ML061710356: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 05/15/2006
| issue date = 05/15/2006
| title = Proposed Control Room JPMs for the Braidwood Initial Examination - May 2006
| title = Proposed Control Room JPMs for the Braidwood Initial Examination - May 2006
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:SIM-108 1 TASK TITLE:
{{#Wiki_filter:TASK TITLE: Emergency Borate During an ATWS from RWST JPM No.:     SIM-108                                   REV:       NRC2006301 TPO No.:   4D.OA-08                                   K&A No.:   000029EK3.12 TASK No.:   R-FR-018, Respond to an ATWS               K&A IMP:   4.4/4.7 TRAINEE:                                               SRO EVALUATOR:                                             DATE:
Emergency Borate During an ATWS from RWST JPM No.: SIM-108 REV: NRC2006301TPO No.: 4D.OA-08 K&A No.: 000029EK3.12 TASK No.: R-FR-018, Respond to an ATWS K&A IMP: 4.4/4.7 TRAINEE:
The Trainee:       PASSED             this JPM.       TIME STARTED:
SRO   EVALUATOR:
FAILED                             TIME FINISHED:
DATE:   The Trainee: PASSED           this JPM. TIME STARTED:
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 4, 5, 6                 APPROX COMPLETION TIME   10 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
FAILED TIME FINISHED:
X  PERFORM                                   IN PLANT SIMULATE                             X  SIMULATOR GENERAL  
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 4, 5, 6 APPROX COMPLETION TIME 10 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X  PERFORM       IN PLANT SIMULATE X  SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwFR-S.1, Rev. 1A WOG 1C, Response to Nuclear Power Generation/ATWS.
: 1. 1BwFR-S.1, Rev. 1A WOG 1C, Response to Nuclear Power Generation/ATWS.
MATERIALS:  
MATERIALS:
: 1. 1BwFR-S.1, Rev. 1A WOG 1C TASK STANDARDS:  
: 1. 1BwFR-S.1, Rev. 1A WOG 1C TASK STANDARDS:
: 1. Determine emergency boration flowpath from BAST unavailable.  
: 1. Determine emergency boration flowpath from BAST unavailable.
: 2. Manually align CV system to perform emergency boration of RCS from the RWST prior to completion of step 4 of 1BwFR-S.1.
: 2. Manually align CV system to perform emergency boration of RCS from the RWST prior to completion of step 4 of 1BwFR-S.1.
TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are an extra NSO.  
: 1. You are an extra NSO.
: 2. The turbine has tripped without a reactor trip from high power.  
: 2. The turbine has tripped without a reactor trip from high power.
: 3. 1BwFR-S.1. Response to Nuclear Power Generation/ATWS is in progress.
: 3. 1BwFR-S.1. Response to Nuclear Power Generation/ATWS is in progress.
INITIATING CUES:  
INITIATING CUES:
: 1. The simulator is frozen and annunciator panel horns are turned off.  
: 1. The simulator is frozen and annunciator panel horns are turned off.
: 2. The US has directed you to perform an Emergency Boration per step 4 of 1BwFR-
: 2. The US has directed you to perform an Emergency Boration per step 4 of 1BwFR-S.1. All other steps of 1BwFR-S.1 are being addressed by other NSOs. All annunciator horns are silenced.
: 3. Notify the US when emergency boration flow has been initiated.
: 4. When you are ready to begin the JPM, the simulator will be placed in run.
Annunciator horns will be left OFF to minimize noise during JPM performance.
1 SIM-108


S.1. All other steps of 1BwFR-S.1 are being addressed by other NSOs. All
RECORD START TIME Note:  After giving the initiating cue, cue the simulator operator to start the simulator.
PERFORMANCE STEP                STANDARD              Circle applicable
: 1. Refer to 1BwFR-S.1 Step 4    Locate and Open 1BwFR-S.1  SAT    UNSAT      N/A Note: Examinee will use      to Step 4                  Comments:
simulator copy of 1BwFR-S.1 for JPM performance.
: 2. Check at least one            Determine one CV pump is  SAT    UNSAT      N/A Centrifugal Charging pump    running:                  Comments:
running
* OBSERVE RUN light indication and/or ammeter for 1A CV pump
* OBSERVE flow indicated on 1FI-121A, charging header flow indicator
: 3. Initiate emergency boration  Attempt to initiate        SAT    UNSAT      N/A from BAST                    emergency boration from    Comments:
the BAST as follows:
* Attempt to OPEN 1CV8104
* Determine emergency boration flow cannot be established from BAST Note:  Alternate path begins here Examiners note: 1BwFR-S.1 step 4 RNO column allows establishing emergency boration flow from either the RWST or BAST (using normal RMCS boration flowpath). If examinee attempts to establish emergency boration via RMCS, the boric acid transfer pump will not start. (See JPM step 6 if examinee attempts emergency boration via RMCS)
  *4  Align CV pump suction to the  Perform the following at  SAT    UNSAT      N/A RWST                          1PM05J:                    Comments:
* OPEN 1CV112D and/or 1CV112E
  *5  Isolate CV pump suction from  Perform the following at  SAT    UNSAT      N/A the VCT                      1PM05J:                    Comments:
* CLOSE 1CV112B and/or 1CV112C 2
SIM-108


annunciator horns are silenced.
PERFORMANCE STEP                 STANDARD             Circle applicable
: 3. Notify the US when emergency boration flow has been initiated.
  *6  Maximize Charging flow        Perform the following at  SAT    UNSAT      N/A 1PM05J:                    Comments:
: 4. When you are ready to begin the JPM, the simulator will be placed in run. 
* Place 1CV121 in manual and raise demand o OBSERVE 1FI-121A increasing o VERIFY letdown established Examiners note: 1BwFR-S.1 step 4 RNO column allows establishing emergency boration flow from either the RWST or BAST (using normal RMCS boration flowpath). If examinee attempts to establish emergency boration via RMCS, the boric acid transfer pump will not start. See JPM step 4 for emergency boration via RWST steps.
 
: 7. Initiate emergency boration  Attempt to initiate        SAT    UNSAT      N/A from RMCS (N/A if not        emergency boration from    Comments:
Annunciator horns will be left OFF to minimize noise during JPM performance.
performed)                    RMCS as follows:
 
* OPEN 1CV110A
SIM-108 2 RECORD START TIME Note:  After giving the initiating cue, cue the simulator operator to start the simulator.
* OPEN 1CV110B
PERFORMANCE STEP STANDARD Circle applicable  
* Attempt to start boric acid transfer pump
: 1. Refer to 1BwFR-S.1 Step 4 Note: Examinee will use simulator copy of 1BwFR-S.1 for JPM
* Determine emergency boration flow cannot be established from RMCS
 
: 8. Check Pressurizer Pressure < CHECKS Pzr Pressure <      SAT    UNSAT      N/A 2335 psig                    2335 psig as follows:      Comments:
performance.
* OBSERVES PZR Pressure indicators o Operate PZR PORV(s) as necessary until pressure <2135 psig, then close PZR PORV(s)
Locate and Open 1BwFR-S.1
: 9. Notify Unit Supervisor        Perform the following:     SAT    UNSAT      N/A CUEAcknowledge reports. o  Notify the Unit        Comments:
 
Supervisor emergency boration flow is established o  Notify Unit Supervisor of 1CV8104 failure to open CUE: THIS COMPLETES THIS JPM.
to Step 4 SAT    UNSAT      N/A Comments:   2. Check at least one Centrifugal Charging pump
RECORD STOP TIME COMMENTS:
 
3 SIM-108
running  Determine one CV pump is
 
running:  OBSERVE RUN light
 
indication and/or
 
ammeter for 1A CV pump OBSERVE flow indicated
 
on 1FI-121A, charging
 
header flow indicator SAT    UNSAT      N/A Comments: 3. Initiate emergency boration
 
from BAST Attempt to initiate
 
emergency boration from
 
the BAST as follows: Attempt to OPEN
 
1CV8104  Determine emergency
 
boration flow cannot
 
be established from
 
BAST  SAT    UNSAT      N/A Comments: Note:  Alternate path begins here Examiners note: 1BwFR-S.1 step 4 RNO column allows establishing emergency boration flow  
 
from either the RWST or BAST (using normal RMCS boration flowpath). If examinee  
 
attempts to establish emergency boration via RMCS, the boric acid transfer pump will not  
 
start. (See JPM step 6 if examinee attempts emergency boration via RMCS)
*4 Align CV pump suction to the RWST Perform the following at
 
1PM05J: OPEN 1CV112D and/or
 
1CV112E  SAT    UNSAT      N/A Comments: *5 Isolate CV pump suction from the VCT Perform the following at
 
1PM05JCLOSE 1CV112B and/or
 
1CV112C  SAT    UNSAT      N/A Comments:
SIM-108 3 PERFORMANCE STEP STANDARD Circle applicable
*6 Maximize Charging flow Perform the following at 1PM05J: Place 1CV121 in
 
manual and raise
 
demand o OBSERVE 1FI-121A
 
increasing o VERIFY letdown
 
established SAT    UNSAT      N/A Comments: Examiners note1BwFR-S.1 step 4 RNO column allows establishing emergency boration flow  
 
from either the RWST or BAST (using normal RMCS boration flowpath). If examinee
 
attempts to establish emergency boration via RMCS, the boric acid transfer pump will not


start. See JPM step 4 for emergency boration via RWST steps.
TASK CONDITIONS:
: 7. Initiate emergency boration from RMCS (N/A if not
: 1. You are an extra NSO.
 
: 2. The turbine has tripped without a reactor trip from high power.
performed)
Attempt to initiate
 
emergency boration from
 
RMCS as follows:  OPEN 1CV110A  OPEN 1CV110B  Attempt to start boric
 
acid transfer pump  Determine emergency
 
boration flow cannot
 
be established from
 
RMCS  SAT    UNSAT      N/A Comments: 8. Check Pressurizer Pressure <
2335 psig CHECKS Pzr Pressure <
 
2335 psig as follows:  OBSERVES PZR Pressure
 
indicators o Operate PZR PORV(s) as
 
necessary until
 
pressure <2135 psig, then close PZR PORV(s)
SAT    UNSAT      N/A Comments: 9. Notify Unit Supervisor CUE: Acknowledge reports.
Perform the following:
o Notify the Unit Supervisor emergency
 
boration flow is
 
established o Notify Unit Supervisor of 1CV8104 failure to
 
open  SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
SIM-108 4  TASK CONDITIONS:  
: 1. You are an extra NSO.  
: 2. The turbine has tripped without a reactor trip from high power.  
: 3. 1BwFR-S.1. Response to Nuclear Power Generation/ATWS is in progress.
: 3. 1BwFR-S.1. Response to Nuclear Power Generation/ATWS is in progress.
INITIATING CUES:  
INITIATING CUES:
: 1. The simulator is frozen and annunciator panel horns are turned off.  
: 1. The simulator is frozen and annunciator panel horns are turned off.
: 2. The US has directed you to perform an Emergency Boration per step 4 of 1BwFR-S.1.
: 2. The US has directed you to perform an Emergency Boration per step 4 of 1BwFR-S.1.
All other steps of 1BwFR-S.1 are being addressed by other NSOs. All annunciator horns  
All other steps of 1BwFR-S.1 are being addressed by other NSOs. All annunciator horns are silenced.
 
: 3. Notify the US when emergency boration flow has been initiated.
are silenced.  
: 4. When you are ready to begin the JPM, the simulator will be placed in run.
: 3. Notify the US when emergency boration flow has been initiated.  
Annunciator horns will be left OFF to minimize noise during JPM performance.
: 4. When you are ready to begin the JPM, the simulator will be placed in run.
4 SIM-108
 
Annunciator horns will be left OFF to minimize noise during JPM performance.  


SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
* Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
Complete items on Simulator Ready for Training Checklist Place simulator in RUN.
* Complete items on Simulator Ready for Training Checklist
Run caep SIM-108 from disk and verify the following actuate:
* Place simulator in RUN.
IMF RP02A IMF RP02B V8104 CLS IOR ZDI1C IMF CV03 IOR ZDIRMIO IN IOR ZDIBKSEL MAN IRF TC03 TRIP Start both AF pumps.
* Run caep SIM-108 from disk and verify the following actuate:
Place simulator in freeze.
* IMF RP02A
Turn off simulator horns.
* IMF RP02B
Verify simulator copy of 1BwFR-S.1 is place kept through step 3.
* IOR ZDI1CV8104 CLS
* IMF CV03
* IOR ZDIRMIO IN
* IOR ZDIBKSEL MAN
* IRF TC03 TRIP
* Start both AF pumps.
* Place simulator in freeze.
* Turn off simulator horns.
* Verify simulator copy of 1BwFR-S.1 is place kept through step 3.
Verify all other place keeping marks removed.
Verify all other place keeping marks removed.
At examiner's cue, place simulator in run.
* At examiners cue, place simulator in run.
If running the JPM repetitively, perform the following:
* If running the JPM repetitively, perform the following:
Open 1CV112B & C Close 1CV112D & E Restore 1CV121 to automatic Verify simulator copy of 1BwFR-S.1 is place kept through step 3.
* Open 1CV112B & C
 
* Close 1CV112D & E
* Restore 1CV121 to automatic
* Verify simulator copy of 1BwFR-S.1 is place kept through step 3.
Verify all other place keeping marks removed.
Verify all other place keeping marks removed.
Place simulator in freeze.
* Place simulator in freeze.
Turn off simulator horns.  
* Turn off simulator horns.
COMMENTS:
(Final) 5 SIM-108


C OMMENTS:  SIM-108 5 (Final)
TASK TITLE: Establish Automatic Pzr Level Control with Failed 1CV121 JPM No.:     SIM-219                                   REV:         NRC2006301 TPO No.:   4C.GP-06                                   K&A No.:     011000A4.04 TASK No.:   R-GP-053, Transfer Pzr level control       K&A IMP:     3.2/2.9 from manual to automatic.
SIM-219 1 TASK TITLE:
TRAINEE:                                               SRO EVALUATOR:                                             DATE:
Establish Automatic Pzr Level Control with Failed 1CV121 JPM No.: SIM-219 REV: NRC2006301TPO No.: 4C.GP-06 K&A No.: 011000A4.04 TASK No.: R-GP-053, Transfer Pzr level control K&A IMP: 3.2/2.9 from manual to automatic.
The Trainee:       PASSED            this JPM.         TIME STARTED:
TRAINEE:
FAILED                             TIME FINISHED:
SRO   EVALUATOR:
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 2, 4                     APPROX COMPLETION TIME   8 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
DATE:   The Trainee: PASSED            this JPM. TIME STARTED:
X  PERFORM                                   IN PLANT SIMULATE                             X   SIMULATOR GENERAL  
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 2, 4 APPROX COMPLETION TIME 8 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X  PERFORM       IN PLANT SIMULATE X   SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwGP 100-1, Rev. 22, Plant Heatup.
: 1. 1BwGP 100-1, Rev. 22, Plant Heatup.
MATERIALS:  
MATERIALS:
: 1. 1BwGP 100-1, Rev. 22, Step 62.
: 1. 1BwGP 100-1, Rev. 22, Step 62.
TASK STANDARDS:  
TASK STANDARDS:
: 1. Determine 1CV121 failed high.  
: 1. Determine 1CV121 failed high.
: 2. Operate 1CV121 in manual to control pressurizer level and RCP seal injection flow prior to completing 1BwGP 100-1, step F.62.
: 2. Operate 1CV121 in manual to control pressurizer level and RCP seal injection flow prior to completing 1BwGP 100-1, step F.62.
TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are the Unit 1 NSO.  
: 1. You are the Unit 1 NSO.
: 2. The Unit is at full power.  
: 2. The Unit is at full power.
: 3. One hour ago, Pzr Level Channel 1LT-459 was restored from test.  
: 3. One hour ago, Pzr Level Channel 1LT-459 was restored from test.
: 4. Actual pressurizer level and demanded pressurizer level have been matched for  
: 4. Actual pressurizer level and demanded pressurizer level have been matched for 16 minutes.
INITIATING CUES:
: 1. The US has directed you restore automatic pressurizer level control per the applicable portions of step F.62 of 1BwGP 100-1.
: 2. Inform the US when automatic pressurizer level control is established.
1 SIM-219


16 minutes.
RECORD START TIME PERFORMANCE STEP                  STANDARD              Circle applicable
INITIATING CUES:  
: 1. Refer to 1BwGP 100-1 step 62  Locate and open 1BwGP      SAT    UNSAT      N/A Note: Examinee will use        100-1 to step F.62        Comments:
: 1. The US has directed you restore automatic pressurizer level control per the
simulator copy of 1BwGP 100-1 for JPM performance.
CUE:   All Prerequisites, Precautions, Limitations and Actions have been met.
Examiners note:   When examinee places 1FK-121 in automatic, 1CV121 will fail to 100%
open.
*2. Place Pressurizer Level        Perform the following at  SAT    UNSAT      N/A control in Automatic          1PM05J to establish        Comments:
automatic pressurizer level control:
o  ADJUST 1CV121 in MANUAL to match PZR actual level with demanded level o  MAINTAIN PZR actual and demanded level equal for 10-15 minutes o  VERIFY/PLACE 1LK-459, Master Pzr Level Controller in MANUAL
* PLACE 1CV121 in AUTO Note:  Alternate path begins here
: 3. Identify 1FK-121 (1CV121)      Identify 1FK-121 (1CV121)  SAT    UNSAT      N/A failure                        failure                    Comments:
o  Annunciator 1-9-D3, CHG LINE FLOW HIGH/LOW o  Identify 1CV121 demand signal rising to 100% and 1CV121 throttling to full open 2
SIM-219


applicable portions of step F.62 of 1BwGP 100-1.  
PERFORMANCE STEP                STANDARD            Circle applicable
: 2. Inform the US when automatic pressurizer level control is established.  
*4. Mitigate the pressurizer    Perform the following to  SAT    UNSAT      N/A level transient caused by an mitigate the failure of   Comments:
increase in charging flow    1CV121:
* PLACE 1FK-121 (1CV121) in MANUAL
* REDUCE demanded signal to throttle charging flow to maintain a stable pressurizer level at program value with no seal injection low flow annunciators lit.
: 5. Inform US of 1CV121          Inform US of 1CV121      SAT    UNSAT      N/A controller failure.          failure                  Comments:
CUE:  As US, acknowledge failure of 1CV121 and that you will inform maintenance CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
3 SIM-219


SIM-219 2 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable
TASK CONDITIONS:
: 1. Refer to 1BwGP 100-1 step 62 Note: Examinee will use simulator copy of 1BwGP 100-1 for JPM
: 1. You are the Unit 1 NSO.
: 2. The Unit is at full power.
: 3. One hour ago, Pzr Level Channel 1LT-459 was restored from test.
: 4. Actual pressurizer level and demanded pressurizer level have been matched for 16 minutes.
INITIATING CUES:
: 1. The US has directed you restore automatic pressurizer level control per the applicable portions of step F.62 of 1BwGP 100-1.
: 2. Inform the US when automatic pressurizer level control is established.
4 SIM-219


performance. CUE: All Prerequisites, Precautions, Limitations and
SIMULATOR SETUP GUIDE:
 
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
Actions have been met.
* Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
Locate and open 1BwGP
* Complete items on Simulator Ready for Training Checklist
 
* Place simulator in RUN.
100-1 to step F.62 SAT    UNSAT      N/A Comments: Examiner's note:  When examinee places 1FK-121 in automatic, 1CV121 will fail to 100%  
* Place 1CV121 in MANUAL
 
* Place Master PZR Level Controller to MANUAL
open.  *2. Place Pressurizer Level control in Automatic Perform the following at
* Insert IMF CV10 100
 
* Verify 1BwGP 100-1 place keeping marks are removed.
1PM05J to establish
COMMENTS:
 
(Final) 5 SIM-219
automatic pressurizer
 
level control:
o ADJUST 1CV121 in  
 
MANUAL to match PZR
 
actual level with
 
demanded level o MAINTAIN PZR actual
 
and demanded level
 
equal for 10-15
 
minutes o VERIFY/PLACE 1LK-459, Master Pzr Level  
 
Controller in MANUAL PLACE 1CV121 in AUTO SAT    UNSAT      N/A Comments: Note:  Alternate path begins here
: 3. Identify 1FK-121 (1CV121) failure  Identify 1FK-121 (1CV121)
 
failure o Annunciator 1-9-D3, CHG LINE FLOW
 
HIGH/LOW o Identify 1CV121
 
demand signal rising
 
to 100% and 1CV121
 
throttling to full
 
open  SAT    UNSAT      N/A Comments:
SIM-219 3  PERFORMANCE STEP STANDARD Circle applicable
*4. Mitigate the pressurizer level transient caused by an increase in charging flow Perform the following to
 
mitigate the failure of
 
1CV121:  PLACE 1FK-121 (1CV121)  
 
in MANUAL  REDUCE demanded signal
 
to throttle charging
 
flow to maintain a
 
stable pressurizer
 
level at program value
 
with no seal injection
 
low flow annunciators
 
lit. SAT    UNSAT      N/A Comments: 5. Inform US of 1CV121 controller failure. CUE: As US, acknowledge failure of 1CV121 and
 
that you will inform
 
maintenance Inform US of 1CV121
 
failure  SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
SIM-219 4  TASK CONDITIONS:
: 1. You are the Unit 1 NSO.
: 2. The Unit is at full power.
: 3. One hour ago, Pzr Level Channel 1LT-459 was restored from test.
: 4. Actual pressurizer level and demanded pressurizer level have been matched for 16 minutes. INITIATING CUES:
: 1. The US has directed you restore automatic pressurizer level control per the
 
applicable portions of step F.62 of 1BwGP 100-1.
: 2. Inform the US when automatic pressurizer level control is established.


SIMULATOR SETUP GUIDE:
TASK TITLE: Raise SI Accumulator Level with 1A SI pump (375 psig in RCS)
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
JPM Number: SIM-204                                     Rev.       NRC2006301 TPO No.:   4C.SI-02                                   K&A No.:   006000A1.13 Task No.:   R-SI-001, Fill the SI accumulators         K&A Imp.:   3.5/3.7 TRAINEE:                                               SRO EVALUATOR:                                             DATE:
Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
The Trainee:       PASSED             this JPM.         TIME STARTED:
Complete items on Simulator Ready for Training Checklist Place simulator in RUN.
FAILED                               TIME FINISHED:
Place 1CV121 in MANUAL Place Master PZR Level Controller to MANUAL Insert IMF CV10 100 Verify 1BwGP 100-1 place keeping marks are removed.
JPM TIME:             MINUTES Critical Elements:       (*) 4, 6, 9, 11-13, 16, 21, 22 Approx. Completion Time: 45 minutes Critical Time:           N/A EVALUATION METHOD:                                     LOCATION:
OMMENTS: C (Final)  SIM-219 5 SIM-204 1 TASK TITLE:
X  PERFORM                                   IN PLANT SIMULATE                               X  SIMULATOR GENERAL  
Raise SI Accumulator Level with 1A SI pump (375 psig in RCS)
JPM Number:
SIM-204 Rev. NRC2006301TPO No.: 4C.SI-02 K&A No.: 006000A1.13 Task No.: R-SI-001, Fill the SI accumulators K&A Imp.: 3.5/3.7 TRAINEE:
SRO EVALUATOR:
DATE:   The Trainee: PASSED           this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES Critical Elements:  
(*) 4, 6, 9, 11-13, 16, 21, 22 Approx. Completion Time:
45 minutes Critical Time:
N/A EVALUATION METHOD:
LOCATION:
X  PERFORM       IN PLANT SIMULATE X  SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BwAR 1-5-C1, Rev. 8E2, ACCUM 1C LEVEL HIGH/LOW  
: 1. BwAR 1-5-C1, Rev. 8E2, ACCUM 1C LEVEL HIGH/LOW
: 2. BwAR 1-5-C2, Rev 6E3, ACCUM 1C PRESS HIGH/LOW  
: 2. BwAR 1-5-C2, Rev 6E3, ACCUM 1C PRESS HIGH/LOW
: 3. BwOP SI-5, Rev. 22, Raising SI Accumulator Level with SI Pumps  
: 3. BwOP SI-5, Rev. 22, Raising SI Accumulator Level with SI Pumps
: 4. BwOP SI-9, Rev 11, Lowering SI Accumulator Pressure  
: 4. BwOP SI-9, Rev 11, Lowering SI Accumulator Pressure
: 5. Tech Spec 3.5.1 MATERIALS:  
: 5. Tech Spec 3.5.1 MATERIALS:
: 1. Copy of BwAR 1-5-C1  
: 1. Copy of BwAR 1-5-C1
: 2. Copy of BwAR 1-5-C2, if needed  
: 2. Copy of BwAR 1-5-C2, if needed
: 3. Copy of BwOP SI-5  
: 3. Copy of BwOP SI-5
: 4. Copy of BwOP SI-9, if needed TASK STANDARDS:  
: 4. Copy of BwOP SI-9, if needed TASK STANDARDS:
: 1. Determine 1A SI train required to be isolated from RCS cold legs during fill of 1C SI Accumulator.  
: 1. Determine 1A SI train required to be isolated from RCS cold legs during fill of 1C SI Accumulator.
: 2. Restore 1C SI Accumulator Level within Tech. Spec. limit prior to completion  
: 2. Restore 1C SI Accumulator Level within Tech. Spec. limit prior to completion of BwOP SI-5, step F.8b.5.
 
: 3. Restore 1C SI Accumulator Level within Tech. Spec. limit prior to JPM completion.
of BwOP SI-5, step F.8b.5.  
TASK CONDITIONS:
: 3. Restore 1C SI Accumulator Level within Tech. Spec. limit prior to JPM  
: 1. You are the Unit 1 Extra NSO.
 
: 2. RCS heat up is in progress per 1BwGP 100-1.
completion.
: 3. Unit 1 is in Mode 3, RCS temperature is 360&deg;F and RCS pressure is 375 psig.
TASK CONDITIONS:  
: 1. You are the Unit 1 Extra NSO.  
: 2. RCS heat up is in progress per 1BwGP 100-1.  
: 3. Unit 1 is in Mode 3, RCS temperature is 360&deg;F and RCS pressure is 375 psig.  
: 4. All systems and controls are normal for the present conditions.
: 4. All systems and controls are normal for the present conditions.
INITIATING CUES:  
INITIATING CUES:
: 1. Annunciator 1-5-C1, ACCUM 1C LEVEL HIGH/LOW, has been is lit.  
: 1. Annunciator 1-5-C1, ACCUM 1C LEVEL HIGH/LOW, has been is lit.
: 2. The US has directed you to raise the 1C accumulator level to > 38% but within  
: 2. The US has directed you to raise the 1C accumulator level to > 38% but within the Technical Specification limit by using the 1A SI pump. Other control room operators are maintaining all other plant conditions. NLOs have been briefed and are standing by as needed.
 
: 3. Inform the US when you have restored 1C SI accumulator level.
the Technical Specification limit by using the 1A SI pump. Other control room  
 
operators are maintaining all other plant conditions. NLOs have been briefed  
 
and are standing by as needed.  
: 3. Inform the US when you have restored 1C SI accumulator level.  
: 4. There a NO personnel in Unit 1 Containment.
: 4. There a NO personnel in Unit 1 Containment.
SIM-204 2 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable
1 SIM-204
: 1. Refer to BwAR 1-5-C1, ACCUM 1C LEVEL HIGH LOW CUE: When student locates correct procedure, provide copy. CUE: If asked as US, confirm that DEQUIP
 
has been entered for
 
1C SI Accumulator
 
level, LCO 3.4.13 has
 
been reviewed, and AAR
 
1BwOS SI-1a is being
 
reviewed.
Locate and open BwAR 1-5-C1 and perform
 
the following:
o Monitor 1LI-954 and
 
955 to determine level
 
is low. o Monitor SER points
 
0581 and 2042 to
 
determine level is
 
low. Monitor 1PI-964 and
 
965 to determine
 
pressure is stable.
o Notify US to enter LCO
 
3.5.1. SAT    UNSAT      N/A Comments: 2. Refer to BwOP SI-5, Raising SI Accumulator Level with SI
 
Pumps. CUE: When examinee locates correct procedure, provide copy. CUE: All Prerequisites, Precautions, Limitations and
 
Actions are met. CUE: If asked as US, RWST recirc pump and
 
purification loop are
 
not running, and RWST
 
boron is 2300 ppm and
 
has not been diluted
 
since last sampled.
Locate and open BwOP SI-
 
5:  SAT    UNSAT      N/A Comments: Examiner's note:  1SI8806 and 8813 are SVAG valves and are maintained deenergized. 
 
Their position may be verified on the 1PM06J Group 1 or 4 Readiness Lights, 1PM06J SVAG
 
Valve Status Lights, or locally. The examinee should NOT energize 1SI8806 and/or
 
1SI8813 per BwOP SI-100 in order to check 1SI8806 and/or 1SI8813 position using the
 
indicating lights at 1PM06J. Energizing 1SI8806 and/or 1SI8813 is NOT necessary since
 
the valves are in their correct position and energizing 1SI8806 and/or 1SI8813 would
 
make BOTH trains of ECCS inoperable and unnecessarily place Unit 1 in Tech Spec 3.5.2.
 
SIM-204 3  PERFORMANCE STEP STANDARD Circle applicable
: 3. Verify valve alignment. (steps F.1 - F.4) CUE: If asked to verify valves locally, as NLO report all valves are
 
OPEN. At 1PM06J, perform the
 
following:  VERIFY/OPEN:  1SI8806  1SI8923A o 1SI8923B  1SI8814  1SI8813 o 1SI8920  SAT    UNSAT      N/A Comments: *4 Align 1A SI Pump to Accumulator fill header. (step F.5)
At 1PM06J, perform the
 
following:  OPEN 1SI8888 SAT    UNSAT      N/A Comments: 5. Verify SI to Radwaste flowpath isolated. (step F.6)
At 1PM11J, perform the
 
following:  Verify/CLOSE 1SI8964 SAT    UNSAT      N/A Comments: *6. Align Accumulator for fill. (step F.7)
At 1PM06J, perform the
 
following:  OPEN 1SI8871 SAT    UNSAT      N/A Comments: 7. Determine applicable plant status for accumulator fill (step F.8)
Determine plant status
 
for accumulator fill  Unit 1 in Mode 3 (RCS
 
temperature > 350 F, Keff <0.99)  RCS pressure  1850 psig  Determine BwOP SI-5, step F.8.b applicable
 
for 1C SI accumulator
 
fill  SAT    UNSAT      N/A Comments: 8. Initiate LCOAR 1BwOL 3.5.2. (step F.8.b) CUE: As US, acknowledge LCOAR 3.5.2 entry
 
requirement.
Inform US of need to
 
enter LCOAR 1BwOL 3.5.2. Determine LCO 3.5.2
 
entry required prior
 
to closing 1SI8821A SAT    UNSAT      N/A Comments:
SIM-204 4  PERFORMANCE STEP STANDARD Circle applicable
*9. Isolate 1A SI Pump from Cold Legs. (step F.8.b.1)
At 1PM06J, VERIFY/CLOSE:  1SI8821A  SAT    UNSAT      N/A Comments: Examiner's note:  1SI8802A is SVAG valve and is maintained deenergized; its position may be verified on the 1PM06J Group 1 or 5 Readiness Lights, 1PM06J SVAG Valve Status
 
Lights, or locally. The examinee should NOT energize 1SI8802A per BwOP SI-100 in order
 
to check valve position using the indicating lights at 1PM06J. Energizing 1SI8802A is
 
NOT necessary since it is in their correct position and energizing 1SI8802A would make
 
BOTH trains of ECCS inoperable and unnecessarily place Unit 1 in Tech Spec 3.5.2.
: 10. Verify/close 1SI8802A, SI to Hot Legs 1A and 1D Isol vlv. (step F.8.b.2) CUE: If asked to verify 1SI8802A position
 
locally, as NLO report
 
1SI8802A is CLOSED.
At 1PM06J, perform the
 
following:  VERIFY/CLOSE 1SI8802A SAT    UNSAT      N/A Comments: Examiner's note: Student may elect to have an NLO do a prestart check of 1A SI pump
 
prior to starting. If so, provide the following CUE: CUE: NLO reports that the 1A SI Pump is ready for a start.
*11. Start 1A SI pump. (step F.8.b.3)
CUE: If dispatched as NLO to monitor pump start
 
locally, report


satisfactory start of  
RECORD START TIME PERFORMANCE STEP                STANDARD              Circle applicable
: 1. Refer to BwAR 1-5-C1, ACCUM  Locate and open            SAT    UNSAT      N/A 1C LEVEL HIGH LOW            BwAR 1-5-C1 and perform    Comments:
CUE:  When student locates  the following:
correct procedure,    o  Monitor 1LI-954 and provide copy.            955 to determine level CUE:  If asked as US,          is low.
confirm that DEQUIP    o  Monitor SER points has been entered for      0581 and 2042 to 1C SI Accumulator        determine level is level, LCO 3.4.13 has    low.
been reviewed, and AAR 1BwOS SI-1a is being
* Monitor 1PI-964 and reviewed.                965 to determine pressure is stable.
o  Notify US to enter LCO 3.5.1.
: 2. Refer to BwOP SI-5, Raising  Locate and open BwOP SI-  SAT    UNSAT      N/A SI Accumulator Level with SI  5:                        Comments:
Pumps.
CUE:  When examinee locates correct procedure, provide copy.
CUE:  All Prerequisites, Precautions, Limitations and Actions are met.
CUE:  If asked as US, RWST recirc pump and purification loop are not running, and RWST boron is 2300 ppm and has not been diluted since last sampled.
Examiners note: 1SI8806 and 8813 are SVAG valves and are maintained deenergized.
Their position may be verified on the 1PM06J Group 1 or 4 Readiness Lights, 1PM06J SVAG Valve Status Lights, or locally. The examinee should NOT energize 1SI8806 and/or 1SI8813 per BwOP SI-100 in order to check 1SI8806 and/or 1SI8813 position using the indicating lights at 1PM06J. Energizing 1SI8806 and/or 1SI8813 is NOT necessary since the valves are in their correct position and energizing 1SI8806 and/or 1SI8813 would make BOTH trains of ECCS inoperable and unnecessarily place Unit 1 in Tech Spec 3.5.2.
2 SIM-204


1A SI pump shortly
PERFORMANCE STEP                  STANDARD            Circle applicable
: 3. Verify valve alignment.      At 1PM06J, perform the    SAT    UNSAT      N/A (steps F.1 - F.4)            following:                Comments:
CUE:  If asked to verify
* VERIFY/OPEN:
valves locally, as NLO
* 1SI8806 report all valves are
* 1SI8923A OPEN.
o  1SI8923B
* 1SI8814
* 1SI8813 o  1SI8920
  *4  Align 1A SI Pump to          At 1PM06J, perform the    SAT    UNSAT      N/A Accumulator fill header.      following:                Comments:
(step F.5)
* OPEN 1SI8888
: 5. Verify SI to Radwaste        At 1PM11J, perform the    SAT    UNSAT      N/A flowpath isolated.            following:                Comments:
(step F.6)
* Verify/CLOSE 1SI8964
*6. Align Accumulator for fill. At 1PM06J, perform the    SAT    UNSAT      N/A (step F.7)                    following:                Comments:
* OPEN 1SI8871
: 7. Determine applicable plant    Determine plant status    SAT    UNSAT      N/A status for accumulator fill  for accumulator fill      Comments:
(step F.8)
* Unit 1 in Mode 3 (RCS temperature > 350&deg;F, Keff <0.99)
* RCS pressure  1850 psig
* Determine BwOP SI-5, step F.8.b applicable for 1C SI accumulator fill
: 8. Initiate LCOAR 1BwOL 3.5.2. Inform US of need to      SAT    UNSAT      N/A (step F.8.b)                  enter LCOAR 1BwOL 3.5.2. Comments:
CUE:  As US, acknowledge
* Determine LCO 3.5.2 LCOAR 3.5.2 entry          entry required prior requirement.              to closing 1SI8821A 3
SIM-204


PERFORMANCE STEP                  STANDARD            Circle applicable
*9. Isolate 1A SI Pump from Cold  At 1PM06J, VERIFY/CLOSE:  SAT    UNSAT      N/A Legs.
* 1SI8821A              Comments:
(step F.8.b.1)
Examiners note: 1SI8802A is SVAG valve and is maintained deenergized; its position may be verified on the 1PM06J Group 1 or 5 Readiness Lights, 1PM06J SVAG Valve Status Lights, or locally. The examinee should NOT energize 1SI8802A per BwOP SI-100 in order to check valve position using the indicating lights at 1PM06J. Energizing 1SI8802A is NOT necessary since it is in their correct position and energizing 1SI8802A would make BOTH trains of ECCS inoperable and unnecessarily place Unit 1 in Tech Spec 3.5.2.
: 10. Verify/close 1SI8802A, SI to  At 1PM06J, perform the    SAT    UNSAT      N/A Hot Legs 1A and 1D Isol vlv. following:                Comments:
(step F.8.b.2)
* VERIFY/CLOSE 1SI8802A CUE:  If asked to verify 1SI8802A position locally, as NLO report 1SI8802A is CLOSED.
Examiners note: Student may elect to have an NLO do a prestart check of 1A SI pump prior to starting. If so, provide the following CUE:
CUE:  NLO reports that the 1A SI Pump is ready for a start.
*11. Start 1A SI pump.              At 1PM06J, perform the    SAT    UNSAT      N/A (step F.8.b.3)                following:                Comments:
CUE:  If dispatched as NLO    o Announce pump start on to monitor pump start      plant page locally, report
* Start 1A SI Pump.
satisfactory start of  o  Check 1A SI Pump Run 1A SI pump shortly        Light LIT.
after pump started.
after pump started.
At 1PM06J, perform the
o  Check 1A SI Pump amps.
 
*12. Fill 1C Accumulator.           At 1PM06J, perform the   SAT    UNSAT      N/A (step F.8.b.4)                 following:               Comments:
following:
* OPEN 1SI8878C o  Monitor Accumulator Level.
o Announce pump start on plant page Start 1A SI Pump.
*13. Stop filling accumulator      At 1PM06J, perform the   SAT    UNSAT      N/A when level is within Tech     following:                Comments:
o Check 1A SI Pump Run
 
Light LIT.
o Check 1A SI Pump amps.
SAT    UNSAT      N/A Comments: *12. Fill 1C Accumulator. (step F.8.b.4)
At 1PM06J, perform the  
 
following:  OPEN 1SI8878C o Monitor Accumulator
 
Level. SAT    UNSAT      N/A Comments: *13. Stop filling accumulator when level is within Tech
 
Spec limits. (step F.8.b.5) Note: Per the initiating cue, direction was
 
given to restore
 
level to >38% but <
63%. CUE: As US, acknowledge report of 1C SI
 
Accumulator level
 
restoration.
At 1PM06J, perform the  
 
following:  CLOSE 1SI8878C when Accumulator Level is  
 
>38%, but prior to
 
exceeding 63%. Inform US 1C SI Accumulator level
 
restored within Tech  
 
Spec limits.
Spec limits.
SAT    UNSAT      N/A Comments:
* CLOSE 1SI8878C when (step F.8.b.5)                   Accumulator Level is Note:   Per the initiating        >38%, but prior to cue, direction was        exceeding 63%.
SIM-204 5  PERFORMANCE STEP STANDARD Circle applicable
given to restore
: 14. Stop 1A SI pump. (step F.8.b.6)
* Inform US 1C SI level to >38% but <      Accumulator level 63%.                     restored within Tech CUE:   As US, acknowledge        Spec limits.
At 1PM06J, perform the following: Stop 1A SI Pump.
report of 1C SI Accumulator level restoration.
o Check 1A SI Pump Stop
4 SIM-204
 
Light LIT.
SAT    UNSAT      N/A Comments: 15. Depressurize SI pump discharge header to less
 
than 50 psig. (step F.8.b.7 - F.8.b.8)
Depressurize the fill
 
header to less than 50
 
psig:  At 1PM11J, open
 
1SI8964  At 1PM06J, monitor 1A
 
SI pump discharge
 
header pressure (1PI-
 
919/923). When pressure is less
 
than 50 psig, perform
 
the following at
 
1PM11J:  CLOSE 1SI8964 SAT    UNSAT      N/A Comments: *16. Restore 1A SI pump to Cold Legs. (step F.8.b.9) CUE: Acknowledge exit LCOAR 1BwOL 3.5.2.
At 1PM06J, perform the
 
following:  OPEN 1SI8821A SAT    UNSAT      N/A Comments: 17. Isolate SI pump from Accumulator. (step F.11 & F.12)
At 1PM06J, close
 
Fill/Test line Isolation
 
valves:  1SI8871  1SI8888  SAT    UNSAT      N/A Comments: 18. Inform US that it may be necessary to initiate 1BwOS
 
SI-1A, and to contact
 
chemistry for Accumulator  
 
samples, and exit LCOAR for
 
level. (step F.13 & 14)
CUE: US will evaluate the need to perform 1BwOS
 
SI-1a and will inform
 
chemistry, and exit
 
LCOAR. Inform US of the
 
following potential
 
requirements:  1BwOS SI-1a  Chemistry to sample
 
the Accumulators for
 
boron. Exit LCOAR from
 
Accumulator level.
SAT    UNSAT      N/A Comments:
SIM-204 6  PERFORMANCE STEP STANDARD Circle applicable Examiner's note:  If 1C SI accumulator rises enough to cause annunciator 1-5-B2 to alarm during accumulator fill, examinee will perform JPM steps 19-23 to lower 1C SI
 
accumulator pressure. If annunciator 1-5-B2 is not in alarm, end JPM here and mark
 
steps 19-23 N/A.
: 19. Refer to BwAR 1-5-C2 CUE: When student locates correct procedure, provide copy. CUE: If asked as US, confirm that the LCOAR
 
(1BwOL 3.5.1) has been
 
entered, LCO 3.4.13
 
has been reviewed, and


AAR 1BwOS SI-1a is
PERFORMANCE STEP                STANDARD            Circle applicable
: 14. Stop 1A SI pump.              At 1PM06J, perform the  SAT    UNSAT      N/A (step F.8.b.6)                following:              Comments:
* Stop 1A SI Pump.
o Check 1A SI Pump Stop Light LIT.
: 15. Depressurize SI pump          Depressurize the fill    SAT    UNSAT      N/A discharge header to less      header to less than 50  Comments:
than 50 psig.                psig:
(step F.8.b.7 - F.8.b.8)
* At 1PM11J, open 1SI8964
* At 1PM06J, monitor 1A SI pump discharge header pressure (1PI-919/923).
* When pressure is less than 50 psig, perform the following at 1PM11J:
* CLOSE 1SI8964
*16. Restore 1A SI pump to Cold    At 1PM06J, perform the  SAT    UNSAT      N/A Legs.                        following:              Comments:
(step F.8.b.9)
* OPEN 1SI8821A CUE:  Acknowledge exit LCOAR 1BwOL 3.5.2.
: 17. Isolate SI pump from          At 1PM06J, close        SAT    UNSAT      N/A Accumulator.                  Fill/Test line Isolation Comments:
(step F.11 & F.12)            valves:
* 1SI8871
* 1SI8888
: 18. Inform US that it may be      Inform US of the        SAT    UNSAT      N/A necessary to initiate 1BwOS  following potential      Comments:
SI-1A, and to contact        requirements:
chemistry for Accumulator
* 1BwOS SI-1a samples, and exit LCOAR for level.
* Chemistry to sample the Accumulators for (step F.13 & 14)                boron.
CUE:  US will evaluate the
* Exit LCOAR from need to perform 1BwOS    Accumulator level.
SI-1a and will inform chemistry, and exit LCOAR.
5 SIM-204


PERFORMANCE STEP                STANDARD              Circle applicable Examiners note: If 1C SI accumulator rises enough to cause annunciator 1-5-B2 to alarm during accumulator fill, examinee will perform JPM steps 19-23 to lower 1C SI accumulator pressure. If annunciator 1-5-B2 is not in alarm, end JPM here and mark steps 19-23 N/A.
: 19. Refer to BwAR 1-5-C2          Locate and open            SAT    UNSAT      N/A CUE:  When student locates  BwAR 1-5-C2 and perform    Comments:
correct procedure,    the following:
provide copy.          o  Monitor 1PI-964 and CUE:  If asked as US,          965 to determine confirm that the LCOAR    pressure is high.
(1BwOL 3.5.1) has been o  Monitor SER points entered, LCO 3.4.13      0578 and 2045 to has been reviewed, and    determine level is AAR 1BwOS SI-1a is        low.
being reviewed.
being reviewed.
Locate and open BwAR 1-5-C2 and perform
* Monitor 1LI-954 and 955 to determine level is stable.
o  Notify US to enter LCO 3.5.1.
: 20. Refer to BwOP SI-9, Lowering  Perform the following      SAT    UNSAT      N/A SI accumulator pressure.
* Locate and open BwOP    Comments:
CUE:  After examinee locates    SI-9.
copy of procedure, provide a copy and
* Determine step F.1 is inform them all            the applicable step.
prerequisites, precautions, limitations and actions are met
*21. Lower 1B SI Accumulator      Perform the following to  SAT    UNSAT      N/A pressure                      lower 1B SI Accumulator    Comments:
CUE:  If asked, as US inform pressure to 625 psig:
examinee that there are no personnel in    o  Verify / Close 1AOV-Unit 1 containment.      SI8880, N2 Supply Isolation valve o  Verify / Close 1SIHCV943, Vent control valve
* Open 1AOV-SI8875C, SI Accumulator 1C Vent valve.
* Throttle open 1SIHCV943, Vent control valve o  Monitor 1PI-964/965 6
SIM-204


the following:
PERFORMANCE STEP              STANDARD            Circle applicable
o Monitor 1PI-964 and
  *22. Secure lowering 1B SI       Perform the following     SAT    UNSAT      N/A accumulator pressure.
 
* Verify 1C SI           Comments:
965 to determine
accumulator pressure 612-637 psig
 
* Close 1AOV-SI8875C o Close 1SIHCV943, Vent Control valve.
pressure is high.
: 23. Exit LOCAR 1BwOL 3.5.1     Inform US that pressure   SAT    UNSAT      N/A is within the Tech Spec   Comments:
o Monitor SER points
limit, the alarm cleared, CUE:  US acknowledges      and the LCOAR may be pressure restored and exited.
 
exits LCOAR.
0578 and 2045 to
CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
determine level is
7 SIM-204
 
low. Monitor 1LI-954 and
 
955 to determine level
 
is stable.
o Notify US to enter LCO
 
3.5.1. SAT    U Comments: NSAT      N/A
: 20. Refer to BwOP SI-9, Lowering SI accumulator pressure. CUE: After examinee locates copy of procedure, provide a copy and
 
inform them all
 
prerequisites, precautions, limitations and
 
actions are met Perform the following Locate and open BwOP SI-9. Determine step F.1 is
 
the applicable step.
SAT    UNSAT      N/A Comments: *21. Lower 1B SI Accumulator pressure CUE: If asked, as US inform examinee that there are no personnel in
 
Unit 1 containment.
Perform the following to lower 1B SI Accumulator
 
pressure to 625 psig:
o Verify / Close 1AOV-
 
SI8880, N 2 Supply Isolation valve o Verify / Close
 
1SIHCV943, Vent
 
control valve  Open 1AOV-SI8875C, SI
 
Accumulator 1C Vent
 
valve. Throttle open
 
1SIHCV943, Vent
 
control valve o Monitor 1PI-964/965 SAT    UNSAT      N/A Comments:
SIM-204 7  PERFORMANCE STEP STANDARD Circle applicable
*22. Secure lowering 1B SI accumulator pressure.
Perform the following  Verify 1C SI accumulator pressure  
 
612-637 psig Close 1AOV-SI8875C o Close 1SIHCV943, Vent  
 
Control valve.
SAT    UNSAT      N/A Comments: 23. Exit LOCAR 1BwOL 3.5.1 CUE: US acknowledges pressure restored and exits LCOAR.
Inform US that pressure is within the Tech Spec  
 
limit, the alarm cleared, and the LCOAR may be  
 
exited. SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.  
 
RECORD STOP TIME COMMENTS:  


SIM-204 8 TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are the Unit 1 Extra NSO.  
: 1. You are the Unit 1 Extra NSO.
: 2. RCS heat up is in progress per 1BwGP 100-1.  
: 2. RCS heat up is in progress per 1BwGP 100-1.
: 3. Unit 1 is in Mode 3, RCS temperature is 360&deg;F and RCS pressure is 375 psig.  
: 3. Unit 1 is in Mode 3, RCS temperature is 360&deg;F and RCS pressure is 375 psig.
: 4. All systems and controls are normal for the present conditions.
: 4. All systems and controls are normal for the present conditions.
INITIATING CUES:  
INITIATING CUES:
: 1. Annunciator 1-5-C1, ACCUM 1C LEVEL HIGH/LOW, has been is lit.  
: 1. Annunciator 1-5-C1, ACCUM 1C LEVEL HIGH/LOW, has been is lit.
: 2. The US has directed you to raise the 1C accumulator level to > 38% but within the Technical Specification limit by using the 1A SI pump. Other control room operators  
: 2. The US has directed you to raise the 1C accumulator level to > 38% but within the Technical Specification limit by using the 1A SI pump. Other control room operators are maintaining all other plant conditions. NLOs have been briefed and are standing by as needed.
: 3. Inform the US when you have restored 1C SI accumulator level.
: 4. There a NO personnel in Unit 1 Containment.
8 SIM-204


are maintaining all other plant conditions. NLOs have been briefed and are standing
SIMULATOR SETUP GUIDE:
 
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
by as needed.  
* Establish the conditions of IC 5, BOL hot shutdown, plant heat up in progress, 340&deg;F, 375 psig.
: 3. Inform the US when you have restored 1C SI accumulator level.  
* Complete items on Simulator Ready for Training Checklist.
: 4. There a NO personnel in Unit 1 Containment.  
* Place simulator in RUN.
* Place 1B CV pump, 1A SI pump, and 1B SI pump in NAT.
* Place PZR PORVs in AUTO.
* Remove placards from 1SI8808A-D C/S.
* Allow the RCS to heat up above 350&deg;F.
* Modify SIMACC[3] TO 57,280 to lower 1C SI Accumulator level to 30%.
* Modify SIMN2ACC[3] TO 1270 to lower 1C SI Accumulator pressure.
* Place RCS Heatup Limits graphic display on right hand MCR CRT.
* Verify/remove 1A SI pump data from HMI terminal screens.
* Replace 1SI8808A-D placards when all examinees have completed JPM.
COMMENTS:
* Provide copy of BwAR 1-5-C1, Rev. 8E2
* Provide copy of BwAR 1-5-C2, Rev 6E3
* Provide copy of BwOP SI-5, Rev. 22
* Provide copy of BwOP SI-9, Rev 11 (Final) 9 SIM-204


SIMULATOR SETUP GUIDE:
TASK TITLE: Swap Essential Service Water Pumps JPM No.:   SIM-S403                                   REV:         NRC2006301 TPO No.:   4C.SX-03                                   K&A No.:     075000A4.01 TASK No.:   R-SX-004, Operate the SX system           K&A IMP:   3.2/3.2 TRAINEE:                                               SRO EVALUATOR:                                             DATE:
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
The Trainee:       PASSED             this JPM.       TIME STARTED:
Establish the conditions of IC 5, BOL hot shutdown, plant heat up in progress, 340 F, 375 psig.
FAILED                             TIME FINISHED:
Complete items on Simulator Ready for Training Checklist.
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 4, 6, 8                 APPROX COMPLETION TIME:   25 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
Place simulator in RUN.
X  PERFORM                                   IN PLANT SIMULATE                             X  SIMULATOR GENERAL  
Place 1B CV pump, 1A SI pump, and 1B SI pump in NAT.
Place PZR PORVs in AUTO.
Remove placards from 1SI8808A-D C/S.
Allow the RCS to heat up above 350 F. Modify SIMACC[3] TO 57,280 to lower 1C SI Accumulator level to 30%.
Modify SIMN2ACC[3] TO 1270 to lower 1C SI Accumulator pressure.
Place RCS Heatup Limits graphic display on right hand MCR CRT.
Verify/remove 1A SI pump data from HMI terminal screens.
Replace 1SI8808A-D placards when all examinees have completed JPM.
OMMENTS: C  Provide copy of BwAR 1-5-C1, Rev. 8E2 Provide copy of BwAR 1-5-C2, Rev 6E3 Provide copy of BwOP SI-5, Rev. 22 Provide copy of BwOP SI-9, Rev 11 (Final)  SIM-204 9 SIM-S403 1 TASK TITLE:
Swap Essential Service Water Pumps JPM No.: SIM-S403 REV: NRC2006301TPO No.: 4C.SX-03 K&A No.: 075000A4.01 TASK No.: R-SX-004, Operate the SX system K&A IMP: 3.2/3.2 TRAINEE:
SRO   EVALUATOR:
DATE:   The Trainee: PASSED           this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 4, 6, 8 APPROX COMPLETION TIME:
25 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X  PERFORM       IN PLANT SIMULATE X  SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BwOP SX-7, Rev. 16, Swapping Essential Service Water Pumps.
: 1. BwOP SX-7, Rev. 16, Swapping Essential Service Water Pumps.
MATERIALS:  
MATERIALS:
: 1. BwOP SX-7, Rev. 16, Swapping Essential Service Water Pumps.
: 1. BwOP SX-7, Rev. 16, Swapping Essential Service Water Pumps.
TASK STANDARDS:  
TASK STANDARDS:
: 1. Manually open 1SX016B prior to completing BwOP SX-7, step F.2.  
: 1. Manually open 1SX016B prior to completing BwOP SX-7, step F.2.
: 2. Start the 1B SX pump prior to securing the 1A SX pump.
: 2. Start the 1B SX pump prior to securing the 1A SX pump.
TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are the Assist NSO.  
: 1. You are the Assist NSO.
: 2. Both Units are at 100% power.  
: 2. Both Units are at 100% power.
: 3. Unit 2 has placed the 2A SX pump in service 5 minutes ago and requests that Unit 1 swap operating SX trains. 1B SX pump has been shutdown for 2 weeks.  
: 3. Unit 2 has placed the 2A SX pump in service 5 minutes ago and requests that Unit 1 swap operating SX trains. 1B SX pump has been shutdown for 2 weeks.
: 4. NLOs have been briefed and are standing by to assist in the field.
: 4. NLOs have been briefed and are standing by to assist in the field.
INITIATING CUES:  
INITIATING CUES:
: 1. The US has directed you to start the 1B SX pump and shutdown the 1A SX pump  
: 1. The US has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP SX-7.
: 2. Inform the US when you have completed the pump swap.
1 SIM-S403


per BwOP SX-7.  
RECORD START TIME PERFORMANCE STEP                STANDARD            Circle applicable
: 2. Inform the US when you have completed the pump swap.  
: 1. Refer to BwOP SX-7.          Locate and open BwOP SX- SAT    UNSAT      N/A CUE:  When examinee locates  7.                        Comments:
correct procedure, provide copy.
CUE:  All Prerequisites, Precautions, Limitations and Actions have been met.
: 2. Verify 1B SX pump suction    Perform the following at  SAT    UNSAT      N/A valve open.                  1PM06J:                  Comments:
CUE:  If requested, NLO
* Verify/Open 1SX001B.
reports that 1SX001B is open.
3  Verify 1PR03J in service      Perform the following at  SAT    UNSAT      N/A the RM-11 console        Comments:
o  Verify 1PR03J cursor status indicates normal (green) on grid 1, grid 5, or grid 6.
*4. Verify RCFC 1B and 1D inlet  Perform the following at  SAT    UNSAT      N/A and outlet valves open.      1PM06J:                  Comments:
* Place control switch for 1SX016B to OPEN.
o  Verify/Open 1SX027B.
: 5. Start 1A and 1B SX pump Aux. Direct NLO to locally    SAT    UNSAT      N/A Oil pumps.                    start 1A and 1B SX pump  Comments:
Aux. Oil pumps.
(1SX01PA/B-C)
Note: Simulator operator to start both Unit 1SX    o  At 1PM06J verify 1A pump aux. oil pumps      and 1B SX pump Aux.
when called.              Oil pump run lights lit.
2 SIM-S403


SIM-S403 2 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable  
PERFORMANCE STEP                 STANDARD             Circle applicable
: 1. Refer to BwOP SX-7. CUE: When examinee locates correct procedure, provide copy. CUE: All Prerequisites, Precautions, Limitations and
*6. Start 1B SX pump.            Perform the following at  SAT    UNSAT      N/A CUE:  If contacted as Unit 2 1PM06J:                   Comments:
operator, acknowledge  o Announce pump swap upcoming SX pump          over plant page swap.
* Start 1B SX pump by CUE:  If dispatched as NLO      taking the control to monitor 1B SX pump    switch to CLOSE until start locally, report    pump starts.
satisfactory start of 1B SX pump shortly after pump started.
: 7. Check running SX pumps        Perform the following at  SAT    UNSAT      N/A parameters.                  1PM06J:                  Comments:
* Check ammeters for 1A and 1B SX pumps
* Determines 1A and 1B SX pumps amps approximately equal.
* Checks 1PI-SX007 and 1PI-SX008
* Determines 1A and 1B SX pumps discharge pressure < 112 psig.
*8. Stop 1A SX pump.              Perform the following at  SAT    UNSAT      N/A CUE:  If dispatched as NLO    1PM06J:                  Comments:
to monitor 1A SX pump
* Stops 1A SX pump by stop locally, report      placing the control satisfactory stop of      switch to TRIP.
1A SX pump shortly
* Determines step F.7 is after pump stopped.        NOT applicable (1B SX pump and 2A SX pump are running)
: 9. Check 1B SX pump local        Direct NLO to check the  SAT    UNSAT      N/A operating conditions.        following local operating Comments:
CUE:   As NLO, report all    conditions:
local operating
* SX pump lube oil conditions for the        temperature: 50-130 pump and strainer are    &deg;F.
normal.
* SX pump seals not leaking.
* SX pump bearing bracket drain holes not plugged.
* Oil flow in bearing oil return sightglass.
* 1SX01FB, strainer control switch for 1B SX pump in AUTO.
CUE:   As NLO, report 1A SX pump is not rotating.
* 1A SX pump is not reverse rotating.
3 SIM-S403


Actions have been met.
PERFORMANCE STEP                 STANDARD           Circle applicable
Locate and open BwOP SX-
: 11. Stop Aux. Oil pumps.         Perform the following:   SAT    UNSAT      N/A
: 7. SAT    UNSAT      N/A Comments: 2. Verify 1B SX pump suction valve open. CUE: If requested, NLO reports that 1SX001B
* Direct NLO to Stop    Comments:
 
Aux. Oil pumps for 1A and 1B SX pumps CUE: As NLO, report 1A & 1B SX pump Aux Oil pumps off as
is open. Perform the following at
* Verify 1A and 1B SX they are secured.                pumps Aux. Oil pump run lights OFF at 1PM06J.
 
: 12. Startup 1B and 1D RCFC and   Perform the following at SAT    UNSAT      N/A Shutdown 1A and 1C RCFC.     1PM06J:                  Comments:
1PM06J:  Verify/Open 1SX001B.
* Verify All RCFCs are CUE:   All RCFCs are required    already running.
SAT    UNSAT      N/A Comments: 3 Verify 1PR03J in service Perform the following at the RM-11 console o Verify 1PR03J cursor
for containment
 
* Determine all RCFC cooling.                  required for CNMT cooling
status indicates
: 13. Ensure SX Chem Feed system   Direct NLO to perform   SAT    UNSAT      N/A aligned properly.            BwOP CF-36 as required. Comments:
 
CUE:  As NLO, acknowledge    (N/A if examinee request.              determines step not required)
normal (green) on grid
: 14. Inform US SX pump swap       Inform US SX pump swap   Inform US SX pump swap complete                      complete                complete CUE:  Acknowledges report.
 
CUE: THIS COMPLETES THIS JPM.
1, grid 5, or grid 6.
RECORD STOP TIME COMMENTS:
SAT    UNSAT      N/A Comments: *4. Verify RCFC 1B and 1D inlet and outlet valves open.
4 SIM-S403
Perform the following at
 
1PM06J:  Place control switch
 
for 1SX016B to OPEN.
o Verify/Open 1SX027B.
SAT    UNSAT      N/A Comments: 5. Start 1A and 1B SX pump Aux.
Oil pumps.
Note: Simulator operator to start both Unit 1SX
 
pump aux. oil pumps
 
when called.
Direct NLO to locally
 
start 1A and 1B SX pump
 
Aux. Oil pumps.
 
(1SX01PA/B-C) o At 1PM06J verify 1A
 
and 1B SX pump Aux.
 
Oil pump run lights
 
lit. SAT    UNSAT      N/A Comments:
SIM-S403 3  PERFORMANCE STEP STANDARD Circle applicable  
*6. Start 1B SX pump. CUE: If contacted as Unit 2 operator, acknowledge upcoming SX pump
 
swap. CUE: If dispatched as NLO to monitor 1B SX pump
 
start locally, report
 
satisfactory start of
 
1B SX pump shortly
 
after pump started.
Perform the following at
 
1PM06J: o Announce pump swap over plant page  Start 1B SX pump by taking the control
 
switch to CLOSE until
 
pump starts.
SAT    UNSAT      N/A Comments: 7. Check running SX pumps parameters.
Perform the following at
 
1PM06J: Check ammeters for 1A and 1B SX pumps  Determines 1A and 1B SX pumps amps
 
approximately equal. Checks 1PI-SX007 and 1PI-SX008  Determines 1A and 1B SX pumps discharge
 
pressure < 112 psig.
SAT    UNSAT      N/A Comments: *8. Stop 1A SX pump. CUE: If dispatched as NLO to monitor 1A SX pump
 
stop locally, report
 
satisfactory stop of
 
1A SX pump shortly
 
after pump stopped.
Perform the following at
 
1PM06J:  Stops 1A SX pump by placing the control
 
switch to TRIP. Determines step F.7 is NOT applicable (1B SX
 
pump and 2A SX pump
 
are running)
SAT    UNSAT      N/A Comments: 9. Check 1B SX pump local operating conditions. CUE: As NLO, report all local operating
 
conditions for the
 
pump and strainer are
 
normal.        CUE: As NLO, report 1A SX pump is not rotating.
Direct NLO to check the
 
following local operating
 
conditions:  SX pump lube oil
 
temperature: 50-130 F. SX pump seals not
 
leaking. SX pump bearing
 
bracket drain holes
 
not plugged. Oil flow in bearing
 
oil return sightglass. 1SX01FB, strainer
 
control switch for 1B  
 
SX pump in AUTO. 1A SX pump is not
 
reverse rotating.
SAT    UNSAT      N/A Comments:
SIM-S403 4  PERFORMANCE STEP STANDARD Circle applicable
: 11. Stop Aux. Oil pumps.
CUE: As NLO, report 1A & 1B SX pump Aux Oil pumps off as  
 
they are secured.
Perform the following:  Direct NLO to Stop
 
Aux. Oil pumps for 1A
 
and 1B SX pumps  Verify 1A and 1B SX  
 
pumps Aux. Oil pump  
 
run lights OFF at  
 
1PM06J. SAT    UNSAT      N/A Comments: 12. Startup 1B and 1D RCFC and Shutdown 1A and 1C RCFC.
CUE: All RCFCs are required for containment
 
cooling. Perform the following at
 
1PM06J: Verify All RCFCs are already running. Determine all RCFC required for CNMT  
 
cooling  SAT    UNSAT      N/A Comments: 13. Ensure SX Chem Feed system aligned properly. CUE: As NLO, acknowledge request. Direct NLO to perform  
 
BwOP CF-36 as required. (N/A if examinee  
 
determines step not  
 
required)
SAT    UNSAT      N/A Comments: 14. Inform US SX pump swap complete CUE: Acknowledges report.
Inform US SX pump swap  
 
complete Inform US SX pump swap  


complete  CUE: THIS COMPLETES THIS JPM.
TASK CONDITIONS:
 
: 1. You are the Assist NSO.
RECORD STOP TIME COMMENTS:
: 2. Both Units are at 100% power.
 
: 3. Unit 2 has placed the 2A SX pump in service 5 minutes ago and requests that Unit 1 swap operating SX trains. 1B SX pump has been shutdown for 2 weeks.
SIM-S403 5 TASK CONDITIONS:  
: 1. You are the Assist NSO.  
: 2. Both Units are at 100% power.  
: 3. Unit 2 has placed the 2A SX pump in service 5 minutes ago and requests that Unit 1 swap operating SX trains. 1B SX pump has been shutdown for 2 weeks.  
: 4. NLOs have been briefed and are standing by to assist in the field.
: 4. NLOs have been briefed and are standing by to assist in the field.
INITIATING CUES:  
INITIATING CUES:
: 1. The US has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP  
: 1. The US has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP SX-7.
: 2. Inform the US when you have completed the pump swap.
5 SIM-S403


SX-7. 2. Inform the US when you have completed the pump swap.  
SIMULATOR SETUP GUIDE:
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
* Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
* Complete items on Simulator Ready for Training Checklist
* Place simulator in RUN.
* Verify/start 1A SX pump
* Verify/stop 1B SX pump
* Close 1SX016B RCFC 1B and 1D inlet isolation valve.
* Remove SX Pump Trends from the HMI.
* Run caep SIM-S403 from disk and verify the following actuate:
* trgset 1 "ZLO1SX01PB(3)==1"
* trg 1 "IMF SW04 (0 3) 15000"
* trgset 2 "ZDI1SX01PA(1)==1"
* trg 2 "DMF SW04"
* To start/stop SX Pump Aux Oil Pumps, use the following remote functions:
* RF SW03 ON / OFF
* RF SW04 ON / OFF COMMENTS:
* Provide copy of BwOP SX-7, Rev. 16 (Final) 6 SIM-S403


SIMULATOR SETUP GUIDE:
TASK TITLE: Synchronize 1A EDG to Bus 141 and respond to Gov. Adj. malfunction.
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
JPM No.:     SIM-608                                   REV:       NRC2006301 TPO No.:   4C.DG-06                                   K&A No.:   064000A4.06 TASK No.:   R-DG-015, Operate the EDG                 K&A IMP:     3.9/3.9 TRAINEE:                                               SRO EVALUATOR:                                             DATE:
Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
The Trainee:       PASSED             this JPM.         TIME STARTED:
Complete items on Simulator Ready for Training Checklist Place simulator in RUN.
FAILED                               TIME FINISHED:
Verify/start 1A SX pump Verify/stop 1B SX pump Close 1SX016B RCFC 1B and 1D inlet isolation valve.
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 3, 4, 6                   APPROX. COMPLETION TIME: 18 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
Remove SX Pump Trends from the HMI.
X  PERFORM                                   IN PLANT SIMULATE                               X  SIMULATOR GENERAL  
Run caep SIM-S403 from disk and verify the following actuate:
trgset 1 "ZLO1SX01PB(3)==1"  trg 1 "IMF SW04 (0 3) 15000" trgset 2 "ZDI1SX01PA(1)==1"  trg 2 "DMF SW04"  To start/stop SX Pump Aux Oil Pumps, use the following remote functions:
RF SW03 ON / OFF RF SW04 ON / OFF OMMENTS: C Provide copy of BwOP SX-7, Rev. 16 (Final)  SIM-S403 6 SIM-608 1 TASK TITLE:
Synchronize 1A EDG to Bus 141 and respond to Gov. Adj. malfunction.
JPM No.: SIM-608 REV: NRC2006301TPO No.: 4C.DG-06 K&A No.: 064000A4.06 TASK No.: R-DG-015, Operate the EDG K&A IMP: 3.9/3.9 TRAINEE:
SRO   EVALUATOR:
DATE:   The Trainee: PASSED           this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 3, 4, 6 APPROX. COMPLETION TIME:
18 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X  PERFORM       IN PLANT SIMULATE X  SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BwOP DG-11, Rev. 30, Diesel Generator Startup  
: 1. BwOP DG-11, Rev. 30, Diesel Generator Startup
: 2. 1BwOSR 3.8.1.2-1, Rev. 15, Unit One 1A Diesel Generator Operability Surveillance MATERIALS:  
: 2. 1BwOSR 3.8.1.2-1, Rev. 15, Unit One 1A Diesel Generator Operability Surveillance MATERIALS:
: 1. BwOP DG-11, Rev. 30, Diesel Generator Startup (steps 1-8 completed)  
: 1. BwOP DG-11, Rev. 30, Diesel Generator Startup (steps 1-8 completed)
: 2. BwOP DG-11T1, Rev. 6, Diesel Generator Start/Stop Log (partially completed)  
: 2. BwOP DG-11T1, Rev. 6, Diesel Generator Start/Stop Log (partially completed)
: 3. 1BwOSR 3.8.1.2-1, Rev. 15 (sections 1.0, 2.0, 4.0 completed.)
: 3. 1BwOSR 3.8.1.2-1, Rev. 15 (sections 1.0, 2.0, 4.0 completed.)
TASK STANDARDS:  
TASK STANDARDS:
: 1. Synchronize 1A Diesel Generator to bus 141  
: 1. Synchronize 1A Diesel Generator to bus 141
: 2. Recognize a failure of the Governor Adjust switch  
: 2. Recognize a failure of the Governor Adjust switch
: 3. Open 1A DG Output Circuit Breaker prior to completion of BwOP DG-11, step  
: 3. Open 1A DG Output Circuit Breaker prior to completion of BwOP DG-11, step F.9.l.
 
TASK CONDITIONS:
F.9.l. TASK CONDITIONS:  
: 1. You are the extra NSO.
: 1. You are the extra NSO.  
: 2. All conditions are normal for current mode on Unit 1.
: 2. All conditions are normal for current mode on Unit 1.  
: 3. The 1A Diesel Generator was SLOW started from the control room per BwOP DG-11 step F.4, and has been running unloaded for approximately fifteen minutes.
: 3. The 1A Diesel Generator was SLOW started from the control room per BwOP DG-11  
Step 9 is ready to be performed.
 
step F.4, and has been running unloaded for approximately fifteen minutes.
 
Step 9 is ready to be performed.  
: 4. 1BwOSR 3.8.1.2-1 is in progress, and complete through step F.4.0.
: 4. 1BwOSR 3.8.1.2-1 is in progress, and complete through step F.4.0.
INITIATING CUES:  
INITIATING CUES:
: 1. Using the partially completed procedures provided, (CUE: Hand examinee copy of 1BwOSR 3.8.1.2-1, BwOP DG-11, and BwOP DG-11T1) you have been directed by the Unit Supervisor to complete Section F.5.0 of 1BwOSR 3.8.1.2-1.  
: 1. Using the partially completed procedures provided, (CUE: Hand examinee copy of 1BwOSR 3.8.1.2-1, BwOP DG-11, and BwOP DG-11T1) you have been directed by the Unit Supervisor to complete Section F.5.0 of 1BwOSR 3.8.1.2-1.
: 2. Inform the US when you have completed section F.5.0 of 1BwOSR 3.8.1.2-1.  
: 2. Inform the US when you have completed section F.5.0 of 1BwOSR 3.8.1.2-1.
 
1 SIM-608
SIM-608 2 RECORD START TIME 
 
Note: Provide the partially completed copies of 1BwOSR 3.8.1.2-1, BwOP DG-11, and BwOP DG-11T1 to the examinee.
PERFORMANCE STEP STANDARD Circle applicable
: 1. Refer to 1BwOSR 3.8.1.2-1, 1A DG Operability Monthly
 
Surveillance. (Section F.
 
5.0)  Refer to copy of 1BwOSR
 
3.8.1.2-1 provided  Determine it is
 
necessary to parallel
 
and load 1A DG using
 
BwOP DG-11.
SAT    UNSAT      N/A Comments: 2. Refer to BwOP DG-11 CUE: All Prerequisites, Precautions, Limitations and
 
Actions are met Refer to BwOP DG-11  Determine step F.9 to


be used to parallel
RECORD START TIME Note: Provide the partially completed copies of 1BwOSR 3.8.1.2-1, BwOP DG-11, and BwOP DG-11T1 to the examinee.
 
PERFORMANCE STEP                STANDARD              Circle applicable
and load 1A DG SAT    UNSAT      N/A Comments:
: 1. Refer to 1BwOSR 3.8.1.2-1,    Refer to copy of 1BwOSR    SAT    UNSAT      N/A 1A DG Operability Monthly    3.8.1.2-1 provided        Comments:
SIM-608 3  PERFORMANCE STEP STANDARD Circle applicable
Surveillance. (Section F.
*3. Parallel the 1A Diesel Generator CUE: If asked, this surveillance is NOT being performed in
* Determine it is 5.0)                            necessary to parallel and load 1A DG using BwOP DG-11.
 
: 2. Refer to BwOP DG-11          Refer to BwOP DG-11        SAT    UNSAT      N/A CUE: All Prerequisites,
conjunction with the
* Determine step F.9 to  Comments:
 
Precautions, Limitations and    be used to parallel Actions are met                  and load 1A DG 2
24-hour load run of
SIM-608
 
surveillance 1BwVSR


PERFORMANCE STEP              STANDARD            Circle applicable
*3. Parallel the 1A Diesel      Perform the following at  SAT    UNSAT      N/A Generator                  1PM01J:                  Comments:
CUE:  If asked, this      o  VERIFY DG Frequency surveillance is NOT    ~60Hz and Voltage being performed in      ~4160V conjunction with the    o  Adjust DG frequency 24-hour load run of        to 60 Hz using Gov.
surveillance 1BwVSR        Adj. Control.
3.8.1.14-1.
3.8.1.14-1.
Perform the following at  
o  Adjust DG voltage to 4160V using Volt Adj. Control.
o  VERIFY approximately the same voltage exists across each phase o  Check voltage on phases A-B, B-C, and A-C using the DIESEL GEN.
VOLTMETER SELECT Switch.
* Turn Sync Selector Switch to ON for ACB 1413.
* Adjust Incoming (DG) voltage (1EI-AP104B) slightly higher (0-4.0 volts) than running voltage (1EI-AP104A) using the Volt Adj.
Control.
* Adjust Generator Speed such that the synchroscope (1SI-AP104) is rotating SLOWLY in the FAST direction using the Gov. Adj. Control.
* When the synchroscope (1SI-AP104) is slightly before the 12 o'clock position, CLOSE ACB 1413.
o  Verify synchroscope (1SI-AP104) "Locks in" at 12 o'clock position.
3 SIM-608


1PM01J: o VERIFY DG Frequency
PERFORMANCE STEP                 STANDARD             Circle applicable Note: Alternate path begins here
 
  *4   Attempt to load the 1A       Perform the following at Diesel Generator              1PM01J:
~60Hz and Voltage
* Attempt to load 1A DG by going to RAISE on the Gov Adj. Control
 
* Determine 1A DG OUTPUT KW (1JI-DG002) NOT rising Examiners note: The following step does not have to be performed prior to tripping ACB 1413. If the examinee trips ACB 1413 prior to turning the Synchroscope off mark this step as N/A.
~4160V o Adjust DG frequency
: 5. Turn the Synchroscope OFF. Perform the following at SAT    UNSAT      N/A 1PM01J:                   Comments:
 
o Place the Sync Selector Switch for DG 1A Feed to 4KV BUS 141 in OFF position.
to 60 Hz using Gov.
*6. Open 1A D/G output breaker. Perform the following at  SAT    UNSAT      N/A CUE:   Examinee will be       1PM01J:                  Comments:
 
unable to load the 1A
Adj. Control.
* OPEN ACB 1413 DG. Procedure          o  Inform US of problem guidance (note prior      encountered.
o Adjust DG voltage
to step F.9.f) is to open ACB 1413.
 
CUE:  As US, acknowledge report of 1A DG failure to load.
to 4160V using Volt
CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
Adj. Control.
4 SIM-608
o VERIFY approximately
 
the same voltage
 
exists across each
 
phase  o Check voltage on
 
phases A-B, B-C, and A-C using the
 
DIESEL GEN.
 
VOLTMETER SELECT
 
Switch. Turn Sync Selector
 
Switch to ON for ACB
 
1413. Adjust Incoming (DG)
 
voltage (1EI-AP104B)
 
slightly higher (0-4.0
 
volts) than running
 
voltage (1EI-AP104A)
 
using the Volt Adj.
 
Control. Adjust Generator Speed
 
such that the
 
synchroscope (1SI-
 
AP104) is rotating
 
SLOWLY in the FAST
 
direction using the
 
Gov. Adj. Control. When the synchroscope
 
(1SI-AP104) is
 
slightly before the 12 o'clock position, CLOSE ACB 1413.
o Verify synchroscope
 
(1SI-AP104) "Locks in" at 12 o'clock
 
position.
SAT    UNSAT      N/A Comments:
SIM-608 4  PERFORMANCE STEP STANDARD Circle applicable Note: Alternate path begins here  
*4 Attempt to load the 1A Diesel Generator Perform the following at 1PM01J: Attempt to load 1A DG  
 
by going to RAISE on  
 
the Gov Adj. Control Determine 1A DG OUTPUT  
 
KW (1JI-DG002) NOT  
 
rising   Examiners note: The following step does not have to be performed prior to tripping ACB  
 
1413. If the examinee trips ACB 1413 prior to turning the Synchroscope off mark this  
 
step as N/A.  
: 5. Turn the Synchroscope OFF.
Perform the following at  
 
1PM01J: o Place the Sync  
 
Selector Switch for DG  
 
1A Feed to 4KV BUS 141  
 
in OFF position.
SAT    UNSAT      N/A Comments: *6. Open 1A D/G output breaker. CUE: Examinee will be unable to load the 1A  
 
DG. Procedure


guidance (note prior
TASK CONDITIONS:
 
: 1. You are the extra NSO.
to step F.9.f) is to
: 2. All conditions are normal for current mode on Unit 1.
 
: 3. The 1A Diesel Generator was SLOW started from the control room per BwOP DG-11 step F.4, and has been running unloaded for approximately fifteen minutes. Step 9 is ready to be performed.
open ACB 1413. CUE: As US, acknowledge report of 1A DG
 
failure to load.
Perform the following at
 
1PM01J:  OPEN ACB 1413 o Inform US of problem
 
encountered.
SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME 
 
COMMENTS:
 
SIM-608 5 TASK CONDITIONS:  
: 1. You are the extra NSO.  
: 2. All conditions are normal for current mode on Unit 1.  
: 3. The 1A Diesel Generator was SLOW started from the control room per BwOP DG-11 step F.4, and has been running unloaded for approximately fifteen minutes. Step 9 is  
 
ready to be performed.  
: 4. 1BwOSR 3.8.1.2-1 is in progress, and complete through step F.4.0.
: 4. 1BwOSR 3.8.1.2-1 is in progress, and complete through step F.4.0.
INITIATING CUES:  
INITIATING CUES:
: 1. Using the partially completed procedures provided, you have been directed by the  
: 1. Using the partially completed procedures provided, you have been directed by the Unit Supervisor to complete Section F.5.0 of 1BwOSR 3.8.1.2-1.
 
: 2. Inform the US when you have completed section F.5.0 of 1BwOSR 3.8.1.2-1.
Unit Supervisor to complete Section F.5.0 of 1BwOSR 3.8.1.2-1.  
5 SIM-608
: 2. Inform the US when you have completed section F.5.0 of 1BwOSR 3.8.1.2-1.  


SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
* Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
Complete items on Simulator Ready for Training Checklist Place simulator in RUN.
* Complete items on Simulator Ready for Training Checklist
Place 1A DG Auto Reclose Circuit Arm switch to SURV TEST Start 1A DG Insert IRF EG06 to clear 1A DG TROUBLE/FAIL TO START annunciator Adjust 1A DG (incoming) voltage lower than running voltage Adjust DG frequency to 60.2 Hz Place synch switch handle in ACB 1414 Run caep SIM-608 from disk and verify the following actuate:
* Place simulator in RUN.
trgset 1 "ZDI1HSDG026(3)==1" trg 1 "IOR ZDI1HSDG019 2" trgset 2 "ZDI1HSDG028(3)==1" trg 2 "IOR ZDI1HSDG022 2"   If running the JPM repetitively, perform the following:
* Place 1A DG Auto Reclose Circuit Arm switch to SURV TEST
Delete Override DOR ZDI1HSDG022 DOR ZDI1HSDG019 Delete Override  Reset Trigger 1 and 2 ning voltage.
* Start 1A DG
Adjust DG voltage lower than run Adjust DG frequency to 60.2 Hz. Place synch switch handle in ACB 1414 COMMENTS:
* Insert IRF EG06 to clear 1A DG TROUBLE/FAIL TO START annunciator
Provide copy of 1BwOSR 3.8.1.2-1, rev 15, with sections 1.0, 2.0, 4.0 completed.  
* Adjust 1A DG (incoming) voltage lower than running voltage
 
* Adjust DG frequency to 60.2 Hz
Provide marked up copy of BwOP DG-11, rev 30, with steps F.1, F.4, F.7  
* Place synch switch handle in ACB 1414
* Run caep SIM-608 from disk and verify the following actuate:
* trgset 1 "ZDI1HSDG026(3)==1"
* trg 1 "IOR ZDI1HSDG019 2"
* trgset 2 "ZDI1HSDG028(3)==1"
* trg 2 "IOR ZDI1HSDG022 2"
* If running the JPM repetitively, perform the following:
* Delete Override DOR ZDI1HSDG022
* Delete Override DOR ZDI1HSDG019
* Reset Trigger 1 and 2
* Adjust DG voltage lower than running voltage.
* Adjust DG frequency to 60.2 Hz.
* Place synch switch handle in ACB 1414 COMMENTS:
* Provide copy of 1BwOSR 3.8.1.2-1, rev 15, with sections 1.0, 2.0, 4.0 completed.
* Provide marked up copy of BwOP DG-11, rev 30, with steps F.1, F.4, F.7 and F.8 place-kept and unit and train designators filled in.
* Provide copy of BwOP DG-11T, rev 6, with 1A DG start data completed (Final) 6 SIM-608


and F.8 place-kept and unit and train designators filled in.
TASK TITLE: Respond to RCP Thermal Barrier Leak with CC Valve Failure JPM No.:     SIM-801                                   REV:       NRC2006301 TPO No.:   4D.OA-51                                   K&A No.:   008000A3.03 TASK No.:   R-OA-061, Respond to a loss of CC         K&A IMP:   3.0/3.1 to RCP oil/thermal barrier coolers TRAINEE:                                               SRO EVALUATOR:                                             DATE:
Provide copy of BwOP DG-11T, rev 6, with 1A DG start data completed SIM-608 6 (Final)
The Trainee:       PASSED             this JPM.       TIME STARTED:
SIM-801 1 TASK TITLE:
FAILED                             TIME FINISHED:
Respond to RCP Thermal Barrier Leak with CC Valve Failure JPM No.: SIM-801 REV: NRC2006301TPO No.: 4D.OA-51 K&A No.: 008000A3.03 TASK No.: R-OA-061, Respond to a loss of CC K&A IMP: 3.0/3.1 to RCP oil/thermal barrier coolers       TRAINEE:
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 7, 8                     APPROX COMPLETION TIME   10  MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
SRO   EVALUATOR:
X  PERFORM                                   IN PLANT SIMULATE                               X SIMULATOR GENERAL  
DATE:   The Trainee: PASSED           this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:  
(*) 7, 8 APPROX COMPLETION TIME 10  MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
X  PERFORM       IN PLANT SIMULATE X   SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOA PRI-6, Rev. 101, Component Cooling Malfunction  
: 1. 1BwOA PRI-6, Rev. 101, Component Cooling Malfunction
: 2. BwAR 1-7-E4, Rev. 51E2, RCP THERM BARR CC WTR FLOW HIGH LOW MATERIALS:  
: 2. BwAR 1-7-E4, Rev. 51E2, RCP THERM BARR CC WTR FLOW HIGH LOW MATERIALS:
: 1. Copy of BwAR 1-7-E4, Rev. 51E2 TASK STANDARDS:  
: 1. Copy of BwAR 1-7-E4, Rev. 51E2 TASK STANDARDS:
: 1. Determine 1B RCP Thermal Barrier is leaking.  
: 1. Determine 1B RCP Thermal Barrier is leaking.
: 2. Isolate RCP thermal barrier leakage by closing 1CC9438 prior to overfilling CC surge tank.  
: 2. Isolate RCP thermal barrier leakage by closing 1CC9438 prior to overfilling CC surge tank.
: 3. Isolate 1B RCP thermal barrier and restore CC cooling to unaffected RCP  
: 3. Isolate 1B RCP thermal barrier and restore CC cooling to unaffected RCP thermal barriers.
 
TASK CONDITIONS:
thermal barriers.
: 1. You are the Assist NSO.
TASK CONDITIONS:  
: 2. Unit 1 is at 100% power.
: 1. You are the Assist NSO.  
: 2. Unit 1 is at 100% power.  
: 3. Annunciator 1-7-E4 RCP THERM BARR CC WTR FLOW HIGH LOW has just alarmed.
: 3. Annunciator 1-7-E4 RCP THERM BARR CC WTR FLOW HIGH LOW has just alarmed.
INITIATING CUES:  
INITIATING CUES:
: 1. Perform actions in response to annunciator 1-7-E4.  
: 1. Perform actions in response to annunciator 1-7-E4.
: 2. Inform the Unit Supervisor when you have completed actions in response to annunciator 1-7-E4.  
: 2. Inform the Unit Supervisor when you have completed actions in response to annunciator 1-7-E4.
1 SIM-801


SIM-801 2 RECORD START TIME Examiners note: Examinee may take the control switch for 1CC685 to CLOSE at any time (see JPM step 6), when it is noted that the valve did not automatically close on high  
RECORD START TIME Examiners note: Examinee may take the control switch for 1CC685 to CLOSE at any time (see JPM step 6), when it is noted that the valve did not automatically close on high flow.
Examiners note: Examinee may refer to BwAR 1-7-E4 which directs responses per 1BwOA Pri-6 (below) and 1BwOA PRI-1. If examinee notes reference to 1BWOA PRI-1, provide CUE:
Another Operator will initiate actions of 1BwOA-PRI-1, you are to perform actions of 1BwOA PRI-6.
Examiners note: RCP thermal barrier leakage will cause a high alarm on 1PR09J, Unit 1 CC Heat Exchanger Radiation Monitor and cause automatic closure of 1CC017, CC Surge Tank Vent Valve. If examinee begins to address the 1PR09J alarm, provide CUE: Another Operator will initiate actions in response to 1PR09J alarm.
Examiners note: RCP thermal barrier leakage will cause annunciator 1-9-D3, CHG LINE FLOW HIGH/LOW. If examinee begins to address annunciator, provide CUE: Another Operator will perform actions in response to annunciator 1-9-D3.
PERFORMANCE STEP                STANDARD              Circle applicable
: 1. Refer to BwAR 1-7-E4          Locate and open 1BwAR 1-  SAT    UNSAT      N/A CUE:  When examinee locates  7-E4                      Comments:
correct procedure,    o  Refer to SER provide copy.          o  Determine RCP thermal barrier CC water flow high in alarm 2  Refer to 1BwOA PRI-6,        Locate and open 1BwOA      SAT    UNSAT      N/A Component Cooling            PRI-6                      Comments:
Malfunction
* Notify Shift Manager Note: Examinee will use          to evaluate for simulator copy of        Emergency Plan 1BwOA PRI-6 for JPM      conditions performance.
CUE:  Acknowledge request for emergency plan evaluation.
: 3. Check surge tank level > 13%  Perform the following at  SAT    UNSAT      N/A and increasing                1PM06J:                    Comments:
* Check CC Surge tank level:
* 1LIT-670/676
* Determine CC surge tank level > 13%
* Determine CC Surge tank level is rising
* Go to 1BwOA PRI-6, Attachment B, step 1
* Determine CC Surge tank level is rising
* Go to 1BwOA PRI-6, Attachment B, Step 5 2
SIM-801


flow. Examiners note: Examinee may refer to BwAR 1-7-E4 which directs responses per 1BwOA
PERFORMANCE STEP              STANDARD            Circle applicable
: 4. Check for leakage from RCP Perform the following at  SAT    UNSAT      N/A Thermal Barrier            1PM05J/1PM06J:           Comments:
* Check for leakage from RCP Thermal Barrier:
o Annunciator 1-7-E4 LIT
* Determine annunciator 1                                          E4 LIT OR o Seal Injection Flows any abnormally high
* Determine 1B RCP has abnormally high seal flows
: 5. Check seal injection flow  Perform the following at  SAT    UNSAT      N/A between 8 and 13 gpm per   1PM05J:                  Comments:
pump
* Determine 1B RCP seal injection flow > 13 gpm
* Adjust 1CV121 AND 1CV182 to obtain between 8 and 13 gpm seal injection flow per RCP (as possible)
: 6. Check 1CC685 Closed        Perform the following at  SAT    UNSAT      N/A 1PM06J:                  Comments:
* Check 1CC685 Closed
* Determine 1CC685 is OPEN
* Place control switch for 1CC685 to CLOSE 3
SIM-801


Pri-6 (below) and 1BwOA PRI-1. If examinee notes reference to 1BWOA PRI-1, provide CUE:
PERFORMANCE STEP                 STANDARD             Circle applicable Note:  Alternate path begins here
 
  *7. Isolate RCP thermal barrier   Perform the following at leakage                       1PM06J:
Another Operator will initiate actions of 1BwOA-PRI-1, you are to perform actions of
CUE: As US, acknowledge
 
* Determine 1CC685 did failure of 1CC685 to       not close close.
1BwOA PRI-6.
* Manually close 1CC9438
Examiners note:  RCP thermal barrier leakage will cause a high alarm on 1PR09J, Unit 1
*8. Restore CC to unaffected     Perform the following:    SAT    UNSAT      N/A RCPs by locally closing RCP   Determine 1B RCP is      Comments:
 
Thermal Barrier CC outlet     affected RCP valve to isolate affected RCP
CC Heat Exchanger Radiation Monitor and cause automatic closure of 1CC017, CC Surge Tank
* Determine 1CC9569B closure required CUE:   SM desires affected RCP to be isolated.
 
* Dispatch operator to enter Unit 1 Note: Inform examinee time       Containment to locally compression will be       close 1CC9496B used and provide the following cue:
Vent Valve. If examinee begins to address the 1PR09J alarm, provide CUE: Another
* After 1CC9496B closed, reopen 1CC9438 CUE:   As NLO, report 1CC9496B closed.
 
: 9. Check CC surge tank status    Perform the following:    SAT    UNSAT      N/A
Operator will initiate actions in response to 1PR09J alarm.
* Check CC surge tank    Comments:
Examiners note:  RCP thermal barrier leakage will cause annunciator 1-9-D3, CHG LINE
level between 50% and 65%
 
o  Dispatch NLO to CUE:  As NLO, acknowledge        restore CC surge tank request to restore CC      level between 50% and surge tank level.          65% in necessary
FLOW HIGH/LOW. If examinee begins to address annunciator, provide CUE: Another Operator
: 10. Refer to Tech Specs          Refer to Tech Specs      SAT    UNSAT      N/A CUE: As US, acknowledge
 
* Determine Tech Spec    Comments:
will perform actions in response to annunciator 1-9-D3.
T.S. 3.6.3 entry for      3.6.3 applies for 1CC685.                    1CC685.
PERFORMANCE STEP STANDARD Circle applicable
: 11. Return to procedure and step  Perform the following:    SAT    UNSAT      N/A in effect                    o  Inform US 1BwOA PRI-6 Comments:
: 1. Refer to BwAR 1-7-E4 CUE: When examinee locates correct procedure, provide copy.
CUE:  Acknowledge report        actions complete CUE: THIS COMPLETES THIS JPM.
Locate and open 1BwAR 1-
RECORD STOP TIME COMMENTS:
 
4 SIM-801
7-E4 o Refer to SER o Determine RCP thermal
 
barrier CC water flow
 
high in alarm SAT    UNSAT      N/A Comments: 2 Refer to 1BwOA PRI-6, Component Cooling
 
Malfunction Note: Examinee will use simulator copy of
 
1BwOA PRI-6 for JPM
 
performance. CUE: Acknowledge request for emergency plan
 
evaluation.
Locate and open 1BwOA
 
PRI-6  Notify Shift Manager
 
to evaluate for
 
Emergency Plan
 
conditions SAT    UNSAT      N/A Comments: 3. Check surge tank level > 13%
and increasing Perform the following at
 
1PM06J:  Check CC Surge tank
 
level:  1LIT-670/676  Determine CC surge
 
tank level > 13%  Determine CC Surge
 
tank level is rising  Go to 1BwOA PRI-6, Attachment B, step 1  Determine CC Surge
 
tank level is rising  Go to 1BwOA PRI-6, Attachment B, Step 5 SAT    UNSAT      N/A Comments:
SIM-801 3  PERFORMANCE STEP STANDARD Circle applicable
: 4. Check for leakage from RCP Thermal Barrier Perform the following at 1PM05J/1PM06J:  Check for leakage from
 
RCP Thermal Barrier:
o Annunciator 1-7-E4
 
LIT  Determine
 
annunciator 1 E4 LIT OR o S eal Injection Flows any abnormally high  Determine 1B RCP
 
has abnormally
 
high seal flows SAT    UNSAT      N/A Comments: 5. Check seal injection flow between 8 and 13 gpm per
 
pump  Perform the following at
 
1PM05J:  Determine 1B RCP seal
 
injection flow > 13
 
gpm  Adjust 1CV121 AND
 
1CV182 to obtain
 
between 8 and 13 gpm
 
seal injection flow
 
per RCP (as possible)
SAT    UNSAT      N/A Comments: 6. Check 1CC685 Closed Perform the following at
 
1PM06J:  Check 1CC685 Closed  Determine 1CC685 is
 
OPEN  Place control switch
 
for 1CC685 to CLOSE SAT    UNSAT      N/A Comments:
SIM-801 4  PERFORMANCE STEP STANDARD Circle applicable Note:  Alternate path begins here  
  *7. Isolate RCP thermal barrier leakage CUE: As US, acknowledge failure of 1CC685 to close. Perform the following at
 
1PM06J:  Determine 1CC685 did
 
not close  Manually close 1CC9438  
  *8. Restore CC to unaffected RCPs by locally closing RCP  
 
Thermal Barrier CC outlet  
 
valve to isolate affected  
 
RCP CUE: SM desires affected RCP to be isolated. Note: Inform examinee time compression will be  
 
used and provide the  
 
following cue: CUE: As NLO, report 1CC9496B closed.
Perform the following:
Determine 1B RCP is
 
affected RCP Determine 1CC9569B
 
closure required Dispatch operator to
 
enter Unit 1
 
Containment to locally


close 1CC9496B  After 1CC9496B closed, reopen 1CC9438 SAT    UNSAT      N/A Comments: 9. Check CC surge tank status CUE: As NLO, acknowledge request to restore CC
TASK CONDITIONS:
 
: 1. You are the Assist NSO.
surge tank level.
: 2. Unit 1 is at 100% power.
Perform the following:  Check CC surge tank
 
level between 50% and
 
65% o Dispatch NLO to
 
restore CC surge tank
 
level between 50% and
 
65% in necessary SAT    UNSAT      N/A Comments: 10. Refer to Tech Specs CUE: As US, acknowledge T.S. 3.6.3 entry for
 
1CC685. Refer to Tech Specs  Determine Tech Spec
 
====3.6.3 applies====
for
 
1CC685. SAT    UNSAT      N/A Comments: 11. Return to procedure and step in effect CUE: Acknowledge report Perform the following:
o Inform US 1BwOA PRI-6
 
actions complete SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
 
SIM-801 5  TASK CONDITIONS:  
: 1. You are the Assist NSO.  
: 2. Unit 1 is at 100% power.  
: 3. Annunciator 1-7-E4 RCP THERM BARR CC WTR FLOW HIGH LOW has just alarmed.
: 3. Annunciator 1-7-E4 RCP THERM BARR CC WTR FLOW HIGH LOW has just alarmed.
INITIATING CUES:  
INITIATING CUES:
: 1. Perform actions in response to annunciator 1-7-E4.  
: 1. Perform actions in response to annunciator 1-7-E4.
: 2. Inform the Unit Supervisor when you have completed actions in response to annunciator 1-7-E4.  
: 2. Inform the Unit Supervisor when you have completed actions in response to annunciator 1-7-E4.
5 SIM-801


SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
* Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
Complete items on Simulator Ready for Training Checklist Place simulator in RUN.
* Complete items on Simulator Ready for Training Checklist
Run caep SIM-801 from disk and verify the following actuate:
* Place simulator in RUN.
IMF CC09 231 IMF CC07B 20 IOR ZDI1CC685 OPEN TRGSET 1 "ZDI1CC9438(1) == 1" TRG 1 "DMF CC09"   Verify 1BwOA PRI-6 place keeping marks are removed.
* Run caep SIM-801 from disk and verify the following actuate:
To close 1CC9496B, perform the following:
* IMF CC09 231
Insert IRF CC45 0 To drain CC surge tank, perform the following:
* IMF CC07B 20
Insert IRF CC15 100 (modify RF to 0 when desired level attained)
* IOR ZDI1CC685 OPEN
Insert IRF CC16 100 (modify RF to 0 when desired level attained)
* TRGSET 1 "ZDI1CC9438(1) == 1"
If running the JPM repetitively, perform the following:
* TRG 1 "DMF CC09"
MRF CC45 50 Reset trigger 1 Restore RCP seal injection to normal band Restore CC surge tank level to normal band IMF CC09 231 COMMENTS:
* Verify 1BwOA PRI-6 place keeping marks are removed.
Provide copy of BwAR 1-7-E4, rev 51E2 SIM-801 6 (Final)
* To close 1CC9496B, perform the following:
SIM-901 1 TASK TITLE:
* Insert IRF CC45 0
Perform Waste Gas Release Channel Checks JPM No.: SIM-901 REV: NRC2006301TPO No.: 4C.GW-01 K&A No.: 071000A4.25 TASK No.: R-GW-001, Perform gaseous release K&A IMP: 3.2/3.2 TRAINEE:
* To drain CC surge tank, perform the following:
SRO   EVALUATOR:
* Insert IRF CC15 100(modify RF to 0 when desired level attained)
DATE:   The Trainee: PASSED            this JPM. TIME STARTED:
* Insert IRF CC16 100(modify RF to 0 when desired level attained)
FAILED TIME FINISHED:
* If running the JPM repetitively, perform the following:
JPM TIME: MINUTES CRITICAL ELEMENTS:  
* MRF CC45 50
(*) 5, 9 APPROX COMPLETION TIME:
* Reset trigger 1
30 MINUTES CRITICAL TIME:
* Restore RCP seal injection to normal band
NA EVALUATION METHOD:
* Restore CC surge tank level to normal band
LOCATION:
* IMF CC09 231 COMMENTS:
X  PERFORM       IN PLANT SIMULATE X   SIMULATOR GENERAL  
* Provide copy of BwAR 1-7-E4, rev 51E2 (Final) 6 SIM-801
 
TASK TITLE: Perform Waste Gas Release Channel Checks JPM No.:     SIM-901                                   REV:       NRC2006301 TPO No.:   4C.GW-01                                   K&A No.:   071000A4.25 TASK No.:   R-GW-001, Perform gaseous release         K&A IMP:   3.2/3.2 TRAINEE:                                               SRO EVALUATOR:                                             DATE:
The Trainee:       PASSED            this JPM.         TIME STARTED:
FAILED                             TIME FINISHED:
JPM TIME:             MINUTES CRITICAL ELEMENTS:       (*) 5, 9                     APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:           NA EVALUATION METHOD:                                     LOCATION:
X  PERFORM                                   IN PLANT SIMULATE                               X SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BwOP GW-500T1, Rev. 26, Gas Decay Tank Release Form MATERIALS:  
: 1. BwOP GW-500T1, Rev. 26, Gas Decay Tank Release Form MATERIALS:
: 1. BwOP GW-500T1, Rev. 26, Gas Decay Tank Release Form completed through step D.17. TASK STANDARDS:  
: 1. BwOP GW-500T1, Rev. 26, Gas Decay Tank Release Form completed through step D.17.
: 1. Perform Gas Decay Tank pre-release channel checks in accordance with BwOP GW-
TASK STANDARDS:
 
: 1. Perform Gas Decay Tank pre-release channel checks in accordance with BwOP GW-500T1.
500T1. 2. Operate the RM-11 for setpoint adjustment/testing.
: 2. Operate the RM-11 for setpoint adjustment/testing.
TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are an extra NSO.  
: 1. You are an extra NSO.
: 2. Both Units are at full power.  
: 2. Both Units are at full power.
: 3. 0PR02J, Gas Decay Tank Monitor, is operable.
: 3. 0PR02J, Gas Decay Tank Monitor, is operable.
INITIATING CUES:  
INITIATING CUES:
: 1. The Unit Supervisor has directed you to perform a portion of the 0F Gas Decay  
: 1. The Unit Supervisor has directed you to perform a portion of the 0F Gas Decay Tank release package, completed through section D.17, and has directed you to complete steps D.18 through D.21. (Cue: Hand examinee copy of procedure).
All previous sections of the release package have been successfully completed.
: 2. Inform the Unit Supervisor when you have completed steps D.18 through D.21.
1 SIM-901


Tank release package, completed through section D.17, and has directed you to
RECORD START TIME PERFORMANCE STEP                STANDARD              Circle applicable
: 1. Review BwOP GW-500T1        Review BwOP GW-500T1      SAT    UNSAT      N/A Comments:
: 2. Select the High Alarm        Perform the following:    SAT    UNSAT      N/A setpoint for 0PA202.
* PLACE the RM-11        Comments:
(steps D.18 - 19.a)            console in the SUPERVISOR mode o  DEPRESS Grid 3 key
* KEY in 0202
* DEPRESS the SEL key o  VERIFY 0PA202 selected
* DEPRESS CHAN ITEM key
* KEY in 9
* DEPRESS the SEL key Examiners note: The following procedure step is not required to be performed if 0PA202 is NOT in HIGH ALARM.
: 3. Verify/enter High Alarm      Perform the following:    SAT    UNSAT      N/A setpoint for 0PA202          o  Refer to step C.3.c    Comments:
suggested by Health Physics is section C.3.c.            o  VERIFY/ENTER the new High Alarm setpoint (step D.19.b)                  from step C.3.c Note: If examinee requests      (6.06E-03) independent          o  DEPRESS the ENTER key verification of steps, provide the    o  VERIFY the new ALERT following cue.          alarm setpoint is displayed CUE:  Verification has been provided.            o OBTAIN VERIFICATION 2
SIM-901


complete steps D.18 through D.21(Cue: Hand examinee copy of procedure).
PERFORMANCE STEP                STANDARD            Circle applicable
All previous sections of the release package have been successfully completed.  
: 4. Select and enter the Alert  Perform the following:    SAT    UNSAT      N/A Alarm setpoint for 0PA202. o  DEPRESS Grid 3 key    Comments:
: 2. Inform the Unit Supervisor when you have completed steps D.18 through D.21.  
(step D.19.c)                o KEY in 0202 o  DEPRESS the SEL key o  VERIFY 0PA202 selected o DEPRESS CHAN ITEM key
* KEY in 10
* DEPRESS the SEL key o  Refer to step C.3.c o  VERIFY/ENTER the new Alert Alarm setpoint 3.03E-03 o  DEPRESS the ENTER key
* VERIFY the new ALERT alarm setpoint is displayed CUE:  Verification has been o  OBTAIN VERIFICATION provided.
3 SIM-901


SIM-901 2 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable  
PERFORMANCE STEP               STANDARD             Circle applicable
: 1. Review BwOP GW-500T1 Review BwOP GW-500T1 SAT    UNSAT      N/A Comments: 2. Select the High Alarm setpoint for 0PA202. (steps D.18 - 19.a)
*5. Perform the following to    Perform the following:   SAT    UNSAT      N/A verify 0RE-PR002B will cause
Perform the following: PLACE the RM-11 console in the SUPERVISOR mode o DEPRESS Grid 3 key  KEY in 0202  DEPRESS the SEL key o VERIFY 0PA202 selected  DEPRESS CHAN ITEM key  KEY in 9  DEPRESS the SEL key SAT    UNSAT      N/A Comments: Examiners note:  The following procedure step is not required to be performed if 0PA202
* Contact the local      Comments:
0GW014 to automatically        operator to:
close.
* Verify/Place 0GW014 (steps D.19.d-q)                  C/S in OPEN CUE:  As local operator
* Place 0GW014 report 0GW014 C/S is      controller to 100%
in open                    open CUE:  As local operator    o  DEPRESS Grid 3 key report 0GW014 controller is at    o  KEY in 0202 100%.               o  DEPRESS the SEL key o  VERIFY 0PA202 selected o  DEPRESS CHAN ITEM key o  KEY in 9 o  Record the current 0PA202 current activity        activity reading setting________
* ENTER a new HIGH alarm setpoint below the current activity value 0PA202 new Hi Alarm setting_________            o  RECORD the new HIGH alarm setpoint that was entered
* DEPRESS the ENTER key o ACKNOWLEDGE the alarm at the RM-11 console CUE:  As local operator    o  Contact the local report 0GW014 Auto      operator to:
Closed                    o VERIFY 0GW014 AUTO CUE:  As local operator          CLOSED report 0GW014 control    o PLACE 0GW014 switch is in closed        control switch in CUE:  As local operator          CLOSED report 0GW014            o PLACE 0GW014 controller is at 0%.        controller at 0%
demand o DEPRESS Grid 3 key o KEY in 0202 o DEPRESS the SEL key o VERIFY 0PA202 selected o DEPRESS CHAN ITEM key o KEY in 9
* ENTER the HIGH alarm setpoint determined in step C.3.c (6.06 E-03) o OBTAIN VERIFICATION CUE:   Verification has been provided.
4 SIM-901


is NOT in HIGH ALARM.  
PERFORMANCE STEP                STANDARD              Circle applicable
: 3. Verify/enter High Alarm setpoint for 0PA202
: 6. Select the High Alarm        Perform the following:    SAT    UNSAT      N/A setpoint for 0PA202.        o  DEPRESS Grid 3 key      Comments:
(step D.20.a)
* KEY in 0102
* DEPRESS the SEL key o  VERIFY 0PB102 selected
* DEPRESS CHAN ITEM key
* KEY in 9
* DEPRESS the SEL key Examiners note: The following procedure step is not required to be performed if 0PA202 is NOT in HIGH ALARM.
: 7. Verify/enter High Alarm      Perform the following:    SAT    UNSAT      N/A setpoint for 0PB102          o  Refer to step C.3.c    Comments:
suggested by Health Physics is section C.3.c.            o  VERIFY/ENTER the new High Alarm setpoint (step D.20.b)                  from step C.3.c (6.06E-04) o  DEPRESS the ENTER key o  VERIFY the new ALERT alarm setpoint is displayed CUE:  Verification has been provided.            o OBTAIN VERIFICATION
: 8. Select and enter the Alert  Perform the following:    SAT    UNSAT      N/A Alarm setpoint for 0PB102. o  DEPRESS Grid 3 key      Comments:
(step D.20.c)                o  KEY in 0102 o  DEPRESS the SEL key o  VERIFY 0PB102 selected o  DEPRESS CHAN ITEM key
* KEY in 10
* DEPRESS the SEL key o  Refer to step C.3.c
* VERIFY/ENTER the new Alert Alarm setpoint (6.06E-05) o  DEPRESS the ENTER key o  VERIFY the new ALERT alarm setpoint is displayed CUE:  Verification has been o  OBTAIN VERIFICATION provided.
5 SIM-901


suggested by Health Physics
PERFORMANCE STEP              STANDARD            Circle applicable
*9. Perform the following to    Perform the following:    SAT    UNSAT      N/A verify 0RE-PR002A will cause
* Contact the local      Comments:
0GW014 to automatically        operator to:
close.
* Verify/Place 0GW014 (steps D.20.d-q)                  C/S in OPEN CUE:  As local operator
* Place 0GW014 report 0GW014 C/S is      controller to 100%
in open                    open CUE:  As local operator    o  DEPRESS Grid 3 key report 0GW014 controller is at    o  KEY in 0102 100%.                o  DEPRESS the SEL key o  VERIFY 0PB102 selected o  DEPRESS CHAN ITEM key
* KEY in 9 o  Record the current 0PB102 current activity        activity reading setting________
* ENTER a new HIGH alarm setpoint below the current activity value 0PB102 new Hi Alarm setting_________            o  RECORD the new HIGH alarm setpoint that was entered
* DEPRESS the ENTER key o  ACKNOWLEDGE the alarm at the RM-11 console CUE:  As local operator    o  Contact the local report 0GW014 Auto      operator to:
Closed                    o VERIFY 0GW014 AUTO CUE:  As local operator          CLOSED report 0GW014 control    o PLACE 0GW014 switch is in closed        control switch in CUE:  As local operator          CLOSED report 0GW014            o PLACE 0GW014 controller is at 0%.        controller at 0%
demand o  DEPRESS Grid 3 key o  KEY in 0102 o  DEPRESS the SEL key o  VERIFY 0PB102 selected o  DEPRESS CHAN ITEM key o  KEY in 9
* ENTER the HIGH alarm setpoint determined in step C.3.c (6.06 E-04)
CUE:  Verification has been provided.            o  OBTAIN VERIFICATION 6
SIM-901


is section C.3.c. (step D.19.b) Note: If examinee requests independent
PERFORMANCE STEP             STANDARD           Circle applicable
 
: 10. Place RM-11 in NORMAL MODE
verification of
* PLACE the RM-11      SAT    UNSAT      N/A console in the NORMAL Comments:
 
mode
steps, provide the
: 11. Inform US pre-release     Inform US steps D.18 channel checks complete    through D.21 are CUE: Acknowledge report. completed CUE: THIS COMPLETES THIS JPM.
 
RECORD STOP TIME COMMENTS:
following cue. CUE: Verification has been provided.
7 SIM-901
Perform the following:
o Refer to step C.3.c o VERIFY/ENTER the new
 
High Alarm setpoint
 
from step C.3.c
 
(6.06E-03) o DEPRESS the ENTER key o VERIFY the new ALERT
 
alarm setpoint is
 
displayed o OBTAIN VERIFICATION SAT    UNSAT      N/A Comments:
SIM-901 3  PERFORMANCE STEP STANDARD Circle applicable  
: 4. Select and enter the Alert Alarm setpoint for 0PA202. (step D.19.c)
CUE: Verification has been provided. Perform the following:
o DEPRESS Grid 3 key o KEY in 0202 o DEPRESS the SEL key o VERIFY 0PA202 selected o DEPRESS CHAN ITEM key  KEY in 10 DEPRESS the SEL key o Refer to step C.3.c o VERIFY/ENTER the new Alert Alarm setpoint
 
3.03E-03 o DEPRESS the ENTER key  VERIFY the new ALERT
 
alarm setpoint is
 
displayed o OBTAIN VERIFICATION SAT    UNSAT      N/A Comments:
SIM-901 4  PERFORMANCE STEP STANDARD Circle applicable
*5. Perform the following to verify 0RE-PR002B will cause 0GW014 to automatically
 
close. (steps D.19.d-q) CUE: As local operator report 0GW014 C/S is
 
in open CUE: As local operator report 0GW014
 
controller is at
 
100%. 0PA202 current activity
 
setting________
0PA202 new Hi Alarm setting_________
CUE: As local operator report 0GW014 Auto
 
Closed CUE: As local operator report 0GW014 control
 
switch is in closed CUE: As local operator report 0GW014
 
controller is at 0%.
CUE: Verification has been provided.
Perform the following:  Contact the local
 
operator to:  Verify/Place 0GW014
 
C/S in OPEN  Place 0GW014
 
controller to 100%
 
open o DEPRESS Grid 3 key o KEY in 0202 o DEPRESS the SEL key o VERIFY 0PA202 selected o DEPRESS CHAN ITEM key o KEY in 9 o Record the current
 
activity reading  ENTER a new HIGH alarm
 
setpoint below the
 
current activity value o RECORD the new HIGH
 
alarm setpoint that
 
was entered  DEPRESS the ENTER key o ACKNOWLEDGE the alarm
 
at the RM-11 console o Contact the local
 
operator to:
o VERIFY 0GW014 AUTO
 
CLOSED o PLACE 0GW014
 
control switch in  
 
CLOSED o PLACE 0GW014
 
controller at 0%
 
demand o DEPRESS Grid 3 key o KEY in 0202 o DEPRESS the SEL key o VERIFY 0PA202 selected o DEPRESS CHAN ITEM key o KEY in 9  ENTER the HIGH alarm
 
setpoint determined in
 
step C.3.c (6.06 E-03) o OBTAIN VERIFICATION SAT    UNSAT      N/A Comments:
SIM-901 5  PERFORMANCE STEP STANDARD Circle applicable
: 6. Select the High Alarm setpoint for 0PA202. (step D.20.a)
Perform the following:
o DEPRESS Grid 3 key  KEY in 0102  DEPRESS the SEL key o VERIFY 0PB102 selected  DEPRESS CHAN ITEM key  KEY in 9  DEPRESS the SEL key SAT    UNSAT      N/A Comments: Examiners note:  The following procedure step is not required to be performed if 0PA202 is NOT in HIGH ALARM.
: 7. Verify/enter High Alarm setpoint for 0PB102
 
suggested by Health Physics
 
is section C.3.c. (step D.20.b)
CUE: Verification has been provided.
Perform the following:
o Refer to step C.3.c o VERIFY/ENTER the new
 
High Alarm setpoint
 
from step C.3.c
 
(6.06E-04) o DEPRESS the ENTER key o VERIFY the new ALERT
 
alarm setpoint is
 
displayed o OBTAIN VERIFICATION SAT    UNSAT     N/A Comments: 8. Select and enter the Alert Alarm setpoint for 0PB102. (step D.20.c)
CUE: Verification has been provided. Perform the following:
o DEPRESS Grid 3 key o KEY in 0102 o DEPRESS the SEL key o VERIFY 0PB102 selected o DEPRESS CHAN ITEM key  KEY in 10  DEPRESS the SEL key o Refer to step C.3.c  VERIFY/ENTER the new
 
Alert Alarm setpoint
 
(6.06E-05) o DEPRESS the ENTER key o VERIFY the new ALERT
 
alarm setpoint is
 
displayed o OBTAIN VERIFICATION SAT    UNSAT      N/A Comments:
SIM-901 6  PERFORMANCE STEP STANDARD Circle applicable
*9. Perform the following to verify 0RE-PR002A will cause 0GW014 to automatically


close. (steps D.20.d-q) CUE: As local operator report 0GW014 C/S is
TASK CONDITIONS:
 
: 1. You are an extra NSO.
in open CUE: As local operator report 0GW014
: 2. Both Units are at full power.
 
controller is at
 
100%. 0PB102 current activity
 
setting________
0PB102 new Hi Alarm setting_________
CUE: As local operator report 0GW014 Auto
 
Closed CUE: As local operator report 0GW014 control
 
switch is in closed CUE: As local operator report 0GW014
 
controller is at 0%.
CUE: Verification has been provided.
Perform the following:  Contact the local
 
operator to:  Verify/Place 0GW014
 
C/S in OPEN  Place 0GW014
 
controller to 100%
 
open o DEPRESS Grid 3 key o KEY in 0102 o DEPRESS the SEL key o VERIFY 0PB102 selected o DEPRESS CHAN ITEM key  KEY in 9 o Record the current
 
activity reading  ENTER a new HIGH alarm
 
setpoint below the
 
current activity value o RECORD the new HIGH
 
alarm setpoint that
 
was entered  DEPRESS the ENTER key o ACKNOWLEDGE the alarm
 
at the RM-11 console o Contact the local
 
operator to:
o VERIFY 0GW014 AUTO
 
CLOSED o PLACE 0GW014
 
control switch in
 
CLOSED o PLACE 0GW014
 
controller at 0%
 
demand o DEPRESS Grid 3 key o KEY in 0102 o DEPRESS the SEL key o VERIFY 0PB102 selected o DEPRESS CHAN ITEM key o KEY in 9  ENTER the HIGH alarm
 
setpoint determined in
 
step C.3.c (6.06 E-04) o OBTAIN VERIFICATION SAT    UNSAT      N/A Comments:
SIM-901 7  PERFORMANCE STEP STANDARD Circle applicable
: 10. Place RM-11 in NORMAL MODE PLACE the RM-11 console in the NORMAL
 
mode  SAT    UNSAT      N/A Comments: 11. Inform US pre-release channel checks complete CUE: Acknowledge report.
Inform US steps D.18
 
through D.21 are
 
completed CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
 
SIM-901 8  TASK CONDITIONS:  
: 1. You are an extra NSO.  
: 2. Both Units are at full power.  
: 3. 0PR02J, Gas Decay Tank Monitor, is operable.
: 3. 0PR02J, Gas Decay Tank Monitor, is operable.
INITIATING CUES:  
INITIATING CUES:
: 1. The Unit Supervisor has directed you to perform a portion of the 0F Gas Decay Tank release package, completed through section D.17, and has directed you to complete  
: 1. The Unit Supervisor has directed you to perform a portion of the 0F Gas Decay Tank release package, completed through section D.17, and has directed you to complete steps D.18 through D.21. All previous sections of the release package have been successfully completed.
 
: 2. Inform the Unit Supervisor when you have completed steps D.18 through D.21.
steps D.18 through D.21. All previous sections of the release package have been  
8 SIM-901
 
successfully completed.  
: 2. Inform the Unit Supervisor when you have completed steps D.18 through D.21.  


SIMULATOR SETUP GUIDE:
SIMULATOR SETUP GUIDE:
Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
* Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
Establish the conditions of IC 21, 100% power, steady state, equilibrium  
* Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
 
* Complete items on Simulator Ready for Training Checklist.
xenon. Complete items on Simulator Ready for Training Checklist.
* Place simulator in RUN.
Place simulator in RUN.
* Adjust 0PR02J radiation level as follows:
Adjust 0PR02J radiation level as follows:
* Record as found values of monitored item RMK0PR02ABKD ______________.
Record as found values of monitored item RMK0PR02ABKD
* Set monitor item RMK0PR02ABKD = 1.31 E-8
______________.
* Record as found values of monitored item RMK0PR02BBKD ______________.
Set monitor item RMK0PR02ABKD = 1.31 E-8 Record as found values of monitored item RMK0PR02BBKD
* Set monitor item RMK0PR02BBKD = 1.31 E-8
______________.
* Adjust 0PR02J setpoints as follows.
Set monitor item RMK0PR02BBKD = 1.31 E-8 Adjust 0PR02J setpoints as follows.
* Record 0PA102 High Alarm current setpoint ___________________.
Record 0PA102 High Alarm current setpoint ___________________.
* Set 0PA102 High Alarm Setpoint = 6.06 E-04 (channel item #9).
Set 0PA102 High Alarm Setpoint =
* Record 0PB102 Alert Alarm current setpoint ___________________.
6.06 E-04 (channel item #9).
* Set 0PA102 Alert Alarm Setpoint = 6.06 E-05 (channel item #10).
Record 0PB102 Alert Alarm current setpoint ___________________.
* Record 0PA202 High Alarm current setpoint ___________________.
Set 0PA102 Alert Alarm Setpoint =
* Set 0PA202 High Alarm Setpoint = 6.06 E-03 (channel item #9).
6.06 E-05 (channel item #10).
* Record 0PA202 Alert Alarm current setpoint ___________________.
Record 0PA202 High Alarm current setpoint ___________________.
* Set 0PA202 Alert Alarm Setpoint = 3.03 E-03 (channel item #10).
Set 0PA202 High Alarm Setpoint =
* Select grid on the RM-11 console
6.06 E-03 (channel item #9).
* AT CONCLUSION OF JPM(S), RESTORE 0PR02J MONITORED ITEMS ALARM SETPOINTS TO ORIGINAL AS FOUND VALUES COMMENTS:
Record 0PA202 Alert Alarm current setpoint ___________________.
Provide copy of BwOP GW-500T1, Rev. 26 (Final) 9 SIM-901}}
Set 0PA202 Alert Alarm Setpoint =
3.03 E-03 (channel item #10).
Select grid on the RM-11 console AT CONCLUSION OF JPM(S), RESTORE 0PR02J MONITORED ITEMS ALARM SETPOINTS TO ORIGINAL AS FOUND VALUES COMMENTS:
Provide copy of BwOP GW-500T1, Rev. 26 (Final) SIM-901 9}}

Latest revision as of 18:23, 23 November 2019

Proposed Control Room JPMs for the Braidwood Initial Examination - May 2006
ML061710356
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/15/2006
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
References
Download: ML061710356 (46)


Text

TASK TITLE: Emergency Borate During an ATWS from RWST JPM No.: SIM-108 REV: NRC2006301 TPO No.: 4D.OA-08 K&A No.: 000029EK3.12 TASK No.: R-FR-018, Respond to an ATWS K&A IMP: 4.4/4.7 TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 5, 6 APPROX COMPLETION TIME 10 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwFR-S.1, Rev. 1A WOG 1C, Response to Nuclear Power Generation/ATWS.

MATERIALS:

1. 1BwFR-S.1, Rev. 1A WOG 1C TASK STANDARDS:
1. Determine emergency boration flowpath from BAST unavailable.
2. Manually align CV system to perform emergency boration of RCS from the RWST prior to completion of step 4 of 1BwFR-S.1.

TASK CONDITIONS:

1. You are an extra NSO.
2. The turbine has tripped without a reactor trip from high power.
3. 1BwFR-S.1. Response to Nuclear Power Generation/ATWS is in progress.

INITIATING CUES:

1. The simulator is frozen and annunciator panel horns are turned off.
2. The US has directed you to perform an Emergency Boration per step 4 of 1BwFR-S.1. All other steps of 1BwFR-S.1 are being addressed by other NSOs. All annunciator horns are silenced.
3. Notify the US when emergency boration flow has been initiated.
4. When you are ready to begin the JPM, the simulator will be placed in run.

Annunciator horns will be left OFF to minimize noise during JPM performance.

1 SIM-108

RECORD START TIME Note: After giving the initiating cue, cue the simulator operator to start the simulator.

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to 1BwFR-S.1 Step 4 Locate and Open 1BwFR-S.1 SAT UNSAT N/A Note: Examinee will use to Step 4 Comments:

simulator copy of 1BwFR-S.1 for JPM performance.

2. Check at least one Determine one CV pump is SAT UNSAT N/A Centrifugal Charging pump running: Comments:

running

  • OBSERVE RUN light indication and/or ammeter for 1A CV pump
3. Initiate emergency boration Attempt to initiate SAT UNSAT N/A from BAST emergency boration from Comments:

the BAST as follows:

  • Attempt to OPEN 1CV8104
  • Determine emergency boration flow cannot be established from BAST Note: Alternate path begins here Examiners note: 1BwFR-S.1 step 4 RNO column allows establishing emergency boration flow from either the RWST or BAST (using normal RMCS boration flowpath). If examinee attempts to establish emergency boration via RMCS, the boric acid transfer pump will not start. (See JPM step 6 if examinee attempts emergency boration via RMCS)
  • 4 Align CV pump suction to the Perform the following at SAT UNSAT N/A RWST 1PM05J: Comments:
  • OPEN 1CV112D and/or 1CV112E
  • 5 Isolate CV pump suction from Perform the following at SAT UNSAT N/A the VCT 1PM05J: Comments:
  • CLOSE 1CV112B and/or 1CV112C 2

SIM-108

PERFORMANCE STEP STANDARD Circle applicable

  • 6 Maximize Charging flow Perform the following at SAT UNSAT N/A 1PM05J: Comments:
  • Place 1CV121 in manual and raise demand o OBSERVE 1FI-121A increasing o VERIFY letdown established Examiners note: 1BwFR-S.1 step 4 RNO column allows establishing emergency boration flow from either the RWST or BAST (using normal RMCS boration flowpath). If examinee attempts to establish emergency boration via RMCS, the boric acid transfer pump will not start. See JPM step 4 for emergency boration via RWST steps.
7. Initiate emergency boration Attempt to initiate SAT UNSAT N/A from RMCS (N/A if not emergency boration from Comments:

performed) RMCS as follows:

  • OPEN 1CV110A
  • OPEN 1CV110B
  • Determine emergency boration flow cannot be established from RMCS
8. Check Pressurizer Pressure < CHECKS Pzr Pressure < SAT UNSAT N/A 2335 psig 2335 psig as follows: Comments:
  • OBSERVES PZR Pressure indicators o Operate PZR PORV(s) as necessary until pressure <2135 psig, then close PZR PORV(s)
9. Notify Unit Supervisor Perform the following: SAT UNSAT N/A CUE: Acknowledge reports. o Notify the Unit Comments:

Supervisor emergency boration flow is established o Notify Unit Supervisor of 1CV8104 failure to open CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

3 SIM-108

TASK CONDITIONS:

1. You are an extra NSO.
2. The turbine has tripped without a reactor trip from high power.
3. 1BwFR-S.1. Response to Nuclear Power Generation/ATWS is in progress.

INITIATING CUES:

1. The simulator is frozen and annunciator panel horns are turned off.
2. The US has directed you to perform an Emergency Boration per step 4 of 1BwFR-S.1.

All other steps of 1BwFR-S.1 are being addressed by other NSOs. All annunciator horns are silenced.

3. Notify the US when emergency boration flow has been initiated.
4. When you are ready to begin the JPM, the simulator will be placed in run.

Annunciator horns will be left OFF to minimize noise during JPM performance.

4 SIM-108

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist
  • Place simulator in RUN.
  • Run caep SIM-108 from disk and verify the following actuate:
  • IMF RP02A
  • IMF RP02B
  • IOR ZDI1CV8104 CLS
  • IMF CV03
  • IOR ZDIRMIO IN
  • IOR ZDIBKSEL MAN
  • IRF TC03 TRIP
  • Start both AF pumps.
  • Place simulator in freeze.
  • Turn off simulator horns.
  • Verify simulator copy of 1BwFR-S.1 is place kept through step 3.

Verify all other place keeping marks removed.

  • At examiners cue, place simulator in run.
  • If running the JPM repetitively, perform the following:
  • Open 1CV112B & C
  • Close 1CV112D & E
  • Restore 1CV121 to automatic
  • Verify simulator copy of 1BwFR-S.1 is place kept through step 3.

Verify all other place keeping marks removed.

  • Place simulator in freeze.
  • Turn off simulator horns.

COMMENTS:

(Final) 5 SIM-108

TASK TITLE: Establish Automatic Pzr Level Control with Failed 1CV121 JPM No.: SIM-219 REV: NRC2006301 TPO No.: 4C.GP-06 K&A No.: 011000A4.04 TASK No.: R-GP-053, Transfer Pzr level control K&A IMP: 3.2/2.9 from manual to automatic.

TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 2, 4 APPROX COMPLETION TIME 8 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwGP 100-1, Rev. 22, Plant Heatup.

MATERIALS:

1. 1BwGP 100-1, Rev. 22, Step 62.

TASK STANDARDS:

1. Determine 1CV121 failed high.
2. Operate 1CV121 in manual to control pressurizer level and RCP seal injection flow prior to completing 1BwGP 100-1, step F.62.

TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. The Unit is at full power.
3. One hour ago, Pzr Level Channel 1LT-459 was restored from test.
4. Actual pressurizer level and demanded pressurizer level have been matched for 16 minutes.

INITIATING CUES:

1. The US has directed you restore automatic pressurizer level control per the applicable portions of step F.62 of 1BwGP 100-1.
2. Inform the US when automatic pressurizer level control is established.

1 SIM-219

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to 1BwGP 100-1 step 62 Locate and open 1BwGP SAT UNSAT N/A Note: Examinee will use 100-1 to step F.62 Comments:

simulator copy of 1BwGP 100-1 for JPM performance.

CUE: All Prerequisites, Precautions, Limitations and Actions have been met.

Examiners note: When examinee places 1FK-121 in automatic, 1CV121 will fail to 100%

open.

  • 2. Place Pressurizer Level Perform the following at SAT UNSAT N/A control in Automatic 1PM05J to establish Comments:

automatic pressurizer level control:

o ADJUST 1CV121 in MANUAL to match PZR actual level with demanded level o MAINTAIN PZR actual and demanded level equal for 10-15 minutes o VERIFY/PLACE 1LK-459, Master Pzr Level Controller in MANUAL

  • PLACE 1CV121 in AUTO Note: Alternate path begins here
3. Identify 1FK-121 (1CV121) Identify 1FK-121 (1CV121) SAT UNSAT N/A failure failure Comments:

o Annunciator 1-9-D3, CHG LINE FLOW HIGH/LOW o Identify 1CV121 demand signal rising to 100% and 1CV121 throttling to full open 2

SIM-219

PERFORMANCE STEP STANDARD Circle applicable

  • 4. Mitigate the pressurizer Perform the following to SAT UNSAT N/A level transient caused by an mitigate the failure of Comments:

increase in charging flow 1CV121:

  • REDUCE demanded signal to throttle charging flow to maintain a stable pressurizer level at program value with no seal injection low flow annunciators lit.
5. Inform US of 1CV121 Inform US of 1CV121 SAT UNSAT N/A controller failure. failure Comments:

CUE: As US, acknowledge failure of 1CV121 and that you will inform maintenance CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

3 SIM-219

TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. The Unit is at full power.
3. One hour ago, Pzr Level Channel 1LT-459 was restored from test.
4. Actual pressurizer level and demanded pressurizer level have been matched for 16 minutes.

INITIATING CUES:

1. The US has directed you restore automatic pressurizer level control per the applicable portions of step F.62 of 1BwGP 100-1.
2. Inform the US when automatic pressurizer level control is established.

4 SIM-219

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist
  • Place simulator in RUN.
  • Place 1CV121 in MANUAL
  • Place Master PZR Level Controller to MANUAL
  • Insert IMF CV10 100
  • Verify 1BwGP 100-1 place keeping marks are removed.

COMMENTS:

(Final) 5 SIM-219

TASK TITLE: Raise SI Accumulator Level with 1A SI pump (375 psig in RCS)

JPM Number: SIM-204 Rev. NRC2006301 TPO No.: 4C.SI-02 K&A No.: 006000A1.13 Task No.: R-SI-001, Fill the SI accumulators K&A Imp.: 3.5/3.7 TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES Critical Elements: (*) 4, 6, 9, 11-13, 16, 21, 22 Approx. Completion Time: 45 minutes Critical Time: N/A EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwAR 1-5-C1, Rev. 8E2, ACCUM 1C LEVEL HIGH/LOW
2. BwAR 1-5-C2, Rev 6E3, ACCUM 1C PRESS HIGH/LOW
3. BwOP SI-5, Rev. 22, Raising SI Accumulator Level with SI Pumps
4. BwOP SI-9, Rev 11, Lowering SI Accumulator Pressure
5. Tech Spec 3.5.1 MATERIALS:
1. Copy of BwAR 1-5-C1
2. Copy of BwAR 1-5-C2, if needed
3. Copy of BwOP SI-5
4. Copy of BwOP SI-9, if needed TASK STANDARDS:
1. Determine 1A SI train required to be isolated from RCS cold legs during fill of 1C SI Accumulator.
2. Restore 1C SI Accumulator Level within Tech. Spec. limit prior to completion of BwOP SI-5, step F.8b.5.
3. Restore 1C SI Accumulator Level within Tech. Spec. limit prior to JPM completion.

TASK CONDITIONS:

1. You are the Unit 1 Extra NSO.
2. RCS heat up is in progress per 1BwGP 100-1.
3. Unit 1 is in Mode 3, RCS temperature is 360°F and RCS pressure is 375 psig.
4. All systems and controls are normal for the present conditions.

INITIATING CUES:

1. Annunciator 1-5-C1, ACCUM 1C LEVEL HIGH/LOW, has been is lit.
2. The US has directed you to raise the 1C accumulator level to > 38% but within the Technical Specification limit by using the 1A SI pump. Other control room operators are maintaining all other plant conditions. NLOs have been briefed and are standing by as needed.
3. Inform the US when you have restored 1C SI accumulator level.
4. There a NO personnel in Unit 1 Containment.

1 SIM-204

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to BwAR 1-5-C1, ACCUM Locate and open SAT UNSAT N/A 1C LEVEL HIGH LOW BwAR 1-5-C1 and perform Comments:

CUE: When student locates the following:

correct procedure, o Monitor 1LI-954 and provide copy. 955 to determine level CUE: If asked as US, is low.

confirm that DEQUIP o Monitor SER points has been entered for 0581 and 2042 to 1C SI Accumulator determine level is level, LCO 3.4.13 has low.

been reviewed, and AAR 1BwOS SI-1a is being

  • Monitor 1PI-964 and reviewed. 965 to determine pressure is stable.

o Notify US to enter LCO 3.5.1.

2. Refer to BwOP SI-5, Raising Locate and open BwOP SI- SAT UNSAT N/A SI Accumulator Level with SI 5: Comments:

Pumps.

CUE: When examinee locates correct procedure, provide copy.

CUE: All Prerequisites, Precautions, Limitations and Actions are met.

CUE: If asked as US, RWST recirc pump and purification loop are not running, and RWST boron is 2300 ppm and has not been diluted since last sampled.

Examiners note: 1SI8806 and 8813 are SVAG valves and are maintained deenergized.

Their position may be verified on the 1PM06J Group 1 or 4 Readiness Lights, 1PM06J SVAG Valve Status Lights, or locally. The examinee should NOT energize 1SI8806 and/or 1SI8813 per BwOP SI-100 in order to check 1SI8806 and/or 1SI8813 position using the indicating lights at 1PM06J. Energizing 1SI8806 and/or 1SI8813 is NOT necessary since the valves are in their correct position and energizing 1SI8806 and/or 1SI8813 would make BOTH trains of ECCS inoperable and unnecessarily place Unit 1 in Tech Spec 3.5.2.

2 SIM-204

PERFORMANCE STEP STANDARD Circle applicable

3. Verify valve alignment. At 1PM06J, perform the SAT UNSAT N/A (steps F.1 - F.4) following: Comments:

CUE: If asked to verify

  • VERIFY/OPEN:

valves locally, as NLO

  • 1SI8806 report all valves are
  • 1SI8923A OPEN.

o 1SI8923B

  • 1SI8814
  • 1SI8813 o 1SI8920

(step F.5)

  • OPEN 1SI8888
5. Verify SI to Radwaste At 1PM11J, perform the SAT UNSAT N/A flowpath isolated. following: Comments:

(step F.6)

  • Verify/CLOSE 1SI8964
  • 6. Align Accumulator for fill. At 1PM06J, perform the SAT UNSAT N/A (step F.7) following: Comments:
  • OPEN 1SI8871
7. Determine applicable plant Determine plant status SAT UNSAT N/A status for accumulator fill for accumulator fill Comments:

(step F.8)

  • Unit 1 in Mode 3 (RCS temperature > 350°F, Keff <0.99)
  • RCS pressure 1850 psig
  • Determine BwOP SI-5, step F.8.b applicable for 1C SI accumulator fill
8. Initiate LCOAR 1BwOL 3.5.2. Inform US of need to SAT UNSAT N/A (step F.8.b) enter LCOAR 1BwOL 3.5.2. Comments:

CUE: As US, acknowledge

  • Determine LCO 3.5.2 LCOAR 3.5.2 entry entry required prior requirement. to closing 1SI8821A 3

SIM-204

PERFORMANCE STEP STANDARD Circle applicable

  • 9. Isolate 1A SI Pump from Cold At 1PM06J, VERIFY/CLOSE: SAT UNSAT N/A Legs.
  • 1SI8821A Comments:

(step F.8.b.1)

Examiners note: 1SI8802A is SVAG valve and is maintained deenergized; its position may be verified on the 1PM06J Group 1 or 5 Readiness Lights, 1PM06J SVAG Valve Status Lights, or locally. The examinee should NOT energize 1SI8802A per BwOP SI-100 in order to check valve position using the indicating lights at 1PM06J. Energizing 1SI8802A is NOT necessary since it is in their correct position and energizing 1SI8802A would make BOTH trains of ECCS inoperable and unnecessarily place Unit 1 in Tech Spec 3.5.2.

10. Verify/close 1SI8802A, SI to At 1PM06J, perform the SAT UNSAT N/A Hot Legs 1A and 1D Isol vlv. following: Comments:

(step F.8.b.2)

  • VERIFY/CLOSE 1SI8802A CUE: If asked to verify 1SI8802A position locally, as NLO report 1SI8802A is CLOSED.

Examiners note: Student may elect to have an NLO do a prestart check of 1A SI pump prior to starting. If so, provide the following CUE:

CUE: NLO reports that the 1A SI Pump is ready for a start.

  • 11. Start 1A SI pump. At 1PM06J, perform the SAT UNSAT N/A (step F.8.b.3) following: Comments:

CUE: If dispatched as NLO o Announce pump start on to monitor pump start plant page locally, report

  • Start 1A SI Pump.

satisfactory start of o Check 1A SI Pump Run 1A SI pump shortly Light LIT.

after pump started.

o Check 1A SI Pump amps.

  • 12. Fill 1C Accumulator. At 1PM06J, perform the SAT UNSAT N/A (step F.8.b.4) following: Comments:
  • 13. Stop filling accumulator At 1PM06J, perform the SAT UNSAT N/A when level is within Tech following: Comments:

Spec limits.

  • CLOSE 1SI8878C when (step F.8.b.5) Accumulator Level is Note: Per the initiating >38%, but prior to cue, direction was exceeding 63%.

given to restore

  • Inform US 1C SI level to >38% but < Accumulator level 63%. restored within Tech CUE: As US, acknowledge Spec limits.

report of 1C SI Accumulator level restoration.

4 SIM-204

PERFORMANCE STEP STANDARD Circle applicable

14. Stop 1A SI pump. At 1PM06J, perform the SAT UNSAT N/A (step F.8.b.6) following: Comments:
  • Stop 1A SI Pump.

o Check 1A SI Pump Stop Light LIT.

15. Depressurize SI pump Depressurize the fill SAT UNSAT N/A discharge header to less header to less than 50 Comments:

than 50 psig. psig:

(step F.8.b.7 - F.8.b.8)

  • At 1PM11J, open 1SI8964
  • When pressure is less than 50 psig, perform the following at 1PM11J:
  • CLOSE 1SI8964
  • 16. Restore 1A SI pump to Cold At 1PM06J, perform the SAT UNSAT N/A Legs. following: Comments:

(step F.8.b.9)

  • OPEN 1SI8821A CUE: Acknowledge exit LCOAR 1BwOL 3.5.2.
17. Isolate SI pump from At 1PM06J, close SAT UNSAT N/A Accumulator. Fill/Test line Isolation Comments:

(step F.11 & F.12) valves:

  • 1SI8871
  • 1SI8888
18. Inform US that it may be Inform US of the SAT UNSAT N/A necessary to initiate 1BwOS following potential Comments:

SI-1A, and to contact requirements:

chemistry for Accumulator

  • 1BwOS SI-1a samples, and exit LCOAR for level.

CUE: US will evaluate the

  • Exit LCOAR from need to perform 1BwOS Accumulator level.

SI-1a and will inform chemistry, and exit LCOAR.

5 SIM-204

PERFORMANCE STEP STANDARD Circle applicable Examiners note: If 1C SI accumulator rises enough to cause annunciator 1-5-B2 to alarm during accumulator fill, examinee will perform JPM steps 19-23 to lower 1C SI accumulator pressure. If annunciator 1-5-B2 is not in alarm, end JPM here and mark steps 19-23 N/A.

19. Refer to BwAR 1-5-C2 Locate and open SAT UNSAT N/A CUE: When student locates BwAR 1-5-C2 and perform Comments:

correct procedure, the following:

provide copy. o Monitor 1PI-964 and CUE: If asked as US, 965 to determine confirm that the LCOAR pressure is high.

(1BwOL 3.5.1) has been o Monitor SER points entered, LCO 3.4.13 0578 and 2045 to has been reviewed, and determine level is AAR 1BwOS SI-1a is low.

being reviewed.

  • Monitor 1LI-954 and 955 to determine level is stable.

o Notify US to enter LCO 3.5.1.

20. Refer to BwOP SI-9, Lowering Perform the following SAT UNSAT N/A SI accumulator pressure.
  • Locate and open BwOP Comments:

CUE: After examinee locates SI-9.

copy of procedure, provide a copy and

  • Determine step F.1 is inform them all the applicable step.

prerequisites, precautions, limitations and actions are met

CUE: If asked, as US inform pressure to 625 psig:

examinee that there are no personnel in o Verify / Close 1AOV-Unit 1 containment. SI8880, N2 Supply Isolation valve o Verify / Close 1SIHCV943, Vent control valve

  • Throttle open 1SIHCV943, Vent control valve o Monitor 1PI-964/965 6

SIM-204

PERFORMANCE STEP STANDARD Circle applicable

  • 22. Secure lowering 1B SI Perform the following SAT UNSAT N/A accumulator pressure.
  • Verify 1C SI Comments:

accumulator pressure 612-637 psig

23. Exit LOCAR 1BwOL 3.5.1 Inform US that pressure SAT UNSAT N/A is within the Tech Spec Comments:

limit, the alarm cleared, CUE: US acknowledges and the LCOAR may be pressure restored and exited.

exits LCOAR.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

7 SIM-204

TASK CONDITIONS:

1. You are the Unit 1 Extra NSO.
2. RCS heat up is in progress per 1BwGP 100-1.
3. Unit 1 is in Mode 3, RCS temperature is 360°F and RCS pressure is 375 psig.
4. All systems and controls are normal for the present conditions.

INITIATING CUES:

1. Annunciator 1-5-C1, ACCUM 1C LEVEL HIGH/LOW, has been is lit.
2. The US has directed you to raise the 1C accumulator level to > 38% but within the Technical Specification limit by using the 1A SI pump. Other control room operators are maintaining all other plant conditions. NLOs have been briefed and are standing by as needed.
3. Inform the US when you have restored 1C SI accumulator level.
4. There a NO personnel in Unit 1 Containment.

8 SIM-204

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 5, BOL hot shutdown, plant heat up in progress, 340°F, 375 psig.
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • Place 1B CV pump, 1A SI pump, and 1B SI pump in NAT.
  • Remove placards from 1SI8808A-D C/S.
  • Allow the RCS to heat up above 350°F.
  • Modify SIMACC[3] TO 57,280 to lower 1C SI Accumulator level to 30%.
  • Place RCS Heatup Limits graphic display on right hand MCR CRT.
  • Verify/remove 1A SI pump data from HMI terminal screens.
  • Replace 1SI8808A-D placards when all examinees have completed JPM.

COMMENTS:

  • Provide copy of BwAR 1-5-C1, Rev. 8E2
  • Provide copy of BwAR 1-5-C2, Rev 6E3
  • Provide copy of BwOP SI-5, Rev. 22
  • Provide copy of BwOP SI-9, Rev 11 (Final) 9 SIM-204

TASK TITLE: Swap Essential Service Water Pumps JPM No.: SIM-S403 REV: NRC2006301 TPO No.: 4C.SX-03 K&A No.: 075000A4.01 TASK No.: R-SX-004, Operate the SX system K&A IMP: 3.2/3.2 TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 6, 8 APPROX COMPLETION TIME: 25 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP SX-7, Rev. 16, Swapping Essential Service Water Pumps.

MATERIALS:

1. BwOP SX-7, Rev. 16, Swapping Essential Service Water Pumps.

TASK STANDARDS:

1. Manually open 1SX016B prior to completing BwOP SX-7, step F.2.
2. Start the 1B SX pump prior to securing the 1A SX pump.

TASK CONDITIONS:

1. You are the Assist NSO.
2. Both Units are at 100% power.
3. Unit 2 has placed the 2A SX pump in service 5 minutes ago and requests that Unit 1 swap operating SX trains. 1B SX pump has been shutdown for 2 weeks.
4. NLOs have been briefed and are standing by to assist in the field.

INITIATING CUES:

1. The US has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP SX-7.
2. Inform the US when you have completed the pump swap.

1 SIM-S403

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to BwOP SX-7. Locate and open BwOP SX- SAT UNSAT N/A CUE: When examinee locates 7. Comments:

correct procedure, provide copy.

CUE: All Prerequisites, Precautions, Limitations and Actions have been met.

2. Verify 1B SX pump suction Perform the following at SAT UNSAT N/A valve open. 1PM06J: Comments:

CUE: If requested, NLO

  • Verify/Open 1SX001B.

reports that 1SX001B is open.

3 Verify 1PR03J in service Perform the following at SAT UNSAT N/A the RM-11 console Comments:

o Verify 1PR03J cursor status indicates normal (green) on grid 1, grid 5, or grid 6.

  • 4. Verify RCFC 1B and 1D inlet Perform the following at SAT UNSAT N/A and outlet valves open. 1PM06J: Comments:
  • Place control switch for 1SX016B to OPEN.

o Verify/Open 1SX027B.

5. Start 1A and 1B SX pump Aux. Direct NLO to locally SAT UNSAT N/A Oil pumps. start 1A and 1B SX pump Comments:

Aux. Oil pumps.

(1SX01PA/B-C)

Note: Simulator operator to start both Unit 1SX o At 1PM06J verify 1A pump aux. oil pumps and 1B SX pump Aux.

when called. Oil pump run lights lit.

2 SIM-S403

PERFORMANCE STEP STANDARD Circle applicable

  • 6. Start 1B SX pump. Perform the following at SAT UNSAT N/A CUE: If contacted as Unit 2 1PM06J: Comments:

operator, acknowledge o Announce pump swap upcoming SX pump over plant page swap.

  • Start 1B SX pump by CUE: If dispatched as NLO taking the control to monitor 1B SX pump switch to CLOSE until start locally, report pump starts.

satisfactory start of 1B SX pump shortly after pump started.

7. Check running SX pumps Perform the following at SAT UNSAT N/A parameters. 1PM06J: Comments:
  • Check ammeters for 1A and 1B SX pumps
  • Determines 1A and 1B SX pumps amps approximately equal.
  • Determines 1A and 1B SX pumps discharge pressure < 112 psig.
  • 8. Stop 1A SX pump. Perform the following at SAT UNSAT N/A CUE: If dispatched as NLO 1PM06J: Comments:

to monitor 1A SX pump

  • Stops 1A SX pump by stop locally, report placing the control satisfactory stop of switch to TRIP.

1A SX pump shortly

  • Determines step F.7 is after pump stopped. NOT applicable (1B SX pump and 2A SX pump are running)
9. Check 1B SX pump local Direct NLO to check the SAT UNSAT N/A operating conditions. following local operating Comments:

CUE: As NLO, report all conditions:

local operating

  • SX pump lube oil conditions for the temperature: 50-130 pump and strainer are °F.

normal.

  • SX pump seals not leaking.
  • SX pump bearing bracket drain holes not plugged.
  • Oil flow in bearing oil return sightglass.
  • 1SX01FB, strainer control switch for 1B SX pump in AUTO.

CUE: As NLO, report 1A SX pump is not rotating.

  • 1A SX pump is not reverse rotating.

3 SIM-S403

PERFORMANCE STEP STANDARD Circle applicable

11. Stop Aux. Oil pumps. Perform the following: SAT UNSAT N/A
  • Direct NLO to Stop Comments:

Aux. Oil pumps for 1A and 1B SX pumps CUE: As NLO, report 1A & 1B SX pump Aux Oil pumps off as

  • Verify 1A and 1B SX they are secured. pumps Aux. Oil pump run lights OFF at 1PM06J.
12. Startup 1B and 1D RCFC and Perform the following at SAT UNSAT N/A Shutdown 1A and 1C RCFC. 1PM06J: Comments:
  • Verify All RCFCs are CUE: All RCFCs are required already running.

for containment

  • Determine all RCFC cooling. required for CNMT cooling
13. Ensure SX Chem Feed system Direct NLO to perform SAT UNSAT N/A aligned properly. BwOP CF-36 as required. Comments:

CUE: As NLO, acknowledge (N/A if examinee request. determines step not required)

14. Inform US SX pump swap Inform US SX pump swap Inform US SX pump swap complete complete complete CUE: Acknowledges report.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

4 SIM-S403

TASK CONDITIONS:

1. You are the Assist NSO.
2. Both Units are at 100% power.
3. Unit 2 has placed the 2A SX pump in service 5 minutes ago and requests that Unit 1 swap operating SX trains. 1B SX pump has been shutdown for 2 weeks.
4. NLOs have been briefed and are standing by to assist in the field.

INITIATING CUES:

1. The US has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP SX-7.
2. Inform the US when you have completed the pump swap.

5 SIM-S403

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist
  • Place simulator in RUN.
  • Verify/start 1A SX pump
  • Verify/stop 1B SX pump
  • Close 1SX016B RCFC 1B and 1D inlet isolation valve.
  • Remove SX Pump Trends from the HMI.
  • Run caep SIM-S403 from disk and verify the following actuate:
  • trgset 1 "ZLO1SX01PB(3)==1"
  • trg 1 "IMF SW04 (0 3) 15000"
  • trgset 2 "ZDI1SX01PA(1)==1"
  • trg 2 "DMF SW04"
  • To start/stop SX Pump Aux Oil Pumps, use the following remote functions:
  • RF SW03 ON / OFF
  • RF SW04 ON / OFF COMMENTS:
  • Provide copy of BwOP SX-7, Rev. 16 (Final) 6 SIM-S403

TASK TITLE: Synchronize 1A EDG to Bus 141 and respond to Gov. Adj. malfunction.

JPM No.: SIM-608 REV: NRC2006301 TPO No.: 4C.DG-06 K&A No.: 064000A4.06 TASK No.: R-DG-015, Operate the EDG K&A IMP: 3.9/3.9 TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 3, 4, 6 APPROX. COMPLETION TIME: 18 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP DG-11, Rev. 30, Diesel Generator Startup
2. 1BwOSR 3.8.1.2-1, Rev. 15, Unit One 1A Diesel Generator Operability Surveillance MATERIALS:
1. BwOP DG-11, Rev. 30, Diesel Generator Startup (steps 1-8 completed)
2. BwOP DG-11T1, Rev. 6, Diesel Generator Start/Stop Log (partially completed)
3. 1BwOSR 3.8.1.2-1, Rev. 15 (sections 1.0, 2.0, 4.0 completed.)

TASK STANDARDS:

1. Synchronize 1A Diesel Generator to bus 141
2. Recognize a failure of the Governor Adjust switch
3. Open 1A DG Output Circuit Breaker prior to completion of BwOP DG-11, step F.9.l.

TASK CONDITIONS:

1. You are the extra NSO.
2. All conditions are normal for current mode on Unit 1.
3. The 1A Diesel Generator was SLOW started from the control room per BwOP DG-11 step F.4, and has been running unloaded for approximately fifteen minutes.

Step 9 is ready to be performed.

4. 1BwOSR 3.8.1.2-1 is in progress, and complete through step F.4.0.

INITIATING CUES:

1. Using the partially completed procedures provided, (CUE: Hand examinee copy of 1BwOSR 3.8.1.2-1, BwOP DG-11, and BwOP DG-11T1) you have been directed by the Unit Supervisor to complete Section F.5.0 of 1BwOSR 3.8.1.2-1.
2. Inform the US when you have completed section F.5.0 of 1BwOSR 3.8.1.2-1.

1 SIM-608

RECORD START TIME Note: Provide the partially completed copies of 1BwOSR 3.8.1.2-1, BwOP DG-11, and BwOP DG-11T1 to the examinee.

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to 1BwOSR 3.8.1.2-1, Refer to copy of 1BwOSR SAT UNSAT N/A 1A DG Operability Monthly 3.8.1.2-1 provided Comments:

Surveillance. (Section F.

  • Determine it is 5.0) necessary to parallel and load 1A DG using BwOP DG-11.
2. Refer to BwOP DG-11 Refer to BwOP DG-11 SAT UNSAT N/A CUE: All Prerequisites,
  • Determine step F.9 to Comments:

Precautions, Limitations and be used to parallel Actions are met and load 1A DG 2

SIM-608

PERFORMANCE STEP STANDARD Circle applicable

  • 3. Parallel the 1A Diesel Perform the following at SAT UNSAT N/A Generator 1PM01J: Comments:

CUE: If asked, this o VERIFY DG Frequency surveillance is NOT ~60Hz and Voltage being performed in ~4160V conjunction with the o Adjust DG frequency 24-hour load run of to 60 Hz using Gov.

surveillance 1BwVSR Adj. Control.

3.8.1.14-1.

o Adjust DG voltage to 4160V using Volt Adj. Control.

o VERIFY approximately the same voltage exists across each phase o Check voltage on phases A-B, B-C, and A-C using the DIESEL GEN.

VOLTMETER SELECT Switch.

  • Turn Sync Selector Switch to ON for ACB 1413.
  • Adjust Incoming (DG) voltage (1EI-AP104B) slightly higher (0-4.0 volts) than running voltage (1EI-AP104A) using the Volt Adj.

Control.

  • Adjust Generator Speed such that the synchroscope (1SI-AP104) is rotating SLOWLY in the FAST direction using the Gov. Adj. Control.
  • When the synchroscope (1SI-AP104) is slightly before the 12 o'clock position, CLOSE ACB 1413.

o Verify synchroscope (1SI-AP104) "Locks in" at 12 o'clock position.

3 SIM-608

PERFORMANCE STEP STANDARD Circle applicable Note: Alternate path begins here

  • 4 Attempt to load the 1A Perform the following at Diesel Generator 1PM01J:
  • Attempt to load 1A DG by going to RAISE on the Gov Adj. Control
  • Determine 1A DG OUTPUT KW (1JI-DG002) NOT rising Examiners note: The following step does not have to be performed prior to tripping ACB 1413. If the examinee trips ACB 1413 prior to turning the Synchroscope off mark this step as N/A.
5. Turn the Synchroscope OFF. Perform the following at SAT UNSAT N/A 1PM01J: Comments:

o Place the Sync Selector Switch for DG 1A Feed to 4KV BUS 141 in OFF position.

  • 6. Open 1A D/G output breaker. Perform the following at SAT UNSAT N/A CUE: Examinee will be 1PM01J: Comments:

unable to load the 1A

  • OPEN ACB 1413 DG. Procedure o Inform US of problem guidance (note prior encountered.

to step F.9.f) is to open ACB 1413.

CUE: As US, acknowledge report of 1A DG failure to load.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

4 SIM-608

TASK CONDITIONS:

1. You are the extra NSO.
2. All conditions are normal for current mode on Unit 1.
3. The 1A Diesel Generator was SLOW started from the control room per BwOP DG-11 step F.4, and has been running unloaded for approximately fifteen minutes. Step 9 is ready to be performed.
4. 1BwOSR 3.8.1.2-1 is in progress, and complete through step F.4.0.

INITIATING CUES:

1. Using the partially completed procedures provided, you have been directed by the Unit Supervisor to complete Section F.5.0 of 1BwOSR 3.8.1.2-1.
2. Inform the US when you have completed section F.5.0 of 1BwOSR 3.8.1.2-1.

5 SIM-608

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist
  • Place simulator in RUN.
  • Place 1A DG Auto Reclose Circuit Arm switch to SURV TEST
  • Start 1A DG
  • Adjust 1A DG (incoming) voltage lower than running voltage
  • Adjust DG frequency to 60.2 Hz
  • Place synch switch handle in ACB 1414
  • Run caep SIM-608 from disk and verify the following actuate:
  • trgset 1 "ZDI1HSDG026(3)==1"
  • trg 1 "IOR ZDI1HSDG019 2"
  • trgset 2 "ZDI1HSDG028(3)==1"
  • trg 2 "IOR ZDI1HSDG022 2"
  • If running the JPM repetitively, perform the following:
  • Delete Override DOR ZDI1HSDG022
  • Delete Override DOR ZDI1HSDG019
  • Reset Trigger 1 and 2
  • Adjust DG voltage lower than running voltage.
  • Adjust DG frequency to 60.2 Hz.
  • Place synch switch handle in ACB 1414 COMMENTS:
  • Provide copy of 1BwOSR 3.8.1.2-1, rev 15, with sections 1.0, 2.0, 4.0 completed.
  • Provide marked up copy of BwOP DG-11, rev 30, with steps F.1, F.4, F.7 and F.8 place-kept and unit and train designators filled in.
  • Provide copy of BwOP DG-11T, rev 6, with 1A DG start data completed (Final) 6 SIM-608

TASK TITLE: Respond to RCP Thermal Barrier Leak with CC Valve Failure JPM No.: SIM-801 REV: NRC2006301 TPO No.: 4D.OA-51 K&A No.: 008000A3.03 TASK No.: R-OA-061, Respond to a loss of CC K&A IMP: 3.0/3.1 to RCP oil/thermal barrier coolers TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 7, 8 APPROX COMPLETION TIME 10 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOA PRI-6, Rev. 101, Component Cooling Malfunction
2. BwAR 1-7-E4, Rev. 51E2, RCP THERM BARR CC WTR FLOW HIGH LOW MATERIALS:
1. Copy of BwAR 1-7-E4, Rev. 51E2 TASK STANDARDS:
1. Determine 1B RCP Thermal Barrier is leaking.
2. Isolate RCP thermal barrier leakage by closing 1CC9438 prior to overfilling CC surge tank.
3. Isolate 1B RCP thermal barrier and restore CC cooling to unaffected RCP thermal barriers.

TASK CONDITIONS:

1. You are the Assist NSO.
2. Unit 1 is at 100% power.
3. Annunciator 1-7-E4 RCP THERM BARR CC WTR FLOW HIGH LOW has just alarmed.

INITIATING CUES:

1. Perform actions in response to annunciator 1-7-E4.
2. Inform the Unit Supervisor when you have completed actions in response to annunciator 1-7-E4.

1 SIM-801

RECORD START TIME Examiners note: Examinee may take the control switch for 1CC685 to CLOSE at any time (see JPM step 6), when it is noted that the valve did not automatically close on high flow.

Examiners note: Examinee may refer to BwAR 1-7-E4 which directs responses per 1BwOA Pri-6 (below) and 1BwOA PRI-1. If examinee notes reference to 1BWOA PRI-1, provide CUE:

Another Operator will initiate actions of 1BwOA-PRI-1, you are to perform actions of 1BwOA PRI-6.

Examiners note: RCP thermal barrier leakage will cause a high alarm on 1PR09J, Unit 1 CC Heat Exchanger Radiation Monitor and cause automatic closure of 1CC017, CC Surge Tank Vent Valve. If examinee begins to address the 1PR09J alarm, provide CUE: Another Operator will initiate actions in response to 1PR09J alarm.

Examiners note: RCP thermal barrier leakage will cause annunciator 1-9-D3, CHG LINE FLOW HIGH/LOW. If examinee begins to address annunciator, provide CUE: Another Operator will perform actions in response to annunciator 1-9-D3.

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to BwAR 1-7-E4 Locate and open 1BwAR 1- SAT UNSAT N/A CUE: When examinee locates 7-E4 Comments:

correct procedure, o Refer to SER provide copy. o Determine RCP thermal barrier CC water flow high in alarm 2 Refer to 1BwOA PRI-6, Locate and open 1BwOA SAT UNSAT N/A Component Cooling PRI-6 Comments:

Malfunction

  • Notify Shift Manager Note: Examinee will use to evaluate for simulator copy of Emergency Plan 1BwOA PRI-6 for JPM conditions performance.

CUE: Acknowledge request for emergency plan evaluation.

3. Check surge tank level > 13% Perform the following at SAT UNSAT N/A and increasing 1PM06J: Comments:
  • Check CC Surge tank level:
  • Determine CC surge tank level > 13%
  • Determine CC Surge tank level is rising
  • Go to 1BwOA PRI-6, Attachment B, step 1
  • Determine CC Surge tank level is rising
  • Go to 1BwOA PRI-6, Attachment B, Step 5 2

SIM-801

PERFORMANCE STEP STANDARD Circle applicable

4. Check for leakage from RCP Perform the following at SAT UNSAT N/A Thermal Barrier 1PM05J/1PM06J: Comments:
  • Check for leakage from RCP Thermal Barrier:

o Annunciator 1-7-E4 LIT

  • Determine annunciator 1 E4 LIT OR o Seal Injection Flows any abnormally high
  • Determine 1B RCP has abnormally high seal flows
5. Check seal injection flow Perform the following at SAT UNSAT N/A between 8 and 13 gpm per 1PM05J: Comments:

pump

  • Determine 1B RCP seal injection flow > 13 gpm
  • Adjust 1CV121 AND 1CV182 to obtain between 8 and 13 gpm seal injection flow per RCP (as possible)
6. Check 1CC685 Closed Perform the following at SAT UNSAT N/A 1PM06J: Comments:
  • Check 1CC685 Closed
  • Determine 1CC685 is OPEN
  • Place control switch for 1CC685 to CLOSE 3

SIM-801

PERFORMANCE STEP STANDARD Circle applicable Note: Alternate path begins here

  • 7. Isolate RCP thermal barrier Perform the following at leakage 1PM06J:

CUE: As US, acknowledge

  • Determine 1CC685 did failure of 1CC685 to not close close.
  • Manually close 1CC9438
  • 8. Restore CC to unaffected Perform the following: SAT UNSAT N/A RCPs by locally closing RCP Determine 1B RCP is Comments:

Thermal Barrier CC outlet affected RCP valve to isolate affected RCP

  • Determine 1CC9569B closure required CUE: SM desires affected RCP to be isolated.
  • Dispatch operator to enter Unit 1 Note: Inform examinee time Containment to locally compression will be close 1CC9496B used and provide the following cue:
  • After 1CC9496B closed, reopen 1CC9438 CUE: As NLO, report 1CC9496B closed.
9. Check CC surge tank status Perform the following: SAT UNSAT N/A
  • Check CC surge tank Comments:

level between 50% and 65%

o Dispatch NLO to CUE: As NLO, acknowledge restore CC surge tank request to restore CC level between 50% and surge tank level. 65% in necessary

10. Refer to Tech Specs Refer to Tech Specs SAT UNSAT N/A CUE: As US, acknowledge
  • Determine Tech Spec Comments:

T.S. 3.6.3 entry for 3.6.3 applies for 1CC685. 1CC685.

11. Return to procedure and step Perform the following: SAT UNSAT N/A in effect o Inform US 1BwOA PRI-6 Comments:

CUE: Acknowledge report actions complete CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

4 SIM-801

TASK CONDITIONS:

1. You are the Assist NSO.
2. Unit 1 is at 100% power.
3. Annunciator 1-7-E4 RCP THERM BARR CC WTR FLOW HIGH LOW has just alarmed.

INITIATING CUES:

1. Perform actions in response to annunciator 1-7-E4.
2. Inform the Unit Supervisor when you have completed actions in response to annunciator 1-7-E4.

5 SIM-801

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist
  • Place simulator in RUN.
  • Run caep SIM-801 from disk and verify the following actuate:
  • IMF CC09 231
  • IMF CC07B 20
  • IOR ZDI1CC685 OPEN
  • TRGSET 1 "ZDI1CC9438(1) == 1"
  • TRG 1 "DMF CC09"
  • Verify 1BwOA PRI-6 place keeping marks are removed.
  • To close 1CC9496B, perform the following:
  • Insert IRF CC45 0
  • To drain CC surge tank, perform the following:
  • Insert IRF CC15 100(modify RF to 0 when desired level attained)
  • Insert IRF CC16 100(modify RF to 0 when desired level attained)
  • If running the JPM repetitively, perform the following:
  • MRF CC45 50
  • Reset trigger 1
  • Restore RCP seal injection to normal band
  • Restore CC surge tank level to normal band
  • IMF CC09 231 COMMENTS:
  • Provide copy of BwAR 1-7-E4, rev 51E2 (Final) 6 SIM-801

TASK TITLE: Perform Waste Gas Release Channel Checks JPM No.: SIM-901 REV: NRC2006301 TPO No.: 4C.GW-01 K&A No.: 071000A4.25 TASK No.: R-GW-001, Perform gaseous release K&A IMP: 3.2/3.2 TRAINEE: SRO EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 5, 9 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP GW-500T1, Rev. 26, Gas Decay Tank Release Form MATERIALS:
1. BwOP GW-500T1, Rev. 26, Gas Decay Tank Release Form completed through step D.17.

TASK STANDARDS:

1. Perform Gas Decay Tank pre-release channel checks in accordance with BwOP GW-500T1.
2. Operate the RM-11 for setpoint adjustment/testing.

TASK CONDITIONS:

1. You are an extra NSO.
2. Both Units are at full power.
3. 0PR02J, Gas Decay Tank Monitor, is operable.

INITIATING CUES:

1. The Unit Supervisor has directed you to perform a portion of the 0F Gas Decay Tank release package, completed through section D.17, and has directed you to complete steps D.18 through D.21. (Cue: Hand examinee copy of procedure).

All previous sections of the release package have been successfully completed.

2. Inform the Unit Supervisor when you have completed steps D.18 through D.21.

1 SIM-901

RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Review BwOP GW-500T1 Review BwOP GW-500T1 SAT UNSAT N/A Comments:
2. Select the High Alarm Perform the following: SAT UNSAT N/A setpoint for 0PA202.
  • PLACE the RM-11 Comments:

(steps D.18 - 19.a) console in the SUPERVISOR mode o DEPRESS Grid 3 key

  • KEY in 0202
  • DEPRESS the SEL key o VERIFY 0PA202 selected
  • DEPRESS CHAN ITEM key
  • KEY in 9
  • DEPRESS the SEL key Examiners note: The following procedure step is not required to be performed if 0PA202 is NOT in HIGH ALARM.
3. Verify/enter High Alarm Perform the following: SAT UNSAT N/A setpoint for 0PA202 o Refer to step C.3.c Comments:

suggested by Health Physics is section C.3.c. o VERIFY/ENTER the new High Alarm setpoint (step D.19.b) from step C.3.c Note: If examinee requests (6.06E-03) independent o DEPRESS the ENTER key verification of steps, provide the o VERIFY the new ALERT following cue. alarm setpoint is displayed CUE: Verification has been provided. o OBTAIN VERIFICATION 2

SIM-901

PERFORMANCE STEP STANDARD Circle applicable

4. Select and enter the Alert Perform the following: SAT UNSAT N/A Alarm setpoint for 0PA202. o DEPRESS Grid 3 key Comments:

(step D.19.c) o KEY in 0202 o DEPRESS the SEL key o VERIFY 0PA202 selected o DEPRESS CHAN ITEM key

  • KEY in 10
  • DEPRESS the SEL key o Refer to step C.3.c o VERIFY/ENTER the new Alert Alarm setpoint 3.03E-03 o DEPRESS the ENTER key
  • VERIFY the new ALERT alarm setpoint is displayed CUE: Verification has been o OBTAIN VERIFICATION provided.

3 SIM-901

PERFORMANCE STEP STANDARD Circle applicable

  • 5. Perform the following to Perform the following: SAT UNSAT N/A verify 0RE-PR002B will cause
  • Contact the local Comments:

0GW014 to automatically operator to:

close.

  • Verify/Place 0GW014 (steps D.19.d-q) C/S in OPEN CUE: As local operator
  • Place 0GW014 report 0GW014 C/S is controller to 100%

in open open CUE: As local operator o DEPRESS Grid 3 key report 0GW014 controller is at o KEY in 0202 100%. o DEPRESS the SEL key o VERIFY 0PA202 selected o DEPRESS CHAN ITEM key o KEY in 9 o Record the current 0PA202 current activity activity reading setting________

  • ENTER a new HIGH alarm setpoint below the current activity value 0PA202 new Hi Alarm setting_________ o RECORD the new HIGH alarm setpoint that was entered
  • DEPRESS the ENTER key o ACKNOWLEDGE the alarm at the RM-11 console CUE: As local operator o Contact the local report 0GW014 Auto operator to:

Closed o VERIFY 0GW014 AUTO CUE: As local operator CLOSED report 0GW014 control o PLACE 0GW014 switch is in closed control switch in CUE: As local operator CLOSED report 0GW014 o PLACE 0GW014 controller is at 0%. controller at 0%

demand o DEPRESS Grid 3 key o KEY in 0202 o DEPRESS the SEL key o VERIFY 0PA202 selected o DEPRESS CHAN ITEM key o KEY in 9

  • ENTER the HIGH alarm setpoint determined in step C.3.c (6.06 E-03) o OBTAIN VERIFICATION CUE: Verification has been provided.

4 SIM-901

PERFORMANCE STEP STANDARD Circle applicable

6. Select the High Alarm Perform the following: SAT UNSAT N/A setpoint for 0PA202. o DEPRESS Grid 3 key Comments:

(step D.20.a)

  • KEY in 0102
  • DEPRESS the SEL key o VERIFY 0PB102 selected
  • DEPRESS CHAN ITEM key
  • KEY in 9
  • DEPRESS the SEL key Examiners note: The following procedure step is not required to be performed if 0PA202 is NOT in HIGH ALARM.
7. Verify/enter High Alarm Perform the following: SAT UNSAT N/A setpoint for 0PB102 o Refer to step C.3.c Comments:

suggested by Health Physics is section C.3.c. o VERIFY/ENTER the new High Alarm setpoint (step D.20.b) from step C.3.c (6.06E-04) o DEPRESS the ENTER key o VERIFY the new ALERT alarm setpoint is displayed CUE: Verification has been provided. o OBTAIN VERIFICATION

8. Select and enter the Alert Perform the following: SAT UNSAT N/A Alarm setpoint for 0PB102. o DEPRESS Grid 3 key Comments:

(step D.20.c) o KEY in 0102 o DEPRESS the SEL key o VERIFY 0PB102 selected o DEPRESS CHAN ITEM key

  • KEY in 10
  • DEPRESS the SEL key o Refer to step C.3.c
  • VERIFY/ENTER the new Alert Alarm setpoint (6.06E-05) o DEPRESS the ENTER key o VERIFY the new ALERT alarm setpoint is displayed CUE: Verification has been o OBTAIN VERIFICATION provided.

5 SIM-901

PERFORMANCE STEP STANDARD Circle applicable

  • 9. Perform the following to Perform the following: SAT UNSAT N/A verify 0RE-PR002A will cause
  • Contact the local Comments:

0GW014 to automatically operator to:

close.

  • Verify/Place 0GW014 (steps D.20.d-q) C/S in OPEN CUE: As local operator
  • Place 0GW014 report 0GW014 C/S is controller to 100%

in open open CUE: As local operator o DEPRESS Grid 3 key report 0GW014 controller is at o KEY in 0102 100%. o DEPRESS the SEL key o VERIFY 0PB102 selected o DEPRESS CHAN ITEM key

  • KEY in 9 o Record the current 0PB102 current activity activity reading setting________
  • ENTER a new HIGH alarm setpoint below the current activity value 0PB102 new Hi Alarm setting_________ o RECORD the new HIGH alarm setpoint that was entered
  • DEPRESS the ENTER key o ACKNOWLEDGE the alarm at the RM-11 console CUE: As local operator o Contact the local report 0GW014 Auto operator to:

Closed o VERIFY 0GW014 AUTO CUE: As local operator CLOSED report 0GW014 control o PLACE 0GW014 switch is in closed control switch in CUE: As local operator CLOSED report 0GW014 o PLACE 0GW014 controller is at 0%. controller at 0%

demand o DEPRESS Grid 3 key o KEY in 0102 o DEPRESS the SEL key o VERIFY 0PB102 selected o DEPRESS CHAN ITEM key o KEY in 9

  • ENTER the HIGH alarm setpoint determined in step C.3.c (6.06 E-04)

CUE: Verification has been provided. o OBTAIN VERIFICATION 6

SIM-901

PERFORMANCE STEP STANDARD Circle applicable

10. Place RM-11 in NORMAL MODE
  • PLACE the RM-11 SAT UNSAT N/A console in the NORMAL Comments:

mode

11. Inform US pre-release Inform US steps D.18 channel checks complete through D.21 are CUE: Acknowledge report. completed CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

7 SIM-901

TASK CONDITIONS:

1. You are an extra NSO.
2. Both Units are at full power.
3. 0PR02J, Gas Decay Tank Monitor, is operable.

INITIATING CUES:

1. The Unit Supervisor has directed you to perform a portion of the 0F Gas Decay Tank release package, completed through section D.17, and has directed you to complete steps D.18 through D.21. All previous sections of the release package have been successfully completed.
2. Inform the Unit Supervisor when you have completed steps D.18 through D.21.

8 SIM-901

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • Adjust 0PR02J radiation level as follows:
  • Record as found values of monitored item RMK0PR02ABKD ______________.
  • Set monitor item RMK0PR02ABKD = 1.31 E-8
  • Record as found values of monitored item RMK0PR02BBKD ______________.
  • Set monitor item RMK0PR02BBKD = 1.31 E-8
  • Adjust 0PR02J setpoints as follows.
  • Record 0PA102 High Alarm current setpoint ___________________.
  • Set 0PA102 High Alarm Setpoint = 6.06 E-04 (channel item #9).
  • Record 0PB102 Alert Alarm current setpoint ___________________.
  • Set 0PA102 Alert Alarm Setpoint = 6.06 E-05 (channel item #10).
  • Record 0PA202 High Alarm current setpoint ___________________.
  • Set 0PA202 High Alarm Setpoint = 6.06 E-03 (channel item #9).
  • Record 0PA202 Alert Alarm current setpoint ___________________.
  • Set 0PA202 Alert Alarm Setpoint = 3.03 E-03 (channel item #10).
  • Select grid on the RM-11 console
  • AT CONCLUSION OF JPM(S), RESTORE 0PR02J MONITORED ITEMS ALARM SETPOINTS TO ORIGINAL AS FOUND VALUES COMMENTS:

Provide copy of BwOP GW-500T1, Rev. 26 (Final) 9 SIM-901