ML18038B386: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/04/1995
| issue date = 08/04/1995
| title = LER 95-002-00:on 950710,DG 3D Auto Started Due to Personnel Error.Work Was Stopped & DGs Shut Down
| title = LER 95-002-00:on 950710,DG 3D Auto Started Due to Personnel Error.Work Was Stopped & DGs Shut Down
| author name = JONES W C
| author name = Jones W
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NRC FORH    366                                      .S. NUCLEAR REGULATORY      C(sall SSION                ROVED BY  (NB NO. 3150-0104 (5-92)                                                                                                              EXPIRES  5/31/95 ESTIHATED BURDEN PER RESPONSE. TO COMPLY HITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS ~
LICENSEE EVENT REPORT                        (LER)'                        FORNARD COMHEHTS REGARDING BURDEN ESTIHATE TO THE IMFORHATIOH AMD RECORDS MAMAGEHEHT BRANCH (MMBB 7714) ~ U.ST NUCLEAR REGULATORY COHHISSIOH, (See reverse    for required nutter of digits/characters for          each  block)        NASHIHGTOH, DC 20555 0001 REDUCTION    PROJECT AMD TO THE PAPERMORK (3140 0104),    OFFICE      OF HAMAGEHEMT AMD BUDGET      UASHIMGTOM    DC  20503.
FACILITY NAHE    (1)                                                                          DOCKET  INNER    (2)                          PAGE  (3)
Browns      Ferry Nuclear Plant              (BFN)    Unit    3                                      05000296                        1OFS TITLE  (4) DIESEL GENERATOR AUTO START DUE TO PERSONNEL ERROR EVENT DATE    5                    LER IRNBER    6                REP(NIT DATE      7                OTHER  FACILITIES INVOLVED 8 SEQUENT I AL      REVISION                              FACILITY NAHE                      DOCKET HUHBER HOMTH      DAY      YEAR      YEAR.                                  HOMTH      DAY    YEAR  NA HUHBER          MUHBER FACILITY MAHE                      DOCKET MUHBER 07      10        95        95          002              00        08        04            NA OPERATING                THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10            CFR:      Check. one  or more    11 M(X)E  (9)        N          20.402(b)                          20.405(c)                      X 50.73(a)(2)(iv)                  73.71(b)
POMER                    20.405(a)(1)(i)                      50.36(c)(1)                        50.73(a)(2)(v)                73.71 (c)
LEVEL  (10)      000        20.405(a)(1)(ii)                    50.36(c)(2)                        50.73(a)(2)(vii)              OTHER 20.405(a)(1)(iii)                    50.73(a)(2)(i)                      50.73(a)(2)(viii)(A) (Specify in 20.405(a)(1)(iv)                    50.73(a)(2)(ii)                    50.73(a)(2)(viii)(B) Abstract and in Text, below 20.405(a)(1)(v)                      50.73(a)(2)(iii)                    50.73(a)(2)(x)            MRC  Form 366A LICEMSEE C(NITACT FOR THIS LER        12 NAHE                                                                                                    TELEPHONE MUHBER    (Include Area    Code)
William      C. Jones,        Compliance Licensing Engineer                                            (205)729-7857 DNPLETE ONE LINE    FOR EACH CXNPONENT    FAILURE DESCRIBED IN THIS REP(NIT        13 SYS                                        REPORTABLE                                                                            REPORTABLE CAUSE              COMPONENT        HAMUFACTURER                                  CAUSE      SYSTEH      COMPONENT      MANUFACTURER TEH                                          TO NPRDS                                                                              TO MPRDS
                                                                    < XV<p~ig.'.
SUPPLHKNTAL REPORT EXPECTED        14                                      EXPECTED              HOMTH      DAY      'EAR YES                                                                                              SUBMISSION (If yes,  complete    EXPECTED SUBHISSIOH DATE).                                                DATE (15)
ABSTRACT    (Limit to    1400 spaces,  i.e.,  approximately    15 single-spaced typewritten lines)          (16)
On    July 10, 1995, at 1446 hours, diesel generator (DG) 3D auto started, and at approximately 1447 hours, DGs 3A, 3B, and 3C auto started during the performance of wire lifts conducted to facilitate testing of the Emergency Core Cooling System logic. During the wire lifts, an electri.cian shorted two relay terminals with a pair of pliers. At the time of this event, Unit 3 was defueled and in a long-term outage. Unit 2 was operating at 100 percent power, and Unit 1 was shutdown and defueled. This event was caused by personnel error due to inattention to detail. The electrician performing the wire failed to take proper precautions while working on energized equipment (e.g.,tape ad)acent lift terminals, tape tools). Subsequent to the event the DGs were shutdown and returned to standby readiness.                This report is submitted in accordance with 10 CFR 50.73 (a)(2)(iv) as a condition that resulted in automatic actuation of an Engineered Safety Feature (ESF).
MRC FORM        (      )
  'P508100319            95080J)
PDR      ADOCK        05000296 8                              PDR
 
4l NRC FORII  366A        U.S. NUCLEAR REGULATORY COMMISSI OH                      APPROVED BY QGI NO. 3150-0104 (5-92)                                                                                    . EXP I RES - 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST:    50.0'RS.          FORWARD COMMENTS REGARDING BURDEH ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714),        U.S. NUCLEAR REGULATORY COMMISSION, LICENSEE EVENT REPORT                            'WASHINGTON, DC 20555-0001,        AHD TO THE PAPERWORK REDUCTION TEXT CONTINUATION                              PROJECT    (3150-0104), OFFICE OF MANAGENENT AHD BUDGET, WASHINGTON DC 20503 FACILITY NAME  (1)              DOCKET NUMBER (2)                    LER NINIBER (6)                    PAGE (3)
YEAR      SEQUENTIAL            REVISION NUHBER              NUMBER Browns      Ferry Unit      3                05000296              95          002                    00              2  of 5 TEX'I  If more  s  ce is r uired    use additional co ies of  NRC  Form 366A    (17)
I ~    PLANT CONDITIONS At the time this event occurred, Unit 3 and Unit                            1  were shutdown and defueled. Unit 2 was at 100 percent power.
DESCRIPTION OF EVENT A.      Event At 1446 hours Central Standard Time (CST) on July 10, 1995/
diesel'enerator (DG) 3D (EK) auto started during the performance of wire lifts conducted to facilitate testing of the Emergency Core Cooling System Logic [JE). The event occurred when an electrician (contractor, non-licensed) was performing a wire    lift  on a relay [RLY) terminal and the electrician's pliers came in contact with an adjacent terminal.                          The initial contact caused partial closure of the relay contacts resulting in the auto start of the 3D DG. At 1447 hours CST, the pliers again contacted the adjacent terminal causing complete closure of the relay contacts resulting in the auto start of the 3A, 3B, and 3C DGs.
The    Assistant Shift Operations Supervisor (ASOS) (utility, licensed) immediately notified personnel in the Auxiliary Instrument Room to stop activities associated with the wire lifts. At 1523 hours the DGs were shutdown and returned to standby readiness.
This event is reportable in accordance with 10 CFR 50.73 (a)(2)(iv) as a condition that resulted in an automatic actuation of an ESF.
B.      Ino erable Structures Com onents or S stems that Contributed to the Event:
None.
Co      Dates and      A    roximate Times of          Ma  or Occurrences:
July 10, 1995 at 1446 hours        CST          3D DG      auto started at 1447 hours        CST          3A, 3B,      & 3C DG    auto started at 1523 hours        CST          Unit    3 DGs    shutdown and returned to standby readiness
 
NRC FORM  366A        U.S. NUCLEAR REGULATORY COMMISSION                            APPROVED BY  (His NO. 3150-0104 (5-92)                                                                                      EXPIRES  5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTIOH REQUEST: 50.0 HRS ~        FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714),      U.S. NUCLEAR REGULATORY COMMISSION/
LICENSEE EVENT REPORT                                WASHINGTON, DC 20555-0001,      AND TO THE PAPERWORK REDUCTIOH TEXT'ONTINUATION                                  PROJECT  (3150-0104), OFFICE OF MANAGEMENT AHD BUDGETS WASHINGTON  DC  20503 FACILITY NAME (1)              DOCKET NIH(BER  (2)                    LER NQ(BER  (6)                PAGE (3)
YEAR      SEQUENTIAL          REVISION NUMBER            NUMBER Browns    Ferry Unit      3                  05000296                95            002                00              3  of 5 TEXT  lf more s  ce is re uired use additional      co ies  of  NRC  Form 366A    (17) at  1607 hours CST                    TVA    provided      a 10 CFR      50.72    (b)(2)(ii) notification to          NRC  Operations Center D~      Other    S  stems  or Secondar            Functions Affected:
None.
E~      Method      of Discover
                        'Thi's condition was discovered                  when    the Unit Operator            (UO)
(utility,        licensed] received alarms                (ALM) and auto started.
indicators that the 3A, 3B, 3C, and            3D DGs had F~      0 erator Actions:
When    the UO observed the alarms, the ASOS immediately notified personnel in the Auxiliary Instrument'oom to stop activities associated with the wire                lift.
G~      Safet      S  stem Res onses:
The    safety systems responded                as designed      for this type of event.
CAUSE OF THE EVENT A.      Immediate Cause:
The immediate cause            of the event was the inadvertent contact of pliers      between two      relay terminals. This short simulated an accident signal resulting in the auto start of the Unit 3 DGs.
B~      Root Cause:
The cause        of this event was personnel error due to inattention to detail.          During the performance of a wire an electrical panel, the electrician's pliers inadvertently lift    on a relay in contacted an adjacent terminal. Although the area inside the electrical panel was cramped, the electrician should have taken additional precautions while working on energized equipment (e.g., tape adjacent terminals, tape tools):
C~      Contributin Factors:
None.
 
