ML17309A555: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Fmxaa.X~rV i(ACCELERATED RIDSPROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9409290181 DOC.DATE:
{{#Wiki_filter:Fmxaa.X~rV i (ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9409290181 DOC.DATE: 94/09/27 NOTARIZED:
94/09/27NOTARIZED:
YES DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
YESDOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION MECREDY,R.C.
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3  
ProjectDirectorate I-3


==SUBJECT:==
==SUBJECT:==
Transmits requested changesto940513LAR,revising TSSection6.0,"Administrative Controls"
Transmits requested changes to 940513 LAR,revising TS Section 6.0,"Administrative Controls"&ack set of revised TS requirements discussed in LAR which will be reviewed by NRC at this time,per 940803 telcon w/NRC.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR I ENCL L SIZE: TITLE: OR Submittal:
&acksetofrevisedTSrequirements discussed inLARwhichwillbereviewedbyNRCatthistime,per940803telconw/NRC.DISTRIBUTION CODE:AOOIDCOPIESRECEIVED:LTR IENCLLSIZE:TITLE:ORSubmittal:
General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
GeneralDistribution NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERN: FILE CENTER 0 ARCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DE/EELB NRR/DRPW NRR/DS SA/SRXB OC/LFDCB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
05000244RECIPIENT IDCODE/NAME PD1-3LAJOHNSON,A INTERN:FILECENTER0ARCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3EXTERNAL:
PLEASE HELP US TO REDUCE IVASTE!CONTACT TIIE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT.504-2083)TO ELlih!INATE YOUR NAlIE PRO~I DISTRIBUTION LISTS I'OR DOCI;MENTS YOU DON"I'EED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 12 AND ROCHESTER GAS AND ELECI1C CORPORAT1ON
NOACCOPIESLTTRENCL1111111111111011RECIPIENT IDCODE/NAME PD1-3PDNRR/DE/EELB NRR/DRPWNRR/DSSA/SRXBOC/LFDCBNRCPDRCOPIESLTTRENCL111111111011NOTETOALL"RIDS"RECIPIENTS:
~89 EASTAVENUE, ROCHESTER, N.Y 1d6d9-OOOI ROBERT C MECREOY Vice President September 27, 1994 Cinna Nudear Production AREA CODE716 5'.27OO U.S.Nuclear Regulatory Commission Document Control Desk Attn: Allen R.Johnson Project Directorate I-3 Washington, D.C.20555  
PLEASEHELPUSTOREDUCEIVASTE!CONTACTTIIEDOCUMENTCONTROLDESK,ROOMPI-37(EXT.504-2083)TOELlih!INATEYOURNAlIEPRO~IDISTRIBUTION LISTSI'ORDOCI;MENTS YOUDON"I'EED!TOTALNUMBEROFCOPIESREQUIRED:
LTTR14ENCL12 ANDROCHESTER GASANDELECI1CCORPORAT1ON
~89EASTAVENUE, ROCHESTER, N.Y1d6d9-OOOI ROBERTCMECREOYVicePresident September 27,1994CinnaNudearProduction AREACODE7165'.27OOU.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonProjectDirectorate I-3Washington, D.C.20555


==Subject:==
==Subject:==
Application forAmendment toFacilityOperating LicenseUpgradeofAdministrative ControlsSection6.0Rochester Gas&ElectricCorporation R.E.GinnaNuclearPowerPlantDocketNo.50-244
Application for Amendment to Facility Operating License Upgrade of Administrative Controls Section 6.0 Rochester Gas&Electric Corporation R.E.Ginna Nuclear Power Plant Docket No.50-244  


==References:==
==References:==


a.LetterfromR.C.Mecredy,RG&E,toA.R.Johnson,NRC,
a.Letter from R.C.Mecredy, RG&E, to A.R.Johnson, NRC,  


==Subject:==
==Subject:==
Application forAmendment toFacilityOperating License,UpgradeofAdministrative ControlsSection6.0,datedHay13,1994.b.LetterfromR.C.Hecredy,RG&E,toA.R.Johnson,NRC,
Application for Amendment to Facility Operating License, Upgrade of Administrative Controls Section 6.0, dated Hay 13, 1994.b.Letter from R.C.Hecredy, RG&E, to A.R.Johnson, NRC,  


==Subject:==
==Subject:==
Conversion toImprovedTechnical Specifications, datedFebruary28,1994.
Conversion to Improved Technical Specifications, dated February 28, 1994.


==DearHr.Johnson,==
==Dear Hr.Johnson,==
Rochester GasandElectric(RG&E)previously submitted aLicenseAmendment Request(LAR)whichproposedtorevisetheGinnaStationTechnical Specifications (TS)Section6,Administrative Controls(Ref.a).OnAugust3,1994,aconference callwasconducted betweentheNRCandRG&EatwhichtimeseveralchangestotheLARwererequested bytheNRC.Thisdocumenttransmits therequested changesandacknowledges thesetofrevisedTSrequirements discussed intheLARwhichwillbereviewedbytheNRCatthistime.Theremaining TSchangeswillbedeferreduntiltheconversion oftheentireGinnaStationTSduringtheTechnical Specification Improvement Program(Ref.b).Thefollowing changesasdiscussed inAttachment AtoReference aarebeingrequested atthistime:ta.SectionC.1,changeiv(exceptfortheproposeddeletionofGinnaTS6.8.1.f).
Rochester Gas and Electric (RG&E)previously submitted a License Amendment Request (LAR)which proposed to revise the Ginna Station Technical Specifications (TS)Section 6, Administrative Controls (Ref.a).On August 3, 1994, a conference call was conducted between the NRC and RG&E at which time several changes to the LAR were requested by the NRC.This document transmits the requested changes and acknowledges the set of revised TS requirements discussed in the LAR which will be reviewed by the NRC at this time.The remaining TS changes will be deferred until the conversion of the entire Ginna Station TS during the Technical Specification Improvement Program (Ref.b).The following changes as discussed in Attachment A to Reference a are being requested at this time: t a.Section C.1, change iv (except for the proposed deletion of Ginna TS 6.8.1.f).tt b.Section C.2, changes i, ii (except for the proposed deletion of TS 6.2.2.b and 6.2.2.c), iii, iv, v, vii (revise the submittal of Radiological Effluent Release Report from semiannual to annual only), ix, and x.c.Section C.3, changes iv, vi, and vii.i>pit p P'Q's1409290181
ttb.SectionC.2,changesi,ii(exceptfortheproposeddeletionofTS6.2.2.band6.2.2.c),
'st40927 PDR ADOCK 05000244 p f I Pp%~\~-W I d.Section C.4, change v.e.Section C.7, changes iii and v.These changes are reflected in the enclosed Attachment 8 and C to this letter.Similar to Reference a, Attachment B provides the marked-up Ginna Station TS which documents the requested changes while Attachment C provides the proposed new TS following the changes.Since the above changes are only a subset of those originally requested in Reference a, several additional changes are now necessary to ensure a complete specification.
iii,iv,v,vii(revisethesubmittal ofRadiological EffluentReleaseReportfromsemiannual toannualonly),ix,andx.c.SectionC.3,changesiv,vi,andvii.i>pitpP'Q's1409290181
These additional changes and their justification are provided in Attachment A.The remaining justification of changes, safety evaluation, and no significant hazards and environmental considerations provided in Attachment A of Reference a remain unchanged.
'st40927PDRADOCK05000244p fIPp%~\~-WI d.SectionC.4,changev.e.SectionC.7,changesiiiandv.Thesechangesarereflected intheenclosedAttachment 8andCtothisletter.SimilartoReference a,Attachment Bprovidesthemarked-up GinnaStationTSwhichdocuments therequested changeswhileAttachment CprovidestheproposednewTSfollowing thechanges.Sincetheabovechangesareonlyasubsetofthoseoriginally requested inReference a,severaladditional changesarenownecessary toensureacompletespecification.
We request that upon NRC approval, this application should be considered effective immediately and implemented within 60 days, or upon NRC approval and implementation of the gA Program changes, whichever is later.Ver uly yours, Robert C, Mecred Subscribed and sworn to before me on this 27th day of September 1994.N ary ublic MDFX634 Attachments Nsr hRPin es sgs g~~NNROE COUNY@g, xc: Mr.Allen R.Johnson (Mail Stop 14DI)PWR Project Directorate I-3 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector I ll>>II g I'E g E~f..ml4 Nqd aP~
Theseadditional changesandtheirjustification areprovidedinAttachment A.Theremaining justification ofchanges,safetyevaluation, andnosignificant hazardsandenvironmental considerations providedinAttachment AofReference aremainunchanged.
Hr.Gene Eckholt Northern States Power Company Prairie Island Nuclear Generating Plant Route 2 Welch, HN 55089 Hr.Thomas Halanowski Wisconsin Electric Power 231 West Michigan Milwaukee, WI 53201 Hs.Sherry Bernhoft Wisconsin Public Service P.O.Box 19002 700 North Adams Green Bay, WI 54307-9002 Mr.Jack Stringfellow Southern Nuclear Operating Company P.O.Box 1295 40 Inverness Center Parkway Birmingham, AL 35201 Hr.Lee Bush Commonwealth Edison Company Zion Nuclear Station 101 Shiloh Boulevard Zion, IL 60099 C~I!5"l Ir ATTACHMENT A Justification of Changes The justification for all changes to the current Ginna Station TS are provided in Attachment A, Section C to the letter from R.C.Mecredy, RGKE, to A.R.Johnson, NRC,  
WerequestthatuponNRCapproval, thisapplication shouldbeconsidered effective immediately andimplemented within60days,oruponNRCapprovalandimplementation ofthegAProgramchanges,whichever islater.Verulyyours,RobertC,MecredSubscribed andsworntobeforemeonthis27thdayofSeptember 1994.NaryublicMDFX634Attachments NsrhRPinessgsg~~NNROECOUNY@g,xc:Mr.AllenR.Johnson(MailStop14DI)PWRProjectDirectorate I-3Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector Ill>>IIgI'EgE~f..ml4NqdaP~
Hr.GeneEckholtNorthernStatesPowerCompanyPrairieIslandNuclearGenerating PlantRoute2Welch,HN55089Hr.ThomasHalanowski Wisconsin ElectricPower231WestMichiganMilwaukee, WI53201Hs.SherryBernhoftWisconsin PublicServiceP.O.Box19002700NorthAdamsGreenBay,WI54307-9002 Mr.JackStringfellow SouthernNuclearOperating CompanyP.O.Box129540Inverness CenterParkwayBirmingham, AL35201Hr.LeeBushCommonwealth EdisonCompanyZionNuclearStation101ShilohBoulevard Zion,IL60099 C~I!5"lIr ATTACHMENT AJustification ofChangesThejustification forallchangestothecurrentGinnaStationTSareprovidedinAttachment A,SectionCtotheletterfromR.C.Mecredy,RGKE,toA.R.Johnson,NRC,


==Subject:==
==Subject:==
Application forAmendment toFacilityOperating License,.UpgradeofAdministrative ControlsSection6.0,datedMay13,1994.Thejustification foradditional changesnotdiscussed intheMay13,1994letterareprovidedbelow:RevisedtheTableofContentstosupporttherequested changes.I2.3.Thefollowing specifications havebeenrevisedtoprovideafootnotewhichallowsforanalternate titletobedesignated forthespecified position:
Application for Amendment to Facility Operating License,.Upgrade of Administrative Controls Section 6.0, dated May 13, 1994.The justification for additional changes not discussed in the May 13, 1994 letter are provided below: Revised the Table of Contents to support the requested changes.I 2.3.The following specifications have been revised to provide a footnote which allows for an alternate title to be designated for the specified position: a.TS 6.2.l.b, 6.7.b and 6.7.d-Senior Vice President, Production and Engineering.
a.TS6.2.l.b,6.7.band6.7.d-SeniorVicePresident, Production andEngineering.
b.TS 6.4.1-Division Training Manager c.TS 6.13.1-Health Physicist Specifying management positions by title within the technical specifications creates a licensee and NRC burden when titles are changed or responsibilities are shifted.The current Ginna Station TS 6.2.l.a requires that"lines of authority, responsibility, and communication shall be established and defined from the highest management levels through intermediate levels to and including all Plant management positions." The footnote requires that the alternate titles be specified in the Updated Final Safety Analysis Report (UFSAR)and that all the technical specification requirements apply to the alternate title.The title of the Senior Vice President, Production and Engineering has also been revised to Senior Vice President, Customer Operations.
b.TS6.4.1-DivisionTrainingManagerc.TS6.13.1-HealthPhysicist Specifying management positions bytitlewithinthetechnical specifications createsalicenseeandNRCburdenwhentitlesarechangedorresponsibilities areshifted.ThecurrentGinnaStationTS6.2.l.arequiresthat"linesofauthority, responsibility, andcommunication shallbeestablished anddefinedfromthehighestmanagement levelsthroughintermediate levelstoandincluding allPlantmanagement positions."
This is an individual's title change only.This Senior Vice President continues to have corporate responsibility for overall Plant nuclear safety and is chairman of the offsite review function (i.e., Nuclear Safety Audit and Review Board).The footnote for the Senior Vice President, Customer Operations further specifies that the use of an alternate title for this position must be performed in accordance with 10 CFR'0.54(a)(3).
Thefootnoterequiresthatthealternate titlesbespecified intheUpdatedFinalSafetyAnalysisReport(UFSAR)andthatallthetechnical specification requirements applytothealternate title.ThetitleoftheSeniorVicePresident, Production andEngineering hasalsobeenrevisedtoSeniorVicePresident, CustomerOperations.
The responsibilities of key organization positions, including the Senior Vice President, Production and Engineering are specified in the Ginna Station gA Program.Since changes to the gA Program are controlled by 10 CFR 50.54(a)(3), equivalent control is provided.TS 6.2.2.a and 6.2,2,d and Table,6.2-1 were removed from the technical specifications since they duplicate current regulations as specified in 10 CFR 50.54(k), (1), and (m).However, the following shift crew requirements as specified in TS Table 6.2-1 are not contained within the current regulations and must be added to TS 6.2.2: a.An auxiliary operator with fuel in the reactor, b.A second auxiliary operator above Cold Shutdown, and.9409290181 I (ii, 4, 5.c.A Shift Technical Advisor (STA)above Cold Shutdown.In addition, the exception provided in TS Table, 6.2-1 with respect to unexpected absences of on-duty shift crew members was also added to TS 6.2.2.Also, TS 6.2.2.b and 6.2.2.c are revised consistent with NUREG-1431 (ITS 5.2.2.b).TS 6.13.1 was revised to replace"health physicist" with"radiation protection" in those places where health physicist was a generic reference since this department is currently identified as radiation protection.
Thisisanindividual's titlechangeonly.ThisSeniorVicePresident continues tohavecorporate responsibility foroverallPlantnuclearsafetyandischairmanoftheoffsitereviewfunction(i.e.,NuclearSafetyAuditandReviewBoard).ThefootnotefortheSeniorVicePresident, CustomerOperations furtherspecifies thattheuseofanalternate titleforthispositionmustbeperformed inaccordance with10CFR'0.54(a)(3).
Specific functions performed by a health physicist were not revised.This is not a technical change.A submittal date of Hay 1 of each year was selected for the Radioactive Effluent Release Report since 10 CFR 50.36a only requires an annual submittal but does not identify a specific submittal date.The last RGEE submittal.
Theresponsibilities ofkeyorganization positions, including theSeniorVicePresident, Production andEngineering arespecified intheGinnaStationgAProgram.SincechangestothegAProgramarecontrolled by10CFR50.54(a)(3),
of this report was on August 30, 1994.Therefore, the next report on May 1, 1995 is less than the required annual submittal frequency and is consistent with the submittal date of the Annual Radiological Environmental Operation Report (TS 6.9.1.3).A cross reference to the justification of each proposed change is provided in the left margin of each Ginna Station TS that has been changed by use of a circle containing section numbers from either Attachment A, Section C of the Hay 13, 1994 letter (e.g., C.l.iv)or the above justifications (e.g., A.1).}}
equivalent controlisprovided.
TS6.2.2.aand6.2,2,dandTable,6.2-1 wereremovedfromthetechnical specifications sincetheyduplicate currentregulations asspecified in10CFR50.54(k),
(1),and(m).However,thefollowing shiftcrewrequirements asspecified inTSTable6.2-1arenotcontained withinthecurrentregulations andmustbeaddedtoTS6.2.2:a.Anauxiliary operatorwithfuelinthereactor,b.Asecondauxiliary operatoraboveColdShutdown, and.9409290181 I(ii, 4,5.c.AShiftTechnical Advisor(STA)aboveColdShutdown.
Inaddition, theexception providedinTSTable,6.2-1withrespecttounexpected absencesofon-dutyshiftcrewmemberswasalsoaddedtoTS6.2.2.Also,TS6.2.2.band6.2.2.carerevisedconsistent withNUREG-1431(ITS5.2.2.b).
TS6.13.1wasrevisedtoreplace"healthphysicist" with"radiation protection" inthoseplaceswherehealthphysicist wasagenericreference sincethisdepartment iscurrently identified asradiation protection.
Specificfunctions performed byahealthphysicist werenotrevised.Thisisnotatechnical change.Asubmittal dateofHay1ofeachyearwasselectedfortheRadioactive EffluentReleaseReportsince10CFR50.36aonlyrequiresanannualsubmittal butdoesnotidentifyaspecificsubmittal date.ThelastRGEEsubmittal.
ofthisreportwasonAugust30,1994.Therefore, thenextreportonMay1,1995islessthantherequiredannualsubmittal frequency andisconsistent withthesubmittal dateoftheAnnualRadiological Environmental Operation Report(TS6.9.1.3).Acrossreference tothejustification ofeachproposedchangeisprovidedintheleftmarginofeachGinnaStationTSthathasbeenchangedbyuseofacirclecontaining sectionnumbersfromeitherAttachment A,SectionCoftheHay13,1994letter(e.g.,C.l.iv)ortheabovejustifications (e.g.,A.1).}}

Revision as of 10:06, 6 July 2018

Transmits Requested Changes to 940513 Lar,Revising TS Section 6.0, Administrative Controls & Ack Set of Revised TS Requirements Discussed in LAR Which Will Be Reviewed by NRC at This Time,Per 940803 Telcon W/Nrc
ML17309A555
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/27/1994
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17263A791 List:
References
NUDOCS 9409290181
Download: ML17309A555 (11)


Text

Fmxaa.X~rV i (ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9409290181 DOC.DATE: 94/09/27 NOTARIZED:

YES DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

Project Directorate I-3

SUBJECT:

Transmits requested changes to 940513 LAR,revising TS Section 6.0,"Administrative Controls"&ack set of revised TS requirements discussed in LAR which will be reviewed by NRC at this time,per 940803 telcon w/NRC.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR I ENCL L SIZE: TITLE: OR Submittal:

General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERN: FILE CENTER 0 ARCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DE/EELB NRR/DRPW NRR/DS SA/SRXB OC/LFDCB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE IVASTE!CONTACT TIIE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT.504-2083)TO ELlih!INATE YOUR NAlIE PRO~I DISTRIBUTION LISTS I'OR DOCI;MENTS YOU DON"I'EED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 12 AND ROCHESTER GAS AND ELECI1C CORPORAT1ON

~89 EASTAVENUE, ROCHESTER, N.Y 1d6d9-OOOI ROBERT C MECREOY Vice President September 27, 1994 Cinna Nudear Production AREA CODE716 5'.27OO U.S.Nuclear Regulatory Commission Document Control Desk Attn: Allen R.Johnson Project Directorate I-3 Washington, D.C.20555

Subject:

Application for Amendment to Facility Operating License Upgrade of Administrative Controls Section 6.0 Rochester Gas&Electric Corporation R.E.Ginna Nuclear Power Plant Docket No.50-244

References:

a.Letter from R.C.Mecredy, RG&E, to A.R.Johnson, NRC,

Subject:

Application for Amendment to Facility Operating License, Upgrade of Administrative Controls Section 6.0, dated Hay 13, 1994.b.Letter from R.C.Hecredy, RG&E, to A.R.Johnson, NRC,

Subject:

Conversion to Improved Technical Specifications, dated February 28, 1994.

Dear Hr.Johnson,

Rochester Gas and Electric (RG&E)previously submitted a License Amendment Request (LAR)which proposed to revise the Ginna Station Technical Specifications (TS)Section 6, Administrative Controls (Ref.a).On August 3, 1994, a conference call was conducted between the NRC and RG&E at which time several changes to the LAR were requested by the NRC.This document transmits the requested changes and acknowledges the set of revised TS requirements discussed in the LAR which will be reviewed by the NRC at this time.The remaining TS changes will be deferred until the conversion of the entire Ginna Station TS during the Technical Specification Improvement Program (Ref.b).The following changes as discussed in Attachment A to Reference a are being requested at this time: t a.Section C.1, change iv (except for the proposed deletion of Ginna TS 6.8.1.f).tt b.Section C.2, changes i, ii (except for the proposed deletion of TS 6.2.2.b and 6.2.2.c), iii, iv, v, vii (revise the submittal of Radiological Effluent Release Report from semiannual to annual only), ix, and x.c.Section C.3, changes iv, vi, and vii.i>pit p P'Q's1409290181

'st40927 PDR ADOCK 05000244 p f I Pp%~\~-W I d.Section C.4, change v.e.Section C.7, changes iii and v.These changes are reflected in the enclosed Attachment 8 and C to this letter.Similar to Reference a, Attachment B provides the marked-up Ginna Station TS which documents the requested changes while Attachment C provides the proposed new TS following the changes.Since the above changes are only a subset of those originally requested in Reference a, several additional changes are now necessary to ensure a complete specification.

These additional changes and their justification are provided in Attachment A.The remaining justification of changes, safety evaluation, and no significant hazards and environmental considerations provided in Attachment A of Reference a remain unchanged.

We request that upon NRC approval, this application should be considered effective immediately and implemented within 60 days, or upon NRC approval and implementation of the gA Program changes, whichever is later.Ver uly yours, Robert C, Mecred Subscribed and sworn to before me on this 27th day of September 1994.N ary ublic MDFX634 Attachments Nsr hRPin es sgs g~~NNROE COUNY@g, xc: Mr.Allen R.Johnson (Mail Stop 14DI)PWR Project Directorate I-3 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector I ll>>II g I'E g E~f..ml4 Nqd aP~

Hr.Gene Eckholt Northern States Power Company Prairie Island Nuclear Generating Plant Route 2 Welch, HN 55089 Hr.Thomas Halanowski Wisconsin Electric Power 231 West Michigan Milwaukee, WI 53201 Hs.Sherry Bernhoft Wisconsin Public Service P.O.Box 19002 700 North Adams Green Bay, WI 54307-9002 Mr.Jack Stringfellow Southern Nuclear Operating Company P.O.Box 1295 40 Inverness Center Parkway Birmingham, AL 35201 Hr.Lee Bush Commonwealth Edison Company Zion Nuclear Station 101 Shiloh Boulevard Zion, IL 60099 C~I!5"l Ir ATTACHMENT A Justification of Changes The justification for all changes to the current Ginna Station TS are provided in Attachment A, Section C to the letter from R.C.Mecredy, RGKE, to A.R.Johnson, NRC,

Subject:

Application for Amendment to Facility Operating License,.Upgrade of Administrative Controls Section 6.0, dated May 13, 1994.The justification for additional changes not discussed in the May 13, 1994 letter are provided below: Revised the Table of Contents to support the requested changes.I 2.3.The following specifications have been revised to provide a footnote which allows for an alternate title to be designated for the specified position: a.TS 6.2.l.b, 6.7.b and 6.7.d-Senior Vice President, Production and Engineering.

b.TS 6.4.1-Division Training Manager c.TS 6.13.1-Health Physicist Specifying management positions by title within the technical specifications creates a licensee and NRC burden when titles are changed or responsibilities are shifted.The current Ginna Station TS 6.2.l.a requires that"lines of authority, responsibility, and communication shall be established and defined from the highest management levels through intermediate levels to and including all Plant management positions." The footnote requires that the alternate titles be specified in the Updated Final Safety Analysis Report (UFSAR)and that all the technical specification requirements apply to the alternate title.The title of the Senior Vice President, Production and Engineering has also been revised to Senior Vice President, Customer Operations.

This is an individual's title change only.This Senior Vice President continues to have corporate responsibility for overall Plant nuclear safety and is chairman of the offsite review function (i.e., Nuclear Safety Audit and Review Board).The footnote for the Senior Vice President, Customer Operations further specifies that the use of an alternate title for this position must be performed in accordance with 10 CFR'0.54(a)(3).

The responsibilities of key organization positions, including the Senior Vice President, Production and Engineering are specified in the Ginna Station gA Program.Since changes to the gA Program are controlled by 10 CFR 50.54(a)(3), equivalent control is provided.TS 6.2.2.a and 6.2,2,d and Table,6.2-1 were removed from the technical specifications since they duplicate current regulations as specified in 10 CFR 50.54(k), (1), and (m).However, the following shift crew requirements as specified in TS Table 6.2-1 are not contained within the current regulations and must be added to TS 6.2.2: a.An auxiliary operator with fuel in the reactor, b.A second auxiliary operator above Cold Shutdown, and.9409290181 I (ii, 4, 5.c.A Shift Technical Advisor (STA)above Cold Shutdown.In addition, the exception provided in TS Table, 6.2-1 with respect to unexpected absences of on-duty shift crew members was also added to TS 6.2.2.Also, TS 6.2.2.b and 6.2.2.c are revised consistent with NUREG-1431 (ITS 5.2.2.b).TS 6.13.1 was revised to replace"health physicist" with"radiation protection" in those places where health physicist was a generic reference since this department is currently identified as radiation protection.

Specific functions performed by a health physicist were not revised.This is not a technical change.A submittal date of Hay 1 of each year was selected for the Radioactive Effluent Release Report since 10 CFR 50.36a only requires an annual submittal but does not identify a specific submittal date.The last RGEE submittal.

of this report was on August 30, 1994.Therefore, the next report on May 1, 1995 is less than the required annual submittal frequency and is consistent with the submittal date of the Annual Radiological Environmental Operation Report (TS 6.9.1.3).A cross reference to the justification of each proposed change is provided in the left margin of each Ginna Station TS that has been changed by use of a circle containing section numbers from either Attachment A, Section C of the Hay 13, 1994 letter (e.g., C.l.iv)or the above justifications (e.g., A.1).