ML18096A735: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 05/15/1992
| issue date = 05/15/1992
| title = Ro:On 920423,fire Pump 1 Declared Inoperable & Remains Inoperable Due to Broken Crankshaft.Both Fire Suppression Sys Inoperable.On 920515,fire Pump 2 Declared Inoperable Due to Severe Oil Leak.Written Rept to Be Provided in 14 Days
| title = Ro:On 920423,fire Pump 1 Declared Inoperable & Remains Inoperable Due to Broken Crankshaft.Both Fire Suppression Sys Inoperable.On 920515,fire Pump 2 Declared Inoperable Due to Severe Oil Leak.Written Rept to Be Provided in 14 Days
| author name = LABRUNA S
| author name = Labruna S
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 23.6, Hancocks Bridge, NJ 08038 609-339-1200
{{#Wiki_filter:Public Service Electric and Gas Company Stanley LaBruna                     Public Service Electric and Gas Company P.O. Box 23.6, Hancocks Bridge, NJ 08038 609-339-1200
* Vice President  
* Vice President - Nuclear Operations MAY 1 ~ 1992 NLR-N92072 united states ~Nuclear Regtilatory**commission Document Control Desk Washington, DC 20555 Gentlemen:
-Nuclear Operations MAY 1 1992 NLR-N92072 united states Regtilatory**commission Document Control Desk Washington, DC 20555 Gentlemen:
CONFIRMATORY LETTER REGARDING THE INOPERABILITY OF SALEM STATION FIRE PUMPS DOCKET NOS. 50-272 AND 50-311 No. 1 Fire Pump was declared inoperable on April 23, 1992, and remains inoperable due to a broken crankshaft. Repairs to the crankshaft are being performed at the manufac.turer' s facility.
CONFIRMATORY LETTER REGARDING THE INOPERABILITY OF SALEM STATION FIRE PUMPS DOCKET NOS. 50-272 AND 50-311 No. 1 Fire Pump was declared inoperable on April 23, 1992, and remains inoperable due to a broken crankshaft.
On May 15, 1992, during performance of a surveillance test the No~ 2 Fire Pump was declared inoperable due to a s~vere oil leak.
Repairs to the crankshaft are being performed at the manufac.turer' s facility.
Accordingly, consistent with the Salem Units 1 and 2 Technical
On May 15, 1992, during performance of a surveillance test the 2 Fire Pump was declared inoperable due to a oil leak. Accordingly, consistent with the Salem Units 1 and 2 Technical .specification requirements (3.7.10.1 Action b), with both fire -suppression systems inoperable, PSE&G established a back up fire suppression system and reported the event to Nuclear Regulatory Commission in accordance with the requirements of the Emergency Classification Guide Section.18 initiating condition R. Pursuant to the requirements of Salem Technical Specification 3.7.10.1 Action b, PSE&G hereby submits this confirmatory letter documenting the Fire Pumps inoperability.
          .specification requirements (3.7.10.1 Action b), with both fire
Additionally, in accordance with Salem Technical Specification requirements, a written report will be provided to the Commission within 14 days of the event outlining the cause of the inoperability, the corrective actions taken, and a schedule for restoring the system .to operable status. Should you have any questions in regard to this transmittal, do not hesitate to call. -')) _,.. .-.. .r ... ,*, d; 9205290022 920515 PDR ADOCK 05000272 S PDR I, . . / \*'-'' .... __ ,/
          -suppression systems inoperable, PSE&G established a back up fire suppression system and reported the event to Nuclear Regulatory Commission in accordance with the requirements of the Emergency Classification Guide Section.18 initiating condition R.
tk' lf:iVJ}J . I l '\', \J J Document Control Desk NLR-N92072 c Mr. J. c. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector 2 Mr. Martin, Administrator Region I Mr. Kent Tosch, Chief --New Jersey Department of Environmental
Pursuant to the requirements of Salem Technical Specification 3.7.10.1 Action b, PSE&G hereby submits this confirmatory letter documenting the Fire Pumps inoperability. Additionally, in accordance with Salem Technical Specification requirements, a written report will be provided to the Commission within 14 days of the event outlining the cause of the inoperability, the corrective actions taken, and a schedule for restoring the system
_Protection Division of Environmental Quality
          .to operable status.
* Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 MAY 1 5 1992}}
Should you have any questions in regard to this transmittal, do not hesitate to call.
                                                                                                                                          -'))
_,. .-. .r
                                                                                                                          . . ,*, d; I,     ~-          .   .
                                                                                                                            \*'-''         ~*
                                                                                                                    ... _ ,/
                                                                                                                      /
                                                                                                                                      -/._~ tk' lf:iVJ}J . I l 9205290022 920515 PDR ADOCK 05000272
                                                                                                                              '\', \J J
S                      PDR
 
                                            --        MAY 1 5 1992 Document Control Desk           2 NLR-N92072 c   Mr. J. c. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T~ Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental _Protection Division of Environmental Quality
* Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625}}

Latest revision as of 10:17, 21 October 2019

Ro:On 920423,fire Pump 1 Declared Inoperable & Remains Inoperable Due to Broken Crankshaft.Both Fire Suppression Sys Inoperable.On 920515,fire Pump 2 Declared Inoperable Due to Severe Oil Leak.Written Rept to Be Provided in 14 Days
ML18096A735
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/15/1992
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLR-N92072, NUDOCS 9205290022
Download: ML18096A735 (2)


Text

Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 23.6, Hancocks Bridge, NJ 08038 609-339-1200

  • Vice President - Nuclear Operations MAY 1 ~ 1992 NLR-N92072 united states ~Nuclear Regtilatory**commission Document Control Desk Washington, DC 20555 Gentlemen:

CONFIRMATORY LETTER REGARDING THE INOPERABILITY OF SALEM STATION FIRE PUMPS DOCKET NOS. 50-272 AND 50-311 No. 1 Fire Pump was declared inoperable on April 23, 1992, and remains inoperable due to a broken crankshaft. Repairs to the crankshaft are being performed at the manufac.turer' s facility.

On May 15, 1992, during performance of a surveillance test the No~ 2 Fire Pump was declared inoperable due to a s~vere oil leak.

Accordingly, consistent with the Salem Units 1 and 2 Technical

.specification requirements (3.7.10.1 Action b), with both fire

-suppression systems inoperable, PSE&G established a back up fire suppression system and reported the event to Nuclear Regulatory Commission in accordance with the requirements of the Emergency Classification Guide Section.18 initiating condition R.

Pursuant to the requirements of Salem Technical Specification 3.7.10.1 Action b, PSE&G hereby submits this confirmatory letter documenting the Fire Pumps inoperability. Additionally, in accordance with Salem Technical Specification requirements, a written report will be provided to the Commission within 14 days of the event outlining the cause of the inoperability, the corrective actions taken, and a schedule for restoring the system

.to operable status.

Should you have any questions in regard to this transmittal, do not hesitate to call.

-'))

_,. .-. .r

. . ,*, d; I, ~- . .

\*'- ~*

... _ ,/

/

-/._~ tk' lf:iVJ}J . I l 9205290022 920515 PDR ADOCK 05000272

'\', \J J

S PDR

-- MAY 1 5 1992 Document Control Desk 2 NLR-N92072 c Mr. J. c. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T~ Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental _Protection Division of Environmental Quality

  • Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625