ML13183A216: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = Letter
| document type = Letter
| page count = 2
| page count = 2
| project = TAC:MF0962, TAC:MF0961, TAC:MF0841, TAC:MF0842
| project = TAC:MF0841, TAC:MF0842, TAC:MF0961, TAC:MF0962
| stage = Other
| stage = Approval
}}
}}


Line 21: Line 21:


==Dear Mr. Sena:==
==Dear Mr. Sena:==
By letter dated February 27,2013, FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted a response to Order EA-12-049 (Mitigation Strategies) for Davis-Besse Nuclear Power Station, Unit No.1; Beaver Valley Power Station, Units 1 and 2; and Perry Nuclear Power Plant, Unit NO.1. To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) review, the licensees' representatives and the NRC staff have discussed the use of an online reference portal ';Iat would allow the NRC staff and contractors limited read-only access to the basis documents and other reference materials cited in your submittal. The online reference portal would allow the NRC staff to audit the licensees' onsite documents that support the information in the submittal. Documents that are necessary to support the NRC staff safety evaluation of the submittal will be identified by the NRC staff. The licensee will be formally requested to submit those documents on the NRC docket. Use of the online reference portal is acceptable as long as the following conditions are met: The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis; The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and Conditions of use of the online reference portal will be displayed on the log-in screen and will require concurrence by each user. The NRC staff requests that the portal be populated, as a minimum, with the references included in the submittal such as draWings, procedures, and calculations. This will help to increase the effectiveness and timeliness of the NRC staff's review. The NRC requests that the portal be ready for access to the NRC staff, within two weeks of receipt of this letter.
By letter dated February 27,2013, FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted a response to Order EA-12-049 (Mitigation Strategies) for Davis-Besse Nuclear Power Station, Unit No.1; Beaver Valley Power Station, Units 1 and 2; and Perry Nuclear Power Plant, Unit NO.1. To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) review, the licensees' representatives and the NRC staff have discussed the use of an online reference portal ';Iat would allow the NRC staff and contractors limited read-only access to the basis documents and other reference materials cited in your submittal.
P. Sena -2 The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation to the NRC stating that you agree to the terms and conditions set forth in this letter. Should you have any questions regarding the Mitigation Strategies online reference portal, please contact Ms. Jessica Kratchman, Project Manager, at 301-415-5112, orvia email at Jessica.Kratchman@nrc.gov. In addition, please email Ms. Kratchman with the information that is needed to access the portal, such as username and password, after the portal is available for use. Sincerely, Blake Purnell, Project Manager Plant licensing Branch 111-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, and 50-440 cc: Distribution via Listserv P.Sena -2 The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation to the NRC stating that you agree to the terms and conditions set forth in this letter. Should you have any questions regarding the Mitigation Strategies online reference portal, please contact Ms. Jessica Kratchman, Project Manager, at 301-415-5112, or via email at Jessica.Kratchman@nrc.gov. In addition, please email Ms. Kratchman with the information that is needed to access the portal, such as username and password, after the portal is available for use. Sincerely, I RAI Blake Purnell, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, and 50-440 cc: Distribution via Listserv DISTRIBUTION: PUBLIC MMitchell, LPL3-2 R/F JKratchman, LPL 1-2 R/F JEvans, JLD RidsNrrDorlLpl3-2 Resource REnnis, DORL RidsNrrDorlLpl1-2 Resource MKhanna, DORL RidsNrrPMBeaverValley Resource RidsNrrPMDavisBesse Resource RidsNrrLASRohrer Resource RidsNrrPMPerry Resource RidsAcrsAcnw _MaiICTR Resource RidsNrrLASABaxter Resource RidsRgn3MailCenter Resource RidsRgn1 MailCenter Resource ADAMS Accession No'<. ML 13183A216 *via email OFFICE LPL3-2/PM LPL3-2/LA JLD/BC LPL3-2/BC LPL3-2/PM NAME BPurnell SRohrer (SFigueora)* MMitchell BPurnell DATE 7/2/13 7/2/13 7/2/13 7/3/13 7/3/13 OFFICIAL RECORD COpy
The online reference portal would allow the NRC staff to audit the licensees' onsite documents that support the information in the submittal.
}}
Documents that are necessary to support the NRC staff safety evaluation of the submittal will be identified by the NRC staff. The licensee will be formally requested to submit those documents on the NRC docket. Use of the online reference portal is acceptable as long as the following conditions are met: The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis; The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and Conditions of use of the online reference portal will be displayed on the log-in screen and will require concurrence by each user. The NRC staff requests that the portal be populated, as a minimum, with the references included in the submittal such as draWings, procedures, and calculations.
This will help to increase the effectiveness and timeliness of the NRC staff's review. The NRC requests that the portal be ready for access to the NRC staff, within two weeks of receipt of this letter.
P. Sena -2 The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation to the NRC stating that you agree to the terms and conditions set forth in this letter. Should you have any questions regarding the Mitigation Strategies online reference portal, please contact Ms. Jessica Kratchman, Project Manager, at 301-415-5112, orvia email at Jessica.Kratchman@nrc.gov.
In addition, please email Ms. Kratchman with the information that is needed to access the portal, such as username and password, after the portal is available for use. Sincerely, Blake Purnell, Project Manager Plant licensing Branch 111-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, and 50-440 cc: Distribution via Listserv P.Sena -2 The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation to the NRC stating that you agree to the terms and conditions set forth in this letter. Should you have any questions regarding the Mitigation Strategies online reference portal, please contact Ms. Jessica Kratchman, Project Manager, at 301-415-5112, or via email at Jessica.Kratchman@nrc.gov.
In addition, please email Ms. Kratchman with the information that is needed to access the portal, such as username and password, after the portal is available for use. Sincerely, I RAI Blake Purnell, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, and 50-440 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC MMitchell, LPL3-2 R/F JKratchman, LPL 1-2 R/F JEvans, JLD RidsNrrDorlLpl3-2 Resource REnnis, DORL RidsNrrDorlLpl1-2 Resource MKhanna, DORL RidsNrrPMBeaverValley Resource RidsNrrPMDavisBesse Resource RidsNrrLASRohrer Resource RidsNrrPMPerry Resource RidsAcrsAcnw
_MaiICTR Resource RidsNrrLASABaxter Resource RidsRgn3MailCenter Resource RidsRgn1 MailCenter Resource ADAMS Accession No'<. ML 13183A216  
*via email OFFICE LPL3-2/PM LPL3-2/LA JLD/BC LPL3-2/BC LPL3-2/PM NAME BPurnell SRohrer (SFigueora)*
MMitchell BPurnell DATE 7/2/13 7/2/13 7/2/13 7/3/13 7/3/13 OFFICIAL RECORD COpy}}