0 NRC FORH  366A        U.S. NUCLEAR REGULATORY COMHISSIOH                            APPROVED BY (NQ NO. 3150-0104 (5-92)                                                                                      EXPIRES  5/31/95 ESTIMATED BURDEH PER RESPONSE TO COHPLY WITH THIS INFORHATIOH COLLECTION REOUEST: 50.0 HRS.        FORWARD CONHENTS REGARDIHG BURDEN EST IHATE TO THE INFORHAT I ON AND RECORDS NANAGEHEHT LICENSEE EVENT REPORT                              BRANCH (MNBB 7714),      U.S. NUCLEAR REGULATORY CONHISSION ~
WASHINGTON, DC 20555-0001,      AND TO,THE PAPERWORK REDUCTION TEXT CONTINUATION                                PROJECT    (3150-0104), OFFICE OF HANAGENENT AND BUDGETS
                                                                  'WASHINGTON  DC  20503 FACILITY NAHE (1)              DOCKET N(MBER  (2)                    LER NQIBER  (6)                PAGE (3)
                                                                    'YEAR      SEQUENTIAL        REVISION NUHBER            NUHBER Browns Ferry      Unit    3                  05000296                95            002              00              4  of 5 TEXT  If more s ace is r uired    use  additional  co ies  of 'NRC  Form 366A    (17)
IV.      ANALYSIS OF THE EVENT The DGs are designed            to auto start when an accident signal is received. In"this event, the auto start of the DGs was a successful completion of the designed function. Operations personnel immediately identified the cause of the ESF actuation and took appropriate corrective actions to restore the DGs to standby readiness.
Therefore, this event did not affect the health and safety of plant
                ,personnel or the public.
V ~    CORRECTIVE ACTIONS A~      Immediate Corrective Actions:
The work was stopped and                the    DGs  were shutdown.
B~      Corrective Actions to Prevent Recurrence:
The  electrician was counseled to further emphasize the need to take necessary precautions when working on energized equipment and to develop a questioning attitude prior to performing work.
VI.,    ADDITIONAL INFORMATION A.      Failed    Com    onents:
None.
B.      Previous        LERs on    Similar Events:
There have been several LERs written to document unplanned DG autostarts. Three of these LERs (i.e., 259/89014, 259/91004/
and 296/91003) occurred as a result of personnel error.
In LER 259/89014, the individual allowed a wire to contact another energized, terminal during performance of an SI. The corrective action was to revise the SI to include a precautionary note to insulate adjacent terminals prior to lifting wires.
 
4l I
 
NRC FORM  366A        U.S    NUCLEAR REGULATORY COIOIISSIOH                      APPROVED BY CKB NO. 3150-0104 (5-92)                                                                                  EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS IHFORHATION, COLLECTION REQUEST: 50.0 MRS'ORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 771C),      U.S. NUCLEAR REGULATORY COMMISSIOH, LICENSEE EVENT REPORT                          WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTION TEXT CONTINUATION                            PROJECT  (3150 0104), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON  DC  20503 FACILITY NAME (1)            DOCKET NINBER  '(2)                LER NWER    (6)                PAGE (3)
YEAR      SEQUENTIAL        REVISION NUMBER            NUMBER Browns    Ferry'Unit      3                05000296            95            002              00              5  of 5 TEXT  If more s ace is re    ired use additionaI  co ies of HRC  Form 366A    (17)
In LER 259/91004, the individual placed the wrong keylock switch in the test position. The corrective actions were to install larger identification labels to assist individuals in identifying the correct component.
In LER 296/91003, the individual did not properly install an inhibiting boot during the performance of an SI. The corrective actions were to train .maintenance personnel on the proper installation of boots.
Only LER 296/91003 is similar to this event. However, the previous corrective actions for this LER would not have precluded      this event.
VII  ~    COMMITMENTS None.
Energy Industry          Identification System (EIIS) system                  and component codes are identified in the text with brackets (e.g., [XX].
 
4l 4I}}

Latest revision as of 23:26, 21 October 2019

LER 95-002-00:on 950710,DG 3D Auto Started Due to Personnel Error.Work Was Stopped & DGs Shut Down
ML18038B386
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 08/04/1995
From: William Jones
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18038B385 List:
References
LER-95-002-03, LER-95-2-3, NUDOCS 9508100319
Download: ML18038B386 (10)


Text

NRC FORH 366 .S. NUCLEAR REGULATORY C(sall SSION ROVED BY (NB NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPONSE. TO COMPLY HITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS ~

LICENSEE EVENT REPORT (LER)' FORNARD COMHEHTS REGARDING BURDEN ESTIHATE TO THE IMFORHATIOH AMD RECORDS MAMAGEHEHT BRANCH (MMBB 7714) ~ U.ST NUCLEAR REGULATORY COHHISSIOH, (See reverse for required nutter of digits/characters for each block) NASHIHGTOH, DC 20555 0001 REDUCTION PROJECT AMD TO THE PAPERMORK (3140 0104), OFFICE OF HAMAGEHEMT AMD BUDGET UASHIMGTOM DC 20503.

FACILITY NAHE (1) DOCKET INNER (2) PAGE (3)

Browns Ferry Nuclear Plant (BFN) Unit 3 05000296 1OFS TITLE (4) DIESEL GENERATOR AUTO START DUE TO PERSONNEL ERROR EVENT DATE 5 LER IRNBER 6 REP(NIT DATE 7 OTHER FACILITIES INVOLVED 8 SEQUENT I AL REVISION FACILITY NAHE DOCKET HUHBER HOMTH DAY YEAR YEAR. HOMTH DAY YEAR NA HUHBER MUHBER FACILITY MAHE DOCKET MUHBER 07 10 95 95 002 00 08 04 NA OPERATING THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR: Check. one or more 11 M(X)E (9) N 20.402(b) 20.405(c) X 50.73(a)(2)(iv) 73.71(b)

POMER 20.405(a)(1)(i) 50.36(c)(1) 50.73(a)(2)(v) 73.71 (c)

LEVEL (10) 000 20.405(a)(1)(ii) 50.36(c)(2) 50.73(a)(2)(vii) OTHER 20.405(a)(1)(iii) 50.73(a)(2)(i) 50.73(a)(2)(viii)(A) (Specify in 20.405(a)(1)(iv) 50.73(a)(2)(ii) 50.73(a)(2)(viii)(B) Abstract and in Text, below 20.405(a)(1)(v) 50.73(a)(2)(iii) 50.73(a)(2)(x) MRC Form 366A LICEMSEE C(NITACT FOR THIS LER 12 NAHE TELEPHONE MUHBER (Include Area Code)

William C. Jones, Compliance Licensing Engineer (205)729-7857 DNPLETE ONE LINE FOR EACH CXNPONENT FAILURE DESCRIBED IN THIS REP(NIT 13 SYS REPORTABLE REPORTABLE CAUSE COMPONENT HAMUFACTURER CAUSE SYSTEH COMPONENT MANUFACTURER TEH TO NPRDS TO MPRDS

< XV<p~ig.'.

SUPPLHKNTAL REPORT EXPECTED 14 EXPECTED HOMTH DAY 'EAR YES SUBMISSION (If yes, complete EXPECTED SUBHISSIOH DATE). DATE (15)

ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) (16)

On July 10, 1995, at 1446 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.50203e-4 months <br />, diesel generator (DG) 3D auto started, and at approximately 1447 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.505835e-4 months <br />, DGs 3A, 3B, and 3C auto started during the performance of wire lifts conducted to facilitate testing of the Emergency Core Cooling System logic. During the wire lifts, an electri.cian shorted two relay terminals with a pair of pliers. At the time of this event, Unit 3 was defueled and in a long-term outage. Unit 2 was operating at 100 percent power, and Unit 1 was shutdown and defueled. This event was caused by personnel error due to inattention to detail. The electrician performing the wire failed to take proper precautions while working on energized equipment (e.g.,tape ad)acent lift terminals, tape tools). Subsequent to the event the DGs were shutdown and returned to standby readiness. This report is submitted in accordance with 10 CFR 50.73 (a)(2)(iv) as a condition that resulted in automatic actuation of an Engineered Safety Feature (ESF).

MRC FORM ( )

'P508100319 95080J)

PDR ADOCK 05000296 8 PDR

4l NRC FORII 366A U.S. NUCLEAR REGULATORY COMMISSI OH APPROVED BY QGI NO. 3150-0104 (5-92) . EXP I RES - 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST: 50.0'RS. FORWARD COMMENTS REGARDING BURDEH ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714), U.S. NUCLEAR REGULATORY COMMISSION, LICENSEE EVENT REPORT 'WASHINGTON, DC 20555-0001, AHD TO THE PAPERWORK REDUCTION TEXT CONTINUATION PROJECT (3150-0104), OFFICE OF MANAGENENT AHD BUDGET, WASHINGTON DC 20503 FACILITY NAME (1) DOCKET NUMBER (2) LER NINIBER (6) PAGE (3)

YEAR SEQUENTIAL REVISION NUHBER NUMBER Browns Ferry Unit 3 05000296 95 002 00 2 of 5 TEX'I If more s ce is r uired use additional co ies of NRC Form 366A (17)

I ~ PLANT CONDITIONS At the time this event occurred, Unit 3 and Unit 1 were shutdown and defueled. Unit 2 was at 100 percent power.

DESCRIPTION OF EVENT A. Event At 1446 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.50203e-4 months <br /> Central Standard Time (CST) on July 10, 1995/

diesel'enerator (DG) 3D (EK) auto started during the performance of wire lifts conducted to facilitate testing of the Emergency Core Cooling System Logic [JE). The event occurred when an electrician (contractor, non-licensed) was performing a wire lift on a relay [RLY) terminal and the electrician's pliers came in contact with an adjacent terminal. The initial contact caused partial closure of the relay contacts resulting in the auto start of the 3D DG. At 1447 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.505835e-4 months <br /> CST, the pliers again contacted the adjacent terminal causing complete closure of the relay contacts resulting in the auto start of the 3A, 3B, and 3C DGs.

The Assistant Shift Operations Supervisor (ASOS) (utility, licensed) immediately notified personnel in the Auxiliary Instrument Room to stop activities associated with the wire lifts. At 1523 hours0.0176 days <br />0.423 hours <br />0.00252 weeks <br />5.795015e-4 months <br /> the DGs were shutdown and returned to standby readiness.

This event is reportable in accordance with 10 CFR 50.73 (a)(2)(iv) as a condition that resulted in an automatic actuation of an ESF.

B. Ino erable Structures Com onents or S stems that Contributed to the Event:

None.

Co Dates and A roximate Times of Ma or Occurrences:

July 10, 1995 at 1446 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.50203e-4 months <br /> CST 3D DG auto started at 1447 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.505835e-4 months <br /> CST 3A, 3B, & 3C DG auto started at 1523 hours0.0176 days <br />0.423 hours <br />0.00252 weeks <br />5.795015e-4 months <br /> CST Unit 3 DGs shutdown and returned to standby readiness

NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY (His NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTIOH REQUEST: 50.0 HRS ~ FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714), U.S. NUCLEAR REGULATORY COMMISSION/

LICENSEE EVENT REPORT WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTIOH TEXT'ONTINUATION PROJECT (3150-0104), OFFICE OF MANAGEMENT AHD BUDGETS WASHINGTON DC 20503 FACILITY NAME (1) DOCKET NIH(BER (2) LER NQ(BER (6) PAGE (3)

YEAR SEQUENTIAL REVISION NUMBER NUMBER Browns Ferry Unit 3 05000296 95 002 00 3 of 5 TEXT lf more s ce is re uired use additional co ies of NRC Form 366A (17) at 1607 hours0.0186 days <br />0.446 hours <br />0.00266 weeks <br />6.114635e-4 months <br /> CST TVA provided a 10 CFR 50.72 (b)(2)(ii) notification to NRC Operations Center D~ Other S stems or Secondar Functions Affected:

None.

E~ Method of Discover

'Thi's condition was discovered when the Unit Operator (UO)

(utility, licensed] received alarms (ALM) and auto started.

indicators that the 3A, 3B, 3C, and 3D DGs had F~ 0 erator Actions:

When the UO observed the alarms, the ASOS immediately notified personnel in the Auxiliary Instrument'oom to stop activities associated with the wire lift.

G~ Safet S stem Res onses:

The safety systems responded as designed for this type of event.

CAUSE OF THE EVENT A. Immediate Cause:

The immediate cause of the event was the inadvertent contact of pliers between two relay terminals. This short simulated an accident signal resulting in the auto start of the Unit 3 DGs.

B~ Root Cause:

The cause of this event was personnel error due to inattention to detail. During the performance of a wire an electrical panel, the electrician's pliers inadvertently lift on a relay in contacted an adjacent terminal. Although the area inside the electrical panel was cramped, the electrician should have taken additional precautions while working on energized equipment (e.g., tape adjacent terminals, tape tools):

C~ Contributin Factors:

None.

0 NRC FORH 366A U.S. NUCLEAR REGULATORY COMHISSIOH APPROVED BY (NQ NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIMATED BURDEH PER RESPONSE TO COHPLY WITH THIS INFORHATIOH COLLECTION REOUEST: 50.0 HRS. FORWARD CONHENTS REGARDIHG BURDEN EST IHATE TO THE INFORHAT I ON AND RECORDS NANAGEHEHT LICENSEE EVENT REPORT BRANCH (MNBB 7714), U.S. NUCLEAR REGULATORY CONHISSION ~

WASHINGTON, DC 20555-0001, AND TO,THE PAPERWORK REDUCTION TEXT CONTINUATION PROJECT (3150-0104), OFFICE OF HANAGENENT AND BUDGETS

'WASHINGTON DC 20503 FACILITY NAHE (1) DOCKET N(MBER (2) LER NQIBER (6) PAGE (3)

'YEAR SEQUENTIAL REVISION NUHBER NUHBER Browns Ferry Unit 3 05000296 95 002 00 4 of 5 TEXT If more s ace is r uired use additional co ies of 'NRC Form 366A (17)

IV. ANALYSIS OF THE EVENT The DGs are designed to auto start when an accident signal is received. In"this event, the auto start of the DGs was a successful completion of the designed function. Operations personnel immediately identified the cause of the ESF actuation and took appropriate corrective actions to restore the DGs to standby readiness.

Therefore, this event did not affect the health and safety of plant

,personnel or the public.

V ~ CORRECTIVE ACTIONS A~ Immediate Corrective Actions:

The work was stopped and the DGs were shutdown.

B~ Corrective Actions to Prevent Recurrence:

The electrician was counseled to further emphasize the need to take necessary precautions when working on energized equipment and to develop a questioning attitude prior to performing work.

VI., ADDITIONAL INFORMATION A. Failed Com onents:

None.

B. Previous LERs on Similar Events:

There have been several LERs written to document unplanned DG autostarts. Three of these LERs (i.e., 259/89014, 259/91004/

and 296/91003) occurred as a result of personnel error.

In LER 259/89014, the individual allowed a wire to contact another energized, terminal during performance of an SI. The corrective action was to revise the SI to include a precautionary note to insulate adjacent terminals prior to lifting wires.

4l I

NRC FORM 366A U.S NUCLEAR REGULATORY COIOIISSIOH APPROVED BY CKB NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS IHFORHATION, COLLECTION REQUEST: 50.0 MRS'ORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 771C), U.S. NUCLEAR REGULATORY COMMISSIOH, LICENSEE EVENT REPORT WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTION TEXT CONTINUATION PROJECT (3150 0104), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON DC 20503 FACILITY NAME (1) DOCKET NINBER '(2) LER NWER (6) PAGE (3)

YEAR SEQUENTIAL REVISION NUMBER NUMBER Browns Ferry'Unit 3 05000296 95 002 00 5 of 5 TEXT If more s ace is re ired use additionaI co ies of HRC Form 366A (17)

In LER 259/91004, the individual placed the wrong keylock switch in the test position. The corrective actions were to install larger identification labels to assist individuals in identifying the correct component.

In LER 296/91003, the individual did not properly install an inhibiting boot during the performance of an SI. The corrective actions were to train .maintenance personnel on the proper installation of boots.

Only LER 296/91003 is similar to this event. However, the previous corrective actions for this LER would not have precluded this event.

VII ~ COMMITMENTS None.

Energy Industry Identification System (EIIS) system and component codes are identified in the text with brackets (e.g., [XX].

4l 4I