| | number = ML070390113 | | | number = ML070390113 |
| | issue date = 02/02/2007 | | | issue date = 02/02/2007 |
| | title = Perry Nuclear Plant - 2006 Annual Report, Fulfills Ongoing Commitments Associated with License Condition 17 | | | title = 2006 Annual Report, Fulfills Ongoing Commitments Associated with License Condition 17 |
| | author name = Pearce L W | | | author name = Pearce L |
| | author affiliation = FirstEnergy Nuclear Operating Co | | | author affiliation = FirstEnergy Nuclear Operating Co |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 L. William Pearce 440-280-5382 Vice President Fax: 440-280-8029 February 2, 2007 PY-CEI/NRR-3017L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 | | {{#Wiki_filter:FENOC Perry Nuclear Power Station 10 CenterRoad FirstEnergyNuclearOperatingCompany Perry, Ohio 44081 L. William Pearce 440-280-5382 Vice President Fax: 440-280-8029 February 2, 2007 PY-CEI/NRR-3017L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| 2006 Annual Report Ladies and Gentlemen: | | 2006 Annual Report Ladies and Gentlemen: |
| Attached is the 2006 Annual Report for the Perry Nuclear Power Plant (PNPP). This report is submitted in accordance with 10 CFR 50.46(a)(3)(ii), and also fulfills ongoing commitments associated with License Commitment 17 contained in the PNPP Updated Safety Analysis Report, Appendix lB.If there are any questions or if additional information is required, please contact Mr. Jeffrey Lausberg, Manager-Regulatory Compliance at (440) 280-5940.Very tr ly 5our, Attachment cc: NRC Project Manager NRC Resident Inspector Office NRC Region III REIRS Project Manager " A0ooz | | Attached is the 2006 Annual Report for the Perry Nuclear Power Plant (PNPP). This report is submitted in accordance with 10 CFR 50.46(a)(3)(ii), and also fulfills ongoing commitments associated with License Commitment 17 contained in the PNPP Updated Safety Analysis Report, Appendix lB. |
| .1 4.Attachment PY-CEI/NRR-3017L Page 1 of 3 FIRSTENERGY NUCLEAR OPERATING COMPANY PERRY NUCLEAR POWER PLANT January 1, 2006 to December 31, 2006 ANNUAL REPORT TO NRC DOCKET NUMBER: 50-440 LICENSE NUMBER: NPF-58 Contents 10 CFR 50.46 Reporting of Emergency Core Cooling System (ECCS) Model Changes and Errors Silicone Sealant Inspections Attachment PY-CEI/NRR-3017L Page 2 of 3 10 CFR 50.46 Reporting of ECCS Model Changes and Errors Model Changes: One change was reported in 2006 concerning the SAFER/GESTR model: 1. GNF Notification 2006-01, Dated July 28, 2006 This notification identifies an issue with the application of the SAFER/GESTR LOCAL analysis tool. The previous methodology was to assume a mid peaked power shape for input. Recent analysis has shown other power shape may be more limiting. | | If there are any questions or if additional information is required, please contact Mr. Jeffrey Lausberg, Manager-Regulatory Compliance at (440) 280-5940. |
| General Electric procedures have been revised to consider a range of power shapes for inputs. General Electric performed a range of studies reviewing past analysis. | | Very tr ly 5our, Attachment cc: NRC Project Manager NRC Resident Inspector Office NRC Region III REIRS Project Manager " |
| GE concluded this change resulted in a no change (0 degrees F) in the licensing basis peak cladding temperature for GE14 fuel at Perry. This change was previously reported by letter dated August 28, 2006 (PY-CEI/NRR-2986L). | | A0ooz |
| Model Errors: None Attachment PY-CEI/NRR-3017L Page 3 of 3 Silicone Sealant Inspections No inspections were scheduled or performed this year. Inspection activities are currently scheduled to be performed in RFO-1 1 (March-April, 2007).}} | | |
| | .1 4. |
| | Attachment PY-CEI/NRR-3017L Page 1 of 3 FIRSTENERGY NUCLEAR OPERATING COMPANY PERRY NUCLEAR POWER PLANT January 1, 2006 to December 31, 2006 ANNUAL REPORT TO NRC DOCKET NUMBER: 50-440 LICENSE NUMBER: NPF-58 Contents 10 CFR 50.46 Reporting of Emergency Core Cooling System (ECCS) Model Changes and Errors Silicone Sealant Inspections |
| | |
| | Attachment PY-CEI/NRR-3017L Page 2 of 3 10 CFR 50.46 Reporting of ECCS Model Changes and Errors Model Changes: |
| | One change was reported in 2006 concerning the SAFER/GESTR model: |
| | : 1. GNF Notification 2006-01, Dated July 28, 2006 This notification identifies an issue with the application of the SAFER/GESTR LOCAL analysis tool. The previous methodology was to assume a mid peaked power shape for input. Recent analysis has shown other power shape may be more limiting. General Electric procedures have been revised to consider a range of power shapes for inputs. General Electric performed a range of studies reviewing past analysis. GE concluded this change resulted in a no change (0 degrees F) in the licensing basis peak cladding temperature for GE14 fuel at Perry. This change was previously reported by letter dated August 28, 2006 (PY-CEI/NRR-2986L). |
| | Model Errors: |
| | None |
| | |
| | Attachment PY-CEI/NRR-3017L Page 3 of 3 Silicone Sealant Inspections No inspections were scheduled or performed this year. Inspection activities are currently scheduled to be performed in RFO-1 1 (March-April, 2007).}} |
Similar Documents at Perry |
---|
Category:Annual Report
MONTHYEARL-20-033, Submittal of Annual Financial Report2020-03-23023 March 2020 Submittal of Annual Financial Report L-15-095, 2014 Annual Report of Emergency Core Cooling System Errors and Model Changes2015-03-23023 March 2015 2014 Annual Report of Emergency Core Cooling System Errors and Model Changes ML12129A3082012-04-30030 April 2012 Annual Environmental and Effluent Release Report 2011 L-12-059, 2011 Annual Report2012-02-23023 February 2012 2011 Annual Report L-11-050, 2010 Annual Report2011-02-16016 February 2011 2010 Annual Report L-11-015, Annual Emission Report, Facility Id: 02-43-12-09222011-01-24024 January 2011 Annual Emission Report, Facility Id: 02-43-12-0922 ML1003302912010-01-25025 January 2010 Annual Emission Report, Facility Id: 02-43-12-0922 ML0909203172009-03-24024 March 2009 Parental Guarantee for Decommissioning Funding ML0808700852008-03-20020 March 2008 Parental Guarantee for Decommissioning Funding L-08-038, Transmittal of Annual Report for the 20072008-02-14014 February 2008 Transmittal of Annual Report for the 2007 ML0703901132007-02-0202 February 2007 2006 Annual Report, Fulfills Ongoing Commitments Associated with License Condition 17 ML0704401442007-02-0101 February 2007 Water Withdrawal Facility Registration Number: 01483 L-06-065, 2005 Annual Report for Firstenergy Corp; Retrospective Premium Guarantee2006-04-0606 April 2006 2005 Annual Report for Firstenergy Corp; Retrospective Premium Guarantee ML0612203752006-03-31031 March 2006 Annual Environmental and Effluent Release Report for the Period of January 1, 2005 Through December 31, 2005 ML0607200552006-02-28028 February 2006 Annual Report ML0607904472006-02-21021 February 2006 Water Withdrawal Facility Registration Number: 01483; Water Withdrawal Report for the Year Ending December 31, 2005 ML0513601832005-04-26026 April 2005 Annual Environmental and Effluent Release Report, for the Period January 1, 2004 Through December 31, 2004 L-05-067, Letter Transmitting Firstenergy Corp. 2004 Annual Report2005-04-0808 April 2005 Letter Transmitting Firstenergy Corp. 2004 Annual Report ML0514505262005-03-18018 March 2005 Firstenergy 2004 Annual Report, Building on Our Progress L-04-037, Letter Forwarding 2003 Firstenergy Corp. Annual Report2004-04-12012 April 2004 Letter Forwarding 2003 Firstenergy Corp. Annual Report ML0407105022004-03-0101 March 2004 2003 Annual Report L-03-045, Firstenergy Corporation Retrospective Premium Guarantee2003-04-0404 April 2003 Firstenergy Corporation Retrospective Premium Guarantee ML0310007252003-04-0404 April 2003 Retrospective Premium Guarantee, Annual Report ML0307101702003-02-28028 February 2003 2002 Annual Report for Perry Nuclear Power Plant, Unit 1 ML0311506352002-12-31031 December 2002 Annual Environmental and Effluent Release Report for Perry Nuclear Power Plant 2002 L-02-041, Annual Financial Reports & Certified Financial Statements for Perry Nuclear Power Plant, Davis-Besse Nuclear Power Station & Beaver Valley Power Station2002-04-24024 April 2002 Annual Financial Reports & Certified Financial Statements for Perry Nuclear Power Plant, Davis-Besse Nuclear Power Station & Beaver Valley Power Station L-02-044, 2001 Firstenergy Corp. Annual Report Completing Requirements for Retrospective Premimum Guarantee2002-04-16016 April 2002 2001 Firstenergy Corp. Annual Report Completing Requirements for Retrospective Premimum Guarantee ML0212000672002-04-16016 April 2002 Part a - Perry Nuclear Power Plant Annual Environmental & Effluent Release Report for Period of 01/01/2001 Through 12/31/2001 L-02-029, Property Insurance Coverage - 2001 Annual Notification for Perry, Davis-Besse & Beaver Valley2002-03-21021 March 2002 Property Insurance Coverage - 2001 Annual Notification for Perry, Davis-Besse & Beaver Valley ML0207106412002-02-27027 February 2002 Annual Report for 2001 ML0036962172000-03-17017 March 2000 Letter Forwarding Documents as Evidence of Licensee Guarantee of the Retrospective Premiums Which May Served Against the Davis-Besse, Unit 1, Perry, Unit 1, and Beaver Valley, Units 1 and 2 ML0037089641998-04-20020 April 1998 Annual Financial Reports and Certified Financial Statements for the Perry Nuclear Power Plant (Docket Number 50-440) and the Davis-Besse Nuclear Power Station (Docket Number 50-346) 2020-03-23
[Table view] Category:Letter
MONTHYEARML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 L-24-168, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 L-24-155, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-140, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24095A3282024-04-19019 April 2024 License Renewal Revised Schedule Letter L-24-083, Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification2024-04-15015 April 2024 Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification L-24-066, Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency2024-04-15015 April 2024 Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency L-24-057, Submittal of the Decommissioning Funding Status Report2024-03-28028 March 2024 Submittal of the Decommissioning Funding Status Report ML24088A1922024-03-28028 March 2024 Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 2024-09-09
[Table view] |
Text
FENOC Perry Nuclear Power Station 10 CenterRoad FirstEnergyNuclearOperatingCompany Perry, Ohio 44081 L. William Pearce 440-280-5382 Vice President Fax: 440-280-8029 February 2, 2007 PY-CEI/NRR-3017L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440
Subject:
2006 Annual Report Ladies and Gentlemen:
Attached is the 2006 Annual Report for the Perry Nuclear Power Plant (PNPP). This report is submitted in accordance with 10 CFR 50.46(a)(3)(ii), and also fulfills ongoing commitments associated with License Commitment 17 contained in the PNPP Updated Safety Analysis Report, Appendix lB.
If there are any questions or if additional information is required, please contact Mr. Jeffrey Lausberg, Manager-Regulatory Compliance at (440) 280-5940.
Very tr ly 5our, Attachment cc: NRC Project Manager NRC Resident Inspector Office NRC Region III REIRS Project Manager "
A0ooz
.1 4.
Attachment PY-CEI/NRR-3017L Page 1 of 3 FIRSTENERGY NUCLEAR OPERATING COMPANY PERRY NUCLEAR POWER PLANT January 1, 2006 to December 31, 2006 ANNUAL REPORT TO NRC DOCKET NUMBER: 50-440 LICENSE NUMBER: NPF-58 Contents 10 CFR 50.46 Reporting of Emergency Core Cooling System (ECCS) Model Changes and Errors Silicone Sealant Inspections
Attachment PY-CEI/NRR-3017L Page 2 of 3 10 CFR 50.46 Reporting of ECCS Model Changes and Errors Model Changes:
One change was reported in 2006 concerning the SAFER/GESTR model:
- 1. GNF Notification 2006-01, Dated July 28, 2006 This notification identifies an issue with the application of the SAFER/GESTR LOCAL analysis tool. The previous methodology was to assume a mid peaked power shape for input. Recent analysis has shown other power shape may be more limiting. General Electric procedures have been revised to consider a range of power shapes for inputs. General Electric performed a range of studies reviewing past analysis. GE concluded this change resulted in a no change (0 degrees F) in the licensing basis peak cladding temperature for GE14 fuel at Perry. This change was previously reported by letter dated August 28, 2006 (PY-CEI/NRR-2986L).
Model Errors:
None
Attachment PY-CEI/NRR-3017L Page 3 of 3 Silicone Sealant Inspections No inspections were scheduled or performed this year. Inspection activities are currently scheduled to be performed in RFO-1 1 (March-April, 2007).