ML16279A479: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:From:Gunderson, LynneTo:Gibson, LaurenCc:Eckholt, Gene F.; Rohrer, Rick J.; Fields, John S.
{{#Wiki_filter:From:Gunderson, Lynne To:Gibson, Lauren Cc:Eckholt, Gene F.
; Rohrer, Rick J.
; Fields, John S.


==Subject:==
==Subject:==
[External_Sender] Prairie Island Nuclear Generating Plant Flood Hazard Reevaluation Report - Response toRequested Information (CAC Nos. MF7710 and MF7711)Date:Thursday, September 29, 2016 5:04:58 PMMs. Gibson,
[External_Sender] Prairie Island Nuclear Generating Plant Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711)
Date:Thursday, September 29, 2016 5:04:58 PM Ms. Gibson,


On August 18, 2016, a joint audit call was held between the NRC and Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, related to the Prairie Island Nuclear Generating Plant's (PINGP) Flood Hazard Reevaluation Report (FHRR)
On August 18, 2016, a joint audit call was held between the NRC and Northern States
(dated May 12, 2016; ADAMS Accession No. ML16133A030). This audit call was held in accordance with the audit plan (ADAMS Accession No. ML16152A126). As a result of the call, the NRC requested on August 30, 2016, that information be submitted on the docket by October 28, 2016. The information request is repeated below along with a response to the request.


Requested Information for Prairie Island: ~        Local Intense Precipitation - General request related to HEC-RAS modeling The schematic diagram (Figure 5.3.2-2 in LIP calculation package) shows a general overview of the HEC-RAS modeling structure. However, detailed information about where the river reaches receive their water from and what are the corresponding drainage basins is missing. Review of the model shows that there is a total of 32 subbasins, 10 river reaches, and 18 storage areas, which should have more reach boundary conditions (including the missing data for subbasin #205), storage area boundary conditions, and connections between these features. However, none of these conditions were specified or discussed in the FHRR or the LIP calculation package. Please provide revised figure(s) to include all critical door opening locations, river reaches, and cross section associated with each of the critical door locations using appropriate annotations and legends. Please send as a .jpeg or .tiff attachment to an e-mail. The e-mail and attachment will be docketed.
Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, related to the Prairie
Northern States Power - Minnesota (NSPM) Response:
 
Three (3) figures are attached, which provide the location of the critical door opening locations, river reaches, and cross section associated with each of the critical door locations including appropriate annotations and legends. The figures for this response reflect corrections performed in Calculation 180461.51.1005, Revision 1, which is discussed in a separate submittal supplementing the PINGP FHRR. The calculation revision is provided to the NRC Staff for audit on DVD.
Island Nuclear Generating Plant's (PINGP) Flood Hazard Reevaluation Report (FHRR)
 
(dated May 12, 2016; ADAMS Accession No. ML16133A030). This audit call was held in
 
accordance with the audit plan (ADAMS Accession No. ML16152A126). As a result of the
 
call, the NRC requested on August 30, 2016, that information be submitted on the docket
 
by October 28, 2016. The information request is repeated below along with a response to
 
the request.
 
Requested Information for Prairie Island
: ~        Local Intense Precipitation - General request related to HEC
-RAS modeling The schematic diagram (Figure 5.3.2-2 in LIP calculation package) shows a general
 
overview of the HEC-RAS modeling structure. However, detailed information about
 
where the river reaches receive their water from and what are the corresponding
 
drainage basins is missing. Review of the model shows that there is a total of 32
 
subbasins, 10 river reaches, and 18 storage areas, which should have more reach
 
boundary conditions (including the missing data for subbasin #205), storage area
 
boundary conditions, and connections between these features. However, none of these
 
conditions were specified or discussed in the FHRR or the LIP calculation package.
Please provide revised figure(s) to include all critical door opening locations, river
 
reaches, and cross section associated with each of the critical door locations using
 
appropriate annotations and legends.
Please send as a .jpeg or .tiff attachment to an e
-
mail. The e-mail and attachment will be docketed.
 
Northern States Power - Minnesota (NSPM) Response
:
Three (3) figures are attached, which provide the location of the critical door opening
 
locations, river reaches, and cross section associated with each of the critical door
 
locations including appropriate annotations and legends. The figures for this response
 
reflect corrections performed in Calculation 180461.51.1005, Revision 1, which is
 
discussed in a separate submittal supplementing the PINGP FHRR. The calculation
 
revision is provided to the NRC Staff for audit on DVD.


Please contact me if you have any questions.
Please contact me if you have any questions.


Thank you, Lynne GundersonXcel Energy l Responsible By Nature Fukushima Response Project - LicensingPrairie Island Nuclear Generating Plant1717 Wakonade Drive East, NPD Welch, MN 55089 P: 651.267.7421 C:612.396.0173}}
Thank you,
 
Lynne Gunderson Xcel Energy l Responsible By Nature Fukushima Response Project - Licensing Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East, NPD
 
Welch, MN 55089
 
P: 651.267.7421 C:612.396.0173}}

Revision as of 02:40, 30 June 2018

Prairie Island Nuclear Generating Plant Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711)
ML16279A479
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/29/2016
From: Gunderson L
Northern States Power Company, Minnesota, Xcel Energy
To: Gibson L K
Japan Lessons-Learned Division
Gibson L K, NRR/JLD, 415-1056
Shared Package
ML16279A476 List:
References
CAC MF7710, CAC MF7711
Download: ML16279A479 (2)


Text

From:Gunderson, Lynne To:Gibson, Lauren Cc:Eckholt, Gene F.

Rohrer, Rick J.
Fields, John S.

Subject:

[External_Sender] Prairie Island Nuclear Generating Plant Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711)

Date:Thursday, September 29, 2016 5:04:58 PM Ms. Gibson,

On August 18, 2016, a joint audit call was held between the NRC and Northern States

Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, related to the Prairie

Island Nuclear Generating Plant's (PINGP) Flood Hazard Reevaluation Report (FHRR)

(dated May 12, 2016; ADAMS Accession No. ML16133A030). This audit call was held in

accordance with the audit plan (ADAMS Accession No. ML16152A126). As a result of the

call, the NRC requested on August 30, 2016, that information be submitted on the docket

by October 28, 2016. The information request is repeated below along with a response to

the request.

Requested Information for Prairie Island

~ Local Intense Precipitation - General request related to HEC

-RAS modeling The schematic diagram (Figure 5.3.2-2 in LIP calculation package) shows a general

overview of the HEC-RAS modeling structure. However, detailed information about

where the river reaches receive their water from and what are the corresponding

drainage basins is missing. Review of the model shows that there is a total of 32

subbasins, 10 river reaches, and 18 storage areas, which should have more reach

boundary conditions (including the missing data for subbasin #205), storage area

boundary conditions, and connections between these features. However, none of these

conditions were specified or discussed in the FHRR or the LIP calculation package.

Please provide revised figure(s) to include all critical door opening locations, river

reaches, and cross section associated with each of the critical door locations using

appropriate annotations and legends.

Please send as a .jpeg or .tiff attachment to an e

-

mail. The e-mail and attachment will be docketed.

Northern States Power - Minnesota (NSPM) Response

Three (3) figures are attached, which provide the location of the critical door opening

locations, river reaches, and cross section associated with each of the critical door

locations including appropriate annotations and legends. The figures for this response

reflect corrections performed in Calculation 180461.51.1005, Revision 1, which is

discussed in a separate submittal supplementing the PINGP FHRR. The calculation

revision is provided to the NRC Staff for audit on DVD.

Please contact me if you have any questions.

Thank you,

Lynne Gunderson Xcel Energy l Responsible By Nature Fukushima Response Project - Licensing Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East, NPD

Welch, MN 55089

P: 651.267.7421 C:612.396.0173