ML16116A098: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-301 Transient and Event Checklist Form ES-301-5  Crew A: SRO-I: Pelletier; RO: Paul; RO: Felske Facility: Byron    Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-4  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Pelletier A T C Paul B O P Felske S R O Surrogate A T C Pelletier B O P Felske S R O Pelletier A T C Felske B O P Paul S R O A T C B O P R I U RO  SRO-I Pelletier SRO-U  RX 2    4  2      2 1 1 0 NOR 1    -  1      2 1 1 1 I/C 3,4,5,6    2,5  4,5,6,7      10 4 4 2 MAJ 7,8,9    6,7  8,9      7 2 2 1 TS 3,4    -  3,4,5      5 0 2 2 RO Paul    SRO-I  SRO-U  RX  2      -    1 1 1 0 NOR  -      1    1 1 1 1 I/C  3,5      4,6    4 4 4 2 MAJ  8,9      8,9    4 2 2 1 TS  -      -    0 0 2 2 RO Felske  SRO-I  SRO-U  RX  -  -  2    1 1 1 0 NOR  1  1  -    2 1 1 1 I/C  4,6  3,4  5,7    6 4 4 2 MAJ  8,9  6,7  8,9    6 2 2 1 TS  -  -  -    0 0 2 2 RO  SRO-I  SRO-U  RX    4          1 1 0 NOR    1          1 1 1 I/C    2,3,4,5          4 4 2 MAJ    6,7          2 2 1 TS    2,3,4          0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
{{#Wiki_filter:ES-301 Transient and Event Checklist Form ES-301-5  Crew A: SRO
ES-301 Transient and Event Checklist Form ES-301-5  Crew B: SRO-I: Martinez; RO: Richards Facility: Byron    Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-3  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Martinez A T C Richards B O P Surrogate S R O Surrogate A T C Martinez B O P Richards S R O  A T C  B O P  S R O A T C B O P R I U RO  SRO-I Martinez  SRO-U  RX 2    1        2 1 1 0 NOR 1    -        1 1 1 1 I/C 3,4,5,6    3,5        6 4 4 2 MAJ 7,8,9    7,8,9        6 2 2 1 TS 3,4    -        2 0 2 2 RO Richards    SRO-I  SRO-U  RX  2    -      1 1 1 0 NOR  -    2      1 1 1 1 I/C  3,5    4,6      4 4 4 2 MAJ  8,9    7,8,9      5 2 2 1 TS  -    -      0 0 2 2 RO  SRO-I  SRO-U  RX  - 1          1 1 0 NOR  1 2          1 1 1 I/C  4,6 3,4,5,6          4 4 2 MAJ  8,9 7,8,9          2 2 1 TS  - 3,5          0 2 2 RO  SRO-I  SRO-U  RX              1 1 0 NOR              1 1 1 I/C              4 4 2 MAJ              2 2 1 TS              0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
-I: Pelletier; RO: Paul; RO: Felske Facility:
ES-301 Transient and Event Checklist Form ES-301-5  Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility: Byron    Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-3  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Hamblin A T C Egeland B O P Mickelson S R O Mickelson A T C Hamblin B O P Egeland S R O Hamblin A T C Mickelson B O P Egeland S R O A T C B O P R I U RO  SRO-I Hamblin  SRO-U  RX 2    4  1      3 1 1 0 NOR 1    -  2      2 1 1 1 I/C 3,4,5,6    2,5  3,4,5,6      8 4 4 2 MAJ 7,8,9    6,7  7,8,9      8 2 2 1 TS 3,4    -  3,5      4 0 2 2 RO  SRO-I Mickelson SRO-U  RX  - 4    1    2 1 1 0 NOR  1 1    -    2 1 1 1 I/C  4,6 2,3,4,5    3,5    8 4 4 2 MAJ  8,9 6,7    7,8,9    7 2 2 1 TS  - 2,3,4    -    3 0 2 2 RO Egeland  SRO-I  SRO-U  RX  2    -  -    2 1 1 0 NOR  -    1  2    2 1 1 1 I/C  3,5    3,4  4,6    6 4 4 2 MAJ  8,9    6,7  7,8,9    7 2 2 1 TS  -    -  -    0 0 2 2 RO  SRO-I  SRO-U  RX              1 1 0 NOR              1 1 1 I/C              4 4 2 MAJ              2 2 1 TS              0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
Byron    Date of Exam: 3/14/2016 Operating Test No.:
ES-301 Transient and Event Checklist Form ES-301-5  Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility: Byron    Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-2 16-3 16-4  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Bolin A T C Bechtel B O P Niehaus S R O Bolin A T C Niehaus B O P Bechtel S R O Surrogate A T C Bolin B O P Bechtel S R O A T C B O P R I U RO  SRO-I Bolin  SRO-U  RX 4  1    2    3 1 1 0 NOR 1  2    -    2 1 1 1 I/C 2,3,4,5  3,4,5,6    5,7    10 4 4 2 MAJ 6,7  7,8,9    8,9    6 2 2 1 TS 2,3,4  3,5    -    5 0 2 2 RO Neihaus    SRO-I  SRO-U  RX  -  1        1 1 1 0 NOR  1  -        1 1 1 1 I/C  3,4  3,5        4 4 4 2 MAJ  6,7  7,8,9        5 2 2 1 TS  -  -        0 0 2 2 RO Bechtel  SRO-I  SRO-U  RX  4    -  -    1 1 1 0 NOR  -    2  1    1 1 1 1 I/C  2,5    4,6  4,6    6 4 4 2 MAJ  6,7    7,8,9  8,9    7 2 2 1 TS  -    -  -    0 0 2 2 RO  SRO-I  SRO-U  RX      2      1 1 0 NOR      1      1 1 1 I/C      4,5,6,7      4 4 2 MAJ      8,9      2 2 1 TS      3,4,5      0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-4  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Pelletier A T C Paul B O P Felske S R O Surrogate A T C Pelletier B O P Felske S R O Pelletier A T C Felske B O P Paul S R O A T C B O P R I U RO  SRO-I Pelletier SRO-U  RX 2    4  2      2 1 1 0 NOR 1    -  1      2 1 1 1 I/C 3,4,5,6    2,5  4,5,6,7      10 4 4 2 MAJ 7,8,9    6,7  8,9      7 2 2 1 TS 3,4    -  3,4,5      5 0 2 2 RO Paul    SRO-I  SRO-U  RX  2      -    1 1 1 0 NOR  -      1    1 1 1 1 I/C  3,5      4,6    4 4 4 2 MAJ  8,9      8,9    4 2 2 1 TS  -      -    0 0 2 2 RO Felske  SRO-I  SRO-U  RX  -  -  2    1 1 1 0 NOR  1  1  -    2 1 1 1 I/C  4,6  3,4  5,7    6 4 4 2 MAJ  8,9  6,7  8,9    6 2 2 1 TS  -  -  -    0 0 2 2 RO  SRO-I  SRO-U  RX    4          1 1 0 NOR    1          1 1 1 I/C    2,3,4,5          4 4 2 MAJ    6,7          2 2 1 TS    2,3,4          0 2 2 Instructions:
ES-301 Transient and Event Checklist Form ES-301-5  Crew A: SRO-I: Pelletier; RO: Paul; RO: Felske Facility: Byron    Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-4  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Pelletier A T C Paul B O P Felske S R O Surrogate A T C Pelletier B O P Felske S R O Pelletier A T C Felske B O P Paul S R O A T C B O P R I U RO  SRO-I Pelletier SRO-U  RX 2    4  2      2 1 1 0 NOR 1    -  1      2 1 1 1 I/C 3,4,5,6    2,5  4,5,6,7      10 4 4 2 MAJ 7,8,9    6,7  8,9      7 2 2 1 TS 3,4    -  3,4,5      5 0 2 2 RO Paul    SRO-I  SRO-U  RX  2      -    1 1 1 0 NOR  -      1    1 1 1 1 I/C  3,5      4,6    4 4 4 2 MAJ  8,9      8,9    4 2 2 1 TS  -      -    0 0 2 2 RO Felske  SRO-I  SRO-U  RX  -  -  2    1 1 1 0 NOR  1  1  -    2 1 1 1 I/C  4,6  3,4  5,7    6 4 4 2 MAJ  8,9  6,7  8,9    6 2 2 1 TS  -  -  -    0 0 2 2 RO  SRO-I  SRO-U  RX    4          1 1 0 NOR    1          1 1 1 I/C    2,3,4,5          4 4 2 MAJ    6,7          2 2 1 TS    2,3,4          0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve i n both the "at-the-controls (ATC)"
ES-301 Transient and Event Checklist Form ES-301-5  Crew B: SRO-I: Martinez; RO: Richards Facility: Byron    Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-3  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Martinez A T C Richards B O P Surrogate S R O Surrogate A T C Martinez B O P Richards S R O  A T C  B O P  S R O A T C B O P R I U RO  SRO-I Martinez  SRO-U  RX 2    1        2 1 1 0 NOR 1    -        1 1 1 1 I/C 3,4,5,6    3,5        6 4 4 2 MAJ 7,8,9    7,8,9        6 2 2 1 TS 3,4    -        2 0 2 2 RO Richards    SRO-I  SRO-U  RX  2    -      1 1 1 0 NOR  -    2      1 1 1 1 I/C  3,5    4,6      4 4 4 2 MAJ  8,9    7,8,9      5 2 2 1 TS  -    -      0 0 2 2 RO  SRO-I  SRO-U  RX  - 1          1 1 0 NOR  1 2          1 1 1 I/C  4,6 3,4,5,6          4 4 2 MAJ  8,9 7,8,9          2 2 1 TS  - 3,5          0 2 2 RO  SRO-I  SRO-U  RX              1 1 0 NOR              1 1 1 I/C              4 4 2 MAJ              2 2 1 TS              0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
ES-301 Transient and Event Checklist Form ES-301-5  Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility: Byron    Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-3  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Hamblin A T C Egeland B O P Mickelson S R O Mickelson A T C Hamblin B O P Egeland S R O Hamblin A T C Mickelson B O P Egeland S R O A T C B O P R I U RO  SRO-I Hamblin  SRO-U  RX 2    4  1      3 1 1 0 NOR 1    -  2      2 1 1 1 I/C 3,4,5,6    2,5  3,4,5,6      8 4 4 2 MAJ 7,8,9    6,7  7,8,9      8 2 2 1 TS 3,4    -  3,5      4 0 2 2 RO  SRO-I Mickelson SRO-U  RX  - 4    1    2 1 1 0 NOR  1 1    -    2 1 1 1 I/C  4,6 2,3,4,5    3,5    8 4 4 2 MAJ  8,9 6,7    7,8,9    7 2 2 1 TS  - 2,3,4    -    3 0 2 2 RO Egeland  SRO-I  SRO-U  RX  2    -  -    2 1 1 0 NOR  -    1  2    2 1 1 1 I/C  3,5    3,4  4,6    6 4 4 2 MAJ  8,9    6,7  7,8,9    7 2 2 1 TS  -    -  -    0 0 2 2 RO  SRO-I  SRO-U  RX              1 1 0 NOR              1 1 1 I/C              4 4 2 MAJ              2 2 1 TS              0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
ES-301 Transient and Event Checklist Form ES-301-5  Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility: Byron    Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-2 16-3 16-4  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Bolin A T C Bechtel B O P Niehaus S R O Bolin A T C Niehaus B O P Bechtel S R O Surrogate A T C Bolin B O P Bechtel S R O A T C B O P R I U RO  SRO-I Bolin  SRO-U  RX 4  1    2    3 1 1 0 NOR 1  2    -    2 1 1 1 I/C 2,3,4,5  3,4,5,6    5,7    10 4 4 2 MAJ 6,7  7,8,9    8,9    6 2 2 1 TS 2,3,4  3,5    -    5 0 2 2 RO Neihaus    SRO-I  SRO-U  RX  -  1        1 1 1 0 NOR  1  -        1 1 1 1 I/C  3,4  3,5        4 4 4 2 MAJ  6,7  7,8,9        5 2 2 1 TS  -  -        0 0 2 2 RO Bechtel  SRO-I  SRO-U  RX  4    -  -    1 1 1 0 NOR  -    2  1    1 1 1 1 I/C  2,5    4,6  4,6    6 4 4 2 MAJ  6,7    7,8,9  8,9    7 2 2 1 TS  -    -  -    0 0 2 2 RO  SRO-I  SRO-U  RX      2      1 1 0 NOR      1      1 1 1 I/C      4,5,6,7      4 4 2 MAJ      8,9      2 2 1 TS      3,4,5      0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.}}
-hand columns.
 
ES-301 Transient and Event Checklist Form ES-301-5  Crew B: SRO-I: Martinez; RO: Richards Facility:
Byron    Date of Exam: 3/14/2016 Operating Test No.:
Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-3  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Martinez A T C Richards B O P Surrogate S R O Surrogate A T C Martinez B O P Richards S R O  A T C  B O P  S R O A T C B O P R I U RO  SRO-I Martinez  SRO-U  RX 2    1        2 1 1 0 NOR 1    -        1 1 1 1 I/C 3,4,5,6    3,5        6 4 4 2 MAJ 7,8,9    7,8,9        6 2 2 1 TS 3,4    -        2 0 2 2 RO Richards    SRO-I  SRO-U  RX  2    -      1 1 1 0 NOR  -    2      1 1 1 1 I/C  3,5    4,6      4 4 4 2 MAJ  8,9    7,8,9      5 2 2 1 TS  -    -      0 0 2 2 RO  SRO-I  SRO-U  RX  - 1          1 1 0 NOR  1 2          1 1 1 I/C  4,6 3,4,5,6          4 4 2 MAJ  8,9 7,8,9          2 2 1 TS  - 3,5          0 2 2 RO  SRO-I  SRO-U  RX              1 1 0 NOR              1 1 1 I/C              4 4 2 MAJ              2 2 1 TS              0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"
and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
 
ES-301 Transient and Event Checklist Form ES-301-5  Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility:
Byron    Date of Exam: 3/14/2016 Operating Test No.:
Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-3  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Hamblin A T C Egeland B O P Mickelson S R O Mickelson A T C Hamblin B O P Egeland S R O Hamblin A T C Mickelson B O P Egeland S R O A T C B O P R I U RO  SRO-I Hamblin  SRO-U  RX 2    4  1      3 1 1 0 NOR 1    -  2      2 1 1 1 I/C 3,4,5,6    2,5  3,4,5,6      8 4 4 2 MAJ 7,8,9    6,7  7,8,9      8 2 2 1 TS 3,4    -  3,5      4 0 2 2 RO  SRO-I Mickelson SRO-U  RX  - 4    1    2 1 1 0 NOR  1 1    -    2 1 1 1 I/C  4,6 2,3,4,5    3,5    8 4 4 2 MAJ  8,9 6,7    7,8,9    7 2 2 1 TS  - 2,3,4    -    3 0 2 2 RO Egeland  SRO-I  SRO-U  RX  2    -  -    2 1 1 0 NOR  -    1  2    2 1 1 1 I/C  3,5    3,4  4,6    6 4 4 2 MAJ  8,9    6,7  7,8,9    7 2 2 1 TS  -    -  -    0 0 2 2 RO  SRO-I  SRO-U  RX              1 1 0 NOR              1 1 1 I/C              4 4 2 MAJ              2 2 1 TS              0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants.
ROs must serve in both the "at-the-controls (ATC)"
and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
 
ES-301 Transient and Event Checklist Form ES-301-5  Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility:
Byron    Date of Exam: 3/14/2016 Operating Test No.:
Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-2 16-3 16-4  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Bolin A T C Bechtel B O P Niehaus S R O Bolin A T C Niehaus B O P Bechtel S R O Surrogate A T C Bolin B O P Bechtel S R O A T C B O P R I U RO  SRO-I Bolin  SRO-U  RX 4  1    2    3 1 1 0 NOR 1  2    -    2 1 1 1 I/C 2,3,4,5  3,4,5,6    5,7    10 4 4 2 MAJ 6,7  7,8,9    8,9    6 2 2 1 TS 2,3,4  3,5    -    5 0 2 2 RO Neihaus    SRO-I  SRO-U  RX  -  1        1 1 1 0 NOR  1  -        1 1 1 1 I/C  3,4  3,5        4 4 4 2 MAJ  6,7  7,8,9        5 2 2 1 TS  -  -        0 0 2 2 RO Bechtel  SRO-I  SRO-U  RX  4    -  -    1 1 1 0 NOR  -    2  1    1 1 1 1 I/C  2,5    4,6  4,6    6 4 4 2 MAJ  6,7    7,8,9  8,9    7 2 2 1 TS  -    -  -    0 0 2 2 RO  SRO-I  SRO-U  RX      2      1 1 0 NOR      1      1 1 1 I/C      4,5,6,7      4 4 2 MAJ      8,9      2 2 1 TS      3,4,5      0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"
and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
 
ES-301 Transient and Event Checklist Form ES-301-5  Crew A: SRO
-I: Pelletier; RO: Paul; RO: Felske Facility:
Byron    Date of Exam: 3/14/2016 Operating Test No.:
Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-4  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Pelletier A T C Paul B O P Felske S R O Surrogate A T C Pelletier B O P Felske S R O Pelletier A T C Felske B O P Paul S R O A T C B O P R I U RO  SRO-I Pelletier SRO-U  RX 2    4  2      2 1 1 0 NOR 1    -  1      2 1 1 1 I/C 3,4,5,6    2,5  4,5,6,7      10 4 4 2 MAJ 7,8,9    6,7  8,9      7 2 2 1 TS 3,4    -  3,4,5      5 0 2 2 RO Paul    SRO-I  SRO-U  RX  2      -    1 1 1 0 NOR  -      1    1 1 1 1 I/C  3,5      4,6    4 4 4 2 MAJ  8,9      8,9    4 2 2 1 TS  -      -    0 0 2 2 RO Felske  SRO-I  SRO-U  RX  -  -  2    1 1 1 0 NOR  1  1  -    2 1 1 1 I/C  4,6  3,4  5,7    6 4 4 2 MAJ  8,9  6,7  8,9    6 2 2 1 TS  -  -  -    0 0 2 2 RO  SRO-I  SRO-U  RX    4          1 1 0 NOR    1          1 1 1 I/C    2,3,4,5          4 4 2 MAJ    6,7          2 2 1 TS    2,3,4          0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve i n both the "at-the-controls (ATC)"
and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
 
ES-301 Transient and Event Checklist Form ES-301-5  Crew B: SRO-I: Martinez; RO: Richards Facility:
Byron    Date of Exam: 3/14/2016 Operating Test No.:
Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-3  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Martinez A T C Richards B O P Surrogate S R O Surrogate A T C Martinez B O P Richards S R O  A T C  B O P  S R O A T C B O P R I U RO  SRO-I Martinez  SRO-U  RX 2    1        2 1 1 0 NOR 1    -        1 1 1 1 I/C 3,4,5,6    3,5        6 4 4 2 MAJ 7,8,9    7,8,9        6 2 2 1 TS 3,4    -        2 0 2 2 RO Richards    SRO-I  SRO-U  RX  2    -      1 1 1 0 NOR  -    2      1 1 1 1 I/C  3,5    4,6      4 4 4 2 MAJ  8,9    7,8,9      5 2 2 1 TS  -    -      0 0 2 2 RO  SRO-I  SRO-U  RX  - 1          1 1 0 NOR  1 2          1 1 1 I/C  4,6 3,4,5,6          4 4 2 MAJ  8,9 7,8,9          2 2 1 TS  - 3,5          0 2 2 RO  SRO-I  SRO-U  RX              1 1 0 NOR              1 1 1 I/C              4 4 2 MAJ              2 2 1 TS              0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"
and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
 
ES-301 Transient and Event Checklist Form ES-301-5  Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility:
Byron    Date of Exam: 3/14/2016 Operating Test No.:
Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-3  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Hamblin A T C Egeland B O P Mickelson S R O Mickelson A T C Hamblin B O P Egeland S R O Hamblin A T C Mickelson B O P Egeland S R O A T C B O P R I U RO  SRO-I Hamblin  SRO-U  RX 2    4  1      3 1 1 0 NOR 1    -  2      2 1 1 1 I/C 3,4,5,6    2,5  3,4,5,6      8 4 4 2 MAJ 7,8,9    6,7  7,8,9      8 2 2 1 TS 3,4    -  3,5      4 0 2 2 RO  SRO-I Mickelson SRO-U  RX  - 4    1    2 1 1 0 NOR  1 1    -    2 1 1 1 I/C  4,6 2,3,4,5    3,5    8 4 4 2 MAJ  8,9 6,7    7,8,9    7 2 2 1 TS  - 2,3,4    -    3 0 2 2 RO Egeland  SRO-I  SRO-U  RX  2    -  -    2 1 1 0 NOR  -    1  2    2 1 1 1 I/C  3,5    3,4  4,6    6 4 4 2 MAJ  8,9    6,7  7,8,9    7 2 2 1 TS  -    -  -    0 0 2 2 RO  SRO-I  SRO-U  RX              1 1 0 NOR              1 1 1 I/C              4 4 2 MAJ              2 2 1 TS              0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants.
ROs must serve in both the "at-the-controls (ATC)"
and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.          Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
 
ES-301 Transient and Event Checklist Form ES-301-5  Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility:
Byron    Date of Exam: 3/14/2016 Operating Test No.:
Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-2 16-3 16-4  T O T A L      M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Bolin A T C Bechtel B O P Niehaus S R O Bolin A T C Niehaus B O P Bechtel S R O Surrogate A T C Bolin B O P Bechtel S R O A T C B O P R I U RO  SRO-I Bolin  SRO-U  RX 4  1    2    3 1 1 0 NOR 1  2    -    2 1 1 1 I/C 2,3,4,5  3,4,5,6    5,7    10 4 4 2 MAJ 6,7  7,8,9    8,9    6 2 2 1 TS 2,3,4  3,5    -    5 0 2 2 RO Neihaus    SRO-I  SRO-U  RX  -  1        1 1 1 0 NOR  1  -        1 1 1 1 I/C  3,4  3,5        4 4 4 2 MAJ  6,7  7,8,9        5 2 2 1 TS  -  -        0 0 2 2 RO Bechtel  SRO-I  SRO-U  RX  4    -  -    1 1 1 0 NOR  -    2  1    1 1 1 1 I/C  2,5    4,6  4,6    6 4 4 2 MAJ  6,7    7,8,9  8,9    7 2 2 1 TS  -    -  -    0 0 2 2 RO  SRO-I  SRO-U  RX      2      1 1 0 NOR      1      1 1 1 I/C      4,5,6,7      4 4 2 MAJ      8,9      2 2 1 TS      3,4,5      0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"
and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.}}

Revision as of 10:39, 30 June 2018

2016 Byron Nuclear Station Initial License Examination Form ES-301-5 Rev 0
ML16116A098
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/23/2016
From: Bielby M E
Operations Branch III
To:
Exelon Generation Co
References
Download: ML16116A098 (8)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Crew A: SRO

-I: Pelletier; RO: Paul; RO: Felske Facility:

Byron Date of Exam: 3/14/2016 Operating Test No.:

Byron 2016301 A P P L I C A N T E V E N T T Y P E Scenarios 16-1 16-2 16-4 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Pelletier A T C Paul B O P Felske S R O Surrogate A T C Pelletier B O P Felske S R O Pelletier A T C Felske B O P Paul S R O A T C B O P R I U RO SRO-I Pelletier SRO-U RX 2 4 2 2 1 1 0 NOR 1 - 1 2 1 1 1 I/C 3,4,5,6 2,5 4,5,6,7 10 4 4 2 MAJ 7,8,9 6,7 8,9 7 2 2 1 TS 3,4 - 3,4,5 5 0 2 2 RO Paul SRO-I SRO-U RX 2 - 1 1 1 0 NOR - 1 1 1 1 1 I/C 3,5 4,6 4 4 4 2 MAJ 8,9 8,9 4 2 2 1 TS - - 0 0 2 2 RO Felske SRO-I SRO-U RX - - 2 1 1 1 0 NOR 1 1 - 2 1 1 1 I/C 4,6 3,4 5,7 6 4 4 2 MAJ 8,9 6,7 8,9 6 2 2 1 TS - - - 0 0 2 2 RO SRO-I SRO-U RX 4 1 1 0 NOR 1 1 1 1 I/C 2,3,4,5 4 4 2 MAJ 6,7 2 2 1 TS 2,3,4 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve i n both the "at-the-controls (ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right

-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew B: SRO-I: Martinez; RO: Richards Facility:

Byron Date of Exam: 3/14/2016 Operating Test No.:

Byron 2016301 A P P L I C A N T E V E N T T Y P E Scenarios 16-1 16-3 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Martinez A T C Richards B O P Surrogate S R O Surrogate A T C Martinez B O P Richards S R O A T C B O P S R O A T C B O P R I U RO SRO-I Martinez SRO-U RX 2 1 2 1 1 0 NOR 1 - 1 1 1 1 I/C 3,4,5,6 3,5 6 4 4 2 MAJ 7,8,9 7,8,9 6 2 2 1 TS 3,4 - 2 0 2 2 RO Richards SRO-I SRO-U RX 2 - 1 1 1 0 NOR - 2 1 1 1 1 I/C 3,5 4,6 4 4 4 2 MAJ 8,9 7,8,9 5 2 2 1 TS - - 0 0 2 2 RO SRO-I SRO-U RX - 1 1 1 0 NOR 1 2 1 1 1 I/C 4,6 3,4,5,6 4 4 2 MAJ 8,9 7,8,9 2 2 1 TS - 3,5 0 2 2 RO SRO-I SRO-U RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right

-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility:

Byron Date of Exam: 3/14/2016 Operating Test No.:

Byron 2016301 A P P L I C A N T E V E N T T Y P E Scenarios 16-1 16-2 16-3 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Hamblin A T C Egeland B O P Mickelson S R O Mickelson A T C Hamblin B O P Egeland S R O Hamblin A T C Mickelson B O P Egeland S R O A T C B O P R I U RO SRO-I Hamblin SRO-U RX 2 4 1 3 1 1 0 NOR 1 - 2 2 1 1 1 I/C 3,4,5,6 2,5 3,4,5,6 8 4 4 2 MAJ 7,8,9 6,7 7,8,9 8 2 2 1 TS 3,4 - 3,5 4 0 2 2 RO SRO-I Mickelson SRO-U RX - 4 1 2 1 1 0 NOR 1 1 - 2 1 1 1 I/C 4,6 2,3,4,5 3,5 8 4 4 2 MAJ 8,9 6,7 7,8,9 7 2 2 1 TS - 2,3,4 - 3 0 2 2 RO Egeland SRO-I SRO-U RX 2 - - 2 1 1 0 NOR - 1 2 2 1 1 1 I/C 3,5 3,4 4,6 6 4 4 2 MAJ 8,9 6,7 7,8,9 7 2 2 1 TS - - - 0 0 2 2 RO SRO-I SRO-U RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants.

ROs must serve in both the "at-the-controls (ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right

-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility:

Byron Date of Exam: 3/14/2016 Operating Test No.:

Byron 2016301 A P P L I C A N T E V E N T T Y P E Scenarios 16-2 16-3 16-4 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Bolin A T C Bechtel B O P Niehaus S R O Bolin A T C Niehaus B O P Bechtel S R O Surrogate A T C Bolin B O P Bechtel S R O A T C B O P R I U RO SRO-I Bolin SRO-U RX 4 1 2 3 1 1 0 NOR 1 2 - 2 1 1 1 I/C 2,3,4,5 3,4,5,6 5,7 10 4 4 2 MAJ 6,7 7,8,9 8,9 6 2 2 1 TS 2,3,4 3,5 - 5 0 2 2 RO Neihaus SRO-I SRO-U RX - 1 1 1 1 0 NOR 1 - 1 1 1 1 I/C 3,4 3,5 4 4 4 2 MAJ 6,7 7,8,9 5 2 2 1 TS - - 0 0 2 2 RO Bechtel SRO-I SRO-U RX 4 - - 1 1 1 0 NOR - 2 1 1 1 1 1 I/C 2,5 4,6 4,6 6 4 4 2 MAJ 6,7 7,8,9 8,9 7 2 2 1 TS - - - 0 0 2 2 RO SRO-I SRO-U RX 2 1 1 0 NOR 1 1 1 1 I/C 4,5,6,7 4 4 2 MAJ 8,9 2 2 1 TS 3,4,5 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right

-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew A: SRO

-I: Pelletier; RO: Paul; RO: Felske Facility:

Byron Date of Exam: 3/14/2016 Operating Test No.:

Byron 2016301 A P P L I C A N T E V E N T T Y P E Scenarios 16-1 16-2 16-4 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Pelletier A T C Paul B O P Felske S R O Surrogate A T C Pelletier B O P Felske S R O Pelletier A T C Felske B O P Paul S R O A T C B O P R I U RO SRO-I Pelletier SRO-U RX 2 4 2 2 1 1 0 NOR 1 - 1 2 1 1 1 I/C 3,4,5,6 2,5 4,5,6,7 10 4 4 2 MAJ 7,8,9 6,7 8,9 7 2 2 1 TS 3,4 - 3,4,5 5 0 2 2 RO Paul SRO-I SRO-U RX 2 - 1 1 1 0 NOR - 1 1 1 1 1 I/C 3,5 4,6 4 4 4 2 MAJ 8,9 8,9 4 2 2 1 TS - - 0 0 2 2 RO Felske SRO-I SRO-U RX - - 2 1 1 1 0 NOR 1 1 - 2 1 1 1 I/C 4,6 3,4 5,7 6 4 4 2 MAJ 8,9 6,7 8,9 6 2 2 1 TS - - - 0 0 2 2 RO SRO-I SRO-U RX 4 1 1 0 NOR 1 1 1 1 I/C 2,3,4,5 4 4 2 MAJ 6,7 2 2 1 TS 2,3,4 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve i n both the "at-the-controls (ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right

-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew B: SRO-I: Martinez; RO: Richards Facility:

Byron Date of Exam: 3/14/2016 Operating Test No.:

Byron 2016301 A P P L I C A N T E V E N T T Y P E Scenarios 16-1 16-3 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Martinez A T C Richards B O P Surrogate S R O Surrogate A T C Martinez B O P Richards S R O A T C B O P S R O A T C B O P R I U RO SRO-I Martinez SRO-U RX 2 1 2 1 1 0 NOR 1 - 1 1 1 1 I/C 3,4,5,6 3,5 6 4 4 2 MAJ 7,8,9 7,8,9 6 2 2 1 TS 3,4 - 2 0 2 2 RO Richards SRO-I SRO-U RX 2 - 1 1 1 0 NOR - 2 1 1 1 1 I/C 3,5 4,6 4 4 4 2 MAJ 8,9 7,8,9 5 2 2 1 TS - - 0 0 2 2 RO SRO-I SRO-U RX - 1 1 1 0 NOR 1 2 1 1 1 I/C 4,6 3,4,5,6 4 4 2 MAJ 8,9 7,8,9 2 2 1 TS - 3,5 0 2 2 RO SRO-I SRO-U RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right

-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility:

Byron Date of Exam: 3/14/2016 Operating Test No.:

Byron 2016301 A P P L I C A N T E V E N T T Y P E Scenarios 16-1 16-2 16-3 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Hamblin A T C Egeland B O P Mickelson S R O Mickelson A T C Hamblin B O P Egeland S R O Hamblin A T C Mickelson B O P Egeland S R O A T C B O P R I U RO SRO-I Hamblin SRO-U RX 2 4 1 3 1 1 0 NOR 1 - 2 2 1 1 1 I/C 3,4,5,6 2,5 3,4,5,6 8 4 4 2 MAJ 7,8,9 6,7 7,8,9 8 2 2 1 TS 3,4 - 3,5 4 0 2 2 RO SRO-I Mickelson SRO-U RX - 4 1 2 1 1 0 NOR 1 1 - 2 1 1 1 I/C 4,6 2,3,4,5 3,5 8 4 4 2 MAJ 8,9 6,7 7,8,9 7 2 2 1 TS - 2,3,4 - 3 0 2 2 RO Egeland SRO-I SRO-U RX 2 - - 2 1 1 0 NOR - 1 2 2 1 1 1 I/C 3,5 3,4 4,6 6 4 4 2 MAJ 8,9 6,7 7,8,9 7 2 2 1 TS - - - 0 0 2 2 RO SRO-I SRO-U RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants.

ROs must serve in both the "at-the-controls (ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right

-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility:

Byron Date of Exam: 3/14/2016 Operating Test No.:

Byron 2016301 A P P L I C A N T E V E N T T Y P E Scenarios 16-2 16-3 16-4 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Bolin A T C Bechtel B O P Niehaus S R O Bolin A T C Niehaus B O P Bechtel S R O Surrogate A T C Bolin B O P Bechtel S R O A T C B O P R I U RO SRO-I Bolin SRO-U RX 4 1 2 3 1 1 0 NOR 1 2 - 2 1 1 1 I/C 2,3,4,5 3,4,5,6 5,7 10 4 4 2 MAJ 6,7 7,8,9 8,9 6 2 2 1 TS 2,3,4 3,5 - 5 0 2 2 RO Neihaus SRO-I SRO-U RX - 1 1 1 1 0 NOR 1 - 1 1 1 1 I/C 3,4 3,5 4 4 4 2 MAJ 6,7 7,8,9 5 2 2 1 TS - - 0 0 2 2 RO Bechtel SRO-I SRO-U RX 4 - - 1 1 1 0 NOR - 2 1 1 1 1 1 I/C 2,5 4,6 4,6 6 4 4 2 MAJ 6,7 7,8,9 8,9 7 2 2 1 TS - - - 0 0 2 2 RO SRO-I SRO-U RX 2 1 1 0 NOR 1 1 1 1 I/C 4,5,6,7 4 4 2 MAJ 8,9 2 2 1 TS 3,4,5 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)"

and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right

-hand columns.