W. Gideon 3  Thank you for your cooperation in this matter.  Mr. Bolin has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: David.Lanyi@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).  Sincerely,        /RA/  Gerald J. McCoy, Chief      Operations Branch 1
 
      Division of Reactor Safety
_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE DRL2 GJM1      NAME LANYI MCCOY      DATE 6/16/2016 6/17/2016      E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO    
Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81
cc:  Distribution via ListServ 
 
 
  PUBLICLY AVAILABLE  NON-PUBLICLY AVAILABLE  SENSITIVE  NON-SENSITIVE ADAMS:  Yes ACCESSION NUMBER:_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE DRL2 GJM1      NAME LANYI MCCOY      DATE 6/16/2016 6/17/2016      E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO     OFFICIAL RECORD COPY          DOCUMENT NAME:  G:\OLEXAMS\BRUNSWICK EXAMINATIONS\INITIAL EXAM 2016-301\CORRESPONDENCE\CORPORATE NOTIFICATION LETTER.DOCX 
   


}}
}}

Revision as of 17:43, 14 May 2018

Brunswick Steam Electric Plant- Notification of Licensed Operator Initial Examination 05000325/2016301 and 05000324/2016301
ML16173A365
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/17/2016
From: McCoy G J
Division of Reactor Safety II
To: Gideon W R
Progress Energy Carolinas
References
IR 2016301
Download: ML16173A365 (4)


See also: IR 05000324/2016301

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 17, 2016 William R. Gideon

Brunswick Steam Electric Plant

Site Vice President

Brunswick Steam Electric Plant

8470 River Rd. SE (M/C BNP001) Southport, NC 28461

SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000325/2016301 AND 05000324/2016301 Dear Mr. Gideon:

During a telephone conversation on June 6, 2016, between Mr. Robert Bolin, Senior Nuclear

Station Instructor - Operations and Mr. David Lanyi, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Brunswick Steam Electric Plant. The on-site preparatory week is scheduled for the week of October 31, 2016. The

operating test is scheduled to be administered during the weeks of November 28, 2016 and

December 5, 2016. The written examination is scheduled to be administered the week of

December 12, 2016.

As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

Mr. Lanyi provided the written examination outline to your staff in January, 2016. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to

ES-201 will be due by October 14, 2016. Pursuant to Title 10, Section 55.40(b)(3), of the Code

of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

W. Gideon 2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

W. Gideon 3 Thank you for your cooperation in this matter. Mr. Bolin has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: David.Lanyi@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov). Sincerely, /RA/ Gerald J. McCoy, Chief Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81

cc: Distribution via ListServ

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE DRL2 GJM1 NAME LANYI MCCOY DATE 6/16/2016 6/17/2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO