IR 05000327/2006403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML070260161
| number = ML070260161
| issue date = 01/23/2007
| issue date = 01/23/2007
| title = Sequoyah Nuclear Plant - NRC Inspection Report No. 05000327/2006403 and 05000328/2006403
| title = NRC Inspection Report No. 05000327/2006403 and 05000328/2006403
| author name = Shea J W
| author name = Shea J
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Singer K W
| addressee name = Singer K
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000327, 05000328
| docket = 05000327, 05000328
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ary 23, 2007
[[Issue date::January 23, 2007]]


EA-06-269EA-06-273Tennessee Valley AuthorityATTN:Mr. Karl W. SingerChief Nuclear Officer and Executive Vice President6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
==SUBJECT:==
SEQUOYAH NUCLEAR PLANT - NRC INSPECTION REPORT NO.


SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC INSPECTION REPORT NO. 05000327/2006403 AND 05000328/2006403
05000327/2006403 AND 05000328/2006403


==Dear Mr. Singer:==
==Dear Mr. Singer:==
On January 18, 2007, the U. S. Nuclear Regulatory Commission (NRC) completed an in-officeinspection of your Sequoyah Nuclear Plant to follow up on previous security inspection findings.
On January 18, 2007, the U. S. Nuclear Regulatory Commission (NRC) completed an in-office inspection of your Sequoyah Nuclear Plant to follow up on previous security inspection findings.


The inspection report documents the inspection results, which were discussed at the exit meeting on January 23, 2007, with Mr. R. Douet and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.
The inspection report documents the inspection results, which were discussed at the exit meeting on January 23, 2007, with Mr. R. Douet and other members of your staff.


The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.The inspection report documents findings that were determined to be greater than very lowsecurity significance (i.e. greater than Green as determined by the Physical Protection Significance Determination Process.)The deficiencies were promptly corrected or compensated for, and the plant was in compliancewith applicable physical protection and security requirements within the scope of this inspection.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room).In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable TVA 2response, please provide the level of protection described in 10 CFR 73.21. Otherwise, markyour entire response "Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.


Sincerely,/RA/
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Joseph W. Shea, DirectorDivision of Reactor SafetyDocket Nos.:50-327, 50-328License Nos.:DPR-77, DPR-79cc:Ashok S. BhatnagarSenior Vice President Nuclear Operations Tennessee Valley Authority Electronic Mail DistributionPreston D. SwaffordSenior Vice President Nuclear Support Tennessee Valley Authority Electronic Mail DistributionLarry S. Bryant, Vice PresidentNuclear Engineering &
Technical Services Tennessee Valley Authority Electronic Mail DistributionRandy DouetSite Vice President Sequoyah Nuclear Plant Electronic Mail DistributionGeneral CounselTennessee Valley Authority Electronic Mail DistributionJohn C. Fornicola, General ManagerNuclear Assurance Tennessee Valley Authority Electronic Mail Distribution(cc cont'd - See page 3)
TVA 3 (cc cont'd)Glenn W. Morris, Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail DistributionBeth A. Wetzel, ManagerCorporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801Robert H. Bryan, Jr., General ManagerLicensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801David A. Kulisek, Plant ManagerSequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail DistributionLawrence E. Nanney, DirectorTN Dept. of Environment & Conservation Division of Radiological Health Electronic Mail DistributionCounty MayorHamilton County Courthouse Chattanooga, TN 37402-2801Ann Harris341 Swing Loop Rockwood, TN 37854 James H. Bassham, DirectorTennessee Emergency Management Agency Electronic Mail DistributionDistribution: (See page 4)
TVA 4Distribution
:Bob Pascarelli, NRR D. Pickett, NRR C. Evans OE Mail RIDSNRRDIRS PUBLIC


_________________________OFFICERII:DRSRII:DRSRII:DRPRII:EICSRII:DRSSIGNATURERARARARARANAMEKDAVISJMUNDAYMWIDMANNCEVANSSHEADATE1/18/20071/18/20071/18/20071/18/20071/23/20071/ /20071/ /2007 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO
The inspection report documents findings that were determined to be greater than very low security significance (i.e. greater than Green as determined by the Physical Protection Significance Determination Process.)
 
The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable
 
TVA  2 response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
 
Sincerely,
/RA/
Joseph W. Shea, Director Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 cc: Ashok S. Bhatnagar Senior Vice President Nuclear Operations Tennessee Valley Authority Electronic Mail Distribution Preston D. Swafford Senior Vice President Nuclear Support Tennessee Valley Authority Electronic Mail Distribution Larry S. Bryant, Vice President Nuclear Engineering &
Technical Services Tennessee Valley Authority Electronic Mail Distribution Randy Douet Site Vice President Sequoyah Nuclear Plant Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution John C. Fornicola, General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution (cc contd - See page 3)
 
TVA  3 (cc contd)
Glenn W. Morris, Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Beth A. Wetzel, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Robert H. Bryan, Jr., General Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 David A. Kulisek, Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Lawrence E. Nanney, Director TN Dept. of Environment & Conservation Division of Radiological Health Electronic Mail Distribution County Mayor Hamilton County Courthouse Chattanooga, TN 37402-2801 Ann Harris 341 Swing Loop Rockwood, TN 37854 James H. Bassham, Director Tennessee Emergency Management Agency Electronic Mail Distribution Distribution: (See page 4)
 
TVA  4 Distribution:
Bob Pascarelli, NRR D. Pickett, NRR C. Evans OE Mail RIDSNRRDIRS PUBLIC
 
_________________________
OFFICE RII:DRS RII:DRS RII:DRP RII:EICS RII:DRS SIGNATURE RA RA RA RA RA NAME KDAVIS JMUNDAY MWIDMANN CEVANS SHEA DATE  1/18/2007 1/18/2007 1/18/2007 1/18/2007 1/23/2007 1/ /2007 1/ /2007 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
}}
}}

Latest revision as of 10:10, 23 November 2019

NRC Inspection Report No. 05000327/2006403 and 05000328/2006403
ML070260161
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/23/2007
From: James Shea
Division of Reactor Safety II
To: Singer K
Tennessee Valley Authority
References
EA-06-269, EA-06-273, IR-06-403
Download: ML070260161 (5)


Text

ary 23, 2007

SUBJECT:

SEQUOYAH NUCLEAR PLANT - NRC INSPECTION REPORT NO.

05000327/2006403 AND 05000328/2006403

Dear Mr. Singer:

On January 18, 2007, the U. S. Nuclear Regulatory Commission (NRC) completed an in-office inspection of your Sequoyah Nuclear Plant to follow up on previous security inspection findings.

The inspection report documents the inspection results, which were discussed at the exit meeting on January 23, 2007, with Mr. R. Douet and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

The inspection report documents findings that were determined to be greater than very low security significance (i.e. greater than Green as determined by the Physical Protection Significance Determination Process.)

The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable

TVA 2 response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,

/RA/

Joseph W. Shea, Director Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 cc: Ashok S. Bhatnagar Senior Vice President Nuclear Operations Tennessee Valley Authority Electronic Mail Distribution Preston D. Swafford Senior Vice President Nuclear Support Tennessee Valley Authority Electronic Mail Distribution Larry S. Bryant, Vice President Nuclear Engineering &

Technical Services Tennessee Valley Authority Electronic Mail Distribution Randy Douet Site Vice President Sequoyah Nuclear Plant Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution John C. Fornicola, General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution (cc contd - See page 3)

TVA 3 (cc contd)

Glenn W. Morris, Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Beth A. Wetzel, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Robert H. Bryan, Jr., General Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 David A. Kulisek, Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Lawrence E. Nanney, Director TN Dept. of Environment & Conservation Division of Radiological Health Electronic Mail Distribution County Mayor Hamilton County Courthouse Chattanooga, TN 37402-2801 Ann Harris 341 Swing Loop Rockwood, TN 37854 James H. Bassham, Director Tennessee Emergency Management Agency Electronic Mail Distribution Distribution: (See page 4)

TVA 4 Distribution:

Bob Pascarelli, NRR D. Pickett, NRR C. Evans OE Mail RIDSNRRDIRS PUBLIC

_________________________

OFFICE RII:DRS RII:DRS RII:DRP RII:EICS RII:DRS SIGNATURE RA RA RA RA RA NAME KDAVIS JMUNDAY MWIDMANN CEVANS SHEA DATE 1/18/2007 1/18/2007 1/18/2007 1/18/2007 1/23/2007 1/ /2007 1/ /2007 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO