NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Requested Licensing Action Request to Revise Technical Specification 3.7.8 Required Actions
ML23207A196
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/26/2023
From: Ballard B
NRC/NRR/DORL/LPL3
To: Kivi J, Mark Miller
Northern States Power Co, Xcel Energy
Ballard B
References
L-2023-LLA-0095
Download: ML23207A196 (3)


Text

From:

Brent Ballard Sent:

Wednesday, July 26, 2023 3:27 PM To:

Kivi, Jeffrey L; Miller, Michael A Cc:

Jeff Whited

Subject:

Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action re: Request to Revise Technical Specification 3.7.8 Required Actions (EPID L-2023-LLA-0095)

Good afternoon, By letter L-PI-23-006 dated June 22, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23173A069), Northern States Power Company (the licensee), a Minnesota Corporation, doing business as Xcel Energy, submitted a license amendment request (LAR) for Prairie Island Nuclear Generating Plant, Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The proposed LAR would revise Technical Specification (TS) 3.7.8, Cooling Water (CL) System, Condition B to combine required actions B.1 and B.2 into a single required action, B.1, to verify operability of a safeguards pump on the opposite train, and add a note to proposed required action B.1 to clarify that the opposite train diesel driven CL pump may be verified operable by administrative means. The proposed amendment would also remove reference to an expired one-time allowance by deleting a footnote associated with the completion time for current required action B.1, which was incorporated by Unit 1 and Unit 2 license amendments 237 and 225, respectively.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 325 hours0.00376 days <br />0.0903 hours <br />5.373677e-4 weeks <br />1.236625e-4 months <br /> to complete. The NRC staff expects to complete this review by July 26, 2024. If there are emergent complexities or challenges in our review that would cause

changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at 301-415-0680 or by e-mail.

Thank you, Brent Brent Ballard Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 301-415-0680

Hearing Identifier:

NRR_DRMA Email Number:

2180 Mail Envelope Properties (BY5PR09MB4627A793CE76B34EC16EEA97E000A)

Subject:

Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action re Request to Revise Technical Specification 3.7.8 Required Actions (EPID L-2023-LLA-0095)

Sent Date:

7/26/2023 3:27:16 PM Received Date:

7/26/2023 3:27:00 PM From:

Brent Ballard Created By:

Brent.Ballard@nrc.gov Recipients:

"Jeff Whited" <Jeffrey.Whited@nrc.gov>

Tracking Status: None "Kivi, Jeffrey L" <jeffrey.l.kivi@xcelenergy.com>

Tracking Status: None "Miller, Michael A" <michael.a.miller@xcelenergy.com>

Tracking Status: None Post Office:

BY5PR09MB4627.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4292 7/26/2023 3:27:00 PM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: