| {{#Wiki_filter:TWONORTHNINTHSTREET,ALLENTOWN,PA.181011PHQN~,(215)52151IPBIOBrlrQnrll'llPenna%"ania,'976.Y'ovanber5,1976gnIPHPrrhiLrr2225552rrrlrINHrrtHrdrcrr.Mr.J.P.O'ReillyDirector-RegionIU.S.NuclearRegulatoryQammission931ParkAvenueKingofPrussia,Pennsylvania19406SUSQUEHANNASTiRMEU!CZRICSTATICN(SSES)INTERIMREPORTOF.REPORTABLEDEFIC~CvDEFECTINRPVUNITI2POTCHHEM'IDEPLATEDOCKETNO:50-388LICENSENO:CPPR-102ERs100450/100508FILE840-4PLA-142 | | {{#Wiki_filter:TWONORTHNINTHSTREET,ALLENTOWN, PA.181011PHQN~,(215)52151IPBIOBrlrQnrll'll Penna%"ania |
| | ,'976.Y'ovanber 5,1976gnIPHPrrhiLrr2225552rrrl rINHrrtHrdrcrr. |
| | Mr.J.P.O'ReillyDirector-Region IU.S.NuclearRegulatory Qammission 931ParkAvenueKingofPrussia,Pennsylvania 19406SUSQUEHANNA STiRMEU!CZRICSTATICN(SSES)INTERIMREPORTOF.REPORTABLE DEFIC~CvDEFECTINRPVUNITI2POTCHHEM'IDEPLATEDOCKETNO:50-388LICENSENO:CPPR-102ERs100450/100508 FILE840-4PLA-142 |
|
| |
|
| ==DearMr.O'Reilly:== | | ==DearMr.O'Reilly:== |
| ThisrelatestoadeficiencyresultingframadefectintheRPVUnitI2bottomheadsideplate.ThecontractorhasreportedthatthedefectwascausedduringtherEmovalofaten~rarysupportstrut.ThedeficiencywasevaluatedandreportedtoMr.MattiaonOctober1,1976asbeingofsuchconseauenceastobeconsideredasasignificantdeficiencyinconstruc-tionand,therefore,reportableurgertheprovisionsdescribedin10CFRPart50.55(e),(iii).TheimpactofthisdefectisbeinganalyzedbyPL,its,contractors,ardatechnicalconsultant,andwillbefullyaddressedinthefinal,definitivereportregardingthedeficiency.Itisanticipatedthatthedefinitivereportwillbesukmittedwithin30daysaft'erthedefecthasbeenrarovedandblended.Shoulditbecomeapparentthatthisschedulecannotbemet,youwillbepnxnptlyadvised.Thefollowingisanaccountoftherelevantdetailsofthedeficiency,theinvestigationpursuedandthedatawhichhavebeenestablishedtodate:A.ChronologyofEvents1.ThedefectintheBPVUnitI2bottcmheadsiaeplateisbelievedtohavebeencreatedaboutfourmonthsagowhenatemporaryattachmentbetweenthevesselandthesupportskirtwasbL22nedoffaccordingtoCBIProcedureLBP-1.PENN5YLVANIAPOWER8LIGHTCOMPANY 0'IP Mr.J.P.O'ReillyPage2Novanber5,19762.Duetomanpowerconsiderations,thecleanupoftheattachnentareawasdelayeduntilSeptanber28,1976.Intheinterim,theactivitywasunderthecontrolofTravelFolderRZK-20,Itan21A.OnSeptanber28,1976,CBIpersonnelbeganrennvingmetalintheareaofthedefect.RemrkisallowedbyGESpecification21A9340whichprovidesforexcavationofsurfacedefectstodeterminetheirdepth.3.Theareawasexcavatedtoadepthof15/16"andonSeptanber29,1976CBIenteredtheconditionasadefectintheirNonconformancelag.4.OnSeptanber30,1976,GESanJosenotifiedPLofthedefect.Afterevaluationoftheincident,PLunsuccessfullyattanptedtoreachMr.HeishnanofNRCRegionIat3:00p.m.Amessagewaslefttoreturnthecall.5.Mr.Mattiareturnedthecallat8:05a.m.onOctober1,1976andwasadvisedoftheincident.Hewasinformedthatthereportabilityofthedefectwasbeingevaluated,andthataninterimreportorfinaldefinitivereport,ifwarranted,auldbesuhnittedtotheNRCbyNcvanber1,1976.6.OnNovanber1,1976,PLadvisedMr.Mattiathattheevaluationwasnotcompletea+2askedforanextensionofthereportdateuntilNovember8,1976.Thisextensionwasgranted.B.AnalisofSafelicationsl.Evaluationoftheimpactof'thedepthofthedefectonthenominalmaterialthicknessincludingreconciliationofthethicknessreductionwiththestxessreportisbeingpursued.2.Theconsiderationoflowcycle,highstressfatigue,duetothermalstressordeteriorationofthemicrostxucturewithintheheataffectedzoneisbeing'studiedfromametallurgicalaspect.C.CorrectiveMeasuresTakenl.OnOctober10,1976CBIissuedRequestForAcceptanceOfNonconformityAsADeviation(RAD)N8.2.Aspecificremrkprocedureisbeingpreparedtogoverntheoperation.Itisanticipatedthattheareawillbeexcavatedtosoundbasemetal,contourblended,examinedbynondestructiveexamination,acidetchedtodetexminethattheheataffectedzonehasbeenranoved,andthenfinalinspected.D.ConclusionThisdeficiencywasdiscoveredduringaroutineworkoperationandtheinspectionactivityisunderthecontroloftheCBIQualityAssuranceProgram.ThiscontrolisassuredbytheuseoftheCBItravelerfolderwhichissequencedsuchthatworkwillmtprogressuntilthedefectisproperlydispositioned.
| | |
| Mr.J.P.O'ReillvPage3Novanber5,1976Thedispositionofthedefectisbeinggivenfulldesignconsideration,includingthetechnicalservicesofametallurgicalconsultant.Remrkwillbedoneinaccordancewithapplicablecodeandregulatoryrecuire-mentsandwillbemonitoredbyPLtoassurecanpliance.Intheinterim,theCczmissionwillbeadvisedofanysignificantissuewhichmayarise.Verytrulyyours,N.W.CurtisVicepresidentEng-ineeringeGcnstructicnJZJ:mcbcc:Mr.ErnstVolgenau(15)DirectorOfficeofInspectionandEnforcementU.S.NuclearRegulatoryCamnissionWashington,D.C.20555Mr.G.McDonaldDirectorOfficeofManagementInfoxmationandPnxp:amControlU.S.NuclearRegulatoryGmmissionWashington,D.C.20555}} | | Thisrelatestoadeficiency resulting framadefectintheRPVUnitI2bottomheadsideplate.Thecontractor hasreportedthatthedefectwascausedduringtherEmovalofaten~rarysupportstrut.Thedeficiency wasevaluated andreportedtoMr.MattiaonOctober1,1976asbeingofsuchconseauence astobeconsidered asasignificant deficiency inconstruc-tionand,therefore, reportable urgertheprovisions described in10CFRPart50.55(e),(iii).TheimpactofthisdefectisbeinganalyzedbyPL,its,contractors, ardatechnical consultant, andwillbefullyaddressed inthefinal,definitive reportregarding thedeficiency. |
| | Itisanticipated thatthedefinitive reportwillbesukmitted within30daysaft'erthedefecthasbeenrarovedandblended.Shoulditbecomeapparentthatthisschedulecannotbemet,youwillbepnxnptlyadvised.Thefollowing isanaccountoftherelevantdetailsofthedeficiency, theinvestigation pursuedandthedatawhichhavebeenestablished todate:A.Chronology ofEvents1.ThedefectintheBPVUnitI2bottcmheadsiaeplateisbelievedtohavebeencreatedaboutfourmonthsagowhenatemporary attachment betweenthevesselandthesupportskirtwasbL22nedoffaccording toCBIProcedure LBP-1.PENN5YLVANIAPOWER8LIGHTCOMPANY 0'IP Mr.J.P.O'ReillyPage2Novanber5,19762.Duetomanpowerconsiderations, thecleanupoftheattachnent areawasdelayeduntilSeptanber 28,1976.Intheinterim,theactivitywasunderthecontrolofTravelFolderRZK-20,Itan21A.OnSeptanber 28,1976,CBIpersonnel beganrennvingmetalintheareaofthedefect.RemrkisallowedbyGESpecification 21A9340whichprovidesforexcavation ofsurfacedefectstodetermine theirdepth.3.Theareawasexcavated toadepthof15/16"andonSeptanber 29,1976CBIenteredthecondition asadefectintheirNonconformance lag.4.OnSeptanber 30,1976,GESanJosenotifiedPLofthedefect.Afterevaluation oftheincident, PLunsuccessfully attanpted toreachMr.HeishnanofNRCRegionIat3:00p.m.Amessagewaslefttoreturnthecall.5.Mr.Mattiareturnedthecallat8:05a.m.onOctober1,1976andwasadvisedoftheincident. |
| | Hewasinformedthatthereportability ofthedefectwasbeingevaluated, andthataninterimreportorfinaldefinitive report,ifwarranted, auldbesuhnitted totheNRCbyNcvanber1,1976.6.OnNovanber1,1976,PLadvisedMr.Mattiathattheevaluation wasnotcompletea+2askedforanextension ofthereportdateuntilNovember8,1976.Thisextension wasgranted.B.AnalisofSafelications l.Evaluation oftheimpactof'thedepthofthedefectonthenominalmaterialthickness including reconciliation ofthethickness reduction withthestxessreportisbeingpursued.2.Theconsideration oflowcycle,highstressfatigue,duetothermalstressordeterioration ofthemicrostxucture withintheheataffectedzoneisbeing'studiedfromametallurgical aspect.C.Corrective MeasuresTakenl.OnOctober10,1976CBIissuedRequestForAcceptance OfNonconformity AsADeviation (RAD)N8.2.Aspecificremrkprocedure isbeingpreparedtogoverntheoperation. |
| | Itisanticipated thattheareawillbeexcavated tosoundbasemetal,contourblended,examinedbynondestructive examination, acidetchedtodetexmine thattheheataffectedzonehasbeenranoved,andthenfinalinspected. |
| | D.Conclusion Thisdeficiency wasdiscovered duringaroutineworkoperation andtheinspection activityisunderthecontroloftheCBIQualityAssurance Program.ThiscontrolisassuredbytheuseoftheCBItravelerfolderwhichissequenced suchthatworkwillmtprogressuntilthedefectisproperlydispositioned. |
| | Mr.J.P.O'ReillvPage3Novanber5,1976Thedisposition ofthedefectisbeinggivenfulldesignconsideration, including thetechnical servicesofametallurgical consultant. |
| | Remrkwillbedoneinaccordance withapplicable codeandregulatory recuire-mentsandwillbemonitored byPLtoassurecanpliance. |
| | Intheinterim,theCczmission willbeadvisedofanysignificant issuewhichmayarise.Verytrulyyours,N.W.CurtisVicepresident Eng-ineering eGcnstructicn JZJ:mcbcc:Mr.ErnstVolgenau(15)DirectorOfficeofInspection andEnforcement U.S.NuclearRegulatory Camnission Washington, D.C.20555Mr.G.McDonaldDirectorOfficeofManagement Infoxmation andPnxp:amControlU.S.NuclearRegulatory Gmmission Washington, D.C.20555}} |
|
---|
Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML24302A2772024-10-28028 October 2024 57243-EN 57243_5 - Rssc Dba Marmon - Update 20241030 ML17223A1982017-07-21021 July 2017 Part 21 Notification - Eaton/Cutler Hammer A200 Series Starter PLA-7613, Interim Report of a Deviation, Units 1 & 2 - (PLA-7613)2017-06-0909 June 2017 Interim Report of a Deviation, Units 1 & 2 - (PLA-7613) ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML11115A0392011-04-14014 April 2011 Notice of Deviation Pursuant to 10 CFR 21, NPKC-7-21A(N) Splice Kit with Possible Compromised Jacket Seal ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1018907392010-07-0101 July 2010 Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm ML1015305642010-05-28028 May 2010 Part 21 Notification from C & D Technologies, Inc., Post Corrosion on Dcu Batteries ML1009604492010-04-0202 April 2010 Part 21 Report by Tyco Valves and Controls, LP Possible Failure of Solenoid Valves with Dual Function Main Steam Safety Valves ML0934301402009-12-0202 December 2009 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0098, Rev. 0, Amot Thermostatic Valve Element, P/N: 9760X ML0232901622002-11-18018 November 2002 Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable ML18024A0581978-09-18018 September 1978 Letter Attaching a Final Report of a Deficiency in Carriage Bolt Fasteners Used on 480 Volt Motor Control Center Bus Splices ML18024A1011978-07-19019 July 1978 Letter Attaching a Report of Defects Discovered During Qualification and Manufacturing of Control Room Systems ML18024A0661978-07-14014 July 1978 Letter Referring to the April 17, 1978 Letter and Regarding an Update of Interim Report of Reportable Deficiency Regarding Potential Transformers on 4.16K Switchgear ML18024A0681978-07-0505 July 1978 Letter Referring to the April 26, 1978 Letter and Advising the Commission That a Definitive Report Will Be Submitted by September 29, 1978 ML18024A0771978-06-23023 June 1978 Letter Referring to the June 22, 1977 Letter and Relating to the Definitive Report, Prepared by Bechtel Power Corp., of a Reportable Deficiency Regarding Unsatisfactory Field Welding and Inspection of Shear Suds ML18024A0691978-05-31031 May 1978 Letter Referring to the December 1, 1977 Letter Providing an Interim Report of a Deficiency in Physical Separation of Electrical Circuits and Advising the Commission That the Definitive Report Will Be Submitted by September ML18024A0711978-04-26026 April 1978 Letter Attaching Bechtel Engineering'S Interim Report on Spot Welding of Struts for SSES Units 1 and 2 and Advising the Commission That the Definitive Report Will Be Submitted by July 31, 1978 ML18025A4791976-11-0505 November 1976 Interim Report of Reportable Deficiency Defect in RPV Susquehanna Unit 2 Bottom Head Side Plate ML18025A4901975-08-29029 August 1975 Letter Regarding the Definitive Report of Deficiencies in Box Column Supports Which Supplements PLA-74 ML18025A4921975-04-0404 April 1975 Letter Attaching an Interim Report on Potential Deficiency Which Was Discussed with Mr. Heishman on March 6, 1975 2024-10-28
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23094A1252023-03-31031 March 2023 Talen Part 21 Final Notification P21-03032023-FN R0 Re Defect Identified in Automatic Transfer Switch ML23094A1242023-03-31031 March 2023 EN 56387 Update - Paragon Energy Solutions Final Notification of Defect of Automatic Transfer Switch ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 ML20073G4572020-03-0909 March 2020 Carrier Corporation - Final Report Notification of Defect Pursuant to 10 CFR Part 21 for 17FA999-1200-107 Oil Pump ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML18087A0022018-03-21021 March 2018 Crane Nuclear, Inc. - Final Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem ML18078A5362018-01-31031 January 2018 Crane Nuclear, Inc. - Interim Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem (Update) ML17311A9092017-10-31031 October 2017 Interim Report for Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem ML17223A1982017-07-21021 July 2017 Part 21 Notification - Eaton/Cutler Hammer A200 Series Starter ML17206A0402017-07-14014 July 2017 Part 21 - Defective Safety Related Valves PLA-7613, Interim Report of a Deviation, Units 1 & 2 - (PLA-7613)2017-06-0909 June 2017 Interim Report of a Deviation, Units 1 & 2 - (PLA-7613) ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML16321A4502016-08-31031 August 2016 Part 21 Notification - Flowserve Swing Check Valves ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15034A5662015-01-23023 January 2015 Notification of Potential Part 21 for Event #50703 ML15030A0332015-01-20020 January 2015 Letter from James Thigpen Notification of Potential Part 21 Nuclear Nonconformance Event Number 50703 ML14337A0942014-11-24024 November 2014 Notification of Potential Part 21 - Lack of Proper Power Supply Indication ML14329A0632014-11-19019 November 2014 Notification of Potential Part 21 Re Lack of Proper Power Supply Indication ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14169A0302014-06-15015 June 2014 Update to Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 ML14303A5262014-03-28028 March 2014 Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12032A2402012-02-0101 February 2012 Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld ML11340A1002011-12-0505 December 2011 Letter 10 CFR Part 21 Notification Report, CON2000 and RTD2100 Spring Clips ML11341A0602011-12-0505 December 2011 Notification of Potential Part 21 Involving Defective Spring Clips Used as Seismic Restraints on Two Scientific Modules ML11363A1882011-12-0202 December 2011 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0098, Rev. 3, Amot Thermostatic Valve Element P/N: 9760X ML11336A3692011-12-0101 December 2011 Notification of Potential Part 21 Interim Report on Thermostatic Valve Failure on Palo Verde EDG ML11228A0842011-08-12012 August 2011 Notification of Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1122401422011-08-11011 August 2011 Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance 2024-09-06
[Table view] |
Text
TWONORTHNINTHSTREET,ALLENTOWN, PA.181011PHQN~,(215)52151IPBIOBrlrQnrll'll Penna%"ania
,'976.Y'ovanber 5,1976gnIPHPrrhiLrr2225552rrrl rINHrrtHrdrcrr.
Mr.J.P.O'ReillyDirector-Region IU.S.NuclearRegulatory Qammission 931ParkAvenueKingofPrussia,Pennsylvania 19406SUSQUEHANNA STiRMEU!CZRICSTATICN(SSES)INTERIMREPORTOF.REPORTABLE DEFIC~CvDEFECTINRPVUNITI2POTCHHEM'IDEPLATEDOCKETNO:50-388LICENSENO:CPPR-102ERs100450/100508 FILE840-4PLA-142
DearMr.O'Reilly:
Thisrelatestoadeficiency resulting framadefectintheRPVUnitI2bottomheadsideplate.Thecontractor hasreportedthatthedefectwascausedduringtherEmovalofaten~rarysupportstrut.Thedeficiency wasevaluated andreportedtoMr.MattiaonOctober1,1976asbeingofsuchconseauence astobeconsidered asasignificant deficiency inconstruc-tionand,therefore, reportable urgertheprovisions described in10CFRPart50.55(e),(iii).TheimpactofthisdefectisbeinganalyzedbyPL,its,contractors, ardatechnical consultant, andwillbefullyaddressed inthefinal,definitive reportregarding thedeficiency.
Itisanticipated thatthedefinitive reportwillbesukmitted within30daysaft'erthedefecthasbeenrarovedandblended.Shoulditbecomeapparentthatthisschedulecannotbemet,youwillbepnxnptlyadvised.Thefollowing isanaccountoftherelevantdetailsofthedeficiency, theinvestigation pursuedandthedatawhichhavebeenestablished todate:A.Chronology ofEvents1.ThedefectintheBPVUnitI2bottcmheadsiaeplateisbelievedtohavebeencreatedaboutfourmonthsagowhenatemporary attachment betweenthevesselandthesupportskirtwasbL22nedoffaccording toCBIProcedure LBP-1.PENN5YLVANIAPOWER8LIGHTCOMPANY 0'IP Mr.J.P.O'ReillyPage2Novanber5,19762.Duetomanpowerconsiderations, thecleanupoftheattachnent areawasdelayeduntilSeptanber 28,1976.Intheinterim,theactivitywasunderthecontrolofTravelFolderRZK-20,Itan21A.OnSeptanber 28,1976,CBIpersonnel beganrennvingmetalintheareaofthedefect.RemrkisallowedbyGESpecification 21A9340whichprovidesforexcavation ofsurfacedefectstodetermine theirdepth.3.Theareawasexcavated toadepthof15/16"andonSeptanber 29,1976CBIenteredthecondition asadefectintheirNonconformance lag.4.OnSeptanber 30,1976,GESanJosenotifiedPLofthedefect.Afterevaluation oftheincident, PLunsuccessfully attanpted toreachMr.HeishnanofNRCRegionIat3:00p.m.Amessagewaslefttoreturnthecall.5.Mr.Mattiareturnedthecallat8:05a.m.onOctober1,1976andwasadvisedoftheincident.
Hewasinformedthatthereportability ofthedefectwasbeingevaluated, andthataninterimreportorfinaldefinitive report,ifwarranted, auldbesuhnitted totheNRCbyNcvanber1,1976.6.OnNovanber1,1976,PLadvisedMr.Mattiathattheevaluation wasnotcompletea+2askedforanextension ofthereportdateuntilNovember8,1976.Thisextension wasgranted.B.AnalisofSafelications l.Evaluation oftheimpactof'thedepthofthedefectonthenominalmaterialthickness including reconciliation ofthethickness reduction withthestxessreportisbeingpursued.2.Theconsideration oflowcycle,highstressfatigue,duetothermalstressordeterioration ofthemicrostxucture withintheheataffectedzoneisbeing'studiedfromametallurgical aspect.C.Corrective MeasuresTakenl.OnOctober10,1976CBIissuedRequestForAcceptance OfNonconformity AsADeviation (RAD)N8.2.Aspecificremrkprocedure isbeingpreparedtogoverntheoperation.
Itisanticipated thattheareawillbeexcavated tosoundbasemetal,contourblended,examinedbynondestructive examination, acidetchedtodetexmine thattheheataffectedzonehasbeenranoved,andthenfinalinspected.
D.Conclusion Thisdeficiency wasdiscovered duringaroutineworkoperation andtheinspection activityisunderthecontroloftheCBIQualityAssurance Program.ThiscontrolisassuredbytheuseoftheCBItravelerfolderwhichissequenced suchthatworkwillmtprogressuntilthedefectisproperlydispositioned.
Mr.J.P.O'ReillvPage3Novanber5,1976Thedisposition ofthedefectisbeinggivenfulldesignconsideration, including thetechnical servicesofametallurgical consultant.
Remrkwillbedoneinaccordance withapplicable codeandregulatory recuire-mentsandwillbemonitored byPLtoassurecanpliance.
Intheinterim,theCczmission willbeadvisedofanysignificant issuewhichmayarise.Verytrulyyours,N.W.CurtisVicepresident Eng-ineering eGcnstructicn JZJ:mcbcc:Mr.ErnstVolgenau(15)DirectorOfficeofInspection andEnforcement U.S.NuclearRegulatory Camnission Washington, D.C.20555Mr.G.McDonaldDirectorOfficeofManagement Infoxmation andPnxp:amControlU.S.NuclearRegulatory Gmmission Washington, D.C.20555