(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 09/01/1992 | | | issue date = 09/01/1992 |
| | title = Access Denied to NRC Inspectors at Five Star Products, Inc. and Construction Products Research, Fairfield, Connecticut | | | title = Access Denied to NRC Inspectors at Five Star Products, Inc. and Construction Products Research, Fairfield, Connecticut |
| | author name = Rossi C E | | | author name = Rossi C |
| | author affiliation = NRC/NRR | | | author affiliation = NRC/NRR |
| | addressee name = | | | addressee name = |
Line 14: |
Line 14: |
| | page count = 8 | | | page count = 8 |
| }} | | }} |
| {{#Wiki_filter:II UNITED STATES NUCLEAR REGULATORY | | {{#Wiki_filter:II |
|
| |
|
| COMMISSION
| | UNITED STATES |
|
| |
|
| ===OFFICE OF NUCLEAR REACTOR REGULATION===
| | NUCLEAR REGULATORY COMMISSION |
| WASHINGTON, D.C. 20555 September
| |
|
| |
|
| 1, 1992 NRC INFORMATION
| | OFFICE OF NUCLEAR REACTOR REGULATION |
|
| |
|
| NOTICE 92-66: ACCESS-DENIED | | WASHINGTON, D.C. 20555 September 1, 1992 NRC INFORMATION NOTICE 92-66: ACCESS-DENIED TO NRC INSPECTORS AT FIVE STAR |
|
| |
|
| TO NRC INSPECTORS
| | PRODUCTS, INC. AND CONSTRUCTION PRODUCTS |
|
| |
|
| AT FIVE STAR PRODUCTS, INC. AND CONSTRUCTION
| | RESEARCH, FAIRFIELD, CONNECTICUT |
| | |
| ===PRODUCTS RESEARCH, FAIRFIELD, CONNECTICUT===
| |
|
| |
|
| ==Addressees== | | ==Addressees== |
| All holders of operating | | All holders of operating licenses or construction permits for nuclear power |
| | |
| licenses or construction | |
| | |
| permits for nuclear power reactors and all recipients | |
| | |
| of NUREG-0040, "Licensee, Contractor
| |
|
| |
|
| and Vendor Inspection | | reactors and all recipients of NUREG-0040, "Licensee, Contractor and Vendor |
|
| |
|
| Status Report" (White Book). | | Inspection Status Report" (White Book). |
|
| |
|
| ==Purpose== | | ==Purpose== |
| The U.S. Nuclear Regulatory | | The U.S. Nuclear Regulatory Commission (NRC) is issuing this information |
|
| |
|
| Commission (NRC) is issuing this information
| | notice to alert addressees to the NRC's concern that Five Star Products, Incorporated (Five Star), and its laboratory contractor, Construction Products |
|
| |
|
| notice to alert addressees
| | test |
|
| |
|
| to the NRC's concern that Five Star Products, Incorporated (Five Star), and its laboratory
| | Research (CPR), denied NRC inspectors necessary access to the contracted |
|
| |
|
| contractor, Construction
| | laboratory and test data for grout and concrete mix products. It is expected |
|
| |
|
| Products Research (CPR), denied NRC inspectors
| | that recipients will review this information and consider actions, as- are |
|
| |
|
| necessary
| | appropriate. However, suggestions contained in this information notice is |
|
| |
|
| access to the contracted
| | not NRC requirements; therefore, no specific action or written response |
|
| |
|
| test laboratory
| | required. |
|
| |
|
| and test data for grout and concrete mix products.
| | ==Description of Circumstances== |
| | On Tuesday, August 18, 1992, NRC inspectors arrived at the Five Star facility, located at Fairfield, Connecticut, to conduct an inspection pursuant to the |
|
| |
|
| It is expected that recipients
| | provisions of Section 21.41, "Inspection," of Title 10 of the Code of Federal |
|
| |
|
| will review this information
| | Regulations, Part 21 (10 CFR Part 21). The NRC promulgated 10 CFR Part 21 under the authority of Section 206 of the Energy Reorganization Act of 1974, |
| | 42 U.S.C. 5846, and Sections 161b and 161o of the Atomic Energy Act of 1954, as amended, (42 U.S.C. 2201(b) and 2201(o)). Section 21.41 authorizes NRC for |
|
| |
|
| and consider actions, as-appropriate.
| | inspections of facilities supplying "basic components," or parts thereof, commercial nuclear power plants as that term is defined in 10 CFR Part 21. |
|
| |
|
| However, suggestions
| | Five Star supplies grout and concrete mix materials, tested at its facility by |
|
| |
|
| contained
| | CPR, to the commercial nuclear industry. Five Star certifies these materials |
|
| |
|
| in this information | | as being manufactured and controlled in accordance with the requirements of |
|
| |
|
| notice are not NRC requirements;
| | Appendix B to 10 CFR Part 50. |
| therefore, no specific action or written response is required.Description
| |
|
| |
|
| of Circumstances
| | 2Ar |
|
| |
|
| On Tuesday, August 18, 1992, NRC inspectors
| | 9209010039 |
| | _7DA\A) |
|
| |
|
| arrived at the Five Star facility, located at Fairfield, Connecticut, to conduct an inspection
| | ill |
|
| |
|
| pursuant to the provisions
| | IN 92-66 September 1, 1992 On Tuesday, August 18, 1992, and Wednesday, August |
|
| |
|
| of Section 21.41, "Inspection," of Title 10 of the Code of Federal Regulations, Part 21 (10 CFR Part 21). The NRC promulgated
| | 19, 1992, the NRC |
|
| |
|
| 10 CFR Part 21 under the authority
| | inspectors were denied access necessary for an |
|
| |
|
| of Section 206 of the Energy Reorganization
| | inspection of the CPR test |
|
| |
|
| Act of 1974, 42 U.S.C. 5846, and Sections 161b and 161o of the Atomic Energy Act of 1954, as amended, (42 U.S.C. 2201(b) and 2201(o)).
| | laboratory and test records on the Five Star premises. |
|
| |
|
| Section 21.41 authorizes
| | 19, 1992, Five Star managers told the NRC inspectors On Wednesday, August |
|
| |
|
| NRC inspections
| | that they would not be |
|
| |
|
| of facilities | | allowed to continue the inspection as of the end |
|
| |
|
| supplying "basic components," or parts thereof, for commercial
| | of the day even though the |
|
| |
|
| nuclear power plants as that term is defined in 10 CFR Part 21.Five Star supplies grout and concrete mix materials, tested at its facility by CPR, to the commercial
| | NRC inspectors indicated that they had not completed |
|
| |
|
| nuclear industry.
| | the inspection. |
|
| |
|
| Five Star certifies
| | Discussion |
|
| |
|
| these materials as being manufactured
| | The NRC conducted this inspection to determine |
|
| |
|
| and controlled
| | the extent to which Five Star |
|
| |
|
| in accordance
| | has supplied material or services to licensed nuclear |
|
| |
|
| with the requirements
| | its quality assurance and testing programs, and plants, the adequacy of |
|
| |
|
| of Appendix B to 10 CFR Part 50.2Ar 9209010039 | | the adequacy of its products. |
| _7DA\A)
| |
| ill IN 92-66 September
| |
|
| |
|
| 1, 1992 On Tuesday, August 18, 1992, and Wednesday, August 19, 1992, the NRC inspectors
| | Purchase orders reviewed during the limited inspection |
|
| |
|
| were denied access necessary
| | licensees have purchased concrete products from indicated that |
|
| |
|
| for an inspection
| | Five Star and are invoking the |
|
| |
|
| of the CPR test laboratory | | requirements of Appendix B to 10 CFR Part 50 and |
|
| |
|
| and test records on the Five Star premises.
| | 10 CFR Part 21 on the orders |
|
| |
|
| On Wednesday, August 19, 1992, Five Star managers told the NRC inspectors
| | to Five Star. The NRC learned that licensees |
|
| |
|
| that they would not be allowed to continue the inspection
| | and licensee contractors |
|
| |
|
| as of the end of the day even though the NRC inspectors
| | auditing Five Star who requested access to CPR's |
|
| |
|
| indicated
| | test laboratory and test |
|
| |
|
| that they had not completed
| | records were denied necessary access to the test |
|
| |
|
| the inspection.
| | laboratory and records. |
|
| |
|
| Discussion
| | During the limited inspection at Five Star, the |
|
| |
|
| The NRC conducted
| | NRC inspectors found that not |
|
| |
|
| this inspection
| | all licensees purchasing from Five Star had performed |
|
| |
|
| to determine
| | Five Star. In October, 1991, a member of the implementation audits of |
|
| |
|
| the extent to which Five Star has supplied material or services to licensed nuclear plants, the adequacy of its quality assurance
| | Nuclear Utility Procurement |
|
| |
|
| and testing programs, and the adequacy of its products.Purchase orders reviewed during the limited inspection
| | Issues Council (NUPIC) performed a NUPIC audit |
|
| |
|
| indicated
| | and concluded that the Five |
|
| |
|
| that licensees
| | Star quality assurance program and its implementation |
|
| |
|
| have purchased
| | did not meet certain requirements of Appendix were unacceptable and |
|
| |
|
| concrete products from Five Star and are invoking the requirements
| | B to 10 CFR Part 50. However, |
| | ~thL-NRC-insp-ectors--determi-ned--that-some-l-fcensees-have-accepted |
|
| |
|
| of Appendix B to 10 CFR Part 50 and 10 CFR Part 21 on the orders to Five Star. The NRC learned that licensees
| | quality assurance program as meeting all applicable the-Five-Star~-- |
| | Appendix B requirements. |
|
| |
|
| and licensee contractors
| | The NRC inspectors reviewed Five Star customer |
|
| |
|
| auditing Five Star who requested
| | purchase orders for the period |
|
| |
|
| access to CPR's test laboratory
| | from 1988 to 1992 and determined that at least |
|
| |
|
| and test records were denied necessary | | seven licensees and one |
|
| |
|
| access to the test laboratory
| | licensee contractor issued purchase orders to Five |
|
| |
|
| and records.During the limited inspection | | Star for grout and concrete |
|
| |
|
| at Five Star, the NRC inspectors
| | mix products and specified compliance to Appendix |
|
| |
|
| found that not all licensees
| | B to 10 CFR Part 50 and 10 |
| | CFR Part 21. Purchasers may have accepted the |
|
| |
|
| purchasing
| | use of Five Star products upon |
|
| |
|
| from Five Star had performed
| | performing audits that did not include reviewing |
|
| |
|
| implementation
| | the test laboratory and test |
|
| |
|
| audits of Five Star. In October, 1991, a member of the Nuclear Utility Procurement
| | records. Therefore, the affected audits were not |
|
| |
|
| Issues Council (NUPIC) performed
| | quality of the Five Star products. adequate to determine the |
|
| |
|
| a NUPIC audit and concluded
| | The denial of access to NRC inspectors appears |
|
| |
|
| that the Five Star quality assurance
| | to be a willful violation of |
|
| |
|
| program and its implementation
| | Section 21.41, which permits the NRC access to |
|
| |
|
| were unacceptable
| | Five Star's records, premises, activities, and basic components as necessary to |
|
| |
|
| and did not meet certain requirements
| | effect the purposes of this |
|
| |
|
| of Appendix B to 10 CFR Part 50. However,~thL-NRC-insp-ectors--determi-ned--that-some-l-fcensees-have-accepted
| | part. Upon being denied access, the NRC could |
|
| |
|
| the-Five-Star~- | | not examine the extent and |
| -quality assurance
| |
|
| |
|
| program as meeting all applicable
| | adequacy of the products produced by Five Star |
|
| |
|
| Appendix B requirements.
| | and therefore does not have |
|
| |
|
| The NRC inspectors
| | reasonable assurance that the products produced |
|
| |
|
| reviewed Five Star customer purchase orders for the period from 1988 to 1992 and determined
| | are |
|
| |
|
| that at least seven licensees
| | safety-related applications in nuclear power plants. adequate for use in |
|
| |
|
| and one licensee contractor
| | Consequently, the NRC is |
|
| |
|
| issued purchase orders to Five Star for grout and concrete mix products and specified
| | interested in receiving any information on tests |
|
| |
|
| compliance
| | or instances of failure of |
|
| |
|
| to Appendix B to 10 CFR Part 50 and 10 CFR Part 21. Purchasers
| | Five Star products. |
|
| |
|
| may have accepted the use of Five Star products upon performing
| | I |
|
| |
|
| audits that did not include reviewing
| | IN 92-66 September 1, 1992 This information notice requires no specific action or written response. If |
|
| |
|
| the test laboratory | | you have any questions about the information in this notice, please contact |
|
| |
|
| and test records. Therefore, the affected audits were not adequate to determine
| | one of the technical contacts listed below or the appropriate NRC Office of |
|
| |
|
| the quality of the Five Star products.The denial of access to NRC inspectors
| | Nuclear Reactor Regulation (NRR) project manager. |
|
| |
|
| appears to be a willful violation
| | Charles E. Rossi, Director |
|
| |
|
| of Section 21.41, which permits the NRC access to Five Star's records, premises, activities, and basic components | | Division of Operational Events Assessment |
|
| |
|
| as necessary
| | Office of Nuclear Reactor Regulation |
|
| |
|
| to effect the purposes of this part. Upon being denied access, the NRC could not examine the extent and adequacy of the products produced by Five Star and therefore
| | Technical contacts: Robert Pettis, NRR |
|
| |
|
| does not have reasonable
| | (301) 504-3214 Stewart Magruder, NRR |
|
| |
|
| assurance
| | (301) 504-3220 |
| | Attachment: List of Recently Issued NRC Information Notices |
|
| |
|
| that the products produced are adequate for use in safety-related
| | Attachment |
|
| |
|
| applications
| | IN 92-66 September 1, 1992 Page I of I - |
| | LIST OF RECENTLY ISSUED |
|
| |
|
| in nuclear power plants. Consequently, the NRC is interested
| | NRC INFORMATION NOTICES |
|
| |
|
| in receiving
| | Information Date of |
|
| |
|
| any information
| | Notice No. Subject Issuance Issued to |
|
| |
|
| on tests or instances
| | 92-65 Safety System Problems 09/03/92 All holders of OLs or CPs |
|
| |
|
| of failure of Five Star products.
| | Caused by Modifications for nuclear power reactors. |
|
| |
|
| I IN 92-66 September
| | That Were Not Adequately |
|
| |
|
| 1, 1992 This information
| | Reviewed and Tested |
|
| |
|
| notice requires no specific action or written response.
| | 92-64 Nozzle Ring Settings 08/28/92 All holders of OLs or CPs |
|
| |
|
| If you have any questions
| | on Low Pressure Water- for nuclear power reactors. |
|
| |
|
| about the information
| | Relief Valves |
|
| |
|
| in this notice, please contact one of the technical | | 92-63 Cracked Insulators in 08/26/92 All holders of OLs or CPs |
|
| |
|
| contacts listed below or the appropriate
| | ASL Dry Type Transformers for nuclear power reactors. |
|
| |
|
| NRC Office of Nuclear Reactor Regulation (NRR) project manager.Charles E. Rossi, Director Division of Operational
| | Manufactured by Westing- house Electric Corporation |
|
| |
|
| ===Events Assessment===
| | 92-62 Emergency Response 08/24/92 All U.S. Nuclear Regulatory |
| Office of Nuclear Reactor Regulation
| |
|
| |
|
| Technical
| | Information Require- Commission licensees. |
|
| |
|
| contacts: Robert Pettis, NRR (301) 504-3214 Stewart Magruder, NRR (301) 504-3220 Attachment:
| | rents for Radioactive |
| List of Recently Issued NRC Information
| |
|
| |
|
| ===Notices Attachment===
| | Material Shipments |
| IN 92-66 September
| |
|
| |
|
| 1, 1992 Page I of I -LIST OF RECENTLY ISSUED NRC INFORMATION
| | 92-61 Loss of High Head 08/20/92 All holders of OLs or CPs |
|
| |
|
| NOTICES Information
| | Safety Injection for nuclear power reactors. |
|
| |
|
| Date of Notice No. Subject Issuance Issued to 92-65 Safety System Problems 09/03/92 All holders of OLs or CPs Caused by Modifications
| | 92-60 Valve Stem Failure 08/20/92 All holders of OLs or CPs |
|
| |
|
| for nuclear power reactors.That Were Not Adequately | | Caused by Embrittlement for pressurized water |
|
| |
|
| Reviewed and Tested 92-64 Nozzle Ring Settings 08/28/92 All holders of OLs or CPs on Low Pressure Water- for nuclear power reactors.Relief Valves 92-63 Cracked Insulators
| | reactors (PWRs). |
|
| |
|
| in 08/26/92 All holders of OLs or CPs ASL Dry Type Transformers
| | 92-59 Horizontally-installed 08/18/92 All holders of OLs or CPs |
|
| |
|
| for nuclear power reactors.Manufactured | | Motor-Operated Gate for nuclear power reactors |
|
| |
|
| by Westing-house Electric Corporation
| | Valves |
|
| |
|
| 92-62 Emergency | | 92-58 Uranium Hexafluoride 08/12/92 All Fuel Cycle Licensees. |
|
| |
|
| Response 08/24/92 All U.S. Nuclear Regulatory
| | Cylinders - Deviations |
|
| |
|
| Information
| | in Coupling Welds |
|
| |
|
| Require- Commission
| | 92-57 Radial Cracking of 08/11/92 All holders of OLs or CPs |
|
| |
|
| licensees.
| | Shroud Support Access for boiling water reactors |
|
| |
|
| rents for Radioactive
| | Hole Cover Welds (BWRs). |
|
| |
|
| Material Shipments 92-61 Loss of High Head 08/20/92 All holders of OLs or CPs Safety Injection
| | 92-56 Counterfeit Valves in 08/06/92 All holders of OLs or CPs |
|
| |
|
| for nuclear power reactors.92-60 Valve Stem Failure 08/20/92 All holders of OLs or CPs Caused by Embrittlement | | the Commercial Grade for nuclear power reactors. |
|
| |
|
| for pressurized
| | Supply System |
|
| |
|
| water reactors (PWRs).92-59 Horizontally-installed
| | OL - Operating License |
|
| |
|
| 08/18/92 All holders of OLs or CPs Motor-Operated
| | CP - Construction Permit |
|
| |
|
| Gate for nuclear power reactors Valves 92-58 Uranium Hexafluoride
| | IN 92-66 September 1, 1992 This information notice requires no specific action or written response. If |
|
| |
|
| 08/12/92 All Fuel Cycle Licensees.
| | you have any questions about the information in this notice, please contact |
|
| |
|
| Cylinders
| | one of the technical contacts listed below or the appropriate NRC Office of |
|
| |
|
| -Deviations
| | Nuclear Reactor Regulation (NRR) project manager. |
|
| |
|
| in Coupling Welds 92-57 Radial Cracking of 08/11/92 All holders of OLs or CPs Shroud Support Access for boiling water reactors Hole Cover Welds (BWRs).92-56 Counterfeit
| | Original Signed by |
|
| |
|
| Valves in 08/06/92 All holders of OLs or CPs the Commercial
| | Charles E. Rossi |
|
| |
|
| Grade for nuclear power reactors.Supply System OL -Operating
| | Charles E. Rossi, Director |
|
| |
|
| License CP -Construction
| | Division of Operational Events Assessment |
|
| |
|
| Permit
| | Office of Nuclear Reactor Regulation |
|
| |
|
| IN 92-66 September
| | Technical contacts: Robert Pettis, NRR |
|
| |
|
| 1, 1992 This information
| | (301) 504-3214 Stewart Magruder, NRR |
|
| |
|
| notice requires no specific action or written response.
| | (301) 504-3220 |
| | Attachment: List of Recently Issued NRC Information Notices |
|
| |
|
| If you have any questions
| | Document Name: 92-66.IN |
|
| |
|
| about the information
| | * See Previous Concurrence |
|
| |
|
| in this notice, please contact one of the technical
| | + Per discussion between CERossi & JLieberman |
|
| |
|
| contacts listed below or the appropriate
| | OFFICE VIB/DRIS VIB/DRIS VIB/DRIS EDITOR DRIS/NRR DI |
|
| |
|
| NRC Office of Nuclear Reactor Regulation (NRR) project manager.Original Signed by Charles E. Rossi Charles E. Rossi, Director Division of Operational
| | NAME SMagruder GCwalina LNorrholm JMain BGrimes RFortuna |
|
| |
|
| ===Events Assessment===
| | DATE 8/24/92* 8/24/92* 8/24/92* 8/24/92* 8/25/92* 8/24/92* |
| Office of Nuclear Reactor Regulation
| | OGC OGCB:DOEA OGCB:DOEA D t IR:OE |
| | |
| Technical
| |
| | |
| contacts: Robert Pettis, NRR (301) 504-3214 Stewart Magruder, NRR (301) 504-3220 Attachment:
| |
| List of Recently Issued NRC Information
| |
|
| |
|
| Notices Document Name: 92-66.IN* See Previous Concurrence
| | GLongo JJPetrosino GHMarcus fE ieberman |
|
| |
|
| + Per discussion | | 8/25/92* 08/26/92* 08/26/92* 0- /92086/92+ |
|
| |
|
| between CERossi & JLieberman
| | '-) IN 92-XX |
|
| |
|
| OFFICE NAME DATE VIB/DRIS SMagruder 8/24/92*VIB/DRIS GCwalina 8/24/92*VIB/DRIS LNorrholm 8/24/92*EDITOR JMain 8/24/92*DRIS/NRR BGrimes 8/25/92*DI RFortuna 8/24/92*OGC GLongo 8/25/92*OGCB:DOEA JJPetrosino
| | August XX, 1992 Page 3 o 3 This information notice requires no specific action or written r sponse. If |
|
| |
|
| 08/26/92*OGCB:DOEA GHMarcus 08/26/92*D t IR:OE fE ieberman 0- /92 086/92+
| | you have any questions about the information in this notice, p ease contact |
| '-) IN 92-XX August XX, 1992 Page 3 o 3 This information
| |
|
| |
|
| notice requires no specific action or written r sponse. If you have any questions
| | one of the technical contacts listed below or the appropriat NRC Office of |
|
| |
|
| about the information
| | Nuclear Reactor Regulation (NRR) project manager. |
|
| |
|
| in this notice, p ease contact one of the technical
| | Charles E. Ross/, Director |
|
| |
|
| contacts listed below or the appropriat
| | Division of 0 rational Events Assessment |
|
| |
|
| NRC Office of Nuclear Reactor Regulation (NRR) project manager.Charles E. Ross/, Director Division of 0 rational Events Assessment
| | Office of Nu ear Reactor Regulation |
|
| |
|
| ===Office of Nu ear Reactor Regulation===
| | Technical contacts: Robert Pettis, NRR |
| Technical | |
|
| |
|
| contacts:
| | (301) 504-3214 Stewart Magruder, N |
| Robert Pettis, NRR (301) 504-3214 Stewart Magruder, N (301) 504-3220 Attachment:
| |
| List of Recently Issued C Information
| |
|
| |
|
| Notices* See Previous Concurrence | | (301) 504-3220 |
| | Attachment: List of Recently Issued C Information Notices |
|
| |
|
| + Per discussion
| | * See Previous Concurrence |
|
| |
|
| between CERossi & JLieberman | | + Per discussion between CERossi & JLieberman |
|
| |
|
| OFFICE VIB/DRIS VIBjDRIS VIB/DRIS EDITOR DRIS/NRR OI NAME SMagruder | | OFFICE VIB/DRIS VIBjDRIS VIB/DRIS EDITOR DRIS/NRR OI |
|
| |
|
| GCwalina LNorrholm | | NAME SMagruder GCwalina LNorrholm JMain BGrimes RFortuna |
|
| |
|
| JMain BGrimes RFortuna DATE 8/24/92* 8/24/92* 8/24/92* 8/24/92* 8/25/92* 8/24/92*OGC OGCB A OGCB:DOEA
| | DATE 8/24/92* 8/24/92* 8/24/92* 8/24/92* 8/25/92* 8/24/92* |
| | OGC OGCB A OGCB:DOEA DIR:DOEA DIR:OE |
|
| |
|
| DIR:DOEA DIR:OE GLongo JJ Pe 0o GHMarcus CERossi JLieberman
| | GLongo JJPe 0o GHMarcus CERossi JLieberman |
|
| |
|
| 8/25/92* 0 08/26/92* | | 8/25/92* 0 08/26/92* 08/ /92 08/26/92+ |
| 08/ /92 08/26/92+ | |
| IN 92-XX August XX, 1992 reasonable
| |
|
| |
|
| assurance
| | IN 92-XX |
|
| |
|
| that the products produced are adequate for use in safety-related | | August XX, 1992 reasonable assurance that the products produced are adequate for use in |
|
| |
|
| applications | | safety-related applications in nuclear power plants. Consequently, the NRC is |
|
| |
|
| in nuclear power plants. Consequently, the NRC is interested | | interested in receiving any information on tests or i stances of failure of |
|
| |
|
| in receiving
| | Five Star products. |
|
| |
|
| any information
| | This information notice requires no specific ac on or written response. If |
|
| |
|
| on tests or i stances of failure of Five Star products.This information
| | you have any questions about the information i this notice, please contact |
|
| |
|
| notice requires no specific ac on or written response.
| | one of the technical contacts listed below or/the appropriate NRC Office of |
|
| |
|
| If you have any questions
| | Nuclear Reactor Regulation (NRR) project mai ger. |
|
| |
|
| about the information
| | ,harles E. Rossi, Director |
|
| |
|
| i this notice, please contact one of the technical
| | Division of Operational Events Assessment |
|
| |
|
| contacts listed below or/the appropriate
| |
|
| |
| NRC Office of Nuclear Reactor Regulation (NRR) project mai ger.,harles E. Rossi, Director Division of Operational
| |
|
| |
| ===Events Assessment===
| |
| Office of Nuclear Reactor Regulation | | Office of Nuclear Reactor Regulation |
|
| |
|
| 4RR-, NRR NRC Information | | Technical contacts: Robert 4RR |
|
| |
|
| Notices Technical
| | (301) ! |
| | Stewa/t Magrudei-, NRR |
|
| |
|
| contacts:
| | (301)! 504-3220 |
| Robert (301) !Stewa/(301)!Attachment:
| | Attachment: List of Re ent NRC Information Notices |
| List of Re ent t Magrudei 504-3220* See Previous Concurrence | |
|
| |
|
| + Per discussion
| | * See Previous Concurrence |
|
| |
|
| between CERossi & JLieberman | | + Per discussion between CERossi & JLieberman |
|
| |
|
| OFFICE NAME DATE VIB/DRIS SMagruder 8/24/92*VIB/DRIS GCwal ina 8/24/92*VIB/DRIS LNorrholm 8/24/92*EDITOR JMain 8/24/92*DRIS/NRR BGrimes 8/25/92*0I RFortuna 8/24/92*OGC GLongo 8/25/92*OGCB:DOEA | | OFFICE VIB/DRIS VIB/DRIS VIB/DRIS EDITOR DRIS/NRR 0I |
|
| |
|
| DIR:DOEA GHMarcus Mo CERossi 08/2"/92 08/ /92 DIR:OE JLieberman
| | NAME SMagruder GCwal ina LNorrholm JMain BGrimes RFortuna |
|
| |
|
| 08/26/92+
| | DATE 8/24/92* 8/24/92* 8/24/92* 8/24/92* 8/25/92* 8/24/92* |
| K>If you have any questions
| | OGC OGCB:DOEA DIR:DOEA DIR:OE |
|
| |
|
| about the information
| | GLongo GHMarcus Mo CERossi JLieberman |
|
| |
|
| in this notice, please contact one of the technical
| | 8/25/92* 08/2"/92 08/ /92 08/26/92+ |
|
| |
|
| contacts listed below or the appropriate
| | K> |
| | If you have any questions about the information in this notice, please contact |
|
| |
|
| Office of Nuclear Reactor Regulation (NRR) project manager.T R S C E Charles E. Rossi, Di t Division of Operati 1 Events Assessment | | one of the technical contacts listed below or the appropriate Office of |
|
| |
|
| ===Office of Nuclear actor Regulation===
| | Nuclear Reactor Regulation (NRR) project manager. |
| echnical contacts: tobert Pettis, NRR 301) 504-3214 tewart Magruder, NRR 301) 504-3220*See previous concurrence)ISTRIBUTION:
| |
| IIB R/F GCwalina OGCB CRossi IRIS R/F LNorrholm
| |
|
| |
|
| 0I;Magruder
| | Charles E. Rossi, Di t |
|
| |
|
| BGrimes OGC/ gaf OI IFFICE VIB/DRIS VIB/DRIS VIB/DRIS EDITOR R I 1AME SMagruder
| | Division of Operati 1 Events Assessment |
|
| |
|
| GCwalina LNorrholm
| | Office of Nuclear actor Regulation |
|
| |
|
| Jeff 1 es)ATE 8/24/92* 8j24/92* 8/24/92* 8/24/92* 8/5/ 92 8/24/92*OGC OGCB o&e-6 ; o: O.rA 8/25/92* 8/ /92 / A 4 C 4 performed
| | Technical contacts: |
|
| |
|
| implementation
| | ===Rtobert Pettis, NRR=== |
| | 301) 504-3214 |
|
| |
|
| audits of Five Star. A Nuclear Utility Procurement
| | ===Stewart Magruder, NRR=== |
| | 301) 504-3220 |
| | *See previous concurrence |
|
| |
|
| Issues Council (NUPIC) member audit performed
| | C)ISTRIBUTION: |
| | IIB R/F GCwalina OGCB CRossi |
|
| |
|
| in October, 1991, concluded
| | EIRIS R/F |
|
| |
|
| that the Five Star quality assurance
| | ;Magruder |
|
| |
|
| program and its implementation
| | LNorrholm |
|
| |
|
| was unacceptable
| | BGrimes |
|
| |
|
| and did not meet certain requirements
| | 0I |
|
| |
|
| of Appendix B to 10 CFR Part 50. However, the NRC inspectors
| | OGC |
|
| |
|
| determined
| | / gaf OI |
|
| |
|
| that some licensees
| | CIFFICE VIB/DRIS VIB/DRIS VIB/DRIS EDITOR R I |
|
| |
|
| have accepted the Five Star quality assurance
| | 1AME SMagruder GCwalina LNorrholm Jeff 1 es |
|
| |
|
| program as meeting all applicable
| | )ATE 8/24/92* 8j24/92* 8/24/92* 8/24/92* 8/5/ 92 8/24/92* |
| | OGC OGCB o:O.rA |
|
| |
|
| Appendix B requirements.
| | ; o&e-6 |
| | 8/25/92* 8/ /92 / A 4 |
| | 4 |
|
| |
|
| Five Star customer purchase orders for the period between 1988 and the present were reviewed by the NRC inspectors. | | performed implementation audits of Five Star. A Nuclear Utility Procurement Issues Council |
|
| |
|
| From this review, it was determined
| | (NUPIC) member audit performed in October, 1991, concluded that the Five Star quality |
|
| |
|
| that at least 7 licensees
| | assurance program and its implementation was unacceptable and did not meet certain |
|
| |
|
| and one licensee contractor
| | requirements of Appendix B to 10 CFR Part 50. However, the NRC inspectors determined that |
|
| |
|
| issued purchase orders to Five Star for grout and concrete mix products and specified
| | some licensees have accepted the Five Star quality assurance program as meeting all |
|
| |
|
| compliance
| | applicable Appendix B requirements. Five Star customer purchase orders for the period |
|
| |
|
| to Appendix B to 10 CFR Part 50 and 10 CFR Part 21. Purchasers
| | between 1988 and the present were reviewed by the NRC inspectors. From this review, it was |
|
| |
|
| may have accepted the use of Five Star products without review of the test laboratory
| | determined that at least 7 licensees and one licensee contractor issued purchase orders to |
|
| |
|
| and test records. Therefore | | Five Star for grout and concrete mix products and specified compliance to Appendix B to 10 |
| | CFR Part 50 and 10 CFR Part 21. Purchasers may have accepted the use of Five Star products |
|
| |
|
| the affected audits may be inadequate, and the acceptability | | without review of the test laboratory and test records. Therefore the affected audits may |
|
| |
|
| of Five Star products indeterminate. | | be inadequate, and the acceptability of Five Star products indeterminate. |
|
| |
|
| The denial of access to NRC inspectors | | The denial of access to NRC inspectors appears to be a willful violation of Section 21.41, which permits NRC access to Five Star's records, premises, activities, and basic components |
|
| |
|
| appears to be a willful violation
| | as necessary to effectuate the purposes of this part. Because of the denied access, the NRC |
|
| |
|
| of Section 21.41, which permits NRC access to Five Star's records, premises, activities, and basic components | | was unable to examine the extent and adequacy of the products produced by Five Star and |
|
| |
|
| as necessary
| | therefore does not have reasonable assurance that the products produced are adequate for use |
|
| |
|
| to effectuate
| | in safety-related applications innuclear power plants. |
|
| |
|
| the purposes of this part. Because of the denied access, the NRC was unable to examine the extent and adequacy of the products produced by Five Star and therefore
| | The NRC is interested in receiving any information with respect to tests or instances of |
|
| |
|
| does not have reasonable
| | failure of Five Star products. However, suggestions contained in this information notice |
|
| |
|
| assurance
| | are not NRC requirements; therefore, no specific action or written response is required. |
|
| |
|
| that the products produced are adequate for use in safety-related
| | Ifyou have any questions about the information inthis notice, please contact one of the |
|
| |
|
| applications
| | technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation |
|
| |
|
| in nuclear power plants.The NRC is interested
| | (NRR) project manager. |
|
| |
|
| in receiving
| | Charles E. Rossi, Director |
|
| |
|
| any information
| | Division of Operational Events Assessment |
|
| |
|
| with respect to tests or instances
| | Office of Nuclear Reactor Regulation |
| | |
| of failure of Five Star products. | |
| | |
| However, suggestions
| |
| | |
| contained
| |
| | |
| in this information
| |
|
| |
|
| notice are not NRC requirements;
| | Technical contacts: |
| therefore, no specific action or written response is required.If you have any questions
| |
|
| |
|
| about the information
| | ===Robert Pettis, NRR=== |
| | (301) 504-3214 |
|
| |
|
| in this notice, please contact one of the technical
| | ===Stewart Magruder, NRR=== |
| | | (301) 504-3220 |
| contacts listed below or the appropriate
| | DISTRIBUTION: |
| | | VIB R/F GCwalina 0I CRossi |
| Office of Nuclear Reactor Regulation (NRR) project manager.Charles E. Rossi, Director Division of Operational
| |
| | |
| ===Events Assessment=== | |
| Office of Nuclear Reactor Regulation
| |
|
| |
|
| Technical
| | DRIS R/F LNorrholm OGC |
|
| |
|
| contacts: Robert Pettis, NRR (301) 504-3214 Stewart Magruder, NRR (301) 504-3220 DISTRIBUTION:
| | ===SMagruder BGrimes OGCB=== |
| VIB R/F GCwalina 0I CRossi DRIS R/F LNorrholm | | OFFICE VIB/I VIBkli VIB 2f Editor DRIS/NRR OI LvG |
|
| |
|
| OGC SMagruder
| | NAME SMag I* G(A ina e.-LN'riiolm Jeff BGrimes |
|
| |
|
| BGrimes OGCB OFFICE VIB/I VIBkli VIB 2f Editor DRIS/NRR OI LvG NAME SMag I* G(A ina e.-LN'riiolm
| | DATE 08/aLy92 08g2I/9] 08/2- 92 08/ /92 08/ /92 08/l//92 |
| | \Nq (W k-ci OGCB |
|
| |
|
| Jeff BGrimes DATE 08/aLy92 08g2I/9] 08/2- 92 08/ /92 08/ /92 08/l//92\Nq (W k- ci OGCB 08/ /92}}
| | 08/ /92}} |
|
| |
|
| {{Information notice-Nav}} | | {{Information notice-Nav}} |
Access Denied to NRC Inspectors at Five Star Products, Inc. and Construction Products Research, Fairfield, ConnecticutML031200381 |
Person / Time |
---|
Site: |
Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, 05000370 |
---|
Issue date: |
09/01/1992 |
---|
From: |
Rossi C Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
References |
---|
IN-92-066, NUDOCS 9209010039 |
Download: ML031200381 (8) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, 05000370 |
---|
Category:NRC Information Notice
MONTHYEARInformation Notice 2020-02, Flex Diesel Generator Operational Challenges2020-09-15015 September 2020 Flex Diesel Generator Operational Challenges ML20225A0322020-09-0303 September 2020 NRC Choice Letter to NAC International with Attached Safety Inspection Report, IR 0721015/2020201, February 24-27, 2020 and July 22, 2020, Inspection of NAC International in Norcross, Georgia Information Notice 2012-09, PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs.2019-11-30030 November 2019 PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs. Information Notice 2011-20, NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011)2019-07-24024 July 2019 NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011) ML19196A2452019-07-15015 July 2019 Public Notice - Sequoyah Nuclear Plant, Unit 2 - Exigent Amendment to Facility Operating License Information Notice 2019-01, Inadequate Evaluation of Temporary Alterations2019-03-12012 March 2019 Inadequate Evaluation of Temporary Alterations ML16028A3082016-04-27027 April 2016 NRC Information Notice; IN 2016-05: Operating Experience Regarding Complications From a Loss of Instrumentation Air Information Notice 2015-05, Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps Information Notice 2015-05, Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps Information Notice 2013-20, OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-20, Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-11, OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2013-11, Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Contain2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Con2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notic2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool Information Notice 2012-11, Age Related Capacitor Degradation2012-07-23023 July 2012 Age Related Capacitor Degradation ML12031A0132012-02-0606 February 2012 U.S. Nuclear Regulatory Commission Investigation Report No. 2-2010-058, Cpn International, Inc Information Notice 2011-19, Licensee Event Reports Containing Information Pertaining to Defects to Basic Components2011-09-26026 September 2011 Licensee Event Reports Containing Information Pertaining to Defects to Basic Components Information Notice 2011-15, Steel Containment Degradation and Associated License Renewal Aging Management Issues2011-08-0101 August 2011 Steel Containment Degradation and Associated License Renewal Aging Management Issues Information Notice 2011-17, Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping2011-07-26026 July 2011 Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping Information Notice 2011-13, Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-13, Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13)2011-06-29029 June 2011 Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13) Information Notice 2011-13, OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-04, IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-262010-12-21021 December 2010 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 ML13066A1872009-12-16016 December 2009 Draft NRC Information Notice 2009-xx - Underestimate of Dam Failure Frequency Used in Probabilistic Risk Assessments ML1007804482009-11-23023 November 2009 Email from Peter Bamford, NRR to Pamela Cowan, Exelon on TMI Contamination Control Event Information Notice 2009-11, NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-112009-07-0707 July 2009 NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-11 Information Notice 2009-10, Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10)2009-07-0707 July 2009 Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10) Information Notice 2009-09, Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify2009-06-19019 June 2009 Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify Information Notice 2008-12, Reactor Trip Due to Off-Site Power Fluctuation2008-07-0707 July 2008 Reactor Trip Due to Off-Site Power Fluctuation Information Notice 2008-11, Service Water System Degradation at Brunswicksteam Electric Plant Unit 12008-06-18018 June 2008 Service Water System Degradation at Brunswicksteam Electric Plant Unit 1 Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants2008-04-0707 April 2008 Counterfeit Parts Supplied to Nuclear Power Plants Information Notice 1991-09, Counterfeiting of Crane Valves2007-09-25025 September 2007 Counterfeiting of Crane Valves Information Notice 2007-28, Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls2007-09-19019 September 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment2007-09-17017 September 2007 Temporary Scaffolding Affects Operability of Safety-Related Equipment Information Notice 2007-14, Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station2007-03-30030 March 2007 Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station Information Notice 2007-06, Potential Common Cause Vulnerabilities in Essential Service Water Systems2007-02-0909 February 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Information Notice 2007-05, Vertical Deep Draft Pump Shaft and Coupling Failures2007-02-0909 February 2007 Vertical Deep Draft Pump Shaft and Coupling Failures Information Notice 2006-31, Inadequate Fault Interrupting Rating of Breakers2006-12-26026 December 2006 Inadequate Fault Interrupting Rating of Breakers Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear Information Notice 2006-13, E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination2006-07-13013 July 2006 E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination 2020-09-03 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] OR [[:05000370]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] OR [[:05000370]] </code>. |
II
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, D.C. 20555 September 1, 1992 NRC INFORMATION NOTICE 92-66: ACCESS-DENIED TO NRC INSPECTORS AT FIVE STAR
PRODUCTS, INC. AND CONSTRUCTION PRODUCTS
RESEARCH, FAIRFIELD, CONNECTICUT
Addressees
All holders of operating licenses or construction permits for nuclear power
reactors and all recipients of NUREG-0040, "Licensee, Contractor and Vendor
Inspection Status Report" (White Book).
Purpose
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information
notice to alert addressees to the NRC's concern that Five Star Products, Incorporated (Five Star), and its laboratory contractor, Construction Products
test
Research (CPR), denied NRC inspectors necessary access to the contracted
laboratory and test data for grout and concrete mix products. It is expected
that recipients will review this information and consider actions, as- are
appropriate. However, suggestions contained in this information notice is
not NRC requirements; therefore, no specific action or written response
required.
Description of Circumstances
On Tuesday, August 18, 1992, NRC inspectors arrived at the Five Star facility, located at Fairfield, Connecticut, to conduct an inspection pursuant to the
provisions of Section 21.41, "Inspection," of Title 10 of the Code of Federal
Regulations, Part 21 (10 CFR Part 21). The NRC promulgated 10 CFR Part 21 under the authority of Section 206 of the Energy Reorganization Act of 1974,
42 U.S.C. 5846, and Sections 161b and 161o of the Atomic Energy Act of 1954, as amended, (42 U.S.C. 2201(b) and 2201(o)). Section 21.41 authorizes NRC for
inspections of facilities supplying "basic components," or parts thereof, commercial nuclear power plants as that term is defined in 10 CFR Part 21.
Five Star supplies grout and concrete mix materials, tested at its facility by
CPR, to the commercial nuclear industry. Five Star certifies these materials
as being manufactured and controlled in accordance with the requirements of
Appendix B to 10 CFR Part 50.
2Ar
9209010039
_7DA\A)
ill
IN 92-66 September 1, 1992 On Tuesday, August 18, 1992, and Wednesday, August
19, 1992, the NRC
inspectors were denied access necessary for an
inspection of the CPR test
laboratory and test records on the Five Star premises.
19, 1992, Five Star managers told the NRC inspectors On Wednesday, August
that they would not be
allowed to continue the inspection as of the end
of the day even though the
NRC inspectors indicated that they had not completed
the inspection.
Discussion
The NRC conducted this inspection to determine
the extent to which Five Star
has supplied material or services to licensed nuclear
its quality assurance and testing programs, and plants, the adequacy of
the adequacy of its products.
Purchase orders reviewed during the limited inspection
licensees have purchased concrete products from indicated that
Five Star and are invoking the
requirements of Appendix B to 10 CFR Part 50 and
10 CFR Part 21 on the orders
to Five Star. The NRC learned that licensees
and licensee contractors
auditing Five Star who requested access to CPR's
test laboratory and test
records were denied necessary access to the test
laboratory and records.
During the limited inspection at Five Star, the
NRC inspectors found that not
all licensees purchasing from Five Star had performed
Five Star. In October, 1991, a member of the implementation audits of
Nuclear Utility Procurement
Issues Council (NUPIC) performed a NUPIC audit
and concluded that the Five
Star quality assurance program and its implementation
did not meet certain requirements of Appendix were unacceptable and
B to 10 CFR Part 50. However,
~thL-NRC-insp-ectors--determi-ned--that-some-l-fcensees-have-accepted
quality assurance program as meeting all applicable the-Five-Star~--
Appendix B requirements.
The NRC inspectors reviewed Five Star customer
purchase orders for the period
from 1988 to 1992 and determined that at least
seven licensees and one
licensee contractor issued purchase orders to Five
Star for grout and concrete
mix products and specified compliance to Appendix
B to 10 CFR Part 50 and 10
CFR Part 21. Purchasers may have accepted the
use of Five Star products upon
performing audits that did not include reviewing
the test laboratory and test
records. Therefore, the affected audits were not
quality of the Five Star products. adequate to determine the
The denial of access to NRC inspectors appears
to be a willful violation of
Section 21.41, which permits the NRC access to
Five Star's records, premises, activities, and basic components as necessary to
effect the purposes of this
part. Upon being denied access, the NRC could
not examine the extent and
adequacy of the products produced by Five Star
and therefore does not have
reasonable assurance that the products produced
are
safety-related applications in nuclear power plants. adequate for use in
Consequently, the NRC is
interested in receiving any information on tests
or instances of failure of
Five Star products.
I
IN 92-66 September 1, 1992 This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
one of the technical contacts listed below or the appropriate NRC Office of
Nuclear Reactor Regulation (NRR) project manager.
