Line 14: |
Line 14: |
| | page count = 2 | | | page count = 2 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:2012 Dresden Initial Examination Outline Review Comments WRITTEN EXAM OUTLINE |
| | - NONE SIMULATOR SCENARIOS |
| | : 1. Recommend adding one more Instrument or Component Malfunction to the Scenario #2 for the BOP operator. Control Room Operator #5 has the Minimum number of component failures and if one of those gets picked up by the other applicant, an additional scenario would need to be run. |
| | No additional malfunctions were added |
| | ; there are a sufficient number of malfunctions for the ROs since they will be observed in multiple scenarions. Recirc MG Fan malfunction was revised from a trip to a degrading condition. |
| | : 2. Need to add a post |
| | -EOP malfunction to Scenario #3. Additionally it seems that the two major events are really one event with the 2 nd major a continuation of the first. |
| | Facility considered the ARI failure as the pos t-EOP malfunction. Counted both major events since crew must deal with the loss of feed in addition to the failure to scram. |
| | : 3. Is the NI failure on Scenario #4 significantly different from the NI failure in Scenario #4 of the Audit Exam; i.e., are the response actions different enough. |
| | After further review there is sufficient difference between failures. |
| | JPMS RO ADMIN 1. Select or write a Conduct of Operations JPM that is NOT associated with K/A 2.1.18 (Ability to make accurate, clear, and concise logs, records, status boards, and reports.). The K/A has been oversampled (selected for the last three exams as well as for the 2012 Audit exam.) |
| | : 2. Select or write a Conduct of Operations JPM that is NOT associated with K/A 2.1.7 (Ability to evaluate plant performance and make operational judgements based on operating characteristics, reactor behavior, and instrument interpretation. |
| | The K/A has been oversampled (selected for the the 2009 and 2010 NRC exams as well as for the 2012 Audit exam.) |
| | : 3. Select or write an Equipment Control JPM that is NOT associated with K/A 2.2.12 (Knowledge of surveillance procedures.) The K/A has been oversampled (Selected for the last 4 NRC Exams as well as the 2012 Audit Exam.) |
| | : 4. Select or write a Radiation Control JPM that is NOT associated with K/A 2.3.11 (Ability to control radiation releases). The K/A has been oversamples (K/A 2.3.11 has been selected on 3 of the last 4 NRC Exams as well as the 2012 Audit Exam |
| | ). All four JPMs were replaced. |
| | |
| | 2012 Dresden Initial Examination Outline Review Comments SRO ADMIN 1. Select or write a Conduct of Operations JPM that is NOT associated with K/A 2.1.2 (Knowledge of operator responsibilities during all modes of operation.) The K/A has been oversampled (selected for the 2009 and 2011 NRC SRO Exams). |
| | Replaced. 2. Select or write a Conduct of Operations JPM that is NOT associated with K/A 2.1.4 (Knowledge of individual licensed operator responsibilities-.) The K/A has been oversampled (selected for the 2009 and 2010 NRC SRO Exams). |
| | Replaced. 3. Select or write an Emergency Plan JPM that is NOT associated with Emergency Classification, Emergency Notifications, or KI Usage. EP Classification/Notification were used on the 2008 |
| | -2010 NRC SRO Exams and KI Usage was used on the 2011 NRC Exam and selected for the 2012 SRO Audit Exam. |
| | Replaced. |
| | CONTROL ROOM/IN |
| | -PLANT SYSTEMS |
| | : 1. Recommend modifying SLC Injection JPM such that valves 1, 2, and 7 fail to automatically close and cannot be closed from MCR. |
| | After further discussion, no changes were made.}} |
Revision as of 21:29, 1 August 2018
|
---|
Category:License-Operator
MONTHYEARML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22215A2492021-05-14014 May 2021 April 2021 Form ES-401-6 ML22216A1902021-05-14014 May 2021 April 2021 Proposed Written Exam ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22235A7572021-05-14014 May 2021 April 2021 Form ES-201-2 Written Outline Only ML22235A7562021-05-14014 May 2021 April 2021 Form ES-301-5 SVPLTR 21-0007, April 2021 Submittal Letter2021-05-14014 May 2021 April 2021 Submittal Letter 2024-06-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22236A6392021-05-14014 May 2021 April 2021 Initial License Exam Form ES-401-9 ML22215A1812021-05-14014 May 2021 April 2021 Administered JPMs ML22215A1852021-05-14014 May 2021 April 2021 Administered Scenarios ML22215A1862021-05-14014 May 2021 April 2021 Administered Written Exam ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22235A7572021-05-14014 May 2021 April 2021 Form ES-201-2 Written Outline Only 2024-06-07
[Table view] |
Text
2012 Dresden Initial Examination Outline Review Comments WRITTEN EXAM OUTLINE
- NONE SIMULATOR SCENARIOS
- 1. Recommend adding one more Instrument or Component Malfunction to the Scenario #2 for the BOP operator. Control Room Operator #5 has the Minimum number of component failures and if one of those gets picked up by the other applicant, an additional scenario would need to be run.
No additional malfunctions were added
- there are a sufficient number of malfunctions for the ROs since they will be observed in multiple scenarions. Recirc MG Fan malfunction was revised from a trip to a degrading condition.
- 2. Need to add a post
-EOP malfunction to Scenario #3. Additionally it seems that the two major events are really one event with the 2 nd major a continuation of the first.
Facility considered the ARI failure as the pos t-EOP malfunction. Counted both major events since crew must deal with the loss of feed in addition to the failure to scram.
- 3. Is the NI failure on Scenario #4 significantly different from the NI failure in Scenario #4 of the Audit Exam; i.e., are the response actions different enough.
After further review there is sufficient difference between failures.
JPMS RO ADMIN 1. Select or write a Conduct of Operations JPM that is NOT associated with K/A 2.1.18 (Ability to make accurate, clear, and concise logs, records, status boards, and reports.). The K/A has been oversampled (selected for the last three exams as well as for the 2012 Audit exam.)
- 2. Select or write a Conduct of Operations JPM that is NOT associated with K/A 2.1.7 (Ability to evaluate plant performance and make operational judgements based on operating characteristics, reactor behavior, and instrument interpretation.
The K/A has been oversampled (selected for the the 2009 and 2010 NRC exams as well as for the 2012 Audit exam.)
- 3. Select or write an Equipment Control JPM that is NOT associated with K/A 2.2.12 (Knowledge of surveillance procedures.) The K/A has been oversampled (Selected for the last 4 NRC Exams as well as the 2012 Audit Exam.)
- 4. Select or write a Radiation Control JPM that is NOT associated with K/A 2.3.11 (Ability to control radiation releases). The K/A has been oversamples (K/A 2.3.11 has been selected on 3 of the last 4 NRC Exams as well as the 2012 Audit Exam
). All four JPMs were replaced.
2012 Dresden Initial Examination Outline Review Comments SRO ADMIN 1. Select or write a Conduct of Operations JPM that is NOT associated with K/A 2.1.2 (Knowledge of operator responsibilities during all modes of operation.) The K/A has been oversampled (selected for the 2009 and 2011 NRC SRO Exams).
Replaced. 2. Select or write a Conduct of Operations JPM that is NOT associated with K/A 2.1.4 (Knowledge of individual licensed operator responsibilities-.) The K/A has been oversampled (selected for the 2009 and 2010 NRC SRO Exams).
Replaced. 3. Select or write an Emergency Plan JPM that is NOT associated with Emergency Classification, Emergency Notifications, or KI Usage. EP Classification/Notification were used on the 2008
-2010 NRC SRO Exams and KI Usage was used on the 2011 NRC Exam and selected for the 2012 SRO Audit Exam.
Replaced.
CONTROL ROOM/IN
-PLANT SYSTEMS
- 1. Recommend modifying SLC Injection JPM such that valves 1, 2, and 7 fail to automatically close and cannot be closed from MCR.
After further discussion, no changes were made.