ML070680073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML070680073
| number = ML070680073
| issue date = 03/09/2007
| issue date = 03/09/2007
| title = 03/14/2007 Meeting with Arizona Public Service Company and Synergy Plans for Conducting a Third-Party Safety Culture Assessment at Palo Verde Generating Station
| title = Meeting with Arizona Public Service Company and Synergy Plans for Conducting a Third-Party Safety Culture Assessment at Palo Verde Generating Station
| author name = Markley M T
| author name = Markley M
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| addressee name = Terao D
| addressee name = Terao D
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:March 9, 2007MEMORANDUM TO:David Terao, Chief Plant Licensing Branch IV
{{#Wiki_filter:March 9, 2007 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing FROM:               Michael T. Markley, Project Manager /RA/
 
Plant Licensing Branch IV Division of Operating Reactor Licensing
Division of Operating Reactor LicensingFROM:Michael T. Markley, Project Manager    
/RA/Plant Licensing Branch IV
 
Division of Operating Reactor Licensing


==SUBJECT:==
==SUBJECT:==
FORTHCOMING CLOSED MEETING WITH ARIZONA PUBLIC SERVICE COMPANY AND SYNERGYDATE & TIME:Wednesday, March 14, 2007 12:30 p.m. to 5:00 p.m.
FORTHCOMING CLOSED MEETING WITH ARIZONA PUBLIC SERVICE COMPANY AND SYNERGY DATE & TIME:       Wednesday, March 14, 2007 12:30 p.m. to 5:00 p.m.
Thursday, March 15, 2007 8:00 a.m. to 11:30 a.m.LOCATION:U.S. Nuclear Regulatory Commission Two White Flint North
Thursday, March 15, 2007 8:00 a.m. to 11:30 a.m.
 
LOCATION:           U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike, Room T-7A1 Rockville, Maryland PURPOSE:           To discuss Arizona Public Service Company (APS) plans for conducting a third-party safety culture assessment at the Palo Verde Nuclear Generating Station, as described in NRC Inspection Procedure 95003, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs, or One Red Input
11545 Rockville Pike, Room T-7A1
[Agencywide Document Access and Management System Accession No. ML062970393]
 
CATEGORY:           This meeting is closed to the public in its entirety to discuss proprietary information about the licensees safety culture assessment and methodology.
Rockville, MarylandPURPOSE:To discuss Arizona Public Service Company (APS) plans for conducting a third-party safety culture assessment at the Palo Verde Nuclear
PARTICIPANTS:       Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR), Office of Enforcement (OE), Office of Nuclear Regulatory Research (RES), and Region IV.
 
NRC                                           APS                     Synergy V. Barnes, RES          M. Markley, NRR        J. Copsey              J. Guilbert J. Cai, NRR            M. Keefe, RES          S. Bauer                H. Levin R. Gramm, NRR          T. Pruett, Region IV G. Werner, Region IV, et al.
Generating Station, as described in NRC Inspection Procedure 95003, "Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple
Docket Nos. STN 50-528, STN 50-529, and STN 50-530
 
Degraded Cornerstones, Multiple Yellow Inputs, or One Red Input"
 
[Agencywide Document Access and Management System Accession No. ML062970393]CATEGORY: This meeting is closed to the public in its entirety to discuss proprietary information about the licensee's safety culture assessment and
 
methodology.PARTICIPANTS:Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR), Office of Enforcement (OE), Office of Nuclear
 
Regulatory Research (RES), and Region IV.
NRC APS SynergyV. Barnes, RESM. Markley, NRRJ. CopseyJ. GuilbertJ. Cai, NRRM. Keefe, RESS. BauerH. Levin R. Gramm, NRRT. Pruett, Region IV G. Werner, Region IV, et al.
Docket Nos. STN 50-528, STN 50-529, and STN 50-530


==Enclosure:==
==Enclosure:==
Agenda (ADAMS Accession No. ML070680073) cc w/encl: See next page MEETING CONTACTS:M. Markley, NRRM. Fields, NRR301-415-5723301-415-3062
Agenda (ADAMS Accession No. ML070680073) cc w/encl: See next page MEETING CONTACTS:           M. Markley, NRR            M. Fields, NRR 301-415-5723              301-415-3062 mtm@nrc.gov               mbf1@nrc.gov
 
* Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002
mtm@nrc.gov mbf1@nrc.gov
* Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002 
 
ML070680073) cc w/encl:  See next page MEETING CONTACTS:M. Markley, NRRM. Fields, NRR301-415-5723301-415-3062
 
mtm@nrc.gov mbf1@nrc.gov
* Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002 DISTRIBUTION PUBLIC LPLIV r/f RidsAcrsAcnwMailCenter
 
RidsNrrAdro
 
RidsNrrDorl
 
RidsOpaMail
 
Receptionist (OWFN &
 
TWFN)
RidsNrrDorlLpl4 RidsNrrLAJBurkhardt
 
RidsNrrPMMFields RidsNrrPMMMarkley
 
RidsOgcRp TLiu, NRR GWerner, RIV RidsRgn4MailCenter (TPruett)
VBarnes, RES
 
RGramm, DIRS/IP
 
JCai, DIRS/IO
 
MKeefe, RES
 
VDricks, OPA RIV
 
DCullison, EDO RIV ADAMS Accession No:  ML070680073OFFICENRR/LPL4/PMNRR/LPL4/LANRR/LPL4/BCNAMEMMarkleyLFeizollahiDTerao DATE3/9/073/9/073/9/07
 
Palo Verde Nuclear Generating Station cc: Mr. Steve Olea
 
Arizona Corporation Commission
 
1200 W. Washington Street
 
Phoenix, AZ  85007 Mr. Douglas Kent Porter Senior Counsel
 
Southern California Edison Company
 
Law Department, Generation Resources
 
P.O. Box 800
 
Rosemead, CA  91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission
 
P.O. Box 40
 
Buckeye, AZ  85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission
 
Harris Tower & Pavillion
 
611 Ryan Plaza Drive, Suite 400 Arlington, TX  76011-8064 Chairman Maricopa County Board of Supervisors
 
301 W. Jefferson, 10th Floor
 
Phoenix, AZ  85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency
 
4814 South 40 Street
 
Phoenix, AZ  85040 Mr. Scott Bauer, Acting General Manager Regulatory Affairs and
 
Performance Improvement
 
Palo Verde Nuclear Generating Station
 
Mail Station 7636
 
P.O. Box 52034
 
Phoenix, AZ  85072-2034 Mr. Matthew Benac Assistant Vice President
 
Nuclear & Generation Services
 
El Paso Electric Company
 
340 East Palm Lane, Suite 310
 
Phoenix, AZ 85004 Mr. John Taylor Public Service Company of New Mexico
 
2401 Aztec NE, MS Z110
 
Albuquerque, NM  87107-4224 Mr. Geoffrey M. Cook Southern California Edison Company
 
5000 Pacific Coast Hwy Bldg N50
 
San Clemente, CA  92672 Mr. Robert Henry Salt River Project
 
6504 East Thomas Road
 
Scottsdale, AZ  85251 Mr. Jeffrey T. Weikert Assistant General Counsel
 
El Paso Electric Company
 
Mail Location 167
 
123 W. Mills El Paso, TX  79901 Mr. John Schumann Los Angeles Department of Water & Power
 
Southern California Public Power Authority
 
P.O. Box 51111, Room 1255-C
 
Los Angeles, CA  90051-0100 Mr. Brian Almon Public Utility Commission
 
William B. Travis Building
 
P.O. Box 13326
 
1701 North Congress Avenue Austin, TX 78701-3326 Ms. Karen O'Regan Environmental Program Manager
 
City of Phoenix
 
Office of Environmental Programs
 
200 West Washington Street
 
Phoenix AZ  85003 Mr. Randall K. Edington Senior Vice President, Nuclear
 
Mail Station 7602
 
Arizona Public Service Company


P. O. Box 52034
ML070680073) cc w/encl: See next page MEETING CONTACTS:          M. Markley, NRR            M. Fields, NRR 301-415-5723              301-415-3062 mtm@nrc.gov                mbf1@nrc.gov
* Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002 DISTRIBUTION PUBLIC                        RidsNrrDorlLpl4                RidsRgn4MailCenter (TPruett)
LPLIV r/f                      RidsNrrLAJBurkhardt            VBarnes, RES RidsAcrsAcnwMailCenter        RidsNrrPMMFields              RGramm, DIRS/IP RidsNrrAdro                    RidsNrrPMMMarkley              JCai, DIRS/IO RidsNrrDorl                    RidsOgcRp                      MKeefe, RES RidsOpaMail                    TLiu, NRR                      VDricks, OPA RIV Receptionist (OWFN &          GWerner, RIV                  DCullison, EDO RIV TWFN)
ADAMS Accession No: ML070680073 OFFICE    NRR/LPL4/PM    NRR/LPL4/LA    NRR/LPL4/BC NAME      MMarkley      LFeizollahi    DTerao DATE      3/9/07        3/9/07        3/9/07 Palo Verde Nuclear Generating Station cc:
Mr. Steve Olea                              Mr. John Taylor Arizona Corporation Commission              Public Service Company of New Mexico 1200 W. Washington Street                  2401 Aztec NE, MS Z110 Phoenix, AZ 85007                          Albuquerque, NM 87107-4224 Mr. Douglas Kent Porter                    Mr. Geoffrey M. Cook Senior Counsel                              Southern California Edison Company Southern California Edison Company          5000 Pacific Coast Hwy Bldg N50 Law Department, Generation Resources        San Clemente, CA 92672 P.O. Box 800 Rosemead, CA 91770                          Mr. Robert Henry Salt River Project Senior Resident Inspector                  6504 East Thomas Road U.S. Nuclear Regulatory Commission          Scottsdale, AZ 85251 P.O. Box 40 Buckeye, AZ 85326                          Mr. Jeffrey T. Weikert Assistant General Counsel Regional Administrator, Region IV          El Paso Electric Company U.S. Nuclear Regulatory Commission          Mail Location 167 Harris Tower & Pavillion                    123 W. Mills 611 Ryan Plaza Drive, Suite 400            El Paso, TX 79901 Arlington, TX 76011-8064 Mr. John Schumann Chairman                                    Los Angeles Department of Water & Power Maricopa County Board of Supervisors        Southern California Public Power Authority 301 W. Jefferson, 10th Floor                P.O. Box 51111, Room 1255-C Phoenix, AZ 85003                          Los Angeles, CA 90051-0100 Mr. Aubrey V. Godwin, Director              Mr. Brian Almon Arizona Radiation Regulatory Agency        Public Utility Commission 4814 South 40 Street                        William B. Travis Building Phoenix, AZ 85040                          P.O. Box 13326 1701 North Congress Avenue Mr. Scott Bauer, Acting General Manager    Austin, TX 78701-3326 Regulatory Affairs and Performance Improvement                    Ms. Karen O'Regan Palo Verde Nuclear Generating Station      Environmental Program Manager Mail Station 7636                          City of Phoenix P.O. Box 52034                              Office of Environmental Programs Phoenix, AZ 85072-2034                      200 West Washington Street Phoenix AZ 85003 Mr. Matthew Benac Assistant Vice President                    Mr. Randall K. Edington Nuclear & Generation Services              Senior Vice President, Nuclear El Paso Electric Company                    Mail Station 7602 340 East Palm Lane, Suite 310              Arizona Public Service Company Phoenix, AZ 85004                          P. O. Box 52034 Phoenix, AZ 85072-2034 WORKING-LEVEL MEETING WITH


Phoenix, AZ  85072-2034 WORKING-LEVEL MEETING WITH ARIZONA PUBLIC SERVICE COMPANY AND SYNERGY ON LICENSEE SAFETY CULTURE ASSESSMENT MARCH 14-15, 20071.Introductions2.Background for meeting 3.Discuss the Nuclear Regulatory Commission's (NRC's) expectations for the licensee safetyculture assessment:*Specific aspects that will be evaluated by the NRC are described in Inspection Procedure (IP) 95003 Sections 02.07, 03.07, and relevant enclosures to the IP.*Assessment team must be independent of licensee (including corporate) personnel, conducted by a third party.*All functional groups (including contractors), all management levels (including corporate) must be included with a rationale for sample selection and sizes.*Cross-walk to all 13 of NRC's safety culture components.
ARIZONA PUBLIC SERVICE COMPANY AND SYNERGY ON LICENSEE SAFETY CULTURE ASSESSMENT MARCH 14-15, 2007
*Rationale for method(s) selected and technical basis for combination of methods.
: 1. Introductions
*Technical basis for method(s) (e.g., if a survey is used, documentation of statisticalcharacteristics of survey instrum ent, survey administration protocol).*Assessment tools should consider insights from prior site safety culture assessment, other self-assessments, and NRC findings for the past two years as deserving special attention.4.Meeting closing remarks 5.Adjourn}}
: 2. Background for meeting
: 3. Discuss the Nuclear Regulatory Commissions (NRCs) expectations for the licensee safety culture assessment:
* Specific aspects that will be evaluated by the NRC are described in Inspection Procedure (IP) 95003 Sections 02.07, 03.07, and relevant enclosures to the IP.
* Assessment team must be independent of licensee (including corporate) personnel, conducted by a third party.
* All functional groups (including contractors), all management levels (including corporate) must be included with a rationale for sample selection and sizes.
* Cross-walk to all 13 of NRCs safety culture components.
* Rationale for method(s) selected and technical basis for combination of methods.
* Technical basis for method(s) (e.g., if a survey is used, documentation of statistical characteristics of survey instrument, survey administration protocol).
* Assessment tools should consider insights from prior site safety culture assessment, other self-assessments, and NRC findings for the past two years as deserving special attention.
: 4. Meeting closing remarks
: 5. Adjourn}}

Latest revision as of 21:50, 22 March 2020

Meeting with Arizona Public Service Company and Synergy Plans for Conducting a Third-Party Safety Culture Assessment at Palo Verde Generating Station
ML070680073
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/09/2007
From: Markley M
NRC/NRR/ADRO/DORL/LPLIV
To: Terao D
NRC/NRR/ADRO/DORL/LPLIV
Markley, M T, NRR/DORL/LP4, 301-415-5723
References
FOIA/PA-2007-0157
Download: ML070680073 (5)


Text

March 9, 2007 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing FROM: Michael T. Markley, Project Manager /RA/

Plant Licensing Branch IV Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING CLOSED MEETING WITH ARIZONA PUBLIC SERVICE COMPANY AND SYNERGY DATE & TIME: Wednesday, March 14, 2007 12:30 p.m. to 5:00 p.m.

Thursday, March 15, 2007 8:00 a.m. to 11:30 a.m.

LOCATION: U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike, Room T-7A1 Rockville, Maryland PURPOSE: To discuss Arizona Public Service Company (APS) plans for conducting a third-party safety culture assessment at the Palo Verde Nuclear Generating Station, as described in NRC Inspection Procedure 95003, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs, or One Red Input

[Agencywide Document Access and Management System Accession No. ML062970393]

CATEGORY: This meeting is closed to the public in its entirety to discuss proprietary information about the licensees safety culture assessment and methodology.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR), Office of Enforcement (OE), Office of Nuclear Regulatory Research (RES), and Region IV.

NRC APS Synergy V. Barnes, RES M. Markley, NRR J. Copsey J. Guilbert J. Cai, NRR M. Keefe, RES S. Bauer H. Levin R. Gramm, NRR T. Pruett, Region IV G. Werner, Region IV, et al.

Docket Nos. STN 50-528, STN 50-529, and STN 50-530

Enclosure:

Agenda (ADAMS Accession No. ML070680073) cc w/encl: See next page MEETING CONTACTS: M. Markley, NRR M. Fields, NRR 301-415-5723 301-415-3062 mtm@nrc.gov mbf1@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002

ML070680073) cc w/encl: See next page MEETING CONTACTS: M. Markley, NRR M. Fields, NRR 301-415-5723 301-415-3062 mtm@nrc.gov mbf1@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002 DISTRIBUTION PUBLIC RidsNrrDorlLpl4 RidsRgn4MailCenter (TPruett)

LPLIV r/f RidsNrrLAJBurkhardt VBarnes, RES RidsAcrsAcnwMailCenter RidsNrrPMMFields RGramm, DIRS/IP RidsNrrAdro RidsNrrPMMMarkley JCai, DIRS/IO RidsNrrDorl RidsOgcRp MKeefe, RES RidsOpaMail TLiu, NRR VDricks, OPA RIV Receptionist (OWFN & GWerner, RIV DCullison, EDO RIV TWFN)

ADAMS Accession No: ML070680073 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME MMarkley LFeizollahi DTerao DATE 3/9/07 3/9/07 3/9/07 Palo Verde Nuclear Generating Station cc:

Mr. Steve Olea Mr. John Taylor Arizona Corporation Commission Public Service Company of New Mexico 1200 W. Washington Street 2401 Aztec NE, MS Z110 Phoenix, AZ 85007 Albuquerque, NM 87107-4224 Mr. Douglas Kent Porter Mr. Geoffrey M. Cook Senior Counsel Southern California Edison Company Southern California Edison Company 5000 Pacific Coast Hwy Bldg N50 Law Department, Generation Resources San Clemente, CA 92672 P.O. Box 800 Rosemead, CA 91770 Mr. Robert Henry Salt River Project Senior Resident Inspector 6504 East Thomas Road U.S. Nuclear Regulatory Commission Scottsdale, AZ 85251 P.O. Box 40 Buckeye, AZ 85326 Mr. Jeffrey T. Weikert Assistant General Counsel Regional Administrator, Region IV El Paso Electric Company U.S. Nuclear Regulatory Commission Mail Location 167 Harris Tower & Pavillion 123 W. Mills 611 Ryan Plaza Drive, Suite 400 El Paso, TX 79901 Arlington, TX 76011-8064 Mr. John Schumann Chairman Los Angeles Department of Water & Power Maricopa County Board of Supervisors Southern California Public Power Authority 301 W. Jefferson, 10th Floor P.O. Box 51111, Room 1255-C Phoenix, AZ 85003 Los Angeles, CA 90051-0100 Mr. Aubrey V. Godwin, Director Mr. Brian Almon Arizona Radiation Regulatory Agency Public Utility Commission 4814 South 40 Street William B. Travis Building Phoenix, AZ 85040 P.O. Box 13326 1701 North Congress Avenue Mr. Scott Bauer, Acting General Manager Austin, TX 78701-3326 Regulatory Affairs and Performance Improvement Ms. Karen O'Regan Palo Verde Nuclear Generating Station Environmental Program Manager Mail Station 7636 City of Phoenix P.O. Box 52034 Office of Environmental Programs Phoenix, AZ 85072-2034 200 West Washington Street Phoenix AZ 85003 Mr. Matthew Benac Assistant Vice President Mr. Randall K. Edington Nuclear & Generation Services Senior Vice President, Nuclear El Paso Electric Company Mail Station 7602 340 East Palm Lane, Suite 310 Arizona Public Service Company Phoenix, AZ 85004 P. O. Box 52034 Phoenix, AZ 85072-2034 WORKING-LEVEL MEETING WITH

ARIZONA PUBLIC SERVICE COMPANY AND SYNERGY ON LICENSEE SAFETY CULTURE ASSESSMENT MARCH 14-15, 2007

1. Introductions
2. Background for meeting
3. Discuss the Nuclear Regulatory Commissions (NRCs) expectations for the licensee safety culture assessment:
  • Specific aspects that will be evaluated by the NRC are described in Inspection Procedure (IP) 95003 Sections 02.07, 03.07, and relevant enclosures to the IP.
  • Assessment team must be independent of licensee (including corporate) personnel, conducted by a third party.
  • All functional groups (including contractors), all management levels (including corporate) must be included with a rationale for sample selection and sizes.
  • Cross-walk to all 13 of NRCs safety culture components.
  • Rationale for method(s) selected and technical basis for combination of methods.
  • Technical basis for method(s) (e.g., if a survey is used, documentation of statistical characteristics of survey instrument, survey administration protocol).
  • Assessment tools should consider insights from prior site safety culture assessment, other self-assessments, and NRC findings for the past two years as deserving special attention.
4. Meeting closing remarks
5. Adjourn