ML22045A497

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Unit 2 - Acceptance of Alternative Request Alternative Related PIV Leakage Monitoring
ML22045A497
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 02/14/2022
From: Robert Kuntz
NRC/NRR/DORL/LPL3
To: Kivi J
Northern States Power Company, Minnesota
References
L-2022-LLR-0012
Download: ML22045A497 (2)


Text

From: Kuntz, Robert Sent: Monday, February 14, 2022 2:07 PM To: Kivi, Jeffrey L.

Cc: Emanuelson, Mary A; Scott, Sara

Subject:

Prairie Island Nuclear Generating Plant, Unit 2 - Acceptance of Alternative Request Re: Alternative Related PIV Leakage Monitoring (EPID: L-2022-LLR-0012)

By submittal dated February 8, 2022, Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, submitted a relief request RR-08 for Prairie Island Nuclear Generating Plant, Unit 2, for an alternative to use an evaluation and monitoring plan for leakage past a pressure isolation valve. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 6 months, which is August 18, 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

Robert F. Kuntz, Senior Project Manager Plant Licensing Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Hearing Identifier: NRR_DRMA Email Number: 1522

Mail Envelope Properties (SA9PR09MB4640710C8EF937B3389BB1C599339)

Subject:

Prairie Island Nuclear Generating Plant, Unit 2 - Acceptance of Alternative Request Re: Alternative Related PIV Leakage Monitoring (EPID: L-2022-LLR-0012)

Sent Date: 2/14/2022 2:07:07 PM Received Date: 2/14/2022 2:07:00 PM From: Kuntz, Robert

Created By: Robert.Kuntz@nrc.gov

Recipients:

"Emanuelson, Mary A" <mary.emanuelson@xcelenergy.com>

Tracking Status: None "Scott, Sara" <sara.scott@xcelenergy.com>

Tracking Status: None "Kivi, Jeffrey L." <jeffrey.l.kivi@xcelenergy.com>

Tracking Status: None

Post Office: SA9PR09MB4640.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 2398 2/14/2022 2:07:00 PM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: