Line 14: |
Line 14: |
| | page count = 3 | | | page count = 3 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 13, 2012 Mr. Christopher Burton Vice President Carolina Power and Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165 |
| | |
| | ==SUBJECT:== |
| | HARRIS NUCLEAR PLANT - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2011-055/RII-2011-A-0133 |
| | |
| | ==Dear Mr. Burton:== |
| | |
| | Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC) |
| | Office of Investigations |
| | = (OI) completed report regarding the falsification of the emergency operations facility (EOF) ventilation surveillance tests. |
| | OI determined that there was insufficient evident to substantiate the allegation that an engineer willfully falsified surveillance tests concerning the Harris Nuclear Plant EOF. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us. |
| | |
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room). |
| | Sincerely, /RA/ |
| | Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects |
| | |
| | ==Enclosure:== |
| | Investigative Synopsis, OI Case No. 2-2011-055/RII-2011-A-0133 |
| | |
| | _________________________ |
| | G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:EICS SIGNATURE TAS /RA/ RAM /RA/ ODM /RA/ NAME TStephen RMusser ODeMiranda DATE 07/12/2012 07/13/2012 07/12/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Official Use Only |
| | - OI Investigation Information NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE DIRECTOR, OFFICE OF INVESTIGATIONS, REGION II Official Use Only |
| | - OI Investigation Information Case No. 2-2011-055 1 SYNOPSIS This investigation was initiated by the U.S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI), Region II (RII), on August 22, 2011, to determine whether an engineer willfully falsified surveillance tests concerning the Harris Nuclear Plant (HNP), Emergency Operations Facility (EOF). |
| | Based upon the evidence developed during the investigation, OI:RII did not substantiate that an engineer willfully falsified surveillance tests concerning the Harris Nuclear Plant (HNP) Emergency Operations Facility (EOF). |
| | |
| | Approved for Release 7/12/2012 Robert Rzepka}} |
Revision as of 23:58, 1 August 2018
|
---|
Category:Letter
MONTHYEARIR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter IR 05000400/20243012023-05-15015 May 2023 Notification of Licensed Operator Initial Examination 05000400/2024301 IR 05000400/20230012023-05-10010 May 2023 Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000400/20220032022-11-10010 November 2022 Integrated Inspection Report 05000400/2022003 IR 05000400/20223012022-11-0202 November 2022 NRC Operator License Examination Report 05000400/2022301 ML22271A6202022-09-29029 September 2022 Notification of Shearon Harris Nuclear Power Plant Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2023010 ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22227A0682022-09-0202 September 2022 Alternative to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Code for Operation and Maintenance for Certain Target Rock Solenoid Valves IR 05000400/20220052022-08-24024 August 2022 Updated Inspection Plan for Shearon Harris Nuclear Power Plant (Report 05000400/2022005) IR 05000400/20224032022-08-23023 August 2022 Security Baseline Inspection Report 05000400/2022403 ML22126A0082022-08-0909 August 2022 Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7 IR 05000400/20220022022-08-0505 August 2022 Integrated Inspection Report 05000400/2022002 ML22161B0332022-07-28028 July 2022 Issuance of Amendment No. 193 Regarding Revision of Surveillance Requirements to Remove Shutdown Limitation IR 05000400/20220112022-07-20020 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000400 2022011 IR 05000400/20224022022-06-30030 June 2022 Material Control and Accounting Program Inspection Report 05000400/2022402 (OUO Removed) IR 05000400/20220102022-06-13013 June 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000400/2022010 ML22138A4012022-05-26026 May 2022 Project Manager Reassignment ML22101A2822022-05-0606 May 2022 Regulatory Audit Summary Related to the Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme IR 05000400/20220012022-05-0404 May 2022 Integrated Inspection Report 05000400/2022001 IR 05000400/20224012022-03-24024 March 2022 Security Baseline Inspection Report 05000400/2022401 ML22020A0072022-03-10010 March 2022 Issuance of Amendment No. 192 Regarding Removal of Extraneous Content and Requirements from the Renewed Facility Operating License and Technical Specifications ML22010A2812022-03-0404 March 2022 Issuance of Amendments to Adopt TSTF-577, Rev. 1 Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0161 IR 05000400/20210062022-03-0202 March 2022 Annual Assessment Letter for Shearon Harris Nuclear Power Plant (Report No. 05000400/2021006) ML21351A4722022-02-10010 February 2022 Issuance of Amendment No. 190 Regarding Revision to Containment Spray Nozzle Test Frequency IR 05000400/20210042022-02-0404 February 2022 Integrated Inspection Report 05000400/2021004 ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 2024-01-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 13, 2012 Mr. Christopher Burton Vice President Carolina Power and Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165
SUBJECT:
HARRIS NUCLEAR PLANT - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2011-055/RII-2011-A-0133
Dear Mr. Burton:
Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC)
Office of Investigations
= (OI) completed report regarding the falsification of the emergency operations facility (EOF) ventilation surveillance tests.
OI determined that there was insufficient evident to substantiate the allegation that an engineer willfully falsified surveillance tests concerning the Harris Nuclear Plant EOF. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely, /RA/
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects
Enclosure:
Investigative Synopsis, OI Case No. 2-2011-055/RII-2011-A-0133
_________________________
G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:EICS SIGNATURE TAS /RA/ RAM /RA/ ODM /RA/ NAME TStephen RMusser ODeMiranda DATE 07/12/2012 07/13/2012 07/12/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Official Use Only
- OI Investigation Information NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE DIRECTOR, OFFICE OF INVESTIGATIONS, REGION II Official Use Only
- OI Investigation Information Case No. 2-2011-055 1 SYNOPSIS This investigation was initiated by the U.S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI), Region II (RII), on August 22, 2011, to determine whether an engineer willfully falsified surveillance tests concerning the Harris Nuclear Plant (HNP), Emergency Operations Facility (EOF).
Based upon the evidence developed during the investigation, OI:RII did not substantiate that an engineer willfully falsified surveillance tests concerning the Harris Nuclear Plant (HNP) Emergency Operations Facility (EOF).
Approved for Release 7/12/2012 Robert Rzepka