ML18066A554: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:


==Subject:==
==Subject:==
 
FW: Comments to NRC Docket ID NRC-2017~0211, NUREG-2215 SUNSI Review Complete ------------------------------**-**-------------------------------------------
FW: Comments to NRC Docket ID NRC-2017~0211, NUREG-2215 SUNSI Review Complete  
Template = ADM -013 From: Kalene Walker [mailto:ggchappykale@yahoo.com]
------------------------------**-**-------------------------------------------
Template  
= ADM -013 From: Kalene Walker [mailto:ggchappykale@yahoo.com]
E-RIDS= ADM-03 Sent: Tuesday, January 02, 2018 6:06 PM Add= "S-er-et1'A(,Sr1t,":f./l C. J"AS'f,J To: Smith, Jeremy <Jeremy.Smith@nrc.gov>  
E-RIDS= ADM-03 Sent: Tuesday, January 02, 2018 6:06 PM Add= "S-er-et1'A(,Sr1t,":f./l C. J"AS'f,J To: Smith, Jeremy <Jeremy.Smith@nrc.gov>  
/ii;Z:\ ---
/ii;Z:\ ---


==Subject:==
==Subject:==
 
[External_Sender]
[External_Sender]
Comments to NRC Docket ID NRC-2017-0211, NUREG~~215 . ' 8;? F/2. s:i.. 9W 11/1S/.2017 . I am glad to see the NRC is developing  
Comments to NRC Docket ID NRC-2017-0211, NUREG~~215  
. ' 8;? F/2. s:i.. 9W 11/1S/.2017 . I am glad to see the NRC is developing  
'New Regulations for Spent Fuel Dry r Storage Systems and Facilities'.
'New Regulations for Spent Fuel Dry r Storage Systems and Facilities'.
Please insure these new regulations have incorporated the following  
Please insure these new regulations have incorporated the following concerns, and will thus direct the Nuclear Regulatory Commission to DENY Southern California Edison's pending ISFSI license at San Onofre Nuclear Generating Station. Surely these new regulations will not allow a nuclear waste storage facility to be built 108 ft from the ocean in an earthquake tsunami-inundation prone zone. Surely they will not allow a storage system that is designed to be built 'below ground' to be built PARTIALLY below ground with less than half the height of the ~ans buried because a fully buried system would hit the water table. Surely thin walled canisters, designed for only short term use, will not be permitted for storing this radioactive waste that is lethal for over 250,000 years. Surely the new regulations will require thorough inspection, maintenance and repair programs and capabilities to be in place before loading any containers.
: concerns, and will thus direct the Nuclear Regulatory Commission to DENY Southern California Edison's pending ISFSI license at San Onofre Nuclear Generating Station.
Surely _real-time radiation monitoring will be in 1 place and available to the public. Surely these regulations will require spent fuel pools or hot cells, or some other facility -for repairing or replacing  
Surely these new regulations will not allow a nuclear waste storage facility to be built 108 ft from the ocean in an earthquake tsunami-inundation prone zone. Surely they will not allow a storage system that is designed to be built 'below ground' to be built PARTIALLY below ground with less than half the height of the ~ans buried because a fully buried system would hit the water table. Surely thin walled canisters, designed for only short term use, will not be permitted for storing this radioactive waste that is lethal for over 250,000 years. Surely the new regulations will require thorough inspection, maintenance and repair programs and capabilities to be in place before loading any containers.
Surely _real-time radiation monitoring will be in1 place and available to the public. Surely these regulations will require spent fuel pools or hot cells, or some other facility  
-for repairing or replacing  
~racking canisters  
~racking canisters  
-to be on site for L aging management or for the unexpected event. Surely these regulations do not .allow a huge nuclear waste storage facility to be built in the immediate vicinity-of a highly trafficked Interstate rail and freeway.
-to be on site for L aging management or for the unexpected event. Surely these regulations do not .allow a huge nuclear waste storage facility to be built in the immediate vicinity-of a highly trafficked Interstate rail and freeway. Surely these regulations do not allow a storage facility to be built in a location that has 8.5 million people within the 50 mile radius. Surely the new regulations consider the increased risk of high burnup fuel. 1 Surely they require all storage containers be maintained in transportable condition.
Surely these regulations do not allow a storage facility to be built in a location that has 8.5 million people within the 50 mile radius. Surely the new regulations consider the increased risk of high burnup fuel. 1 Surely they require all storage containers be maintained in transportable condition.
Surely these new regulations demand the highest possible safety standards  
Surely these new regulations demand the highest possible safety standards  
-for the people and environment  
-for the people and environment  

Latest revision as of 01:14, 6 July 2018

Comment (156) of Kalene Walker Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities
ML18066A554
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/02/2018
From: Gostenhofer C, Walker K
- No Known Affiliation
To:
Rules, Announcements, and Directives Branch
References
82FR52944 00156, NRC-2017-0211
Download: ML18066A554 (2)


Text

Blount, Barbara

Subject:

FW: Comments to NRC Docket ID NRC-2017~0211, NUREG-2215 SUNSI Review Complete ------------------------------**-**-------------------------------------------

Template = ADM -013 From: Kalene Walker [1]

E-RIDS= ADM-03 Sent: Tuesday, January 02, 2018 6:06 PM Add= "S-er-et1'A(,Sr1t,":f./l C. J"AS'f,J To: Smith, Jeremy <Jeremy.Smith@nrc.gov>

/ii;Z:\ ---

Subject:

[External_Sender]

Comments to NRC Docket ID NRC-2017-0211, NUREG~~215 . ' 8;? F/2. s:i.. 9W 11/1S/.2017 . I am glad to see the NRC is developing

'New Regulations for Spent Fuel Dry r Storage Systems and Facilities'.

Please insure these new regulations have incorporated the following concerns, and will thus direct the Nuclear Regulatory Commission to DENY Southern California Edison's pending ISFSI license at San Onofre Nuclear Generating Station. Surely these new regulations will not allow a nuclear waste storage facility to be built 108 ft from the ocean in an earthquake tsunami-inundation prone zone. Surely they will not allow a storage system that is designed to be built 'below ground' to be built PARTIALLY below ground with less than half the height of the ~ans buried because a fully buried system would hit the water table. Surely thin walled canisters, designed for only short term use, will not be permitted for storing this radioactive waste that is lethal for over 250,000 years. Surely the new regulations will require thorough inspection, maintenance and repair programs and capabilities to be in place before loading any containers.

Surely _real-time radiation monitoring will be in 1 place and available to the public. Surely these regulations will require spent fuel pools or hot cells, or some other facility -for repairing or replacing

~racking canisters

-to be on site for L aging management or for the unexpected event. Surely these regulations do not .allow a huge nuclear waste storage facility to be built in the immediate vicinity-of a highly trafficked Interstate rail and freeway. Surely these regulations do not allow a storage facility to be built in a location that has 8.5 million people within the 50 mile radius. Surely the new regulations consider the increased risk of high burnup fuel. 1 Surely they require all storage containers be maintained in transportable condition.

Surely these new regulations demand the highest possible safety standards

-for the people and environment

-for the present and for the long term. And surely NRC safety standards are not cc;>mpromised by financial interests of the industry.

The potential costs of a ,criticality Event to human health, the environmental, the California economy and the future are mind boggling.

If each and all of these concerns have not been addressed in the new regulations, please do so before allowing any containe_rs to be loaded. The people of California, across the country ( and around the globe) look forward to the NRC demanding the highest possible safety regulations for this extremely lethal, long lasting, radioactive material.

--1 With these new regulations, thank you for-denying So Cal Edison's pending license for the Holtec UMAXX ISFSI at San Onofre. Sincerely, Christa Gostenhof er Laguna Woods, CA II 2