Similar Documents at Perry |
---|
Category:Annual Report
MONTHYEARL-20-033, Submittal of Annual Financial Report2020-03-23023 March 2020 Submittal of Annual Financial Report L-15-095, 2014 Annual Report of Emergency Core Cooling System Errors and Model Changes2015-03-23023 March 2015 2014 Annual Report of Emergency Core Cooling System Errors and Model Changes ML12129A3082012-04-30030 April 2012 Annual Environmental and Effluent Release Report 2011 L-12-059, 2011 Annual Report2012-02-23023 February 2012 2011 Annual Report L-11-050, 2010 Annual Report2011-02-16016 February 2011 2010 Annual Report L-11-015, Annual Emission Report, Facility Id: 02-43-12-09222011-01-24024 January 2011 Annual Emission Report, Facility Id: 02-43-12-0922 ML1003302912010-01-25025 January 2010 Annual Emission Report, Facility Id: 02-43-12-0922 ML0909203172009-03-24024 March 2009 Parental Guarantee for Decommissioning Funding ML0808700852008-03-20020 March 2008 Parental Guarantee for Decommissioning Funding L-08-038, Transmittal of Annual Report for the 20072008-02-14014 February 2008 Transmittal of Annual Report for the 2007 ML0703901132007-02-0202 February 2007 2006 Annual Report, Fulfills Ongoing Commitments Associated with License Condition 17 ML0704401442007-02-0101 February 2007 Water Withdrawal Facility Registration Number: 01483 L-06-065, 2005 Annual Report for Firstenergy Corp; Retrospective Premium Guarantee2006-04-0606 April 2006 2005 Annual Report for Firstenergy Corp; Retrospective Premium Guarantee ML0612203752006-03-31031 March 2006 Annual Environmental and Effluent Release Report for the Period of January 1, 2005 Through December 31, 2005 ML0607200552006-02-28028 February 2006 Annual Report ML0607904472006-02-21021 February 2006 Water Withdrawal Facility Registration Number: 01483; Water Withdrawal Report for the Year Ending December 31, 2005 ML0513601832005-04-26026 April 2005 Annual Environmental and Effluent Release Report, for the Period January 1, 2004 Through December 31, 2004 L-05-067, Letter Transmitting Firstenergy Corp. 2004 Annual Report2005-04-0808 April 2005 Letter Transmitting Firstenergy Corp. 2004 Annual Report ML0514505262005-03-18018 March 2005 Firstenergy 2004 Annual Report, Building on Our Progress L-04-037, Letter Forwarding 2003 Firstenergy Corp. Annual Report2004-04-12012 April 2004 Letter Forwarding 2003 Firstenergy Corp. Annual Report ML0407105022004-03-0101 March 2004 2003 Annual Report L-03-045, Firstenergy Corporation Retrospective Premium Guarantee2003-04-0404 April 2003 Firstenergy Corporation Retrospective Premium Guarantee ML0310007252003-04-0404 April 2003 Retrospective Premium Guarantee, Annual Report ML0307101702003-02-28028 February 2003 2002 Annual Report for Perry Nuclear Power Plant, Unit 1 ML0311506352002-12-31031 December 2002 Annual Environmental and Effluent Release Report for Perry Nuclear Power Plant 2002 L-02-041, Annual Financial Reports & Certified Financial Statements for Perry Nuclear Power Plant, Davis-Besse Nuclear Power Station & Beaver Valley Power Station2002-04-24024 April 2002 Annual Financial Reports & Certified Financial Statements for Perry Nuclear Power Plant, Davis-Besse Nuclear Power Station & Beaver Valley Power Station L-02-044, 2001 Firstenergy Corp. Annual Report Completing Requirements for Retrospective Premimum Guarantee2002-04-16016 April 2002 2001 Firstenergy Corp. Annual Report Completing Requirements for Retrospective Premimum Guarantee ML0212000672002-04-16016 April 2002 Part a - Perry Nuclear Power Plant Annual Environmental & Effluent Release Report for Period of 01/01/2001 Through 12/31/2001 L-02-029, Property Insurance Coverage - 2001 Annual Notification for Perry, Davis-Besse & Beaver Valley2002-03-21021 March 2002 Property Insurance Coverage - 2001 Annual Notification for Perry, Davis-Besse & Beaver Valley ML0207106412002-02-27027 February 2002 Annual Report for 2001 ML0036962172000-03-17017 March 2000 Letter Forwarding Documents as Evidence of Licensee Guarantee of the Retrospective Premiums Which May Served Against the Davis-Besse, Unit 1, Perry, Unit 1, and Beaver Valley, Units 1 and 2 ML0037089641998-04-20020 April 1998 Annual Financial Reports and Certified Financial Statements for the Perry Nuclear Power Plant (Docket Number 50-440) and the Davis-Besse Nuclear Power Station (Docket Number 50-346) 2020-03-23
[Table view] Category:Letter
MONTHYEARL-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 05000440/LER-2024-003, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 05000440/LER-2024-002, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models 05000440/LER-2024-001, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24095A3282024-04-19019 April 2024 License Renewal Revised Schedule Letter 2024-09-09
[Table view] |
Text
FENOC ~10 Perry Nuclear Power Station Center Road FirstEnergyNuclear Operating Company Perry,Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 440-280-8029 January 25, 2010 PY-CEI/OEPA-0523L Mr. Ken Djukic Ohio Environmental Protection Agency Northeast District Office Air Pollution Group 2110 East Aurora Road Twinsburg, Ohio 44087.
SUBJECT:
Perry Nuclear Power Plant Annual Emission Report, Facility ID: 02-43-12-0922 The Perry Nuclear Power Plant hereby submits this annual report for the period January 1 through December 31, 2009, in accordance with and specified by Permit To Operate No. 02-43-12-0922 B001 and B002.
If youtave questiOhs orprequire additi&nal inf6r M-4atidn; please contact Mr. Rand.Killihg at (440) 280-7370.
Sincerely, Mark B. Bezilla .
Attachment:
(1) Emissions for 2009 cc: NRC Region III NRC Resident Inspeqtor..
NRR Project Manager
. NRC Docutment Control Desk "(Docket Nbo5-440)*
M. J. Jirousek
Attachment 1 Emissions for 2009 PY-CEI/OEPA-0523L Pace 1 of 2
- RUN TIME FOR 2009-(HOURS j,~
I
- I 1 . 1...-l_ r Jan. Feb. Mar. Apr. May Jun. Jul.' Aug. Sep. Oct. Nov. Dec. YTD Diesels _ 2 1_ 0. 2. 1. 1 2. 1 Dlvi 2.6 1.8 0.0 20.5 1.8 1,1 20 1.7 1.8 1.9 25.7 2.01 63.32 Dii 1.6 2.2 2.3 9.0 2.3 25.6 1.6 1.9 2.1 1.7 3.4 3.1 56.73 Div III 1.6 1.4 3.8 8.4 1.5 1.7 1.7 1.4 1.8 1.5 1.4 24.7 50.84 Totals 5.8 5.4 6.1 37.9 5.6 28.8 5.3 5.0 5.7 5.0 30.5 29.8 170.89 Aux Boiler 'A' 0.0 171.2 715.4 684.9 399.6 78.3 0.0 00 0.[ 410.0 2618 0.00 2721.2 50 01 00 0 0.0 0 0.50 007 0.0 0.0 55.62 Aux Boiler B'00 OlGll 7, a.I Fe. Mr I p. My Jn PER.
W§*T0jk7MO Diesels v Gal) Jan. Feb. Mar. Apr. May j Jun. Jul. Aug. Sep. Oct. Nov. Dec. YTD Div I 1274 899 0 3941 676 635 712 710 414 485 9592 997 20335 Dii 757 941 510 1142 579 . 10630 353 404 451 941 1060 592 18360 Div iii 383 149 887 1036 411 331 178 202 1711 331 178 4822 9079 Totals 2414 1989 1397 6119 1666 11596 1243 1316 1036 1757 10830 6411 47774 Aux Boilers (Gal) 0 25500 85000j 72500 57509 12500 0 0o 15000 85422.9 54549 0 407980.9 I- -- -- -_AWEISIO - xjt**
- 4-t, TNV Jan Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec. YTD Total NOx Diesels (TPY) _____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 15.370 0.0001 0.864 0.148 0.139 0.156 0.156 0.091 0.106 2.103 0.219 4.458 15.370 Div i 0.279 0.197 Div II 0.166 0.206 0.112 0.250 0.127 2.331 0.077 0.089 0.099 0.206 0.232 0.130 4.025 Div IIl 0.084 0.033 0.194 0.227 0.090 0.073 0.039 0.044 0.037 0.073 0.039 1.057 1.991 Totals 01529 0.436 0.306 1.3421 0.365 2.542 0.273 0.289 0.227 0.385 2.374 1.406 10.474, Aux Boiler (TPY) 0.000 0.306 1.0201 0.870. 0.690 0.150 0.000 0.000 0.180 1.025 0.655 0.000 4.896 NOx Emission Factor of 0.024 Lb/gal for Aux Boilers lAW AP-42 Table 1.3-1 NOx Emission Factor of 3.2 Lb/MMBtu for Diesels lAW AP-42 Table 3.4-1 Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec. YTD Total S02 Diesels (TPY) ____________________]_________________________ 1.548 0.0001 0.008 0.001 0.001 0.001 0.001 0.001 0.001 0.020 0.002 0.042 1.548 Div I 0.003 0.002 Div II 0.002 0.002 0.001 0.002 0.001 0.022 0.001 0.001 0.001 0.002 0.002 0.001 0.038 Div III 0.001 0.000 0.002 0.002 0.001] 0.001 0.000 0.000 0.000 0.001 0.000 0.010 0.019 Totals 0.005 0.004 0.003 0.013 0.003 0.024 0.003 0.003 0.002 0.004 0.022 0.013 0.099 __
Aux Boiler (TPY) 0.000, 0.091 0.302 0.257 0.204 0.044 0.000. 0.000 0.053 0.303 0.194. 0.000 1.448 S02 Emission Factor of 0.142 Lb/gal for Aux Boilers lAW AP-42 Table 1.3-1 S02 Emission Factor of 1.01 Lb/MMBtu for Diesels lAW AP-42 Table 3.4-1 Jan. I Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct Nov. Dec. YTD Total CO Diesels (TPY) ,I I-- F _ 1.184 __
3.802 Div 0.074 0.052 0.0001 . 0.230 0.039 0.0371 0.041 0.041 0.024 0.028 0.559 0.058 Div I1 0.044 0.055 0.030t 0.067 0.034 0.619 0.021 0.024 0.026 0.055 0.062 0.034 1.069 Div iii 0.022 0.009 0.0521 0.060 0.024 0.019 0.010 . 0.012 0.0101 0.019 0.010 0.281 0.529 otals 0.1411 0.116 0.0811 0.356 0.097 0.675 0.072 0.077 0.0601 0.102 0.631 0.373 2.7821 Page 1
Attachment I Emissions for 2009 PY-CEI/OEPA-0523L Page 2 of 2 Aux Boiler (TPV) 0.000 0.064 0.2131 01811 0.144 0.031 0.000 0.000 0.038 0.214 0.136 0.000 1.020 CO Emission Factor of 0.005 Lb/gal for Aux Boilers lAW AP-42 Table 1.3-1 CO Emission Factor of 0.85 Lb/MMBtu for Diesels lAW AP-42 Table 3.4-1
!fAlk!EMISSION TAkiNGd FORPARTICULAATE-M-ATERI(PM) INTS.~.~
Jan. Feb. Mar. Apr. May Jun. Jul. - Aug. Sep. Oct. Nov. Dec. YTD Total PM Diesels (TPY) 0.735 Div I 0.009 0.006 0.000 0.027 0.005 0.004 0.005 0.005 0.003 0.003 0.066 0.007 0.139 Div II 0.005 0.006 0.003 0.008 0.004 0.073 0.002 0.003 0.003 0.006 0.007 0.004 0.126 Div III 0.003 0.001 0.006 0.007 0.003 0.002 0.001 0.001 0.001 0.002 0.001 0.033 0.062 Totals 0.017 0.014 0.010 0.042 0.011 0.079 0.009 0.009 0.007 0.012 0.074 0.044 0.327 Aux Boiler (TPY) 0.000 0.026 0.085 0.073 0.058 0.013 0.000 0.000 0.015 0.085 0.055 0.000 0.408 PM Emission Factor of 0.002 Lb/gal for Aux Boilers lAW AP-42 Table 1.3-1 PM Emission Factor of 0.1 Lb/MMBtu for Diesels lAW AP-42 Table 3.4-1 Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec. YTD Total VOC Diesels (TPY). 0.346 Div I 0.008 0.006 0.000 0.024 0.004 0.004 0.004 0.004 0.003 0.003 0.059 0.006 0.125 Div II 0.005 0.006 0.003 0.007 0.004 0.066 0.002 0.002 0.003 0.006 0.007 0.004 0.113 Div III 0.002 0.001 0.005 0.006 0.003 0.002 0.001 0.001 0.001 0.002 0.001 0.030 0.056 Totals 0.015 0.012 0.009 0.038 0.010 0.072 0.008 0.008 0.006 0.011 0.067 0.040 0.295 Aux Boiler (TPY) 0.000 0.003 0.011 0.009 0.007 0.002 0.000 0.000 0.002 0.011 0.007 0.000 0.051 VOC Emissions are conservatively estimated based on TOC EF's of 0.000252 Lb/gal for Aux Boilers lAW AP-42 Table 1.3-3 VOC Emissions are conservatively estimated based on TOC EF's of 0.09 Lb/MMBtu for Diesels lAW AP-42 Table 3.4-1 Fuel Data From Sample Analysis Ash Weight 0.015 %
BTU/#** 19300 BTUI#
Sulfur % (Boiler)* 0.05 %
Part/MBTU 0.0005 Part/MBTU
- IGallon** 7.1 #/GAL Sulfur % (Diesels)* 0.03 %
Based on sample analysis results
- Based on AP-42, Table 3.4-1, Note a (There are 4 PBR qualified emissions units at the facility with minimal emissions annually, and until or unless S02 emissions from B001 and B002 approach 20%
of.the major source (20 tpy) level, actual emissions won't be calculated.) I I I I I I_1__
Page 2