ML18038B384
| ML18038B384 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/04/1995 |
| From: | Machon R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18038B385 | List: |
| References | |
| NUDOCS 9508100315 | |
| Download: ML18038B384 (6) | |
Text
(ACCELERATED RZDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION DBR:9508100315 DOC.DATE: 95/08/04 NOTARIZED: NO DOCKET FACIL:50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 p
AUTH.NAME AUTHOR AFFILIATION MACHON,R.D.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION R
Document Control Branch (Document Control Desk)
SUBJECT:
Forwards LER 95-002 re auto start of Unit 3 DGs.
DISTRIBUTION CODE:
ZE22T COPIES RECEIVED:LTR Q ENCL Q SIZE:
+ 9 TITLE: 50.73/50.9 Licensee Event Report (LER), Xnciden&Rpt, etc.
NOTES:
RECIPIENT XD CODE/NAME PD2-3-PD INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB'RR/DE/EMEB NRR/DOPS/OECB NRR/DRCH/HICB NRR/DSSA/S PLB NRR/DSSA/SRXB RGN2 FILE 01 EXTERNAL: L ST LOBBY WARD NOAC MURPHYi G A NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1.
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME WILLIAMS,J.
AEOD/SPD/
B CENTER NHR/DEYEELB NRR/DISP/PIPB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DSSA/SPSB/B RES/DSIR/EIB LITCO BRYCE,J H
NOAC POORE,W.
NUDOCS FULL TXT COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 2
2 1
1 1
1 D
0 NOTE TO ALL HRZDS RECIPIENTS PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON>T NEED!
FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED:
LTTR 27 ENCL 27
Tennessee Va".ey Atrtttorny, Post 0!fee Box 2000. Decatu., Atabarna 35609.2000 R. D. (Rick) Machon Vce Pres!dent, Browns Ferry Nuctear Plan!
August 4, 1995 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555
Dear Sir:
10 CFR 50.73 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1i 2i AND 3 DOCKET NOS 50-259i 50-260'ND 50-296 - FACILITY OPERATING L'ICENSE DPR-33i 52'ND 68 - LICENSEE EVENT REPORT 50-296/95002 The enclosed report provides details concerning the auto start of the Unit 3 diesel generators.
This event resulted from personnel error during performance of wire lifts associated with establishing separation boundaries to facilitate testing on Division I Emergency Core Cooling System Logic.
This report is submitted in accordance with 10 CFR 50.73 (a)(2)(iv) as a condition that resulted in automatic actuation of an Engineered Safety Feature.
Sincerely;///4P~
R.
D.
M on Site Vi e President Enclosure cc See page 2
V~ g 95081003i5 950804 PDR ADDCK 05000296 8
U.S. Nuclear Regulatory Commission Page
'2 August 4, 1995 Enclosure cc (Enclosure):
INPO Records Center 700 Gal'leria Parkway Atlanta, Georgia 30339 Paul Krippner American Nuclear Insurers Town Center, Suite 300S 29 South Main Street West Hartford, Connecticut 06107 NRC Resident Inspector'rowns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J.
F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852
I