{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038
* June 24, 2015 SUBJECT: HOPE CREEK GENERATING STATION -CORRECTION TO AMENDMENT NO. 198 REGARDING UPDATE OF APPENDIX B TO THE RENEWED FACILITY OPERATING LICENSE (TAC NO. MF5389) Dear Mr. Braun: On June 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 198 to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station (Hope Creek), and Amendment Nos. 308 and 290 to Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15141A271). The amendments were issued in response to PSEG Nuclear LLC's (PSEG) application dated December 9, 2014, as supplemented by letter dated April 9, 2015 (ADAMS Accession Nos. ML 14343A926 and ML 15099A766, respectively). The amendments revised PSEG's Environm.ental Protection Plans (Non-Radiological). On June 22, 2015, PSEG staff notified the NRC staff that one of the license pages revised by Hope Creek Amendment No. 198 was in error. Specifically, on page 3 of the license, License Condition C.(2) incorrectly refers to Appendix S instead of Appendix Band the amendment number was inadvertently left off the bottom of the same page. The corrected page 3 is enclosed. Please replace page 3 of Renewed Facility Operating License No. NPF-57 with the enclosed page. The NRC staff regrets any inconvenience this may have caused. If you have any questions, please contact me at 301-415-1603 or carleen.parker@nrc.gov. Docket No. 50-354 Enclosure: Hope Creek License Page 3 cc w/encl: Distribution via Listserv Sincyely, j "--:> Wo. Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
* June 24, 2015  
-3-reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 1 O CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation. (7) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Part 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60. C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at reactor core power levels not in excess of 3840 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein. (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 198, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. Renewed License No. NPF-57 Amendment No. 198 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: HOPE CREEK GENERATING STATION -CORRECTION TO AMENDMENT NO. 198 REGARDING UPDATE OF APPENDIX B TO THE RENEWED FACILITY OPERATING LICENSE (TAC NO. MF5389) Dear Mr. Braun: On June 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 198 to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station (Hope Creek), and Amendment Nos. 308 and 290 to Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15141A271 ). The amendments were issued in response to PSEG Nuclear LLC's (PSEG) application dated December 9, 2014, as supplemented by letter dated April 9, 2015 (ADAMS Accession Nos. ML 14343A926 and ML 15099A766, respectively). The amendments revised PSEG's Environmental Protection Plans (Non-Radiological). On June 22, 2015, PSEG staff notified the NRC staff that one of the license pages revised by Hope Creek Amendment No. 198 was in error. Specifically, on page 3 of the license, License Condition C.(2) incorrectly refers to Appendix S instead of Appendix Band the amendment number was inadvertently left off the bottom of the same page. The corrected page 3 is enclosed. Please replace page 3 of Renewed Facility Operating License No. NPF-57 with the enclosed page. The NRC staff regrets any inconvenience this may have caused. If you have any questions, please contact me at 301-415-1603 or carleen.parker@nrc.gov. Docket No. 50-354 Enclosure: Hope Creek License Page 3 cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPL 1-2 R/F RidsNrrDlrRerb Resource RidsNrrLALRonewiczResource RidsRgn1 MailCenter Resource ADAMS Accession No.: ML 15174A127 Sincerely, IRA/ Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation GHill, OIS RidsACRS MailCTR Resource RidsNrrDorlLpl 1-2 Resource RidsNrrPMHopeCreek Resource BGrange, NRR OFFICE NRR/DORL/LPLl-2/PM NRR/DORL/LPLl-2/LA NRR/DORL/LPLl-2/BC NRR/DORL/LPLl-2/PM NAME CParker LRonewicz DBroaddus CParker DATE 6/23/15 6/23/15 6/24/15 6/24/15 OFFICIAL RECORD COPY   
 
==SUBJECT:==
HOPE CREEK GENERATING STATION -CORRECTION TO AMENDMENT NO. 198 REGARDING UPDATE OF APPENDIX B TO THE RENEWED FACILITY OPERATING LICENSE (TAC NO. MF5389)  
 
