ML15005A017

From kanterella
Jump to navigation Jump to search

Update to Appendix B LAR Acceptance Review
ML15005A017
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 12/31/2014
From: Carleen Parker
Plant Licensing Branch 1
To: Duke P
Public Service Enterprise Group
Carleen Parker, NRR/DORL
References
TAC MF5389, TAC MF5390, TAC MF5391
Download: ML15005A017 (2)


Text

1 Sanders-Parker, Carleen From:

Sanders-Parker, Carleen Sent:

Wednesday, December 31, 2014 10:55 AM To:

Duke, Paul R. (Paul.Duke@pseg.com)

Subject:

Acceptance Review: Hope Creek and Salem 1 and 2 License Amendment Request to Update Appendix B (MF5389, MF5390, and MF5391)

Paul,

ByletterdatedDecember09,2014(ADAMSAccessionNo.ML14343A926),PSEGNuclearLLC(PSEG)submittedalicense amendmentrequestforHopeCreekGeneratingStation(HopeCreek)andSalemGeneratingStation(Salem),UnitNos.1 and2.TheproposedamendmentwouldupdateHopeCreek,andSalem,UnitNos.1and2s,AppendixB,Environmental ProtectionPlan(NonRadiological).Specifically,therequestwouldmodifytheAquaticMonitoringsection,including clarificationthatPSEGmustadheretothecurrentapplicableIncidentalTakeStatementoftheBiologicalOpinion, removeoutdatedprograminformation,andremoveunnecessaryorduplicativereportingtotheU.S.NuclearRegulatory Commission(NRC),asapplicable.

ThepurposeofthisletteristoprovidetheresultsoftheNRCstaffsacceptancereviewofthisamendmentrequest.The acceptancereviewwasperformedtodetermineifthereissufficienttechnicalinformationinscopeanddepthtoallow theNRCstafftocompleteitsdetailedtechnicalreview.Theacceptancereviewisalsointendedtoidentifywhetherthe applicationhasanyreadilyapparentinformationinsufficienciesinitscharacterizationoftheregulatoryrequirementsor thelicensingbasisoftheplant.

ConsistentwithSection50.90ofTitle10oftheCodeofFederalRegulations(10CFR),anamendmenttothelicense (includingtheEnvironmentalProtectionPlan(NonRadiological))mustfullydescribethechangesrequested,and followingasfarasapplicable,theformprescribedfororiginalapplications.Section50.34of10CFRaddressesthe contentoftechnicalinformationrequired.Thissectionstipulatesthatthesubmittaladdressthedesignandoperating characteristics,unusualornoveldesignfeatures,andprincipalsafetyconsiderations.

TheNRCstaffhasreviewedyourapplicationandconcludedthatitdoesprovidetechnicalinformationinsufficientdetail toenabletheNRCstafftocompleteitsdetailedtechnicalreviewandmakeanindependentassessmentregardingthe acceptabilityoftheproposedamendmentsintermsofregulatoryrequirementsandtheprotectionofpublichealthand safetyandtheenvironment.Giventhelesserscopeanddepthoftheacceptancereviewascomparedtothedetailed technicalreview,theremaybeinstancesinwhichissuesthatimpacttheNRCstaffsabilitytocompletethedetailed technicalreviewareidentifieddespitecompletionofanadequateacceptancereview.Youwillbeadvisedofanyfurther informationneededtosupporttheNRCstaffsdetailedtechnicalreviewbyseparatecorrespondence.

Ifyouhaveanyquestions,pleasecontactmeat3014151603

CarleenParker,ProjectManager PlantLicensingBranchI2 DivisionofOperatingReactorLicensing OfficeofNuclearReactorRegulation

DocketNos.50272,50311,and50354 CarleenParker ProjectManager-

2 HopeCreekandSalem PlantLicensingBranchI2 DivisionofOperatingReactorLicensing OfficeofNuclearReactorRegulation U.S.NuclearRegulatoryCommission (301)4151603 carleen.sandersparker@nrc.gov