Charles E. Rossi, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical contacts: Robert Pettis, NRR
(301) 504-3214 Stewart Magruder, NRR
(301) 504-3220
Attachment: List of Recently Issued NRC Information Notices
Attachment
IN 92-66 September 1, 1992 Page I of I -
LIST OF RECENTLY ISSUED
NRC INFORMATION NOTICES
Information Date of
Notice No. Subject Issuance Issued to
92-65 Safety System Problems 09/03/92 All holders of OLs or CPs
Caused by Modifications for nuclear power reactors.
That Were Not Adequately
Reviewed and Tested
92-64 Nozzle Ring Settings 08/28/92 All holders of OLs or CPs
on Low Pressure Water- for nuclear power reactors.
Relief Valves
92-63 Cracked Insulators in 08/26/92 All holders of OLs or CPs
ASL Dry Type Transformers for nuclear power reactors.
Manufactured by Westing- house Electric Corporation
92-62 Emergency Response 08/24/92 All U.S. Nuclear Regulatory
Information Require- Commission licensees.
rents for Radioactive
Material Shipments
92-61 Loss of High Head 08/20/92 All holders of OLs or CPs
Safety Injection for nuclear power reactors.
92-60 Valve Stem Failure 08/20/92 All holders of OLs or CPs
Caused by Embrittlement for pressurized water
reactors (PWRs).
92-59 Horizontally-installed 08/18/92 All holders of OLs or CPs
Motor-Operated Gate for nuclear power reactors
Valves
92-58 Uranium Hexafluoride 08/12/92 All Fuel Cycle Licensees.
Cylinders - Deviations
in Coupling Welds
92-57 Radial Cracking of 08/11/92 All holders of OLs or CPs
Shroud Support Access for boiling water reactors
Hole Cover Welds (BWRs).
92-56 Counterfeit Valves in 08/06/92 All holders of OLs or CPs
the Commercial Grade for nuclear power reactors.
Supply System
OL - Operating License
CP - Construction Permit
IN 92-66 September 1, 1992 This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
one of the technical contacts listed below or the appropriate NRC Office of
Nuclear Reactor Regulation (NRR) project manager.
Original Signed by
Charles E. Rossi
Charles E. Rossi, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical contacts: Robert Pettis, NRR
(301) 504-3214 Stewart Magruder, NRR
(301) 504-3220
Attachment: List of Recently Issued NRC Information Notices
Document Name: 92-66.IN
+ Per discussion between CERossi & JLieberman
OFFICE VIB/DRIS VIB/DRIS VIB/DRIS EDITOR DRIS/NRR DI
NAME SMagruder GCwalina LNorrholm JMain BGrimes RFortuna
DATE 8/24/92* 8/24/92* 8/24/92* 8/24/92* 8/25/92* 8/24/92*
OGC OGCB:DOEA OGCB:DOEA D t IR:OE
GLongo JJPetrosino GHMarcus fE ieberman
8/25/92* 08/26/92* 08/26/92* 0- /92086/92+
'-) IN 92-XX
August XX, 1992 Page 3 o 3 This information notice requires no specific action or written r sponse. If
you have any questions about the information in this notice, p ease contact
one of the technical contacts listed below or the appropriat NRC Office of
Nuclear Reactor Regulation (NRR) project manager.
Charles E. Ross/, Director
Division of 0 rational Events Assessment
Office of Nu ear Reactor Regulation
Technical contacts: Robert Pettis, NRR
(301) 504-3214 Stewart Magruder, N
(301) 504-3220
Attachment: List of Recently Issued C Information Notices
+ Per discussion between CERossi & JLieberman
OFFICE VIB/DRIS VIBjDRIS VIB/DRIS EDITOR DRIS/NRR OI
NAME SMagruder GCwalina LNorrholm JMain BGrimes RFortuna
DATE 8/24/92* 8/24/92* 8/24/92* 8/24/92* 8/25/92* 8/24/92*
OGC OGCB A OGCB:DOEA DIR:DOEA DIR:OE
GLongo JJPe 0o GHMarcus CERossi JLieberman
8/25/92* 0 08/26/92* 08/ /92 08/26/92+
IN 92-XX
August XX, 1992 reasonable assurance that the products produced are adequate for use in
safety-related applications in nuclear power plants. Consequently, the NRC is
interested in receiving any information on tests or i stances of failure of
Five Star products.
This information notice requires no specific ac on or written response. If
you have any questions about the information i this notice, please contact
one of the technical contacts listed below or/the appropriate NRC Office of
Nuclear Reactor Regulation (NRR) project mai ger.
,harles E. Rossi, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical contacts: Robert 4RR
(301) !
Stewa/t Magrudei-, NRR
(301)! 504-3220
Attachment: List of Re ent NRC Information Notices
+ Per discussion between CERossi & JLieberman
OFFICE VIB/DRIS VIB/DRIS VIB/DRIS EDITOR DRIS/NRR 0I
NAME SMagruder GCwal ina LNorrholm JMain BGrimes RFortuna
DATE 8/24/92* 8/24/92* 8/24/92* 8/24/92* 8/25/92* 8/24/92*
OGC OGCB:DOEA DIR:DOEA DIR:OE
GLongo GHMarcus Mo CERossi JLieberman
8/25/92* 08/2"/92 08/ /92 08/26/92+
K>
If you have any questions about the information in this notice, please contact
one of the technical contacts listed below or the appropriate Office of
Nuclear Reactor Regulation (NRR) project manager.
Charles E. Rossi, Di t
Division of Operati 1 Events Assessment
Office of Nuclear actor Regulation
Technical contacts:
Rtobert Pettis, NRR
301) 504-3214
Stewart Magruder, NRR
301) 504-3220
C)ISTRIBUTION:
IIB R/F GCwalina OGCB CRossi
EIRIS R/F
- Magruder
LNorrholm
BGrimes
0I
OGC
/ gaf OI
CIFFICE VIB/DRIS VIB/DRIS VIB/DRIS EDITOR R I
1AME SMagruder GCwalina LNorrholm Jeff 1 es
)ATE 8/24/92* 8j24/92* 8/24/92* 8/24/92* 8/5/ 92 8/24/92*
OGC OGCB o:O.rA
- o&e-6
8/25/92* 8/ /92 / A 4
4
performed implementation audits of Five Star. A Nuclear Utility Procurement Issues Council
(NUPIC) member audit performed in October, 1991, concluded that the Five Star quality
assurance program and its implementation was unacceptable and did not meet certain
requirements of Appendix B to 10 CFR Part 50. However, the NRC inspectors determined that
some licensees have accepted the Five Star quality assurance program as meeting all
applicable Appendix B requirements. Five Star customer purchase orders for the period
between 1988 and the present were reviewed by the NRC inspectors. From this review, it was
determined that at least 7 licensees and one licensee contractor issued purchase orders to
Five Star for grout and concrete mix products and specified compliance to Appendix B to 10
CFR Part 50 and 10 CFR Part 21. Purchasers may have accepted the use of Five Star products
without review of the test laboratory and test records. Therefore the affected audits may
be inadequate, and the acceptability of Five Star products indeterminate.
The denial of access to NRC inspectors appears to be a willful violation of Section 21.41, which permits NRC access to Five Star's records, premises, activities, and basic components
as necessary to effectuate the purposes of this part. Because of the denied access, the NRC
was unable to examine the extent and adequacy of the products produced by Five Star and
therefore does not have reasonable assurance that the products produced are adequate for use
in safety-related applications innuclear power plants.
The NRC is interested in receiving any information with respect to tests or instances of
failure of Five Star products. However, suggestions contained in this information notice
are not NRC requirements; therefore, no specific action or written response is required.
Ifyou have any questions about the information inthis notice, please contact one of the
technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation
(NRR) project manager.
Charles E. Rossi, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical contacts:
Robert Pettis, NRR
(301) 504-3214
Stewart Magruder, NRR
(301) 504-3220
DISTRIBUTION:
VIB R/F GCwalina 0I CRossi
DRIS R/F LNorrholm OGC
SMagruder BGrimes OGCB
OFFICE VIB/I VIBkli VIB 2f Editor DRIS/NRR OI LvG
NAME SMag I* G(A ina e.-LN'riiolm Jeff BGrimes
DATE 08/aLy92 08g2I/9] 08/2- 92 08/ /92 08/ /92 08/l//92
\Nq (W k-ci OGCB
08/ /92
|
---|
|
list | - Information Notice 1992-01, Cable Damage Caused by Inadequate Cable Installation Procedures and Controls (3 January 1992, Topic: Overspeed trip)
- Information Notice 1992-02, Relap5/MOD3 Computer Code Error Associated with the Conservation of Energy Equation (3 January 1992, Topic: Overspeed trip)
- Information Notice 1992-02, Relap5/Mod3 Computer Code Error Associated with the Conservation of Energy Equation (3 January 1992)
- Information Notice 1992-03, Remote Trip Function Failures in General Electric F-Frame Molded-Case Circuit Breakers (6 January 1992, Topic: Overspeed trip)
- Information Notice 1992-04, Potter and Brumfield Model Mdr Rotary Relay Failures (6 January 1992, Topic: Probabilistic Risk Assessment, Commercial Grade, Overspeed trip)
- Information Notice 1992-04, Potter and Brumfield Model MDR Rotary Relay Failures (6 January 1992, Topic: Probabilistic Risk Assessment, Commercial Grade)
- Information Notice 1992-05, Potential Coil Insulations Breakdown in Abs RXMH2 Relays (8 January 1992, Topic: Commercial Grade, Overspeed trip)
- Information Notice 1992-05, Potential Coil Insulations Breakdown in Abs Rxmh2 Relays (8 January 1992, Topic: Commercial Grade)
- Information Notice 1992-05, Potential Coil Insulations Breakdown in ABS RXMH2 Relays (8 January 1992, Topic: Commercial Grade)
- Information Notice 1992-06, Reliability of ATWS Mitigation System and Other NRC Required Equipment Not Controlled by Plant Technical Specifications (15 January 1992)
- Information Notice 1992-06, Reliability of ATWS Mitigation System and Other NRC Required Equipment not Controlled by Plant Technical Specifications (15 January 1992)
- Information Notice 1992-07, Rapid Flow-induced Erosion/Corrosion of Feedwater Piping (9 January 1992)
- Information Notice 1992-08, Revised Protective Action Guidance for Nuclear Incidents (23 January 1992)
- Information Notice 1992-09, Overloading and Subsequent Lock Out of Electrical Buses During Accident Conditions (30 January 1992)
- Information Notice 1992-10, Brachytherapy Incidents Involving Iridium-192 Wire Used in Endobronchial Treatments (31 January 1992, Topic: Brachytherapy)
- Information Notice 1992-10, Brachytherapy Incidents Involving Iridium-192 Wire used in Endobronchial Treatments (31 January 1992, Topic: Brachytherapy)
- Information Notice 1992-11, Soil and Water Contamination at Fuel Cycle Facilities (5 February 1992, Topic: Brachytherapy)
- Information Notice 1992-12, Effects of Cable Leakage Currents on Instrument Settings and Indications (10 February 1992, Topic: Brachytherapy)
- Information Notice 1992-13, Inadequate Control Over Vehicular Traffic at Nuclear Power Plant Sites (18 February 1992, Topic: Brachytherapy)
- Information Notice 1992-14, Uranium Oxide Fires at Fuel Cycle Facilities (21 February 1992, Topic: Brachytherapy)
- Information Notice 1992-15, Failure of Primary Systems Compression Fitting (24 February 1992, Topic: Unidentified leakage)
- Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown (25 February 1992, Topic: Reactor Vessel Water Level, Temporary Modification, Brachytherapy)
- Information Notice 1992-17, NRC Inspections of Programs Being Developed at Nuclear Power Plants in Response to Generic Letter 89-10 (26 February 1992, Topic: Stroke time)
- Information Notice 1992-18, Potential for Loss of Remote Shutdown Capability During a Control Room Fire (28 February 1992, Topic: Hot Short, Safe Shutdown)
- Information Notice 1992-19, Misapplication of Potter and Brumfield Mdr Rotary Relays (2 March 1992)
- Information Notice 1992-19, Misapplication of Potter and Brumfield MDR Rotary Relays (2 March 1992)
- Information Notice 1992-20, Inadequate Local Leak Rate Testing (3 March 1992, Topic: Local Leak Rate Testing)
- Information Notice 1992-21, Spent Fuel Pool Reactivity Calculations (24 March 1992)
- Information Notice 1992-23, Results of Validation Testing of Motor-Operated Valve Diagnostic Equipment (27 March 1992)
- Information Notice 1992-24, Distributor Modification to Certain Commercial-Grade Agastat Electrical Relays (30 March 1992)
- Information Notice 1992-25, Pressure Locking of Motor-Operated Flexible Wedge Gate Valves (2 April 1992, Topic: Stroke time, Hydrostatic)
- Information Notice 1992-27, Thermally Induced Accelerated Aging and Failure of ITE/Gould A.C. Relays used in Safety-Related Applications (3 April 1992)
- Information Notice 1992-27, Thermally Induced Accelerated Aging and Failure of Ite/Gould A.C. Relays Used in Safety-Related Applications (3 April 1992, Topic: Commercial Grade)
- Information Notice 1992-28, Inadequate Fire Suppression System Testing (8 April 1992, Topic: Safe Shutdown)
- Information Notice 1992-29, Potential Breaker Miscoordination Caused by Instantaneous Trip Circuitry (17 April 1992)
- Information Notice 1992-30, Falsification of Plant Records (23 April 1992)
- Information Notice 1992-31, Electrical Connection Problem in Johnson Yokogawa Corporation YS-80 Programmable Indicating Controllers (27 April 1992)
- Information Notice 1992-32, Problems Identified with Emergency Ventilation Systems for Near-Site (Within 10 Miles) Emergency Operations Facilities and Technical Support Centers (29 April 1992)
- Information Notice 1992-32, Problems Identified with Emergency Ventilation Systems for Near-Site (within 10 Miles) Emergency Operations Facilities and Technical Support Centers (29 April 1992)
- Information Notice 1992-33, Increased Instrument Response Time When Pressure Dampening Devices Are Installed (30 April 1992)
- Information Notice 1992-33, Increased Instrument Response Time When Pressure Dampening Devices are Installed (30 April 1992)
- Information Notice 1992-34, New Exposure Limits for Airborne Uranium and Thorium (6 May 1992)
- Information Notice 1992-35, Higher than Predicted Erosion/Corrosion in Unisolable Reactor Coolant Pressure Boundary Piping Inside Containment at a Boiling Water Reactor (6 May 1992)
- Information Notice 1992-35, Higher than Predicted Erosion/Corrosion in Unisolable Reactor Coolant Pressure Boundary Piping inside Containment at a Boiling Water Reactor (6 May 1992)
- Information Notice 1992-36, Intersystem LOCA Outside Containment (7 May 1992)
- Information Notice 1992-37, Implementation of the Deliberate Misconduct Rule (8 May 1992)
- Information Notice 1992-38, Implementation Date for the Revision to the EPA Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (26 May 1992, Topic: Brachytherapy)
- Information Notice 1992-39, Unplanned Return to Criticality During Reactor Shutdown (13 May 1992, Topic: Fuel cladding)
- Information Notice 1992-40, Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry (27 May 1992)
- Information Notice 1992-41, Consideration of Stem Rejection Load In Calculation of Required Valve Thrust (29 May 1992, Topic: Anchor Darling)
... further results |
---|