Other: L-13-243, Firstenergy Nuclear Operating Companys, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No, L-13-254, Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049, L-14-025, Firstenergy Nuclear Operating Companys Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-, L-14-257, Davis-Bes, Perry, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Reqard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, L-15-002, Firstenergy Nuclear Operating Companys (Fenocs) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies, L-15-219, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External, L-16-004, Sixth Six-Month Status Report in Response to March 12. 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), ML13364A166, ML14029A021, ML15152A218, ML15292A139
|
MONTHYEARL-13-035, Firstenergy Nuclear Operating Companys Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12013-02-27027 February 2013 Firstenergy Nuclear Operating Companys Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-1 Project stage: Other L-13-057, Overall Integrated Plan in Response to March 12, 2012 Commission Order Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2013-02-27027 February 2013 Overall Integrated Plan in Response to March 12, 2012 Commission Order Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) Project stage: Other DCL-13-021, Areva Affidavit for Areva Calculations 32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and 32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer N2013-03-0505 March 2013 Areva Affidavit for Areva Calculations #32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and #32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Noz Project stage: Request DCL-13-024, Supplement to ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 22013-03-0707 March 2013 Supplement to ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 2 Project stage: Supplement L-13-156, Capability of Perform Offsite Dose Assessment During an Event Involving Multiple Release Sources2013-06-25025 June 2013 Capability of Perform Offsite Dose Assessment During an Event Involving Multiple Release Sources Project stage: Request ML13172A1792013-06-25025 June 2013 Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: RAI ML13183A2162013-07-0303 July 2013 Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049 Project stage: Approval L-13-234, Response to Request for Additional Information Regarding Firstenergy Nuclear Operating Companys (Fenocs) Overall Integrated Plan in Response to 03/12/2012 Commission Order Issuance of Order to Modify2013-07-18018 July 2013 Response to Request for Additional Information Regarding Firstenergy Nuclear Operating Companys (Fenocs) Overall Integrated Plan in Response to 03/12/2012 Commission Order Issuance of Order to Modify Project stage: Response to RAI ML13211A1682013-07-26026 July 2013 Westinghouse, Notification of Potential Existence of Defects Pursuant to 10 CFR Part 21 Inconsistency Between the Intended Design Functionality of the Shield Passive Thermal Shutdown Seal (SDS) and That Observed During Post-Service Testing Project stage: Request L-13-254, Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-0492013-08-0505 August 2013 Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049 Project stage: Other L-13-244, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)2013-08-26026 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) Project stage: Other L-13-243, Firstenergy Nuclear Operating Companys, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No2013-08-26026 August 2013 Firstenergy Nuclear Operating Companys, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No Project stage: Other IR 05000412/20132012013-08-26026 August 2013 FENOC, Closed Meeting Notice 13-02, Requested a Regulatory Conference with the NRC to Discuss IR 05000354 and 05000412/2013201 Project stage: Request ML13232A3082013-08-28028 August 2013 Relief Request REP-1 U2, Revision 2, Alternative to Code Requirements for Pressurizer Structural Weld Overlays, for the Third 10-Year Inservice Inspection Interval Project stage: Approval L-13-274, Response to Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations2013-08-28028 August 2013 Response to Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations Project stage: Request ML13273A3742013-09-30030 September 2013 September 2013 Status Update Letter Project stage: Request ML13277A7252013-10-0303 October 2013 Intervenors Memorandum in Opposition to FENOCs Petition for Certification of Waste Confidence-Related Question to the Commission Pursuant to 10CFR2.323(f)(2) Project stage: Request ML13297A2332013-11-19019 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: RAI ML14014A2092014-01-14014 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Perry Nuclear Power Plant, Unit 1, TAC No.: MF0962 (Revision 1) Project stage: Other ML13338A4602014-01-22022 January 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies Project stage: Other ML14029A0212014-01-28028 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Beaver Valley Power Station, Units 1 and 2, TAC Nos.: MF0841 and MF0842 (Revision 2) Project stage: Other ML13364A1662014-01-29029 January 2014 Interim Staff Evaluation Related to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Other ML14042A2942014-02-19019 February 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Davis-Besse Nuclear Power Station, TAC No.: MF0961 Project stage: Other ML14007A6702014-02-21021 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Other L-14-024, Firstenergy Nuclear Operating Companys (Fenocs) Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-02-27027 February 2014 Firstenergy Nuclear Operating Companys (Fenocs) Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other L-14-025, Firstenergy Nuclear Operating Companys Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-2014-02-27027 February 2014 Firstenergy Nuclear Operating Companys Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- Project stage: Other L-14-119, Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-04-25025 April 2014 Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Request ML14120A0492014-05-20020 May 2014 Relaxation of the Schedule Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events, Project stage: Approval L-14-259, Firstenergy Nuclear Operating Companys (Fenocs) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Companys (Fenocs) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other L-14-257, Davis-Bes, Perry, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Reqard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-28028 August 2014 Davis-Bes, Perry, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Reqard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other L-14-285, Revision of Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-09-25025 September 2014 Revision of Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other L-14-401, 2734296-R-010, Rev. 0, Expedited Seismic Evaluation Process (ESEP) Report Davis-Besse Nuclear Power Station2014-11-0303 November 2014 2734296-R-010, Rev. 0, Expedited Seismic Evaluation Process (ESEP) Report Davis-Besse Nuclear Power Station Project stage: Request ML14321A0572014-11-19019 November 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other L-15-001, Firstenergy Nuclear Operating Companys (Fenocs) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool2015-02-26026 February 2015 Firstenergy Nuclear Operating Companys (Fenocs) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Project stage: Other L-15-002, Firstenergy Nuclear Operating Companys (Fenocs) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies2015-02-26026 February 2015 Firstenergy Nuclear Operating Companys (Fenocs) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies Project stage: Other L-15-097, Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-03-26026 March 2015 Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Request ML15089A1822015-04-15015 April 2015 Relaxation of the Schedule Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Project stage: Approval ML15098A0562015-06-0101 June 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other ML15152A2182015-06-0909 June 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other L-15-218, Firstenergy Nuclear Operating Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2015-08-18018 August 2015 Firstenergy Nuclear Operating Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) Project stage: Other L-15-219, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External2015-08-27027 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Project stage: Other ML15286A2942015-10-14014 October 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other ML15292A1392015-11-0202 November 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other L-15-337, Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool2015-12-21021 December 2015 Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool Project stage: Other L-16-004, Sixth Six-Month Status Report in Response to March 12. 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to March 12. 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other L-16-123, Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-09-23023 September 2016 Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other 2014-11-03
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 3, 2013 Mr. Peter P. Sena, III President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron,OH 44320
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1; BEAVER VALLEY POWER STATION, UNITS 1 AND 2; AND PERRY NUCLEAR POWER PLANT, UNIT NO.1 - ONLINE REFERENCE PORTAL FOR REVIEW OF MITIGATION STRATEGIES SUBMITTAL IN RESPONSE TO ORDER EA-12-049 (TAC NOS. MF0841, MF0842, MF0961, AND MF0962)
Dear Mr. Sena:
By letter dated February 27,2013, FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted a response to Order EA-12-049 (Mitigation Strategies) for Davis-Besse Nuclear Power Station, Unit No.1; Beaver Valley Power Station, Units 1 and 2; and Perry Nuclear Power Plant, Unit NO.1.
To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) review, the licensees' representatives and the NRC staff have discussed the use of an online reference portal ';Iat would allow the NRC staff and contractors limited read-only access to the basis documents and other reference materials cited in your submittal. The online reference portal would allow the NRC staff to audit the licensees' onsite documents that support the information in the submittal. Documents that are necessary to support the NRC staff safety evaluation of the submittal will be identified by the NRC staff. The licensee will be formally requested to submit those documents on the NRC docket. Use of the online reference portal is acceptable as long as the following conditions are met:
- The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis;
- The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and
- Conditions of use of the online reference portal will be displayed on the log-in screen and will require concurrence by each user.
The NRC staff requests that the portal be populated, as a minimum, with the references included in the submittal such as draWings, procedures, and calculations. This will help to increase the effectiveness and timeliness of the NRC staff's review. The NRC requests that the portal be ready for access to the NRC staff, within two weeks of receipt of this letter.
P. Sena
- 2 The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation to the NRC stating that you agree to the terms and conditions set forth in this letter.
Should you have any questions regarding the Mitigation Strategies online reference portal, please contact Ms. Jessica Kratchman, Project Manager, at 301-415-5112, orvia email at Jessica.Kratchman@nrc.gov. In addition, please email Ms. Kratchman with the information that is needed to access the portal, such as username and password, after the portal is available for use.
Sincerely, Blake Purnell, Project Manager Plant licensing Branch 111-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, and 50-440 cc: Distribution via Listserv
P.Sena
- 2 The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation to the NRC stating that you agree to the terms and conditions set forth in this letter.
Should you have any questions regarding the Mitigation Strategies online reference portal, please contact Ms. Jessica Kratchman, Project Manager, at 301-415-5112, or via email at Jessica.Kratchman@nrc.gov. In addition, please email Ms. Kratchman with the information that is needed to access the portal, such as username and password, after the portal is available for use.
Sincerely, I RAI Blake Purnell, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, and 50-440 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC MMitchell, ~ILD LPL3-2 R/F JKratchman, ~ILD LPL 1-2 R/F JEvans, JLD RidsNrrDorlLpl3-2 Resource REnnis, DORL RidsNrrDorlLpl1-2 Resource MKhanna, DORL RidsNrrPMBeaverValley Resource RidsNrrPMDavisBesse Resource RidsNrrLASRohrer Resource RidsNrrPMPerry Resource RidsAcrsAcnw _MaiICTR Resource RidsNrrLASABaxter Resource RidsRgn3MailCenter Resource RidsRgn1 MailCenter Resource ADAMS Accession No'<. ML13183A216
- via email OFFICE LPL3-2/PM LPL3-2/LA JLD/BC LPL3-2/BC LPL3-2/PM NAME BPurnell SRohrer (SFigueora)*
MMitchell
~IBowen BPurnell DATE 7/2/13 7/2/13 7/2/13 7/3/13 7/3/13 OFFICIAL RECORD COpy