ML16217A344: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 19: | Line 19: | ||
{{#Wiki_filter:ES-301 Control Room/In | {{#Wiki_filter:ES-301 Control Room/In | ||
-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination: | -Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination: | ||
__6/20/ | __6/20/1 6 thru 6/2 0/1 6 __ Exam Level: RO SRO(I) SRO(U) Operating Test No.: | ||
__DB NRC | __DB NRC 201 6__ Control Room Systems | ||
@ (8 for RO); (7 for SRO | @ (8 for RO); (7 for SRO | ||
-I); (2 or 3 for SRO | -I); (2 or 3 for SRO | ||
-U) System / JPM Title Type Code* | -U) System / JPM Title Type Code* | ||
Safety Function S1 - (001) / Swap CRD Booster Pumps (Alt Path - Loss of CRDM cooling flow) | Safety Function S1 - (001) / Swap CRD Booster Pumps (Alt Path - Loss of CRDM cooling flow) | ||
(JPM New) | (JPM New) N, A, S 1 S2 - (006) / Transfer LPI Suction to the Emergency Sump (Alt Path - Failure of Permit Interlock) | ||
N, A, S 1 S2 - (006) / Transfer LPI Suction to the Emergency Sump (Alt Path - Failure of Permit Interlock) | (JPM 291) D, A, S, E, EN 2 S7 - (012) / Deenergize Source Range NIs (JPM 185) D, S, L 7 In-Plant Systems | ||
(JPM 291) | |||
D, A, S, E, EN 2 S7 - (012) / Deenergize Source Range NIs (JPM 185) | |||
D, S, L 7 In-Plant Systems | |||
@ (3 for RO); (3 for SRO | @ (3 for RO); (3 for SRO | ||
-I); (3 or 2 for SRO | -I); (3 or 2 for SRO | ||
-U) P2 - ( | -U) P2 - (0 39) / Locally Operate Atmospheric Vent Valve ICS11A (JPM 024) D, E, R 4s P3 - (064) / Energize Station Blackout Diesel Generator Auxiliaries (Alt Path - Cooling Fan Failure | ||
D, E, R 4s P3 - (064) / Energize Station Blackout Diesel Generator Auxiliaries (Alt Path | ) (JPM 258) D, A 6 @ All RO and SRO control room (and in | ||
- Cooling Fan Failure | |||
) (JPM 258) | |||
D, A 6 @ All RO and SRO control room (and in | |||
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | -plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | ||
*Type Codes Criteria for RO | *Type Codes Criteria for RO |
Revision as of 06:58, 8 July 2018
ML16217A344 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 08/02/2016 |
From: | Operations Branch III |
To: | FirstEnergy Nuclear Operating Co |
Shared Package | |
ML15274A353 | List: |
References | |
L-16-044 | |
Download: ML16217A344 (1) | |
Text
ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:
__6/20/1 6 thru 6/2 0/1 6 __ Exam Level: RO SRO(I) SRO(U) Operating Test No.:
__DB NRC 201 6__ Control Room Systems
-I); (2 or 3 for SRO
-U) System / JPM Title Type Code*
Safety Function S1 - (001) / Swap CRD Booster Pumps (Alt Path - Loss of CRDM cooling flow)
(JPM New) N, A, S 1 S2 - (006) / Transfer LPI Suction to the Emergency Sump (Alt Path - Failure of Permit Interlock)
(JPM 291) D, A, S, E, EN 2 S7 - (012) / Deenergize Source Range NIs (JPM 185) D, S, L 7 In-Plant Systems
-I); (3 or 2 for SRO
-U) P2 - (0 39) / Locally Operate Atmospheric Vent Valve ICS11A (JPM 024) D, E, R 4s P3 - (064) / Energize Station Blackout Diesel Generator Auxiliaries (Alt Path - Cooling Fan Failure
) (JPM 258) D, A 6 @ All RO and SRO control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 / / > 1 (control room system)
(randomly selected)