ML13016A502: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:1 Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Thursday, December 20, 2012 11:04 AM To: Larry S. Hinkle Cc: Davis-BesseHearingFile Resource; Dou tt, Clifford; dorts@firstenergycorp.com
==Subject:==
FW: DB High Strength Bolt Inspection DeferralsLarry,  Below is the staff's position.
From: Holston, William Sent: Wednesday, December 19, 2012 3:52 PM To: CuadradoDeJesus, Samuel
==Subject:==
DB High Strength Bolt Inspection Deferrals Sam - our position is that if evidence of contamination is found, a deferral of the UT inspections until he next refueling outage would only be acceptable if visual inspections of the coatings demonstrate that the liquid could not have penetrated to the base metal of the stud. For example, coatings are intact on the stud and nut on all surfaces, coatings on the base plate are intact between the wall/column and the base plate.
Hearing Identifier:  Davis_BesseLicenseRenewal_Saf_NonPublic Email Number:  3995  Mail Envelope Properties  (377CB97DD54F0F4FAAC7E9FD88BCA6D0B954F8A338) 
==Subject:==
FW: DB High Strength Bolt Inspection Deferrals  Sent Date:  12/20/2012 11:04:14 AM  Received Date:  12/20/2012 11:04:16 AM From:    CuadradoDeJesus, Samuel Created By:  Samuel.CuadradoDeJesus@nrc.gov Recipients:    "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>  Tracking Status: None  "Doutt, Clifford" <Clifford.Doutt@nrc.gov>  Tracking Status: None  "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>  Tracking Status: None "Larry S. Hinkle" <larry.hinkle@embarqmail.com>  Tracking Status: None
Post Office:  HQCLSTR01.nrc.gov Files    Size      Date & Time MESSAGE    641      12/20/2012 11:04:16 AM 
Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}

Revision as of 12:56, 19 July 2018

2012/12/20 Davis-Besse Lr - FW: DB High Strength Bolt Inspection Deferrals
ML13016A502
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/20/2012
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML13016A502 (2)


Text

1 Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Thursday, December 20, 2012 11:04 AM To: Larry S. Hinkle Cc: Davis-BesseHearingFile Resource; Dou tt, Clifford; dorts@firstenergycorp.com

Subject:

FW: DB High Strength Bolt Inspection DeferralsLarry, Below is the staff's position.

From: Holston, William Sent: Wednesday, December 19, 2012 3:52 PM To: CuadradoDeJesus, Samuel

Subject:

DB High Strength Bolt Inspection Deferrals Sam - our position is that if evidence of contamination is found, a deferral of the UT inspections until he next refueling outage would only be acceptable if visual inspections of the coatings demonstrate that the liquid could not have penetrated to the base metal of the stud. For example, coatings are intact on the stud and nut on all surfaces, coatings on the base plate are intact between the wall/column and the base plate.

Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 3995 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0B954F8A338)

Subject:

FW: DB High Strength Bolt Inspection Deferrals Sent Date: 12/20/2012 11:04:14 AM Received Date: 12/20/2012 11:04:16 AM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients: "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov> Tracking Status: None "Doutt, Clifford" <Clifford.Doutt@nrc.gov> Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com> Tracking Status: None "Larry S. Hinkle" <larry.hinkle@embarqmail.com> Tracking Status: None

Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 641 12/20/2012 11:04:16 AM

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: