| {{#Wiki_filter:Bill CarskyPlant ManagerExelon Generation° R.E. Ginna Nuclear Power Plant1503 Lake Rd.Ontario, NY 14519315 791 5205 Office215 605 9364 Mobilewww.exeloncorp.com William~carsky@exeloncorp.corn September 24, 2015U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: | | {{#Wiki_filter:Bill Carsky Plant Manager Exelon Generation° R.E. Ginna Nuclear Power Plant 1503 Lake Rd.Ontario, NY 14519 315 791 5205 Office 215 605 9364 Mobile www.exeloncorp.com William~carsky@exeloncorp.corn September 24, 2015 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: |
| Document Control Desk | | Document Control Desk |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| R.E. Ginna Nuclear Power PlantRenewed Facility Operating License No. DPR-1 8Docket No. 50-244Thirty (30) Day Special ReportIn accordance with Section 3.3 and Table 3.3-1, Action 1, of the R.E. Ginna Nuclear PowerPlant Offsite Dose Calculation Manual (ODCM), Revision 30, this special report is beingsubmitted due to a radiation monitor being inoperable for greater than 30 days. Section 3.3of the ODCM requires that the radiation monitor be operable during all modes of operation. | | R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-1 8 Docket No. 50-244 Thirty (30) Day Special Report In accordance with Section 3.3 and Table 3.3-1, Action 1, of the R.E. Ginna Nuclear Power Plant Offsite Dose Calculation Manual (ODCM), Revision 30, this special report is being submitted due to a radiation monitor being inoperable for greater than 30 days. Section 3.3 of the ODCM requires that the radiation monitor be operable during all modes of operation. |
| : However, radiation monitor RM-14A, Plant Vent Accident Range Radiation
| | However, radiation monitor RM-14A, Plant Vent Accident Range Radiation Monitor, was inoperable for greater than 30 days. This report outlines the action taken, the cause of the inoperability, and period of time the monitor was inoperable. |
| : Monitor, wasinoperable for greater than 30 days. This report outlines the action taken, the cause of theinoperability, and period of time the monitor was inoperable.
| | Radiation monitor RM-14A, was taken out of service on 8/12/15 at 0236 for replacement of upgraded equipment under ECP 13-000030. |
| Radiation monitor RM-14A, was taken out of service on 8/12/15 at 0236 for replacement ofupgraded equipment under ECP 13-000030. | | However, due to challenges to the work schedule presented by unusually high temperatures in the Intermediate Building from unseasonably hot weather, the modification was not completed within 30 days. Installation and testing have been completed and the radiation monitor was returned to operable status on 9/23/1 5. During the time that RM-14A was Out of Service, compensatory measures were in place.Return to service of the radiation monitor was delayed based on worker safety issues with heat stress. Corrective Action Program issue report 2555033 was opened to document the radiation monitor being inoperable for greater than 30 days.There are no regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Thomas Harding at 315-791-5219. |
| : However, due to challenges to the workschedule presented by unusually high temperatures in the Intermediate Building fromunseasonably hot weather, the modification was not completed within 30 days. Installation and testing have been completed and the radiation monitor was returned to operable statuson 9/23/1 5. During the time that RM-14A was Out of Service, compensatory measures werein place.Return to service of the radiation monitor was delayed based on worker safety issues withheat stress. Corrective Action Program issue report 2555033 was opened to document theradiation monitor being inoperable for greater than 30 days.There are no regulatory commitments contained in this letter. Should you have anyquestions regarding this submittal, please contact Thomas Harding at 315-791-5219.
| | Sincerely, ,, L WC/kc J cc: NRC Re ~ isftor, RE NRC Project Manager, Ginna NRC Resident Inspector, Ginna egion I AJ~?Z wOPLAf _- /00 301"5}} |
| Sincerely, | |
| ,, LWC/kc Jcc: NRC Re ~ isftor, RENRC Project Manager, GinnaNRC Resident Inspector, Ginnaegion IAJ~?ZwOPLAf _- /00 301"5}} | |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:Licensee 30-Day Written Event Report
MONTHYEARML15275A2732015-09-24024 September 2015 Submits Thirty (30) Day Special Report Due to a Radiation Monitor Being Inoperable for Greater than 30 Days ML12233A6212012-08-16016 August 2012 ECCS 30-Day Report for the Thermal Conductivity Degradation Impact on Large Break Loss of Coolant Accident Analysis with Astrum ML11347A1952011-12-0606 December 2011 R. E. Ginna Nuclear Power Plant - Thirty (30) Day Special Report - Inoperable Radiation Monitors ML11221A0232011-08-0202 August 2011 Thirty (30) Day Special Report ML0720603692007-07-0505 July 2007 Follow-up Summary of Close-Out of July 4, 2007 Unusual Event Classification ML0420802562004-07-20020 July 2004 Thirty (30) Day Special Report Inoperable Fire Barrier Component, Due to Door Blocked Open for Ginna Nuclear Power Plant ML0322506402003-08-0707 August 2003 Special Report, Containment Area Radiation (High Range) Instrumentation Inoperable for More than 30 Days ML18143A9601976-05-25025 May 1976 R. E. Ginna - Supplemental Report on Reportable Occurrence 76-12, 30-Day Report, Containment Personnel Airlock Handwheel Shaft Seal Excessive Leakage During Testing 2015-09-24
[Table view] |
Text
Bill Carsky Plant Manager Exelon Generation° R.E. Ginna Nuclear Power Plant 1503 Lake Rd.Ontario, NY 14519 315 791 5205 Office 215 605 9364 Mobile www.exeloncorp.com William~carsky@exeloncorp.corn September 24, 2015 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:
Document Control Desk
SUBJECT:
R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-1 8 Docket No. 50-244 Thirty (30) Day Special Report In accordance with Section 3.3 and Table 3.3-1, Action 1, of the R.E. Ginna Nuclear Power Plant Offsite Dose Calculation Manual (ODCM), Revision 30, this special report is being submitted due to a radiation monitor being inoperable for greater than 30 days. Section 3.3 of the ODCM requires that the radiation monitor be operable during all modes of operation.
However, radiation monitor RM-14A, Plant Vent Accident Range Radiation Monitor, was inoperable for greater than 30 days. This report outlines the action taken, the cause of the inoperability, and period of time the monitor was inoperable.
Radiation monitor RM-14A, was taken out of service on 8/12/15 at 0236 for replacement of upgraded equipment under ECP 13-000030.
However, due to challenges to the work schedule presented by unusually high temperatures in the Intermediate Building from unseasonably hot weather, the modification was not completed within 30 days. Installation and testing have been completed and the radiation monitor was returned to operable status on 9/23/1 5. During the time that RM-14A was Out of Service, compensatory measures were in place.Return to service of the radiation monitor was delayed based on worker safety issues with heat stress. Corrective Action Program issue report 2555033 was opened to document the radiation monitor being inoperable for greater than 30 days.There are no regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Thomas Harding at 315-791-5219.
Sincerely, ,, L WC/kc J cc: NRC Re ~ isftor, RE NRC Project Manager, Ginna NRC Resident Inspector, Ginna egion I AJ~?Z wOPLAf _- /00 301"5