{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001 June 30, 2014    In the Matter of FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1) Docket No. 50-346-LR 
==Dear Administrative Judges:==
Pursuant to the Atomic Safety and Licensing Board's ("Board") Memorandum and Order dated June 15, 2011 ("Order") and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission ("Staff") notes that the Safety Evaluation Report ("SER") with open items was published July 31, 2012. The Staff published the SER on September 3, 2013. The Staff published the Draft Supplemental Environmental Impact Statement ("DSEIS") in February 2014. Currently, the Staff anticipates publishing the Final SEIS in September 2014.
Respectfully submitted,        /signed (electronically) by/        Brian G. Harris        Counsel for the NRC Staff        U.S. Nuclear Regulatory Commission        Mail Stop O-15 D21        Washington, DC 20555-0001        (301) 415-1392          brian.harris@nrc.gov  Administrative Judge  William J. Froehlich, Chair Atomic Safety and Licensing Board  Mail Stop: T-3F23 Washington, DC 20555-001  Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001  Administrative Judge  Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  BEFORE THE ATOMIC SAFETY AND LICENSING BOARD  In the Matter of      )        )  FIRSTENERGY NUCLEAR OPERATING CO.  )  Docket No. 50-346-LRA ) (Davis-Besse Nuclear Power Station, Unit 1) )          )  CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the June 30, 2014 Letter from Brian G. Harris in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRC's E-Filing System, in the above captioned proceeding, this 30th day of June, 2014.
Signed (electronically) by      Brian G. Harris      Counsel for the NRC Staff      U.S. Nuclear Regulatory Commission      Mail Stop O-15 D21      Washington, DC 20555-0001      (301) 415-1392  brian.harris@nrc.gov}}

Revision as of 01:09, 28 June 2018

June 2014 Status Update Letter, in the Matter of Firstenergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1)
ML14181A024
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/30/2014
From: Harris B G
NRC/OGC
To: Froehlich W J, Kastenberg W E, Trikouros N G
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-346-LR, ASLBP 11-907-01-LR-BD01, RAS 26124
Download: ML14181A024 (2)


Text

UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001 June 30, 2014 In the Matter of FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1) Docket No. 50-346-LR

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Board's ("Board") Memorandum and Order dated June 15, 2011 ("Order") and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission ("Staff") notes that the Safety Evaluation Report ("SER") with open items was published July 31, 2012. The Staff published the SER on September 3, 2013. The Staff published the Draft Supplemental Environmental Impact Statement ("DSEIS") in February 2014. Currently, the Staff anticipates publishing the Final SEIS in September 2014.

Respectfully submitted, /signed (electronically) by/ Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov Administrative Judge William J. Froehlich, Chair Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) FIRSTENERGY NUCLEAR OPERATING CO. ) Docket No. 50-346-LRA ) (Davis-Besse Nuclear Power Station, Unit 1) ) ) CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the June 30, 2014 Letter from Brian G. Harris in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRC's E-Filing System, in the above captioned proceeding, this 30th day of June, 2014.

Signed (electronically) by Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov