{{#Wiki_filter:1NRR-PMDAPEm Resource From:Saba, Farideh Sent:Monday, August 18, 2014 3:26 PM To:ken.frehafer@fpl.com Cc:Lewis, Atanya (Atanya.Lewis@fpl
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Saba, Farideh Sent: Monday, August 18, 2014 3:26 PM To: ken.frehafer@fpl.com Cc: Lewis, Atanya (Atanya.Lewis@fpl.com); eric.katzman@fpl.com
.com); eric.katzman@fpl.com


==Subject:==
==Subject:==
Line 25: Line 24:
Attachments:
Attachments:
MF4339_SL 2 RAI.docx Importance:
MF4339_SL 2 RAI.docx Importance:
HighKen, By letter dated June 30, 2014, (Agencywide Docu ments Access and Management System (ADAMS) Accession Number ML114203A047), the licensee, Florida Power and Light, submitted Request for Relief (RR) 17, Revision 0 from the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components for St. Lucie, Unit 2. The request for relief applies to the third 10-year ISI interval, in which the licensee adopted the 1998 Edition through the 2000 Addenda of ASME Code Section XI as the code of record.  
High Ken, By letter dated June 30, 2014, (Agencywide Docu ments Access and Management System (ADAMS) Accession Number ML114203A047), the licensee, Florida Power and Light, submitted Request for Relief (RR) 17, Revision 0 from the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components for St. Lucie, Unit 2. The request for relief applies to the third 10-year ISI interval, in which the licensee adopted the 1998 Edition through the 2000 Addenda of ASME Code Section XI as the code of record.  


The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined the information in the attached document is required to complete the evaluation. Draft RAIs were sent to the licensee by an email on August 1, 2014. You have confirmed today during our telephone communications that you do not need any clarification call and can support the NRC staff requested response date of September 1,  
The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined the information in the attached document is required to complete the evaluation. Draft RAIs were sent to the licensee by an email on August 1, 2014. You have confirmed today during our telephone communications that you do not need any clarification call and can support the NRC staff requested response date of September 1, 2014. Thanks, Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV
 
2014. Thanks, Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV


Hearing Identifier:  NRR_PMDA Email Number:  1512  Mail Envelope Properties  (Farideh.Saba@nrc.gov20140818152500)   
Hearing Identifier:  NRR_PMDA Email Number:  1512  Mail Envelope Properties  (Farideh.Saba@nrc.gov20140818152500)   

Revision as of 12:42, 9 July 2018

2014/08/18 NRR E-mail Capture - RAI on the Third 10-year Inservice Inspection Interval Request for Relief No. 17 for St. Lucie Unit 2 (MF4339)
ML14231A289
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/18/2014
From: Saba F E
Division of Operating Reactor Licensing
To: Frehafer K
Florida Power & Light Co
References
MF4339
Download: ML14231A289 (3)


Text

1 NRR-PMDAPEm Resource From: Saba, Farideh Sent: Monday, August 18, 2014 3:26 PM To: ken.frehafer@fpl.com Cc: Lewis, Atanya (Atanya.Lewis@fpl.com); eric.katzman@fpl.com

Subject:

RAI on the third 10-year Inservice Inspection In terval Request for Relief No. 17 for St. Lucie Unit 2 (MF4339)

Attachments:

MF4339_SL 2 RAI.docx Importance:

High Ken, By letter dated June 30, 2014, (Agencywide Docu ments Access and Management System (ADAMS) Accession Number ML114203A047), the licensee, Florida Power and Light, submitted Request for Relief (RR) 17, Revision 0 from the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components for St. Lucie, Unit 2. The request for relief applies to the third 10-year ISI interval, in which the licensee adopted the 1998 Edition through the 2000 Addenda of ASME Code Section XI as the code of record.

The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined the information in the attached document is required to complete the evaluation. Draft RAIs were sent to the licensee by an email on August 1, 2014. You have confirmed today during our telephone communications that you do not need any clarification call and can support the NRC staff requested response date of September 1, 2014. Thanks, Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV

Hearing Identifier: NRR_PMDA Email Number: 1512 Mail Envelope Properties (Farideh.Saba@nrc.gov20140818152500)

Subject:

RAI on the third 10-year Inservice Inspection Interval Request for Relief No. 17 for St. Lucie Unit 2 (MF4339) Sent Date: 8/18/2014 3:25:42 PM Received Date: 8/18/2014 3:25:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: "Lewis, Atanya (Atanya.Lewis@fpl.com)" <Atanya.Lewis@fpl.com> Tracking Status: None "eric.katzman@fpl.com" <eric.katzman@fpl.com> Tracking Status: None "ken.frehafer@fpl.com" <ken.frehafer@fpl.com>

Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1265 8/18/2014 3:25:00 PM MF4339_SL 2 RAI.docx 29436 Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received: ZZZ REQUEST FOR ADDITIONAL INFORMATION (RAI)

ON THE THIRD TEN YEAR 10-YEAR INSERVICE INSPECTION INTERVAL REQUEST FOR RELIEF 17, REVISON 0 FLORIDA POWER AND LIGHT ST LUCIE, UNIT 2 DOCKET NUMBER: 50-389 TAC No. MF4339 By letter dated June 30, 2014, (Agencywide Documents Access and Management System (ADAMS) Accession Number ML114203A047), the licensee, Florida Power and Light, submitted Request for Relief (RR) 17, Revision 0 from the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components for St Lucie, Unit 2(PSL-2). The request for relief applies to the third 10-year inservice inspection (ISI) interval, in which the licensee adopted the 1998 Edition through the 2000 Addenda of ASME Code Section XI as the code of record.

In accordance with 10 CFR 50.55a(g)(5)(iii), the licensee has submitted the subject request for relief for limited examinations in multiple ASME Code Examination Categories. The ASME Code requires that 100 percent of the examination volumes, or surface areas, described in Table IWB-2500 be performed during each interval.

10 CFR 50.55a(g)(5)(iii) states that when licensees determine that conformance with ASME Code requirements is impractical at their facility, they shall submit information to support this determination. The NRC will evaluate such requests based on impracticality, and may impose alternatives, giving due consideration to public safety and the burden imposed on the licensee.

The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined the following information is required to complete the evaluation.

RAIs Regarding Request for Relief 17 from ASME Code,Section XI, Examination Category B-A, Items B1.10, B1.11, B1.12, B1.20, B1.21, and B1.22 Pressure Retaining Welds in Vessels in Reactor Vessels, PSL-2 RAI 1 It appears that only the percentage of the interferences was provided for each examination and the volumetric coverage was provided in the CAD drawings. Provide the volumetric coverage obtained for each weld examination in a table to insure that all of the volumetric examination coverages were listed in Request for Relief No. 17, Revision 0.

RAI 2 Fully clarify the wave modality and insonification angles used for all ultrasonic examinations. It appears they were 45 Degrees Shear, 45 degrees and 70 degrees Longitudinal scans based on Figure 1 of the licensee's submittal.