ML16217A344: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:          Davis Besse                           Date of Examination:__6/20/16 thru 6/20/16 __ Exam Level:  RO    SRO(I)      SRO(U)          Operating Test No.: __DB NRC 2016__ Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)  System / JPM Title Type Code* Safety Function S1 - (001) / Swap CRD Booster Pumps   (Alt Path - Loss of CRDM cooling flow)                     (JPM New)         N, A, S  1 S2 - (006) / Transfer LPI Suction to the Emergency Sump  (Alt Path - Failure of Permit Interlock)         (JPM 291) D, A, S, E, EN  2              S7 - (012) / Deenergize Source Range NIs                     (JPM 185) D, S, L  7    In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)    P2 - (039) / Locally Operate Atmospheric Vent Valve ICS11A                                                                                        (JPM 024) D, E, R  4s  P3 - (064) / Energize Station Blackout Diesel Generator Auxiliaries         (Alt Path - Cooling Fan Failure)                                        (JPM 258) D, A  6 @ All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all  5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. *Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3      /  / > 1 (control room system)     (randomly selected)}}
{{#Wiki_filter:ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2 Facility:          Davis Besse Date of Examination:
__6/20/16 thru 6/20/16 __ Exam Level:  RO    SRO(I)      SRO(U)          Operating Test No.:
__DB NRC 2016__ Control Room Systems
@ (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U)  System / JPM Title Type Code*
Safety Function S1 - (001) / Swap CRD Booster Pumps (Alt Path - Loss of CRDM cooling flow)
                    (JPM New)
N, A, S  1 S2 - (006) / Transfer LPI Suction to the Emergency Sump  (Alt Path - Failure of Permit Interlock)
          (JPM 291)
D, A, S, E, EN  2              S7 - (012) / Deenergize Source Range NIs (JPM 185)
D, S, L  7    In-Plant Systems
@ (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U)    P2 - (039) / Locally Operate Atmospheric Vent Valve ICS11A                                                                                        (JPM 024)
D, E, R  4s  P3 - (064) / Energize Station Blackout Diesel Generator Auxiliaries (Alt Path  
- Cooling Fan Failure
)                                        (JPM 258)
D, A  6 @ All RO and SRO control room (and in
-plant) systems must be different and serve different safety functions; all  5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
*Type Codes Criteria for RO
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3      /  / > 1 (control room system)
    (randomly selected)}}

Revision as of 05:11, 30 June 2018

Davis-Besse, Unit 1 - ES-301-2 Srou
ML16217A344
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/02/2016
From:
Operations Branch III
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML15274A353 List:
References
L-16-044
Download: ML16217A344 (1)


Text

ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:

__6/20/16 thru 6/20/16 __ Exam Level: RO SRO(I) SRO(U) Operating Test No.:

__DB NRC 2016__ Control Room Systems

@ (8 for RO); (7 for SRO

-I); (2 or 3 for SRO

-U) System / JPM Title Type Code*

Safety Function S1 - (001) / Swap CRD Booster Pumps (Alt Path - Loss of CRDM cooling flow)

(JPM New)

N, A, S 1 S2 - (006) / Transfer LPI Suction to the Emergency Sump (Alt Path - Failure of Permit Interlock)

(JPM 291)

D, A, S, E, EN 2 S7 - (012) / Deenergize Source Range NIs (JPM 185)

D, S, L 7 In-Plant Systems

@ (3 for RO); (3 for SRO

-I); (3 or 2 for SRO

-U) P2 - (039) / Locally Operate Atmospheric Vent Valve ICS11A (JPM 024)

D, E, R 4s P3 - (064) / Energize Station Blackout Diesel Generator Auxiliaries (Alt Path

- Cooling Fan Failure

) (JPM 258)

D, A 6 @ All RO and SRO control room (and in

-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO

/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 / / > 1 (control room system)

(randomly selected)