from that "Licensees who employ a formal Program dated December 04, program. The new program will be implemented for the TVA's formal commitment commitment tracking system may 2007. (104071204840) second inservice inspection interval, tracking program because choose to remove items from their NCO080030001 TVA License Amendment WBN Unit 1 will revise procedures to include the the commitments are now tracking systems upon placement of request TS-08-08 to revise ice requirements for ice condenser inspections within 24 embodied in the UFSAR. the information into another licensing condenser licensing basis dated hours following an OBE or greater that occurs within Based on this, changes to basis document (e.g., updated FSAR 09/19/2008. (C04080919899) five weeks of ice basket maintenance, the commitments are now and QA Program), to the extent that NCO080031 001 As discussed in the model SE 1. TVA has verified that a hydrogen monitoring system controlled under TVA's 10 controls and reporting requirements published in the FederalRegister capable of diagnosing beyond design-basis accidents is CFR 50.59 program. for subsequent changes are on September 25, 2003 (68 FR installed at WBN and is making a regulatory consistent with expectations mutually 55416) for this TS improvement, commitment to maintain that capability. The hydrogen agreed upon by the licensee and TVA is making the following monitoring function will be included in the WBN NRC staff."

verifications and regulatory Technical Requirements Manual. This regulatory commitment. commitment will be implemented in conjunction with the implementation of the proposed TS revision.

2. WBN does not have an inerted containment.

NCO080004001 As discussed in TVA's response The component level criteria will be revised to be more to RAI for TS Change TS-07-04, consistent with the reliability assumptions in WCAPS.

Reactor Trip system/Engineered The card failure criteria will be revised to no more than Safety Feature Logic, Reactor 1 card failure (universal, safeguards or undervoltage Trip Breaker Allowable Outage output) per 24 months. The relay failure criteria will be Time, and Surveillance Testing revised to not more than 1 relay failure per 24 months.

Interval Relaxations dated 12/26/2007. (T04071226845)

E-5 of 6

Commitment Summary Report Commitment Evaluation No. Source Document Summary of Original Commitmentary of Basis/Justification For Commitment Commitment Changes Changes Tracking No.

NCO080005001 As discussed in TVA's response The procedure governing the risk matrix will be revised The list of commitments NEI 99-004, "Guidelines for Managing to RAI for TS Change TS-07-04, to include the restrictions discussed in the WBN are not being revised but NRC Commitment Changes," states Reactor Trip system/Engineered submittal. This change will be implemented as part of are being removed from that "Licensees who employ a formal Safety Feature Logic, Reactor the license amendment. TVA's formal commitment commitment tracking system may Trip Breaker Allowable Outage tracking program because choose to remove items from their Time, and Surveillance Testing the commitments are now tracking systems upon placement of Interval Relaxations dated embodied in the UFSAR. the information into another licensing 12/26/2007. (T04071226845) Based on this, changes to basis document (e.g., updated FSAR 111952889 As discussed in IVA's corrected As an administrative control, TVA will revise WBN Unit the commitments are now and QA Program), to the extent that response to RAI for ASME Boiler 1 UFSAR Section 5.2.1.5 and UFSAR Table 5.2-2 to controlled under TVA's 10 controls and reporting requirements for and Pressure Vessel Code, prohibit the performance of a Turbine Roll Test or a CFR 50.59 program. subsequent changes are consistent Section XI - Reactor Pressure Hydrostatic Test transient. In addition, site procedure 1- with expectations mutually agreed Vessel Head (RPVH) SI-0-8 will be revised to reflect that any additional upon by the licensee and NRC staff."

Penetration Tube Remote Inner- performances of these tests will exceed the maximum Diameter Temper Bead (IDTB) - allowed by the plant's licensing basis. This Generic Request for Relief G- administrative control will be implemented only ifan RR-2 dated February 07, 2008. IDTP repair is made under the purview of this request (T04080207853) for relief.

112576642 This commitment was made for NEI 07-07 was developed to describe the industry's the nuclear industry in NEI 07- Ground Water Protection Initiative. The Ground Water 07, Ground Water Protection Protection Initiative identifies actions to improve utilities' Initiative:" management and response to instances where the inadvertent release of radioactive substances may result in low but detectible levels of plant-related materials in subsurface soils and water.

It is expected that this Initiative will be implemented by each member company currently operating or decommissioning a nuclear power plant and by each member company constructing a new plant after year 2006.

E-6 of 6