==Dear Mr. Braun:==
On June 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 198 to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station (Hope Creek), and Amendment Nos. 308 and 290 to Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15141A271). The amendments were issued in response to PSEG Nuclear LLC's (PSEG) application dated December 9, 2014, as supplemented by letter dated April 9, 2015 (ADAMS Accession Nos. ML 14343A926 and ML 15099A766, respectively). The amendments revised PSEG's Environm.ental Protection Plans (Non-Radiological). On June 22, 2015, PSEG staff notified the NRC staff that one of the license pages revised by Hope Creek Amendment No. 198 was in error. Specifically, on page 3 of the license, License Condition C.(2) incorrectly refers to Appendix S instead of Appendix Band the amendment number was inadvertently left off the bottom of the same page. The corrected page 3 is enclosed. Please replace page 3 of Renewed Facility Operating License No. NPF-57 with the enclosed page. The NRC staff regrets any inconvenience this may have caused. If you have any questions, please contact me at 301-415-1603 or carleen.parker@nrc.gov. Docket No. 50-354  
 
==Enclosure:==
Hope Creek License Page 3 cc w/encl: Distribution via Listserv Sincyely, j "--:> Wo. Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 1 O CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation. (7) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Part 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60. C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at reactor core power levels not in excess of 3840 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein. (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 198, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. Renewed License No. NPF-57 Amendment No. 198 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038  
 
==SUBJECT:==
HOPE CREEK GENERATING STATION -CORRECTION TO AMENDMENT NO. 198 REGARDING UPDATE OF APPENDIX B TO THE RENEWED FACILITY OPERATING LICENSE (TAC NO. MF5389)  
 
==Dear Mr. Braun:==
On June 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 198 to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station (Hope Creek), and Amendment Nos. 308 and 290 to Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15141A271 ). The amendments were issued in response to PSEG Nuclear LLC's (PSEG) application dated December 9, 2014, as supplemented by letter dated April 9, 2015 (ADAMS Accession Nos. ML 14343A926 and ML 15099A766, respectively). The amendments revised PSEG's Environmental Protection Plans (Non-Radiological). On June 22, 2015, PSEG staff notified the NRC staff that one of the license pages revised by Hope Creek Amendment No. 198 was in error. Specifically, on page 3 of the license, License Condition C.(2) incorrectly refers to Appendix S instead of Appendix Band the amendment number was inadvertently left off the bottom of the same page. The corrected page 3 is enclosed. Please replace page 3 of Renewed Facility Operating License No. NPF-57 with the enclosed page. The NRC staff regrets any inconvenience this may have caused. If you have any questions, please contact me at 301-415-1603 or carleen.parker@nrc.gov. Docket No. 50-354  
 
==Enclosure:==
Hope Creek License Page 3 cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPL 1-2 R/F RidsNrrDlrRerb Resource RidsNrrLALRonewiczResource RidsRgn1 MailCenter Resource ADAMS Accession No.: ML 15174A127 Sincerely, IRA/ Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation GHill, OIS RidsACRS MailCTR Resource RidsNrrDorlLpl 1-2 Resource RidsNrrPMHopeCreek Resource BGrange, NRR OFFICE NRR/DORL/LPLl-2/PM NRR/DORL/LPLl-2/LA NRR/DORL/LPLl-2/BC NRR/DORL/LPLl-2/PM NAME CParker LRonewicz DBroaddus CParker DATE 6/23/15 6/23/15 6/24/15 6/24/15 OFFICIAL RECORD COPY   
}}
}}

Revision as of 05:00, 5 April 2018

Hope Creek Generating Station - Correction to Amendment No. 198 Regarding Update of Appendix B to the Renewed Facility Operating License (TAC No. MF5389)
ML15174A127
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/24/2015
From: Carleen Parker
Plant Licensing Branch 1
To: Braun R
Public Service Enterprise Group
Parker C J, NRR/DORL/LPLI-2, 415-1603
References
TAC MF5389
Download: ML15174A127 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038

  • June 24, 2015

SUBJECT:

HOPE CREEK GENERATING STATION -CORRECTION TO AMENDMENT NO. 198 REGARDING UPDATE OF APPENDIX B TO THE RENEWED FACILITY OPERATING LICENSE (TAC NO. MF5389)

Dear Mr. Braun:

On June 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 198 to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station (Hope Creek), and Amendment Nos. 308 and 290 to Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15141A271). The amendments were issued in response to PSEG Nuclear LLC's (PSEG) application dated December 9, 2014, as supplemented by letter dated April 9, 2015 (ADAMS Accession Nos. ML 14343A926 and ML 15099A766, respectively). The amendments revised PSEG's Environm.ental Protection Plans (Non-Radiological). On June 22, 2015, PSEG staff notified the NRC staff that one of the license pages revised by Hope Creek Amendment No. 198 was in error. Specifically, on page 3 of the license, License Condition C.(2) incorrectly refers to Appendix S instead of Appendix Band the amendment number was inadvertently left off the bottom of the same page. The corrected page 3 is enclosed. Please replace page 3 of Renewed Facility Operating License No. NPF-57 with the enclosed page. The NRC staff regrets any inconvenience this may have caused. If you have any questions, please contact me at 301-415-1603 or carleen.parker@nrc.gov. Docket No. 50-354

Enclosure:

Hope Creek License Page 3 cc w/encl: Distribution via Listserv Sincyely, j "--:> Wo. Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 1 O CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation. (7) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Part 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60. C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at reactor core power levels not in excess of 3840 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein. (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 198, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. Renewed License No. NPF-57 Amendment No. 198 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

HOPE CREEK GENERATING STATION -CORRECTION TO AMENDMENT NO. 198 REGARDING UPDATE OF APPENDIX B TO THE RENEWED FACILITY OPERATING LICENSE (TAC NO. MF5389)

Dear Mr. Braun:

On June 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 198 to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station (Hope Creek), and Amendment Nos. 308 and 290 to Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15141A271 ). The amendments were issued in response to PSEG Nuclear LLC's (PSEG) application dated December 9, 2014, as supplemented by letter dated April 9, 2015 (ADAMS Accession Nos. ML 14343A926 and ML 15099A766, respectively). The amendments revised PSEG's Environmental Protection Plans (Non-Radiological). On June 22, 2015, PSEG staff notified the NRC staff that one of the license pages revised by Hope Creek Amendment No. 198 was in error. Specifically, on page 3 of the license, License Condition C.(2) incorrectly refers to Appendix S instead of Appendix Band the amendment number was inadvertently left off the bottom of the same page. The corrected page 3 is enclosed. Please replace page 3 of Renewed Facility Operating License No. NPF-57 with the enclosed page. The NRC staff regrets any inconvenience this may have caused. If you have any questions, please contact me at 301-415-1603 or carleen.parker@nrc.gov. Docket No. 50-354

Enclosure:

Hope Creek License Page 3 cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPL 1-2 R/F RidsNrrDlrRerb Resource RidsNrrLALRonewiczResource RidsRgn1 MailCenter Resource ADAMS Accession No.: ML 15174A127 Sincerely, IRA/ Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation GHill, OIS RidsACRS MailCTR Resource RidsNrrDorlLpl 1-2 Resource RidsNrrPMHopeCreek Resource BGrange, NRR OFFICE NRR/DORL/LPLl-2/PM NRR/DORL/LPLl-2/LA NRR/DORL/LPLl-2/BC NRR/DORL/LPLl-2/PM NAME CParker LRonewicz DBroaddus CParker DATE 6/23/15 6/23/15 6/24/15 6/24/15 OFFICIAL RECORD COPY