June 22, 2017, letters, the NRC staff could reach different conclusions.  
June 22, 2017, letters, the NRC staff could reach different conclusions.  


If you have any questions, please contact Steven Lynch at 301-415-1524, or by electronic mail at Steven.Lynch@nrc.gov
If you have any questions, please contact Steven Lynch at 301-415-1524, or by electronic mail at Steven.Lynch@nrc.gov. Sincerely,          /RA/  Louise Lund, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation  
. Sincerely,  
         /RA/  Louise Lund, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation  


==Enclosure:==
==Enclosure:==
Line 53: Line 51:
101 E. Milwaukee Street, Suite 600 Janesville, WI 53545  
101 E. Milwaukee Street, Suite 600 Janesville, WI 53545  


Jeff Chamberlin National Nuclear Security Administration,  
Jeff Chamberlin National Nuclear Security Administration, NA-231 U.S. Department of Energy 1000 Independence Ave SW  Washington, DC  20585  
 
NA-231 U.S. Department of Energy 1000 Independence Ave SW  Washington, DC  20585  


Mark Paulson  
Mark Paulson  

Revision as of 21:33, 7 July 2018

Shine Medical Technologies, Inc. - NRC Staff Response to Request Regarding the Applicability of the Definition of Utilization Facility to the Shine Demonstration Unit
ML17142A432
Person / Time
Site: SHINE Medical Technologies
Issue date: 07/14/2017
From: Louise Lund
NRC/NRR/DPR/PRLB
To: Piefer G
SHINE Medical Technologies
Lynch S T
Shared Package
ML17142A431 List:
References
Download: ML17142A432 (5)


Text

July 14, 2017

Gregory Piefer, Ph.D.

Chief Executive Officer SHINE Medical Technologies, Inc. 101 E. Milwaukee Street, Suite 600 Janesville, WI 53545

SUBJECT:

SHINE MEDICAL TECHNOLOGIES, INC. - U.S. NUCLEAR REGULATORY COMMISSION STAFF RESPONSE TO REQUEST REGARDING THE APPLICABILITY OF THE DEFINITION OF UTILIZATION FACILITY TO THE SHINE DEMONSTRATION UNIT

Dear Dr. Piefer:

On February 29, 2016, the U.S. Nuclear Regulatory Commission (NRC or Commission) authorized the construction of the SHINE Medical Isotope Production Facility, consisting of eight utilization facilities (irradiation units) and one production facility, under Construction Permit No.

CPMIF-001 (Agencywide Documents Access and Management System [ADAMS] Accession No. ML16041A471) for the production of medical radioisotopes.

By letters dated March 17, 2017, and June 22, 2017 (ADAMS Accession Nos. ML17079A476 and ML17173A013, respectively), SHINE Medical Technologies, Inc. (SHINE) submitted to the NRC information on its plans to conduct a series of short-duration tests within an accelerator-driven subcritical operating assembly (demonstration unit) using a less than critical mass of low enriched uranium (LEU). SHINE would operate this demonstration unit to show certain operating characteristics of the proposed irradiation units described in the preliminary safety analysis report (PSAR) (ADAMS Accession No. ML15258A431) included in its construction permit application and assigned Docket No. 50-608. SHINE's March 17, 2017, letter requests that the NRC staff confirm that the planned demonstration unit would not meet the definition of "utilization facility" in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.2, "Definitions."

Previously, the NRC staff had determined in SECY-14-0061, "Direct Final Rule: Adding SHINE Medical Technologies, Inc.'s Accelerator-Driven Subcritical Operating Assembly to the Definition of Utilization Facility," that the safety considerations associated with SHINE's proposed irradiation units closely resembled those of former and currently operating non-power reactors (ADAMS Accession No. ML14052A123). The NRC staff thus proposed, and the Commission approved, a direct final rule that modified the definition of "utilization facility" in 10 CFR 50.2 to include SHINE's proposed irradiation units. The direct final rule was published in the Federal Register on October 17, 2014 (79 FR 62329).

As described in the March 17, 2017, letter, the demonstration unit would primarily consist of a deuterium-tritium accelerator, full-scale multiplier, and solution vessel. The demonstration unit would be contained within a concrete, light water-filled pit of dimensions similar to the irradiation unit cells of SHINE's proposed irradiation facility described in the construction permit application assigned Docket No. 50-608.

However, unlike the proposed irradiation units, SHINE does not expect that the demonstration unit would need to include a primary or other acti ve cooling system; reactivity protection system; engineered safety features to meet 10 CFR Part 20, "Standards for Protection Against Radiation," dose limits; or safety systems for the control of fission gases, the radiolytic decomposition of water and associated oxygen and hydrogen gas generation, or fission product inventory.

In response to SHINE's request, the NRC staff considered the definitions of "utilization facility" in 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," and the Atomic Energy Act of 1954, as amended (AEA); the safety and security characteristics of the demonstration unit and associated special nuclear material (SNM); and the relationship between SHINE's proposed irradiation units and the demonstration unit. In particular, the NRC staff considered the thermal power level, effective multiplication factor, potential accident scenarios, quantities of SNM, intended use, and location associated with the proposed operation of the demonstration unit to support its conclusions.

As described in the enclosure to this letter, the NRC staff has concluded that the demonstration unit would not meet the definitions of "utilization facility" in either 10 CFR 50.2 or the AEA. In particular, the demonstration unit, as described, is not a nuclear reactor. It is also not an accelerator-driven subcritical operating assembly used for the irradiation of materials containing SNM and described in the application assigned Docket No. 50-608. Further, it appears that the demonstration unit, if designed to operate as described, would not require engineered safety features or other safety systems to mitigate radiological releases to meet 10 CFR Part 20 dose limits and would not require a physical protection system. Therefore, the demonstration unit would not be capable of making use of SNM or atomic energy "in such quantity as to be of significance to the common defense and security" or "in such manner as to affect the health and safety of the public" and would not be considered an important component part especially designed for a utilization facility.

Since the information provided in SHINE's March 17, 2017, and June 22, 2017, letters is preliminary and does not constitute a license ap plication, this NRC staff response does not constitute either a review or approval of the design of the demonstration unit or a verification that the planned demonstration unit would perform as described. In addition, if the actual demonstration unit differs from the descriptions and information in SHINE's March 17, 2017, and

June 22, 2017, letters, the NRC staff could reach different conclusions.

If you have any questions, please contact Steven Lynch at 301-415-1524, or by electronic mail at Steven.Lynch@nrc.gov. Sincerely, /RA/ Louise Lund, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

Enclosure:

Response on Applicability of Definition of Utilization Facility cc: See next page SHINE External Stakeholder Mailing List Jeff Bartelme Licensing Manager SHINE Medical Technologies, Inc.

101 E. Milwaukee Street, Suite 600 Janesville, WI 53545

Jeff Chamberlin National Nuclear Security Administration, NA-231 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585

Mark Paulson

Supervisor

Radiation Protection Section Wisconsin Department of Health Services P.O. Box 2659

Madison, WI 53701-2659

TRTR Newsletter University of Florida Department of Nuclear Engineering Sciences 202 Nuclear Sciences Center

Gainesville, FL 32611

Mark Freitag City Manager P.O. Box 5005 Janesville, WI 53547-5005

Bill McCoy 1326 Putnam Avenue Janesville, WI 53546

Alfred Lembrich

541 Miller Avenue Janesville, WI 53548

Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546

Package: ML17142A431; Letter: ML17142A432;

Enclosure:

ML17142A433; *concurred via email NRR-088 OFFICE NRR/DPR/PRLB/PM* NRR/DPR/PROB/LA* NMSS/FCSE/ECB/BC* NAME SLynch NParker JZimmerman DATE 5/24/17 5/24/17 6/21/17 OFFICE NMSS/MSTR/ASPB/BC* NSIR/DPCP/FCTSB/BC* NRR/DPR/PROB/BC NAME PMichalak WGott AMendiola DATE 6/16/17 6/15/17 6/15/17 OFFICE RIII/DNMS/D* OGC NRR/DPR/PRLB/BC NAME JGiessner MYoung AAdams DATE 6/21/17 6/29/17 6/29/17 OFFICE NRR/DPR/D NAME LLund DATE 7/14/17