ML082200212: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Final Submittal( | {{#Wiki_filter:Final Submittal (Blue Paper) | ||
Final Submittal( | |||
Ifl£e:LsaoB{50 | Final Submittal (Blue Paper) | ||
Ifl£e:LsaoB{50 / | |||
Ope(ClT'f'l~ "Te5{ ~J.1I~ | |||
"Sllo ~3)3JUU? | |||
FINAL JPMS ADMINISTRATIVE JPMs | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | |||
HARRIS Task No.: | |||
301144H601 Task | |||
==Title:== | |||
Determine the Cold, Xenon-free Boron Concentration Requirement for a Natural Circulation Cooldown JPM No.: | |||
2008.NRC JPM RO/SRO A1-1 KIA | |||
==Reference:== | ==Reference:== | ||
2.1.25(2.8/3.1) | 2.1.25 (2.8/3.1) | ||
Examinee: | Examinee: | ||
Date: | NRC Examiner: | ||
Facility Evaluator: | |||
Date: | |||
Method of testing: | |||
Simulated Performance: | Simulated Performance: | ||
Classroom READ TO THE EXAMINEE X | |||
Plant | Simulator Actual Performance: | ||
INITIAL | Plant X | ||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied. | |||
INITIAL The unit tripped due to a loss of off-site power. All control rods CONDITIONS: | |||
have inserted. | |||
The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN. | |||
The unit will be taken to Cold Shutdown. | |||
PowerTrax is not available. | |||
Current RCS Boron concentration is 1125 ppm. | |||
Core Burnup is 130 EFPD. | |||
RCS B-10 Atom Percent is 19.36 Temperature is 140°F. | |||
Task Standard: | |||
Calculations within specified range. | |||
Required Materials: | |||
Calculator General | |||
==References:== | ==References:== | ||
EPP-005, NATURAL CIRCULATION COOLDOWN OST-1036, SDM CALCULATION MODES 1-5 Curve Book Handouts: | |||
EPP-005, Step 7 OST-1036 Curve Book (Ensure Curve A-X-22 is available and unmarked) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9 | |||
Validation Time: | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Initiating Cue: | |||
Time Critical Task: | |||
Determines OST-1036 applies.Provide EPP-005, Step 7.Locates/ | Validation Time: | ||
Provide OST-1036. | USCG has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036. | ||
Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration. | |||
CRODS CCURVE | |||
Enters O. | : CREQ, | ||
: CRCS, CSDM MET | |||
/ | |||
NOT MET (Circle one) | |||
NO 15 minutes 2008 HARRIS NRC RO-SRO At-1 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C (Denote Critical Steps with a ~) | |||
Start Time: | |||
Page 3 of 8 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 1 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
Performance Step: 2 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
Performance Step: 3 Standard:;. | |||
Comment: | |||
Reviews EPP-005, Step 7. | |||
Determines OST-1036 applies. | |||
Provide EPP-005, Step 7. | |||
Locates/reviews OST-1036. | |||
Determines OST-1036, Section 7.2 applies. | |||
Provide OST-1036. | |||
Record the following: | |||
Core burn up from MCR Status board. | |||
Temperature for which this SDM calculation is taking credit. | |||
Latest available RCS boron sample. | |||
From Initial Conditions, records: | |||
130 EFPD 200°F, or less 1125 ppm 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C Page 4 of 8 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 4 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
Performance Step: 5 Standard: | |||
Comment: | |||
Performance Step: 6 Standard: | |||
Comment: | |||
Record the following: | |||
RCS B-10 ATOM percent from MCR Status Board OR RWST B-10 Atom percent, IF following Core Reload. | |||
Records 19.36 RCS 8-10 ATOM percent from cue sheet Check rod status as follows: | |||
If all rods are inserted, record CRODS = 0 in Step 7.2.2.a and N/A Step 7.2.2.b. | |||
Records 0 in 7.2.2.a and N/A's 7.2.2.b. | |||
Determine Xenon free SDM boron concentration, CSDM, as follows: | |||
: a. Record the following information: | |||
Boron addition to compensate for stuck rods from or Step 7.2.2.a. | |||
Enters O. | |||
2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 7 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
Performance Step: 8 Standard: | |||
Comment: | |||
~ | |||
Performance Step: 9 Standard: | |||
Comment: | |||
Determine Xenon free SOM boron concentration, CSOM, as follows: | |||
: a. Record the following information: | |||
Uncorrected required SOM boron concentration from curve A-X-22 (Use action level line on curve.) | |||
Reads 2020 to 2040 ppm Determine required Xenon free SOM uncorrected boron concentration CREQ: | |||
CREQ ~ CROOS + CCURVE CREQ= | |||
CREQ = 2020 to 2040 ppm Determine Xenon free SOM corrected boron concentration, CSOM: | |||
19.9/Arcs x CREQ Divides 19.9 by 19.36 and multiplies by CREQ: | |||
19.9/19.36 (2020 to 2040 ppm) = | |||
Records 2076 to 2097 ppm 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C Page 6 of 8 PERFORMANCE INFORMATION Form ES-C-1 | |||
~ | |||
Performance Step: 10 Standard: | |||
Comment: | |||
Terminating Cue: | |||
Determine whether SDM requirements can be met by Xenon free SOM calculation: | |||
Compare RCS boron concentration, CRCS, and Xenon free SOM corrected boron concentration, CSDM: | |||
CRCS RCS boron sample from Step 7.2.1. | |||
CSOM Xenon free SDM corrected boron concentration from Step 7.2.3.c. | |||
If CRCS is less than or equal to CSDM, then continue with Step 7.2.5 to take credit for Xenon effects. | |||
Determines current RCS boron concentration is <CSDM boron concentration. | |||
When the candidate proceeds to Step 7.2.5: This JPM is complete. | |||
Stop Time: | |||
2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C Page 7 of 8 VERIFICATION QF COMPLETION Form ES-C-1 Job Performance Measure No.: | |||
2008 NRC JPM RO/SRO A1-1 Examinee's Name: | |||
Date Performed: | |||
Facility Evaluator: | |||
Number of Attempts: | |||
Time to Complete:. | |||
Question Documentation: | Question Documentation: | ||
Question: Response | Question: | ||
SAT UNSAT Date: | |||
INITIATING CUE: | ===Response=== | ||
Result: | |||
Examiner's Signature: | |||
SAT UNSAT Date: | |||
2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9 | |||
INITIATING CUE: | |||
Appendix C Page 8 of 8 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: | |||
CRODS C"'}..,./("')()...,/r"j.r; | INITIATING CUE: | ||
( | The unit tripped due to a loss of off-site power. All control rods have inserted. | ||
(9c.)((()) | The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN. | ||
eRCS\ | The unit will be taken to Cold Shutdown. | ||
PowerTrax is not available. | |||
Current RCS Boron concentration is 1125 ppm. | |||
Core Burnup is 130 EFPD. | |||
RCS B-10 Atom Percent is 19.36 Temperature is 140°F. | |||
USCO has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036. | |||
Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration. | |||
CRODS CCURVE CREQ CRCS CSDM MET | |||
/ | |||
NOT MET (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C Page 8 of 8 JPM CUE SHEET INITIAL CONDITIONS: | |||
INITIATING CUE: | |||
The unit tripped due to a toss of off-site power. All control rods have inserted. | |||
The operating crew is performing EPP-005 7 NATURAL CIRCULATION COOLDOWN. | |||
The unit will be taken to Cold Shutdown. | |||
PowerTrax is not available. | |||
Current ReS Boron concentration is 1125 ppm. | |||
Core Burnup is 130 EFPD. | |||
ReS B-10 Atom Percent is 19.36 Temperature is 140°F. | |||
usee has directed you to perform step 7.aof EPP-005~ | |||
determine the corrected Xe-free cold shutdown boron concentration using OST-1036. | |||
Record values on this cue sheet once it is determined if 8DM requirements are met by the current boron concentration. | |||
CRODS C"'} | |||
:~:. | |||
..,./ | |||
("' | |||
) ()..., | |||
/r"j. | |||
r; I | |||
...~ | |||
CCURVE (1.(),~.}O l/7(j(;2o I~O Bo<.fq) | |||
CREQ | |||
~c\\:3t) | |||
( 9t)(~o,,\\nc} (9c.)((()) | |||
eRCS | |||
\\ l L.~) | |||
CSDM f) b '7(~ t (c, (90'7& +~ deft7) | |||
MET I~~~V (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | |||
HARRIS Task No.: | |||
005016H101 Task | |||
==Title:== | |||
KIA | |||
==Reference:== | ==Reference:== | ||
Examinee: | |||
Estimate Primary to Secondary Leak Rate 2.1.31 (4.2) | |||
JPM No.: | |||
2008 NRC RO ADM JPM A1-2 NRC Examiner: | |||
Facility Evaluator: | |||
Date: | |||
Method of testing: This JPM should be performed on a frozen simulator. | |||
Simulated Performance: | |||
Classroom READ TO THE EXAMINEE Simulator Actual Performance: | |||
X Plant X | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied. | |||
Initial Conditions: | |||
The plant is at 100% | |||
power. | |||
A steam generator tube leak is in progress. | |||
AOP-016 has been entered and actions are in progress. | |||
OSI-PI is not available. | |||
Chemistry sampling has not commenced. | |||
Motivating air is isolated. | |||
Task Standard: | |||
Determines leak rate to be --25 gpd using Method 1 of AOP-016, Att. 1. | |||
Required Materials: | |||
None General | |||
==References:== | |||
AOP-016, Excessive Primary Plant Leakage, Rev 37 Curve Book Handouts: | |||
Initiating Cue: | |||
Time Critical Task: | |||
Validation Time: | |||
AOP-016, Attachment 1 The USCG has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage. | |||
No 10 minutes HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9 | |||
- | |||
Appendix C Job Performance Measure Worksheet SIMULATOR SETUP Form ES-C-1 IC-19 imf RMS079 (REM-1TV-3534 CVPETS) to 6.00 E-7 uCi/ml. | |||
NOTE: Must go to RUN for the malfunction to show. | |||
Leave simulator in FREEZE once malfunction has appeared. | |||
Page 3'of 6 PERFORMANCE | HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9 | ||
Provide Curve | |||
Appendix C (Denote Critical Steps with a ~) | |||
Calculates Primary to | Start Time: | ||
Page 3'of 6 PERFORMANCE INFORMATION Form ES-C-1 ' | |||
Performance Step: 1 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
~ | |||
Performance Step: 2 Standard: | |||
Comment: | |||
~ | |||
Performance Step: 3 Standard: | |||
Comment: | |||
Obtain procedure. | |||
Locates and reviews procedures. | |||
Provide Curve Book and AOP-016, Att. 1, step 3 after the procedure is located. | |||
ESTIMATE Primary-To-Secondary leak rate using ONE of the methods listed (no preferred method): | |||
Method 1: Use Condenser Vacuum Pump Rad Monitor REM-3534 (Grid 2), Curve H-X-15A, Curve H-X-15B, or H-X-15C (Depending on status of motivating air) | |||
Determines that Method 1 is required. | |||
Operates RM-11 to obtain reading for REM-1TV-3534 (Grid 2). | |||
Reads REM-1TV-3534 as 6.00 E-7 ~Ci/ml. | |||
HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9 | |||
Appendix C | |||
~ | |||
Performance Step: 4 Page 4 of 6 PERFORMANCE INFORMATION Determines which curve from Curve Book to use. | |||
Form ES-C-1 Standard: | |||
Comment: | |||
~ | |||
Performance Step: 5 Standard: | |||
Comment: | |||
Terminating Cue: | |||
Stop Time: | |||
Uses Curve H-X-15C since motivating air is isolated. | |||
Calculates Primary to Secondary leak rate. | |||
Determines Primary to Secondary leak rate is between 22 gpd to 27 gpd). | |||
+/- 2.5 gpd is margin of error based on reading data from graph When the primary to secondary leak rate has been determined and reported to the USCO: Evaluation on this JPM is complete. | |||
HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9 | |||
Appendix C Page 5 of 6 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.: | |||
2008 NRC RO ADM JPM A1-2 Examinee's Name: | |||
Date Performed: | |||
Facility Evaluator: | |||
Number of Attempts: | |||
Time to Complete: | |||
Question Documentation: | Question Documentation: | ||
Question: Response | Question: | ||
SAT UNSAT Date: | |||
INITIATING CUE: | ===Response=== | ||
%power. | Result: | ||
Examiner's Signature: | |||
SAT UNSAT Date: | |||
HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9 | |||
Appendix C Page 6 of 6 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: | |||
INITIATING CUE: | |||
The plant is at 100 | |||
% power. | |||
A steam generator tube leak is in progress. | |||
AOP-016 has been entered and actions are in progress. | |||
OSI-PI is not available. | |||
Chemistry sampling has not commenced. | |||
Motivating air is isolated. | |||
The USCO has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage. | |||
HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | |||
HARRIS Task No.: | |||
341010H302 Task | |||
==Title:== | |||
Perform Review of Daily Surveillance Requirements Log JPM No.: | |||
2008 NRC SRO A1-2 KJA | |||
==Reference:== | ==Reference:== | ||
2.1.18 (3.0) | |||
Examinee: | |||
NRC Examiner: | |||
Facility Evaluator: | |||
Date: | |||
Method of testing: | |||
Simulated Performance: | |||
Classroom READ TO THE EXAMINEE X | |||
Simulator Actual Performance: | |||
Plant x | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied. | |||
Initial Conditions: | |||
The plant is in Mode 2, waiting for management approval to proceed to Mode 1. | |||
EDG "8" is synchronized to the grid for a post-maintenance test. | |||
The Daily Surveillance Logs (OST-1021, Attachment 4) for 2100 have been completed. | |||
ERFIS Pressurizer Pressures are unavailable. | |||
Task Standard: | |||
All errors and TS actions identified Required Materials: | |||
Perform in a location with TS or electronic access to TS available. | |||
General | |||
==References:== | |||
OST-1021, DAILY SURVEILLANCE REQUIREMENTS, DAILY INTERVAL, MODE 1 AND 2 Technical Specifications HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Handouts: | |||
Initiating Cue: | |||
Time Critical Task: | |||
Validation Time: | |||
Copy of a completed OST-1021, Attachment 4. | |||
Delete all notes. | |||
Substitute the following incorrect data: | |||
Modify log readings on p.19 of OST-1021 so that the 1500 reading of 457 and 456 are low and together average < 2205. | |||
Include 455 approximately 60 psig high so that the channel check is unsat. | |||
Condensate Storage Tank Level (both channels) progressively lowering from 85% to 60% throughout the day (TS). | |||
RCS Loop Flow Channel FI-424 progressively lowering from 100.21 to 98.13 throughout the day (TS). | |||
EDG Room Temperature channel TDG6903B @ 121°F (should be circled) | |||
You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021, logs. At the conclusion of your review, discuss any findings with me. | |||
No 20 minutes HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C (Denote Critical Steps with a ~) | |||
Start Time: | |||
Page 3 of 7 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 1 Standard: | |||
Evaluator Cue: | |||
Evaluator Note: | |||
Comment: | |||
-v Performance Step: 2 Standard: | |||
Comment: | |||
Review OST-1021, | Obtain completed log. | ||
Reviews handout. | |||
Provide handout for NRC SRO A1-2 after the Initial Conditions are reviewed and the Initiating Cue is provided. | |||
* If necessary, after the applicant discusses each finding: | |||
If requested: | What action, if any, is required relative to this reading? | ||
EDG"B" | Only the incorrect items in the logs are identified in the JPM Steps. | ||
Review OST-1021, Attachment 4 for approval. | |||
Identifies that Pressurizer Pressure Channel 455. fails it's channel check. | |||
HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C | |||
'./ | |||
Performance Step: 3 Page 4 of 7 PERFORMANCE INFORMATION Review OST-1021, Attachment 4 for approval. | |||
Form ES-C-1 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
'./ | |||
Performance Step: 4 Standard: | |||
Comment: | |||
'./ | |||
Performance Step: 5 Standard: | |||
Comment: | |||
Identifies that the Pressurizer Pressures should have the calculations completed. | |||
Pressurizer pressure should be identified low out of spec based on performing calculation with only Channels 456 and 457. | |||
SRO may send paperwork back to RO to do the calculations. | |||
If so cue the SRO to perform the calculations. | |||
Review OST-1021, Attachment 4 for approval. | |||
Identifies one RCS Loop "B" Flow Channel (Sheet 5) is below Acceptance Criteria. | |||
Reading should be circled. TS does not apply in Mode 2. | |||
Review OST-1021, Attachment 4 for approval. | |||
Condensate Storage Tank Level (Sheet 7) is below Acceptance Criteria. | |||
Reading should be circled and entry into TS 3.7.1.3 Action a - | |||
restore to operable or be in HSB within 6 hours, is required. | |||
HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C | |||
-Y Performance Step: 6 Page 5 of 7 PERFORMANCE INFORMATION Review OST-1021, Attachment 4 for approval. | |||
Form ES-C-1 Standard: | |||
Evaluator Cue: | |||
Evaluator Note: | |||
Comment: | |||
Terminating Cue: | |||
Stop Time: | |||
Identifies Diesel Generator Room 261 temperature TDG6903B (Sheet 10) exceeds Acceptance Criteria. | |||
Reading should be circled and investigative/corrective actions implemented. | |||
If requested: EDG "B" has been running for 30 minutes. | |||
Reading does not meet criteria for declaring equipment in the room inoperable. | |||
After all findings have been reviewed: Evaluation on this JPM is complete. | |||
HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9 | |||
Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.: | |||
2008 NRC SRO A1-2 Examinee's Name: | |||
Date Performed: | |||
Facility Evaluator: | |||
Number of Attempts: | |||
Time to Complete: | |||
Question Documentation: | Question Documentation: | ||
Question: Response | Question: | ||
SAT UNSAT Date: | |||
INITIATING CUE: | ===Response=== | ||
sample | Result: | ||
{h0 itO ihQ"if (-)) | Examiner's Signature: | ||
4.3.3.6.5 PARAMETER PRESSURIZER LEVEL INSTRUMENT LI-460 LI-461.1 LI-459A.1 N/A | SAT UNSAT Date: | ||
HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9 | |||
If all operable | |||
++= | Appendix C Page 7 of 7 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: | ||
PI--457 P\-456 0300: 0900:+PRC0457 PRC0456 PI..456 1500: | INITIATING CUE: | ||
.+Wy PRC0457 PRC0456 PI..457 PI-456+ | The plant is in Mode 2, waiting for management approval to proceed to Mode 1. | ||
*"***P"RESSURIZER PRESSURE PRC0456 PRC0455-PI-457 PI-456 2100:++(#Operable Channels used Normally 3):=PRESSURIZER PRESSURE | EDG "8" is synchronized to the grid tor.a post-maintenance test. | ||
1.Average of operable Mea indicator channels greater | The Daily Surveillance Logs (OST-1021, Attachment 4) for 2100 have been completed. | ||
IfaU operable channels are | ERFIS Pressurizer Pressures are unavailable. | ||
++= | You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021, Attachment 4 logs. At the conclusion of your review, discuss any findings with me. | ||
(#Operable Channels | HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9 | ||
=Res LOOP TAVG 0900:++=:TRC0412. | |||
4.5.1,1.a.11 a.z TECH SPEC... DailySurveillance Requirements Log Sheet 1 of 15 etA A PRESSURE CLA B PRESSURE CLA C PRESSURE Between 585 and 665 psig OPEN Eees ACCUMULATORS PI..927 Pl-929 PI... 931 PI-925 PI-923 PI-921 PARAMETER INSTRUMENT ACCEPTANCE CRITER!A MODE 1~ 2 AND 3 WITH ReS PRESSURE ABOVE1000 PSIG 0300 0900 1500 210q TECHSPEC a.s.1.1,8.1 14.5.1.1, b (partial) | |||
1, Average of operable Mea indicator channels mustbe | PARAMETER ECCSA.CCUMULATORS CLA A LEVEL CLAB LEVEL CLA C LEVEL INSTRUMENT SampUng Not Sampling Not SampUng Not LI..920 Lt..922 Required per LI ~ 924 Ll-926* | ||
Requiredper Ll..928 U | |||
TI.. | ~. 930 Required per AU6 Att 6 Aft 6 ACCEPTANCE CRiTERIA MODE between 66 and96 ok Indicatedlevel viith less tha.~ 9(}k cumulativelevel increase(excludfng makeupfrom operable RWST) ~inye last satisfact() | ||
TI-4328 TJ....412A*TJ.. | sample 11 2 AND 3 WITH ReS PRESSUREABOVE 1000PSIG PreviousDays Level 0300 0900 1500 2100 TECHSPEC 4A.6,2,1.b 4.3.2.1.10 1 2c, Sa3 1 3b3~ 3c3~ 4c 1 5c, Bd,6g; 4,3.3.6.1a; 4J3.1.4 PARAMETER CNMTSUMP FLOW MONITORiNG SUMP LEAKRATE CNMTSUMPLEVEL CONTAINMENT PRESSURE PROGRAM ACCEPTANCE NO CHECKS CRITERIA ALARM PER OP..163 iNSTRUMENT ALB 1 ERF1S URE URE 9001 9002 N/A LeT LeT 7161A 7161B NfA PI 950 LESSTHAN 1.6 PSfG PI 953 N/A CHAN. | ||
INSTRUMENT FRC0414 FI.. | CHECK MODE 0300 0900 1500 2100 | ||
[6ST-1021 Rev. 66 Page17 of~OI | |||
5.6 PARAMETER | - Daily Surveillance Requirements Log Sheet 2 of 15 TECH SPEC 4.1.2.6.a.2; 4.5.4.a.1; 4.3.2.1.7b, se: 4.3.3.6.9 4.1.2.6.a.2~ a.3 PARAMETER RWST LEVEL BORICACID TANK INSTRUMENT L!..990 Ll...991 LI-992 LI..993 N/A LI-106 L1..161.158 TCS7240 ACCEPTANCE CHANNEL GREATERTHAN OR GREATER THAN GREATER THAN OR EQUAL TO 92°k> | ||
,'\1//)rJ/A 0900 | OR EQUAL TO CRITERJA CHECK EQUAL TO 74%> | ||
65 QF MODE 1.213) and.4 1.2,3 and 4 0300 C,iP C1C-, | |||
485.PI486 PI-495.PI-496.1 CHANNEL CHECK t,2. | (il.l 9,5 IC)-(~) | ||
2? I gc:) | |||
ESWTOAFW INSTRUMENT 1SW..121 1SW++'124 18W..127 1SW...130 1SW-123 1SW+M126 1SW-129 1SW-132 ACCEPTANCE OPEN (only when supplying CRITERIA AFW pumps)MODE | Ci~? | ||
.....*............... | ~ | ||
"'W.<<.>>;.;-;.,;.;,.;.X/Vo."",.,..NNA*I'.";. | 0900 | ||
0900 | /:.::' | ||
'~ | |||
1500 2100 | |||
If acceptable, | ;h(') | ||
\J'J V\t'J | V TECH SPEC 4.5,2.a 4.4.9.3 PARAMETER ECCSVALVEALIGNMENT PRZ SPRAY ~T INSTRUMENT 181..340 181-341 181-359 I 181-86 I 1$1-52 I 181-107 TJ-123 TI-454.1 ACCEPTANCE OPEN AND PULLEDTO SHUT AND PULLED TO LOCK WITH LESS THAN CRITERIA LOCK WiTH CONTROL CONTROL POWER OFF OR EQUAL POWER OFF TO 625°F MODE 1r 2, and 3 DURINGAUX SPRAY OPS 0300 Ai) | ||
(\\41 rtJ r\\O | |||
... | ~~J dl~) | ||
INSTRUCTION 1. | tJ /;~ | ||
'indicate 291°F | (; ", | ||
;)17" (0 I 4&v6 | 0900 | ||
''':b | |||
.~ | |||
At times the | th* | ||
, | .:~ | ||
and differential temperature (or stability class).The meteorological instrumentation | ~~. | ||
~ | |||
Z-3 | f.J If~ | ||
1.(0 11..55" j,.-I,() | ,~f~ | ||
'"11 jlL3< | 1500 r-~\\) | ||
'J)-l,' | r~;U | ||
~ | |||
~1:) | |||
~ | |||
~ | |||
If,JIA 2100 "k) | |||
TECH SPEC PLp..114 ELECT SW1TCHGEAR PARAMETER PENETRAT' | ~O | ||
':' | 'A-~O | ||
{h0 itO ihQ "if (-) | |||
) | |||
l | |||
.................. | ~ | ||
..,.-..........---------- | lJ V | ||
TECH SPEC 4.1.2.2. | V V | ||
HT-18753C I HT-18753C I HT-18753B I I HT..18753B | TECH SPEC 4.4.3,1: 4.3.1.1.11: 4.3.3.6.5 PARAMETER PRESSURIZER LEVEL INSTRUMENT LI-460 LI-461.1 LI-459A.1 N/A ACCEPTANCE LESSTHAN OR CHANNEL CRITERIA EQUAL TO 90% | ||
\_*..*---------1------- | CHECK MODE 1} 2. and 3 1 | ||
0300 | |||
.I r.(NOTE 1) | -(0 \\ | ||
THESE SHOULD BE USED WHEN PRIMARY INSTRUMENTS PARAMETER FAll.(N/ | (~/O | ||
Appendix C Job Performance Measure | &; c | ||
!r<J 0900 lor (t;;; C> | |||
00 | |||
~l{~ | |||
1500 CbiJ (0(\\ | |||
(0 [) | |||
(';A j | |||
2100 | |||
(),rQ\\. | |||
(0 (') | |||
&(~) | |||
{~~7 v | |||
I08T-1021 Rev. 66 Page 18 of 40 I | |||
-Daily Surveillance Requirements Log Sheet 3 of 15 TECH SPEC PARAMETER | |||
~ | |||
4.2.5.1; 4.3,1.1.9, 10; 4.32.1,1d~ 3a3} 3c3, 5c t6d PRESSURIZER PRESSURE tNDEPENDENT CALCULATION VERIFICATION ACCEPTANCE COMPLETED COMPLETED CRITERIA MET ACCEPTANCE C-RtTERIA SEEBELOW N/A N/A NiA N/A CHANNEL CHECK MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE: | |||
NOTE: | |||
Calculations must be done with either the MCB IndicatorsOR ERFISlndlcsuons, NOT a combination. | |||
If all operable channels ~re greater than or equal to the acceptance criteria, calculations are not required. | |||
CALCULATIONS FOR PRESSURIZER PRESSURE PRESSURTzEFf>>~ | |||
PRESSURE | |||
(# Operable Channels used Normally 3) | |||
PRC0455 PI~455 | |||
+ | |||
+ | |||
= | |||
~ | |||
PRC0457"~' | |||
~~P-RC~O-4-5._.........,.....-~~ | |||
PI--457 P\\-456 0300: | |||
0900: | |||
+ | |||
PRC0457 PRC0456 PI~457 PI..456 1500: | |||
.~,.,,~:Q:;too.+ Wy :;l~05 PRC0457 PRC0456 PI..457 PI-456 | |||
+ | |||
PRC0455 PI-455 | |||
+ | |||
= | |||
PRC0455 Pl...455 | |||
(# Operable Channels used Normally 3) | |||
Q-(# Operable Channels used Normally 3) | |||
PRESSURIZER PRESSURE | |||
= ~6~.5 | |||
*"***P"RESSURIZER PRESSURE PRC04~ | |||
PRC0456 PRC0455-PI-457 PI-456 Pl~455 2100: | |||
+ | |||
+ | |||
(#Operable Channels used Normally 3) | |||
:= | |||
PRESSURIZER PRESSURE ACCEPTANCEGRITER1AFOR PRESSURIZER PRESSURE (must meet one of the following): | |||
1. | |||
Average of operable Mea indicator channels greater than or equal to 2205 psig. | |||
2, Average of operable ERF1S points greaterthan or equal to 2202 psig. | |||
3, If three MeB indicators are not available,then the lowest channel should be greater than or equal to 2220 psig+ | |||
4. | |||
If three ERFIS points are not available, then the lowest channel should be greater than or equal to 2211 pSlg, IOST~1021 Rev. 66 Page 19 of 40 I | |||
TECH $PEC PARAMETER.. Daily Surveillance Requirements Log Sheet 4 of 15 4,2.5.1 Res LOOPTAVG INSTRUMENT (MeB OR ERFlS) | |||
ACCEPTANCE CRtTERIA TRC0412D TRC04220 TRC0432D CALCULATION TI~412D TI-422D TI..432D COMPLETED SEE BELOW NIA INDEPENDENT VERIFICATION COMPLETED NfA ACCEPTANCE CRITERIA MET N/A MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE: | |||
Calculatlons must be done with either the Mea Indicators OR ERFIS lndicatlons, NOT a combination. | |||
IfaU operable channels are less than or equal to the acceptance critena, calculations are not required.. | |||
CALCULATIONSF.OR ReS LOOP TAVG 0300: | |||
TRC0412D TI~412D | |||
+ | |||
+ | |||
= | |||
-~..-- | |||
H~'TRC0432D TI~432D | |||
(# Operable Channels used Normally3) | |||
= | |||
Res LOOP TAVG 0900: | |||
+ | |||
+ | |||
=: | |||
TRC0412.D TRC0422D TRC0432D TI...412D Tt-422D TI...432D | |||
+ | |||
(# Operable | |||
~-- | |||
Channels used ReS LOOP Normally 3) | |||
TAVG 1500: | |||
TRC0412D Tt-412D | |||
+ | |||
TRC0422D Ti-422D | |||
+ | |||
W""'r"R"C043W-TI~432D | |||
(# Operable Channels used Normally3) | |||
= | |||
RCSLOOP TAVG 2100: | |||
+ | |||
+ | |||
= | |||
TRC0412D TRC04226""~ | |||
TRC0432D | |||
--~- | |||
11-412D Ttw422D TI-432D | |||
(# Operable | |||
:: ~ | |||
Channelsused ReS LOOP Normally 3) | |||
TAVG ACCI;PTANCE CRITERIA FOR ReS LOOpTAVG. (must meet one of the following): | |||
1, Average of operable Mea indicator channels mustbe less than or equal to 592.5 QF. | |||
2. | |||
Average of operable ERF1S points less than or equal to 593.1 "F. | |||
3. | |||
If three Mea indicators are notavallable, then the highest channel should be less than or equal to 591,3>:>F. | |||
4. | |||
If three ERFIS points are not available, then the highest channel should be less than or equal to 592,3OF. | |||
IOST~1021 Rev. 66 Page 20 of 40 I | |||
,. DailySurveillance Requirements Log Sheet 50f 15 TECH SPEC 4,3.2.1 4.4.6.2.1.e PARAMETER Res PRESSURE FLANGE LEAKOFFTEMP OTliT OPllT PROTECTIONllT iNSTRUMENT PI-403.1 P1402,1 TI401 Ttw412C} | |||
TI422C 2 TI..432C Tl..-412B) | |||
TI..422B~ | |||
TI-4328 TJ....412A* TJ..422At Tl-432A ACCEPTANCE CRITERIA MODE 0300 0900 1500 2100 CHANNEL CHECK N/A CHANNELCHECK INSTRUCTION If ReS flow acceptance criteria isnot met, perform EST-70B, RCSFlowDetermination. | |||
INSTRUMENT FRC0414 FI..414 | |||
~ 98.30/0 FRC0434 F(~434 4.4.6.2.1.d OST~1004 or OST~1204 2100 1500 0900 Tf?CH SPEC PARAMETER PARAMETER INSTRUMENT TeCH SPEC ACCEPTANCE CRITER~A ACCEPTANCE CRITER1A COMPLETED COMPLETED (Typicallyon NightShift) | |||
MODE 1above 15% | |||
Power 1~ 2~3~ and 4 0300 rOST-1021 Rev. 56 I | |||
Page 210f 40 I M Daily Surveillance Requirements Log Sheet 6 of 15 TECH SPEC 4.4.1.t 4.3.1.1.12 PARAMETER* | |||
Res LOOP FLOWS FRC0414 FRC0415 FRC0416 RCPA N/A FRC0424 FRC0425 FRC0426 Reps N/A INSTRUMENT FI-414 FI-415 F1..416 FI-424 Fl-425 FI-426 ACCEPTANCE POSITIVE INDICAT10N OF FLOW WITH CHANNEL POSITIVE INDICATION OF FLOW WITH CHANNEL CR1TERIA Rep RUNNING INDICATION CHECK Rep RUNNING lNDICATION CHECK MODE 112 1 | |||
1.2 1 | |||
0300 | |||
~() | |||
,\\(~) | |||
k) | |||
A'O AD AtO MJ | |||
(~0 (uD rIO | |||
{ | |||
~b | |||
~ | |||
~. | |||
(:ti JiJ. | |||
y........ | |||
~ | |||
r:J) y~ | |||
~ | |||
0900 | |||
~ | |||
~... | |||
\\- | |||
~:D | |||
\\:. | |||
1500 | |||
(~\\ | |||
~~ | |||
~ | |||
~ll | |||
~~ | |||
f~~ | |||
("1. | |||
r,l\\- | |||
(& | |||
(11 (j. | |||
~ | |||
..~.:~. | |||
~6J | |||
~.() | |||
lo to t\\1() | |||
(~ | |||
rf() | |||
r¥-J At£) | |||
2100 | |||
( J | |||
\\J | |||
\\1 "J | |||
~ | |||
V V | |||
v v | |||
TECH SPEC 4.4.1.1: 4.3.1.1.12 4.3.1.1.2a.2b. 5.6 PARAMETER Res LOOP FLOWS POWER INTERMEDIATE SOURCE RANGE RANGE RANGE INSTRUMENT FRC0434 FRC0435 FRC0436 RCPC N/A Nt-41, Nl-42 Nl..35 Nl-31 FI-434 FJ*435 FI-436 N143, NI-44 NI-36 NI-32 ACCEPTANCE POSITIVE INDICATION OF FLOW WITH CHANNEL CHANNEL CHECK CRITERIA Rep RUNNING iNDICATION CHECK MODE 1,2 1 | |||
1} 2 1 <<P-10). 2 2 <<P..6), 3.4.5 0300 | |||
(~() | |||
A6"') | |||
~ | |||
~iC) r\\£) | |||
(~kL) | |||
,'\\1 //) | |||
rJ/A 0900 | |||
~~ | |||
~14 | |||
~~ | |||
~ | |||
~~. | |||
~ | |||
~1/'1 N li~ | |||
f\\l fJ 1500 | |||
~~ | |||
(~) | |||
~. | |||
(~.... | |||
r~ | |||
\\J) f\\l if-\\ | |||
j\\J fA J+. | |||
;~~ | |||
\\. | |||
2100 | |||
(~) | |||
r-b rK) | |||
~/r\\() | |||
1-10 | |||
)to l~ Ifi t J 114- | |||
'v v | |||
\\J V | |||
V v | |||
TECH SPEC PARAMETER INSTRUMENT ACCEPTANCE CRITERIA MODE 0300 0900 1500 2100 IOST~1021 4.3.2.1.1e. 3a3. 3c31 4d, sc, 6d, 69 4.3.3.6.6 STEAM LINE PRESSURE Pl..474.1. | |||
PI-484.1 Pi-494 Pl..475. PI-476 PI..485. PI486 PI-495. PI-496.1 CHANNEL CHECK t, 2. 3 and 4 Rev. 66 4.3.1.1.14 CHANNEL CHECK 1,2 Page 22 of 40 I | |||
- DailySurveillance Requirements Log Sheet 7 of 15 TECH SPEC PARAMETER 4,3,1.1,13;4.3.1>1~ 14;4.3.2.1.se. ec, 10~t 4.3.3.6,7 SG LEVEL 4,7,1,3,1 CST LEVEL LI~901 081 S8 GREATERTHAN OR EQUAL-.TO 62% | |||
LI-9010A.1 SA Ll~483f LI..484 LI..493l LI-494 LI~485~ L148j Lt:.,,495~ Lj...496 CHANNELCHECK 2100 1500 0900 0300 MOPE INSTRUMENT ACCEPTANCE CRITERIA TECH SPEC 4.7.1.3.2 PARAMETER. | |||
ESWTOAFW INSTRUMENT 1SW..121 1SW++'124 18W..127 1SW...130 1SW-123 1SW+M126 1SW-129 1SW-132 ACCEPTANCE OPEN (only when supplying CRITERIA AFW pumps) | |||
MODE 1t 2,- and3 0300 | |||
~)rpr' | |||
.....*..............."'W.<<.>>;.;-;.,;.;,.;.X/Vo."",.,..NNA*I'.";. | |||
0900 rJ If\\" | |||
~X>>m-:-:->Jo>>>;'>>> | |||
1500 tJltPr | |||
)0 | |||
~~~/ | |||
-<<-~ | |||
;N>>>:':~;MYN>>~>>Y>>' | |||
2100 | |||
~0/A | |||
.,..,;.;.""-",,,.,,___K_ | |||
~:-:<<~<N.~ | |||
IOST-1021 Rev. 66 | |||
~age 23 of 40 I | |||
.. Daily Surveillance Requirements Log Sheet 8 of 15 INSTRUCTIONS 1. | |||
ERFIS is the preferred source for verifying CNTMT AVG TEMP. | |||
2. | |||
VerIfy TCV97540 computer point quality code is acceptable. If acceptable, record the ERFlS value for CNTMT AVG TEMP and verify Jessthan or equal to 120°F. | |||
3. | |||
If computer point TCV97540 is not available, verify both MeB indicators for CNTMT AVG TEMP less than or equal to 120 0 F. | |||
TECH SPEC PARAMETER INSTRUMENT ACCEPTANCE CRITERiA MODE PLP-114 A EDG ELEC B EDG ELEC ROOM 261 ROOM 261 ALB 27/1..3 NO ALARM ~ 116 0 F) LOCAL TEMP IS NEEDED IF ALARM IS PRESENT WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS R'EQU1RED TO BE OPERABLE 4.6.1.5 N/A CNMT AVG TEMP TCV97540 TJ-7542 TI-7541 SA SB LESS THAN OR EQUAL TO 120°F | |||
: 1. 2. 3. and 4 4.6.1.4 CONTAINMENT PRESSURE PDl*7680 PDI-7680 A SA B 58 GREATER THAN -1.0 JNWG PLP-114 CONTROL ROOM ENVELOPE 305 TI-7837 TI-7837 A1SA B188 LESS THAN OR EQUAL TO 85 QF WHENEVER THE EQUtPMENT IN AN AFFECTEDAREA IS REQUlRED TO BE OPERABLE 0300 0900 1500 2100 | |||
(\\UJ | |||
\\/ | |||
'l f TECH SPEC PLp..114 ROD STEAM SA ELECT 5B ELECT 1A35SA. | |||
PARAMETER FHB EMER EXHAREA CNTRL CAB PENET PENET AREA 305 TUNNEL AREA 261 AREA 261 1B35SB261 INSTRUMENT Tl..6537A1SA TI..65378158 ALB 23/3-5 ALB 23J2-11 ALB 2312-8 ALB 23/2..5 ACCEPTANCE LESS THAN OR EQUAL TO NO ALARM NO ALARM NO ALARM CRITERIA 104°F | |||
<< 104°F) | |||
<< 122°F) | |||
(LESS THAN OR EQUAL TO 104°F) | |||
WHENEVERTHE EQUIPMENT IN AN WHENEVER THE EQUIPMENT,IN AN AFFECTED AREA IS REQUIRED TO BE MODE AFFECTED AREA IS REQUIRED TO BE OPERABLE (LOCALTEMP MUST BE TAKEN IF ALARM IS PRESENT) | |||
OPERABLE 0300 tv c( | |||
ro | |||
~'? | |||
~6J kC) | |||
A-o rro rJp:) | |||
./ | |||
:.) | |||
0900 | |||
{j-/d | |||
(~() I | |||
~ | |||
(& | |||
~ | |||
\\tJ9. | |||
(~ | |||
cL "- | |||
1500 | |||
&'-1 rv | |||
~l | |||
'~. | |||
<~~, | |||
tA | |||
'~J) | |||
~~ | |||
. "",) | |||
2100 (0"7 Cv cl | |||
(~O k~:) | |||
~:> | |||
(ro | |||
)}-6~) | |||
\\J | |||
'J V | |||
\\t | |||
'J IOST-1021 Rev. 66 Page 24 of 40 I | |||
TECH SPEC - Daily Surveillance Requirements Log Sheet 9 of 15 PLp...114 PARAMETER CHILLER I AFW CCW PUMPS PIPE & VALVE | |||
& HX AFW AREA 261 PUMPS 236 A..SA B-S8 1C-SAB CSIP ROOM CSI? ROOM C$1iP ROOM 236 236 236 SW BSTR B-SB PUMP 236 MECH & ELEC PENETAREA 236 INSTRUMENT ALB 23/2-6 ALB 23/1*6 ALB 23/2...7 ALB 23/1-7 ALB 23/1..5 ALB 23/1-4 ALB 23/1-11 ALB 23/2..9 ALB 23/2-10 ACCEPTANCE CRITERIA MODE 0300 0900 1500 2100 NO ALARM (LESS THAN OR EQUAL TO 104¢F) | |||
WHENEVERTHE EQUiPMENT IN AN AFFECTEDAREA IS REQU1RED TO BE OPERABLE LOCAL TEMP MUST BE TAKEN IF ALARM lS PRESENT TECH SPEC I PLP..114 4.9.1*1 COMMITMENT CSAT& | |||
WPB A*SA BwSB FUEL POOLS PARAMETER HVAC HVAC CS~ RHR 1 CS, RHR~ | |||
EQUIP RM EQUIPRM HVAC HVAC SPENT FP NEWFP SFPC SFP D 216 236 190 190 INSTRUMENT ALB 23/1-8 ALB 23/1 w9 ALB 23/1..10 ALB 23/4-17 ALB 23/5-17 ALB 23/4*18 ALB23/5..18 ACCEPTANCE NO ALARM (LESSTHAN OR EQUALTO 104 OF) | |||
NO ALARM (GREATER THAN 23 FT) | |||
CRITERIA WHENEVER THE EQUIPMENT IN AN AFFECTED MODE AREA 18REQUIRED TO BE OPERABLE WHEN IRRADIATED FUEL IS IN THE POOL (LOCAL TEMP MUST BE TAKEN IF ALARM IS (LOCAL LEVEL MUST BE TAKEN IF ALARM rs PRESENT) | |||
PRESENT) 0300 d<) | |||
{~) | |||
({O | |||
~ | |||
'-~~ | |||
'~~ | |||
')~ | |||
~dJ- | |||
"-~J)~ | |||
~~ | |||
,.)) | |||
~' | |||
l~ | |||
0900 V }I/~ | |||
~ | |||
1500 | |||
.~ | |||
b | |||
.~- | |||
.~ | |||
2100 (kJ r!P | |||
)tto ko | |||
~.J | |||
\\/ | |||
v | |||
'tJ IOST-1021 Rev. 56 Page 25 of 40 I | |||
... Daily Surveillance Requirements Log Sheet 10 of 15 TECH SPECI COMMiTMENT PARAMETER INSTRUMENT ACCEPTANCE CRiTERIA MODE 0300 0900 1500 2100 TECH SPEC ESR97..00272 SPENT FUEL POOL HIGH TEMPERATURE ALARM ALB 23/4..16 NO ALARM ESR 95~00425 SPENTFUELPOOLHIGH TEMPERATURE ALARM ALB 23/4...15 ALB 2315~15 NOALARM PLP-114 ESR97-00272 NEW FUELPOOLHIGH TEMPERATUR~ALARM ALB 23/5...16 NOALARM PARAMETER INSTRUMENT ACCEPTANCE CRITERIA 0900 1500 2100 IOST-1021 ESWELECEQUJP ROOM261 ESW PUMP ROOM261 EDG ROOM: 261 TEV6588A TEV658~~ | |||
TEV6592A TEV6592B TDG6903A TDG6903f.3... | |||
LESS THAN OR EQUAL LESSTHAN OR EQUALTO LESSTHAN OR EQUALTO TO 116$;)F122~F WHENEVER THE EQUIPfv1ENT IN AN AFFECTED AREAIS RE.QUIRED TO BE OPERABl.E Rev. 66 Page 26 of 40 I | |||
.. Daily Surveillance Requirements Log Sheet 11 of 15 NOTE 1: | |||
If a reservoir level computer point is bad, manual reservoir level determination can be performed per OPw163. | |||
NOTE 2: | |||
If a reservoir temperature computer point is bad, manual reservoir temperature readings can be performed per OP-163. | |||
INSTRUCTION 1. | |||
Due to a 3°F instrument inaccuracy associated with the permanently installed reservoir TSWs, if TSW9114ITSW9115 'indicate 291 °F J obtain local temperature readings per OP-163. | |||
4.1.2.6b TECH SPEC 4.5.4.b 4.7.5 RWST AUX RSVR PARAMETER TEMP AUX RSVR LEVEL TEMP MAIN RSVR LEVEL MAIN RSVR TEMP lNSTRUMENT TCT7110 LSC8752A LSC87528 TSW9114 LSC8750A LSC8750B TSW9115 | |||
~40°F GREATER THAN OR GREATER THAN OR EQUAL ACCEPTANCE AND EQUAL TO 250 FT | |||
::; 94°F TO 215 FT s 94°F CRITERlA | |||
< 125°F NOTE 1 NOTE 2 NOTE 1 NOTE 2 MODE 1 ~ 2) 3 and 4 0300 5~7. &.' | |||
(9-5Jl i: | |||
r?~SL~S(} | |||
l{() t o.;.:; | |||
9Jt\\~;S | |||
;)17" (0 I 4&v6 0900 1500 t~~-7, 5 | |||
~SI\\5 | |||
/)5~ j 5<1 L(~t3~ | |||
l)r9. Sec, J,j l15 J | |||
<7 LJS..,....., | |||
~ W | |||
-:l | |||
{ | |||
~... | |||
~ | |||
2100 INSTRUCTION 1. | |||
The ECCS leakage outside RABEES reading is only required every 72 hours. Perform on Sunday, WednesdaYt and Friday (mark as N/A on other days). | |||
2. | |||
If any ECCS leakage outside RABEES is measured, record the cumulative leakrate on t along with the locations leaking. | |||
TECH SPEC PLP-114 PARAMETER ECCS leakage outside RABEES INSTRUMENT N/A ACCEPTANCE LESS THAN 2 GPH (125 cc/min) cumulative CRITERIA MODE 1,2,3 and 4 0300 0900 1500 VJ/t\\ | |||
2100 IOST-1021 Rev. 66 Page 27 of 40 I | |||
- Daily Surveillance Requirements Log Sheet 12 of15 NOTE 1: | |||
Meteorological Channel check includes: (1) Initialing for a acceptable quality code if using ERFIS or verifying data quality is consistent with actual weather conditions if using a Personal Computer(PC) to access the meteorological tower, and (2) | |||
Recording present values and verifying trend appears normal. | |||
NOTE 1: | |||
During calm wind conditions (approximately 2 mph or less) it is normal to see disagreement between the upper and lower wind direction indicators. At times the vanes may actually rotate in opposite directions. | |||
NOTE 1: | |||
The following shall be used for performing the daily channel check of the meteorological instrumentation channels: | |||
On ERFIS observe the points for wind speed, wind direction, and differential temperature. | |||
*. Using a PC, access the meteoroloqical tower and observe upper and lower wind speed, upper and lower wind directlon. and differential temperature (or stability class). | |||
The meteorological instrumentation should only be considered inoperable if both of the above methods are unavailable. | |||
NOTE 2: | |||
MIMS Channel check should include, as a minimum, both a Self Test and an Audio Monitoring Test of all operable channels. Op wo182 contains guidance for resetting the CPU FAILED light if lit. | |||
(Reference 2.6.4) | |||
TECH SPEC PLP-114 PLP-114 METEOROLOGICAL MIMS PARAMETER LOWER WIND UPPERWIND LOWERWIND UPPER WIND A1R SPEED SPEED DIRECTION D1RECTION llT INSTRUMENT MMT1008 MMT1010 MMT1014 MMT1013 MMT1004 MMT1Q05 ALL CHANNELS ACCEPTANCE CHANNEL CHECK NOTE 1 CHANNEL CRITERIA Value Init Value Init Value Init Value Init Value Init Value Init CHECK NOTE 2 MODE AT ALL TlMES 1,2 0300 C\\t/& | |||
M;~) | |||
'f) 7 1) | |||
S~f) 3~:;*21 Z-3 liJ f1/31 rh-J | |||
\\ L.~,,~ | |||
1.(0 11..55" j,.-I,() | |||
Af) | |||
J. | |||
'.7~ | |||
i "0" | |||
~.'.. | |||
-s: | |||
'J' 0900 | |||
~'},J~ | |||
'"11 jlL3<6 | |||
~ | |||
~{Z~ l2. | |||
l~ | |||
(,<1/l3 | |||
~~ | |||
*-~Lgti | |||
'J) -l,'7J | |||
'~J2 | |||
.~ | |||
1500 | |||
~ll | |||
~' | |||
2100 IOST-1021 I | |||
Page 28 of 40'1 | |||
- Daily Surveillance Requirements Log Sheet 13 of 15 LOCAL TEMPERATURES TECH SPEC PLp..114 PARAMETER SFP PUMP & | |||
TANK AREA E-6 ROOMS 261 HX ROOM 236 A-SA B-SB lNSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESSTHAN OR EQUAL TO LESSTHAN OR EQUALTO 104.oF VERIFIED CRlTERIA 115.5 of WHENEVERTHE EQUIPMENT iN AN AFECTED MODE AT ALL TIMES t*:,':.:,-.:.::*::.*\\.:;>~~}~t~.: (;/}~:::::~:r.:::~*:** | |||
AREA IS REQUIRED TO BE*OPERABLE 0100-0400 1.--7 S 0:?G7 t L{ | |||
& v-1 | |||
~.:) | |||
&L/~ 7 | |||
)D | |||
,) | |||
I 1300..1600 | |||
~51\\"3 lait, ~ Lf t9?? | |||
~ (p | |||
" c.( C:i r7~ | |||
l | |||
'/ | |||
C!..-/ | |||
TECH SPEC PLP-114 EDG HVAC ROOM 280 EDG HVAC ROOM 292 DFOST BLDG PARAMETER A-SA B-58 A-SA B-SB 242 lNSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR EQUAL TO LESSTHAN OR EQUALTO LESS THAN OR EQUAL VERIFIED CRITERIA 118°F 122°F TO 122 QF MODE WHEN THE EQUIPMENT iN THE AFFECTEDAREA 18REQUlRED TO BE OPERABLE 0100..0400 | |||
~-?&( GI g::) D | |||
*'7t;5t '*'7 ifIf>3 | |||
<>>. <./ | |||
(~QJ | |||
~ | |||
~~7? \\,~5' 71L{td | |||
''") ~1 ~ "j 7l0~fo C:Ol, L( | |||
~~Q 1300-1600 | |||
~.;} | |||
IOST-1021 Rev. 66 Page 29 of 40 I | |||
.. Daily Surveillance Requirements Log Sheet 14 of 15 LOCAL TEMPERATURES INSTRUCTION 1. | |||
If battery room temperature is less than 71 of, perform Step 7.0.5. | |||
TECH SPEC PLp..114 ELECT SW1TCHGEAR PARAMETER PENETRAT'ON ROOM286 SATIERY ROOM286 ACP 286 AREA 286 A..SA BwSB A-SA B-S8 A..SA I | |||
B...SB INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR LESS THAN OR | |||
~ 71°F AND | |||
~ 85°F LESS THAN OR VERIF1ED CRITERIA EQUAL TO 104°F EQUAL TO gO°F EQUALTO gO°F WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS REQUIRED TO BE | |||
/':.':",::, | |||
MODE O:':':':::::::',\\,~: | |||
OPERABLE y\\, C:j | |||
'7~~1~ c1 "7ip ~ i? | |||
l 0900-1200 | |||
&~;;)\\G.' | |||
'~7[{ (to | |||
~*-?0. ~ | |||
.-~] ~7 ~ '--7 l"~J 2100-2400 Q ci | |||
-7 L(J~. | |||
~t\\t _~3 | |||
~7<l,, | |||
':-7~S | |||
~ t:t "7~J | |||
~ C} | |||
"7'7 G | |||
:1;) | |||
(0:-- | |||
~ | |||
\\ | |||
<:1 TECH SPEC PLpw114 AUX TRANSFER PANEL ROOM PIC ROOMS PARAMETER 286 286 A-SA B..SB 17 t 19 18 INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR EQUAL TO LESS THAN OR EQUAL TO CRITERJA 104°F 85°F MODE WHENEVER THE EQUIPMENT iN AN AFFEOTED AREA IS REQUIRED TO BE OPERABLE 0900...1200 | |||
--7~:) | |||
~ | |||
~~-'1 | |||
'~'7 | |||
~1. | |||
~), | |||
"'}~, c. | |||
"'7:5~ C) | |||
(... | |||
(-~ | |||
2100...2400 | |||
"'7 2..-- | |||
~ '~7 | |||
'-'7 2 | |||
'<2- | |||
~~7. | |||
£2 | |||
~7 Lo( t | |||
~l | |||
'(>, | |||
~ | |||
'J VERiFIED TECH SPEC PLP-114 ARPROOM AH-15 VENTILATION PARAMETER PIC ROOM 305 305 ROOM INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR EQUAL TO LESS THAN OR VERIF1ED CRITERIA 85°F EQUAL TO 104°F WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS | |||
':.'. :-:/. | |||
MODE REQUIRED TO BE OPERABLE | |||
~7 t. 0 | |||
{(i{a, ~ | |||
4,0 \\ ( | |||
~ | |||
0900-1200 r0 2100-2400 | |||
~7C) ~ ~6 | |||
(&~~ ~ | |||
'~7 | |||
&0 | |||
~ | |||
(~) | |||
~ | |||
1OST-1021 Rev. 66 Page 30 of 40 I | |||
- Daily Surveillance Requirements Log Sheet 15 of 15 NOTE 1: | |||
These readings are only required on Sundays. These readings may be marked N/A on other days. | |||
TECH SPEC 4.1.2.2.a VCTVALVE BAT BORJCACID EMER BORATION BORIC ACID PARAMETER GALLERY ROOM XFER PUMP VALVE RM XFER PUMP VALVE GALLERY ROOM INSTRUMENT LOCALTHERMOMETER ACCEPTANCE GREATER THAN OR EQUAL TO 65°F CR1TERIA MODE 1,2 and 3 1300-1600 rrJ lA- | |||
---._~ | |||
(NOTE 1) | |||
....__..-......---...------Y'O"+i'---.M........-.-....................,.-..........---------- | |||
TECH SPEC 4.1.2.2.a BAT TO CSt? SUCTION HEADER PfPE TEMPERATURE (IF ANY OF THESE INSTRUMENTS FAIL. INITIATE CORRECTIVEACTION AND NOTE IN COMMENTS PARAMETER SECTION. USE SECONDARY INSTRUMENTS TO SATISFY THE SURVEILLANCE REQUfREMENT) | |||
HT-18753C I HT-18753C I HT-18753B I HT~18753B I HT..18753B I HT..18753B INSTRUMENT C2-1 C2-2 C1-9 C1-13 C2..3 C2-5 ACCEPTANCE CRiTERIA GREATER THAN OR EQUAL TO 65°F MODE 1,2 and 3 1300..1600 | |||
\\_*..*---------1------- | |||
t | |||
~ J 1 | |||
--~~.-_"'-~ | |||
I r. r~ | |||
(NOTE 1) | |||
N | |||
;.~. | |||
I I | |||
I TECH SPEC 4.1.2.2.8 BAT TO CSIP SUCTION HEADER PlPE TEMPERATURE (THESE ARE SECONDARY INSTRUMENTS. THESE SHOULD BE USED WHEN PRIMARY INSTRUMENTS PARAMETER FAll. (N/A IF NOT BE1NG USED.) | |||
HT-18753CCI HT..18753CC I HT-18753BB I HT-18753BB 1 | |||
HT..187538B I HT-18753BB INSTRUMENT C2-1 C2...2 C1v9 C1-13 C2...3 C2-5 ACCEPTANCE CRITERIA GREATERTHAN OR EQUAL TO 65°F MODE 1,2 and 3 1300-1600 f~1 f) 1---*-----.1-I i. | |||
1 | |||
-.~----;.""i (NOTE 1) | |||
I IOST-1021 Rev,66 Page 31 of 40 I | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | |||
HARRIS Task No.: | |||
015004H201 Task | |||
==Title:== | |||
Perform the Quadrant Power Tilt Ratio Surveillance JPM No.: | |||
2008 NRC RO A2 KIA | |||
==Reference:== | ==Reference:== | ||
2.2.12 (3.4) | |||
2.2.12 (3.4)Examinee: NRC Examiner: Facility Evaluator: | Examinee: | ||
Date: Method | NRC Examiner: | ||
Facility Evaluator: | |||
Plant | Date: | ||
Initial Conditions: | Method oftesting: | ||
Simulated Performance: | |||
Classroom READ TO THE EXAMINEE X | |||
Simulator Actual Performance: | |||
Plant x | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied. | |||
Initial Conditions: | |||
The plant has been stabilized at 100% | |||
power following a dropped rod in Control Bank "B" (M-6). | |||
The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND"INDICATION SYSTEM. | |||
No deficiency tags on PRNls. | |||
Task Standard: | |||
Calculations within required band. | |||
Required Materials: | |||
Calculator General | Calculator General | ||
==References:== | ==References:== | ||
OST-1039, CALCULATION OF QPTR, Revision 13 Handouts: | |||
Initiating Cue: | |||
Time Critical Task: | |||
Validation Time: | |||
OST-1039 Curve Book (Ensure F-X-8 included and unmarked) | |||
The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below. | |||
For the purposes of the examination, there will be no independent verification of your work. | |||
NO 12 minutes HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C (Denote Critical Steps with a ~) | |||
Start Time: | |||
Page 2 of 10 VERIFICATION OF COMPLETION Form ES-C-1 Performance Step: 1 Standard: | |||
Evaluator Cue: | |||
Evaluator Note: | |||
Comment: | |||
Performance Step: 2 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
Obtain procedure. | |||
Reviews procedure. | Reviews procedure. | ||
Provide OST-1039. | Provide OST-1039. | ||
Completes Prerequisites section: | A KEY is provided for your use on JPM Page 7. | ||
Completes Prerequisites section: | |||
Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication. | |||
Verify the most recent Curve F-X-8 is used in the performance of this procedure. | |||
Verify all prerequisites are met, then obtain Unit SCO permission to perform this OST. | |||
Logs F-X-8 revision number (NRC Exam) | |||
On the KEY, this value is shown at the bottom of Column C. | Initials/signs all blocks HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9 | ||
The | Appendix C Page 30f 10 VERIFICATION OF COMPLETION Form ES-C-1 Performance Step: 3 Standard: | ||
Records Maximum QPTR value 1.026 to 1.036 (N44 UPPER) | Comment: | ||
Performance Step: 4 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
=1.031 | Performance Step: 5 Standard: | ||
=1.0296 (1.03) | Comment: | ||
If Quadrant Power Tilt Ratio Calculation Computer Program is used, perform Section 7.1, and N/A section 7.2. | |||
If manual calculation of the Quadrant Power Tilt Ratio is used, perform Section 7.2, and N/A section 7.1. | |||
Marks Section 7.1 N/A Proceeds to Section 7.2 Prior to reading the value of detector current, ensure the meter range/rate switch is in the 400 J,lAlSLOW position. | |||
Verifies meter range/rate switches were in the 400 J,lAlSLOW position when the readings were taken. | |||
Record on Attachment 2, in Column A, the upper and lower detector currents from all operable power range channels as read on the Nuclear Instrumentation Cabinet. | |||
Transposes readings from PRNIS Readings Table onto. | |||
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 4 of 10 VERIFICATION OF COMPLETION Form ES-C-1 Performance Step: 6 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
Performance Step: 7 Standard: | |||
Comment: | |||
Performance Step: 8 Standard: | |||
Evaluator Note: | |||
Comment: | |||
Record on Attachment 2, in Column B, the 100 power normalized current for each channel. (Refer to Curve F-X-8) | |||
Transposes TOP and BOTTOM 100 current values from the Curve Book provided. | |||
Divide values in Column A by the respective normalized current in Column B and record the result in Column C as the Normalized Fraction. | |||
Divides each Upper and Lower reading by the respective 100 normalized current value and records in Column C. | |||
Calculate the average value for the upper and the lower Normalized Fractions by adding the Normalized Fraction in each section of Column C and divide by the number of operable NI channels. Record in Column D of Attachment 2. | |||
Adds all Normalized Fractions for the same plane, divides by four and records result in Column D. | |||
On the KEY, this value is shown at the bottom of Column C. | |||
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 5 of 10 VERIFICATION OF COMPLETION Form ES-C-1 | |||
~ | |||
Performance Step: 9 Standard: | |||
Evaluator Note: | |||
Comment: | |||
Performance Step: 10 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
~ | |||
Performance Step: 11 Standard: | |||
Comment: | |||
Using the formula and values from Attachment 2 calculate the Upper and Lower Ratios. | |||
Divides the Maximum Normalized Fraction by the Average Normalized Fraction on each plane. | |||
Determines both UPPER and LOWER ~ 1.029. | |||
The applicant may inform the USCO as soon as any calculation is > 1.02. If so, acknowledge and direct applicant to complete. | |||
Perform independent verification of all calculations made on. | |||
Requests Independent Verifier. | |||
If necessary, repeat Initiating Cue: For the purpose of this examination, there will be no independent verification of your work. | |||
Candidate may choose to check calculations. | |||
The upper ratio or the lower ratio, whichever is greater, is the quadrant power tilt ratio (QPTR). Record QPTR and verify QPTR is less than or equal to 1.02. | |||
Records Maximum QPTR value 1.026 to 1.036 (N44 UPPER) | |||
Acceptable band is +/- 50/0 (rounded to.005) around 1.031. | |||
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 6 of 10 VERIFICATION OF COMPLETION Form ES-C-1 | |||
-v Performance Step: 12 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
Terminating Cue: | |||
Complete applicable sections of Attachment 3, Certifications and Reviews and inform the Unit SCO when this test is completed. | |||
Check marks Periodic Surveillance or notes AOP-001 in Comments section Plant Condition: 100 Power (may note dropped rod) | |||
Mode 1 Today's Date Current Time OST Completed By: Applicant's name Initials/Name Indicate in General Comments Section and/or informs USCG that the limit is exceeded (-V) | |||
Acknowledge any report. | |||
After the USCO has been notified: Evaluation on this JPM is complete. | |||
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 7 of 10 VERIFICATION OF COMPLETION KEY Form ES-C-1 A | |||
B C | |||
UPPER UPPER UPPER 100% POWER NORMALIZED UPPER DETECTOR NORMALIZED FRACTION DETECTOR CURRENT CURRENT (NOTE 1) | |||
N-41 149.7 155.2 | |||
.965 N-42 177.9 175.6 1.013 N-43 202.0 200.0 1..010 N-44 165.5 159.5 1.038 SUM 4.026/4 = | |||
1.0065 A | |||
B C | |||
LOWER LOWER LOWER 100% | |||
POWER NORMALIZED LOWER DETECTOR NORMALIZED FRACTION DETECTOR CURRENT CURRENT (NOTE 1) | |||
N-41 169.2 176.1 | |||
.961 N-42 202.6 202.2 1.002 N-43 221.1 221.2 | |||
.9995 N-44 197.5 192.3 1.027 SUM 3.99/4 = | |||
.9975 Highest Upper (N-44) 1.038/1.0065 = 1.031 Highest Lower (N-44) 1.027/.9975 =1.0296 (1.03) | |||
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 8 of 10 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.: | |||
2008 NRC RO A2 Examinee's Name: | |||
Date Performed: | |||
Facility Evaluator: | |||
Number of Attempts: | |||
Time to Complete: | |||
Question Documentation: | Question Documentation: | ||
Question: Response | Question: | ||
SAT UNSAT Date: | |||
INITIATING CUE: | ===Response=== | ||
Result: | |||
PRNIS Readings N41 N42 N43 N44 149.7 177.9 202.0 165.5 169.2 202.6 221.1 197.5* | Examiner's Signature: | ||
SAT UNSAT Date: | |||
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 9 of 10 VERIFICATION OF COMPLETION HARRIS 2008 NRC RO JPM A2 Curve F-X-8 HANDOUT Revision Number: NRC Exam NIS Current Setpoint Table uA, 100% power Form ES-C-1 N41 N42 N43 N44 155.2 175.6 200.0 159.5 176.1 202.2 221.2 192.3 HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 10 of 10 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: | |||
INITIATING CUE: | |||
The plant has been stabilized at 100 power following a dropped rod in Control Bank "B" (M-6). | |||
The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM. | |||
No deficiency tags on PRNls. | |||
The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below. | |||