Revision as of 05:08, 14 July 2018

Davis-Besse Nuclear Power Station, Unit 1, Beaver Valley Power Station, Units 1 and 2, and Perry Nuclear Power Plant, Unit No. 1 -Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049
ML13183A216
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 07/03/2013
From: Purnell B A
Plant Licensing Branch III
To: Sena P P
FirstEnergy Nuclear Operating Co
Blake Purnell, NRR/DORL 415-1380
References
TAC MF0841, TAC MF0842, TAC MF0961, TAC MF0962
Download: ML13183A216 (2)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 July 3, 2013 Mr. Peter P. Sena, III President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron,OH 44320 DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1; BEAVER VALLEY POWER STATION, UNITS 1 AND 2; AND PERRY NUCLEAR POWER PLANT, UNIT NO.1 -ONLINE REFERENCE PORTAL FOR REVIEW OF MITIGATION STRATEGIES SUBMITTAL IN RESPONSE TO ORDER EA-12-049 (TAC NOS. MF0841, MF0842, MF0961, AND MF0962)

Dear Mr. Sena:

By letter dated February 27,2013, FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted a response to Order EA-12-049 (Mitigation Strategies) for Davis-Besse Nuclear Power Station, Unit No.1; Beaver Valley Power Station, Units 1 and 2; and Perry Nuclear Power Plant, Unit NO.1. To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) review, the licensees' representatives and the NRC staff have discussed the use of an online reference portal ';Iat would allow the NRC staff and contractors limited read-only access to the basis documents and other reference materials cited in your submittal.

The online reference portal would allow the NRC staff to audit the licensees' onsite documents that support the information in the submittal.

Documents that are necessary to support the NRC staff safety evaluation of the submittal will be identified by the NRC staff. The licensee will be formally requested to submit those documents on the NRC docket. Use of the online reference portal is acceptable as long as the following conditions are met: The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis; The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and Conditions of use of the online reference portal will be displayed on the log-in screen and will require concurrence by each user. The NRC staff requests that the portal be populated, as a minimum, with the references included in the submittal such as draWings, procedures, and calculations.

This will help to increase the effectiveness and timeliness of the NRC staff's review. The NRC requests that the portal be ready for access to the NRC staff, within two weeks of receipt of this letter.

P. Sena -2 The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation to the NRC stating that you agree to the terms and conditions set forth in this letter. Should you have any questions regarding the Mitigation Strategies online reference portal, please contact Ms. Jessica Kratchman, Project Manager, at 301-415-5112, orvia email at Jessica.Kratchman@nrc.gov.

In addition, please email Ms. Kratchman with the information that is needed to access the portal, such as username and password, after the portal is available for use. Sincerely, Blake Purnell, Project Manager Plant licensing Branch 111-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, and 50-440 cc: Distribution via Listserv P.Sena -2 The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation to the NRC stating that you agree to the terms and conditions set forth in this letter. Should you have any questions regarding the Mitigation Strategies online reference portal, please contact Ms. Jessica Kratchman, Project Manager, at 301-415-5112, or via email at Jessica.Kratchman@nrc.gov.

In addition, please email Ms. Kratchman with the information that is needed to access the portal, such as username and password, after the portal is available for use. Sincerely, I RAI Blake Purnell, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, and 50-440 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC MMitchell, LPL3-2 R/F JKratchman, LPL 1-2 R/F JEvans, JLD RidsNrrDorlLpl3-2 Resource REnnis, DORL RidsNrrDorlLpl1-2 Resource MKhanna, DORL RidsNrrPMBeaverValley Resource RidsNrrPMDavisBesse Resource RidsNrrLASRohrer Resource RidsNrrPMPerry Resource RidsAcrsAcnw

_MaiICTR Resource RidsNrrLASABaxter Resource RidsRgn3MailCenter Resource RidsRgn1 MailCenter Resource ADAMS Accession No'<. ML 13183A216

  • via email OFFICE LPL3-2/PM LPL3-2/LA JLD/BC LPL3-2/BC LPL3-2/PM NAME BPurnell SRohrer (SFigueora)*

MMitchell BPurnell DATE 7/2/13 7/2/13 7/2/13 7/3/13 7/3/13 OFFICIAL RECORD COpy