ML12286A338

From kanterella
Jump to navigation Jump to search
2012 Dresden Nuclear Power Station Initial License Examination Preparation Checklist ES-201-1R9 Supp1
ML12286A338
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/26/2012
From: David Reeser
Operations Branch III
To:
Shared Package
ML11354A120 List:
References
Download: ML12286A338 (2)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility: Dresden Unit 2/3 Date of Examination: Aug 6-17, 2012 Developed by: Written - Facility NRC // Operating - Facility NRC Target Chief Date* Task Description (Reference) Examiners Initials 02/06/2012 1. Examination administration date confirmed (C.1.a; C.2.a and b) dwr 03/02/2012 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) dwr 03/02/2012 3. Facility contact briefed on security and other requirements (C.2.c) dwr 03/02/2012 4. Corporate notification letter sent (C.2.d) Dwr 2/27/2012 N/A [5. Reference material due (C.1.e; C.3.c; Attachment 3)] N/A 04/06/2012 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, dwr ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and 04/09/2012 ES-401-4, as applicable (C.1.e and f; C.3.d) 04/13/2012 {7. Examination outline(s) reviewed by NRC and feedback provided to facility dwr licensee (C.2.h; C.3.e)} 4/12/2012 06/15/2012 8. Proposed examinations (including written, walk-through JPMs, and dwr scenarios, as applicable), supporting documentation (including Forms 06/22/2012 ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d) 07/06/2012 9. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; dwr ES-202) 7/09/2012 07/20/2012 10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; dwr ES-202) 7/23/2012 07/13/2012 11. Examination approved by NRC supervisor for facility licensee review dwr (C.2.h; C.3.f) 7/13/2012 07/20/2012 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) dwr 7/19/2012 07/27/2012 13. Written examinations and operating tests approved by NRC supervisor dwr (C.2.i; C.3.h) 7/27/2012 07/27/2012 14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm dwr qualifications / eligibility; and examination approval and waiver letters sent 7/27/2012 (C.2.i; Attachment 5; ES-202, C.2.e; ES-204) 07/27/2012 15. Proctoring/written exam administration guidelines reviewed Dwr with facility licensee (C.3.k) 8/14//2012 07/27/2012 16. Approved scenarios, job performance measures, and questions Dwr distributed to NRC examiners (C.3.i) 7/27/2012

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.