For the purposes of the examination, there will be no independent verification of your work. | |||
PRNIS Readings N41 N42 N43 N44 149.7 177.9 202.0 165.5 169.2 202.6 221.1 197.5 | |||
* All values were taken,with the Range/Rate switch in 400 IJAiSlow position. | |||
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Facility: | |||
HARRIS Job Performance Measure Worksheet Task No.: | |||
Form ES-C-1 Task | |||
==Title:== | |||
Review the Completed OST for Auxiliary Feedwater Pump 1A-SA JPM No.: | |||
2008 NRC SRO A2 KIA | |||
==Reference:== | ==Reference:== | ||
2.2.12(3.4) | 2.2.12 (3.4) | ||
Examinee: | Examinee: | ||
Date: | NRC Examiner: | ||
Facility Evaluator: | |||
Date: | |||
Method of testing: | |||
Simulated Performance: | Simulated Performance: | ||
Classroom READ TO THE EXAMINEE X | |||
Plant | Simulator Actual Performance: | ||
Plant x | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied. | |||
Initial Conditions: | |||
The unit is in Mode 1 at 100 power All major controllers are in AUTO No TS Action Statements are in effect OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4, has just been completed Task Standard: | |||
All errors (4) identified Required Materials: | |||
None General | |||
==References:== | ==References:== | ||
OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4 Handout: | |||
Initiating Cue: | |||
Completed OST-1211 with the errors incorporated. | |||
You are the USCO. Completely review the procedure and note any problems in the | |||
==GENERAL COMMENT== | |||
S section of Attachment 6 - | |||
Certification and Review. Discuss your review with me at the conclusion. | |||
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9 | |||
OST-1211, | Appendix C Time Critical Task: | ||
Validation Time: | |||
No 12 minutes Job Performance Measure Worksheet Form ES-C-1 HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Job Performance Measure Worksheet SIMULATOR SETUP N/A Form ES-C-1 HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 4 of 8 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with a check mark) | |||
START TIME: | |||
Performance Step: 1 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
~ | |||
Performance Step: 2 Standard: | |||
Evaluator Note: | |||
Comment: | |||
Review procedure Ensures proper conditions, signatures/initials, and may verify the current revision of the procedure Provide the completed OST-1211. | |||
Review the completed OST (Page 16) - Identifies stopwatch is past calibration date This makes the OST invalid and/or any timed elements would have to be repeated. | |||
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C | |||
-v Performance Step: 3 Page 5 of 8 PERFORMANCE INFORMATION Review the completed OST Form ES-C-1 Standard: | |||
Evaluator Note: | |||
Comment: | |||
-v Performance Step: 4 Standard: | |||
Evaluator Note: | |||
Comment: | |||
-v Performance Step: 5 Standard: | |||
Comment: | |||
*, Sheet 1 (Page 17) - wrong Specific Volume used to determine ilPcorr. | |||
l\\Pcorr still exceeds minimum requirement but is incorrect. | |||
Review the completed OST | |||
* (Page 20) - Outboard Horizontal Vibration reading is in the ALERT range but there is no documentation in accordance with Instructions 1.a and 1.b. | |||
The pump would still be operable but this could prevent corrective action or the required increase in surveillance frequency. | |||
Review the completed OST (Page 21) - 1AF-74 SHUT time exceeds CODE CRITERIA and, in accordance with Step 7.0.1, should have been retested immediately. | |||
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Performance Step: 6 Page 6 of 8 PERFORMANCE INFORMATION Review the completed OST Form ES-C-1 Standard: | |||
Comment: | |||
Terminating Cue: | |||
STOP TIME: | |||
Returns the procedure unsigned or, if signed, with EXCEPTIONS circled and all errors identified in the | |||
==GENERAL COMMENT== | ==GENERAL COMMENT== | ||
S section. | |||
When the procedure is returned: Evaluation on this JPM is complete. | |||
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.: | |||
2008 NRC SRO A2 Examinee's Name: | |||
Date Performed: | |||
Facility Evaluator: | |||
Number of Attempts: | |||
Time to Complete: | |||
Question Documentation: | Question Documentation: | ||
Question: Response | Question: | ||
SAT UNSAT Date: | |||
INITIATING CUE: | ===Response=== | ||
Result: | |||
Examiner's Signature: | |||
SAT UNSAT Date: | |||
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 8 of 8 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: | |||
INITIATING CUE: | |||
The unit is in Mode 1 at 100 power All major controllers are in AUTO No TS Action Statements are in effect OST-1211, AUXI LIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4,' | |||
has just been completed You are the USCO. Completely review the procedure and note any problems in the | |||
==GENERAL COMMENT== | ==GENERAL COMMENT== | ||
S section of | S section of - Certification and Review. Discuss your review with me at the conclusion. | ||
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9 | |||
NOTE*2: Satisfactory Acceptance Criteria is.determlnedby u.sing the following and verifying the correcteodlfterenttatpressure ts\tifit.hinthe | NUMBER: | ||
. | C CO*NTINUOUS USE HARRIS NUCLEAR PLANT PLANT OPERATING MAN UAl VOLUME 3 PART 9 QPERAT10NS SU*RVEllLANCE TEST OST-1211 TITLE: | ||
la: tlPcorr:::;APind:=Uf=: 7.1.24 Corrected DifferentIal Pressure Discharge Pressure minus Indicated sucuon Pressure SpeCific Volume (ftslfbm)for | NOTE: | ||
...V*2 Test G:8uge at1AF-11*HV.2 ERFISPoint TCE901..*::or Test Gauqe at 1AF-7 Calculated per NOTE 1 Calculated | A*U:XILIARY FEEDWATER PUMP 1A.-SA OPERABILITY TEST QUARTERLYI*NTERVAL MOD:ES 1 -4 Thlsprccedure has been screened perPLP-1 00 Criteria and determined to be CASE Iii, | ||
1.If pump vibration data is | :additionalmanagementinvolveme*nt is required. | ||
Initiate a Condition Report (CR)v F s\, Vibration ACCEPTANCE | IOST-1211 | ||
:CRITERIA.location IN/SEC Acceptable Range Alert Range Required Action Axial*J.1Q:s.0.285:> | .. *1 Rev, 16 Page 1 of 261 | ||
-Calibration Data Sheet Sheet 1 of 1 Cal Due Date o~ I o | |||
N.A QT' 0 (JT" c | |||
Rev. 16 Page 18 of261 | |||
>ON2775 tos 0.666>0,666 Vertical/'0.............Inboard I s | |||
*>O.2.i5Sto*s | A'ttaehm.ent 2 ~ Performance Data Sheet 1 of*3 Auxiliary PeecwaterPump 1A..SA NOTE1:Caiculate DifferentiaiPressure as foltows: | ||
:>0:.636 Hortzontat | lb{)() | ||
{DC(J Inboard Vertica': s | Step 7'. 1.21 | ||
>0.315 to s 0.70>0.'70'*../;1:0. | < (iSIS Step 7~1.18 | ||
= | |||
J514~d, psid Step 7.1.23* | |||
L!==========:,======= | |||
..::=.:.. | |||
.=====;======~ | |||
NOTE* 2: | |||
Satisfactory Acceptance Criteria is.determlnedby u.sing the following | |||
~.rH l~-HO and verifying the correcteodlfterenttatpressure ts \\tifit.hinthe | |||
~t;:t;. | |||
\\i.~ Iltj'~: la: | |||
tlPcorr :::; | |||
APind | |||
:= | |||
Uf | |||
=: | |||
7.1.24 Corrected DifferentIal Pressure tndlq.~ted Discharge Pressure minus Indicated sucuon Pressure SpeCific Volume (ftslfbm) for saturatedIiquidwater (u,)forsuction temperature recorded inStep7..*1.22. This number can be determined from Sheet3 of this Attachment or Standard Steam Tabtes~ | |||
I0$1-1211 r | |||
w Rev. 16 Page 11 of 26, | |||
Attachm.ent 2 ~ Performance Data Sheet 2 of 3 INSTRUC*TIONS 1. | |||
If pump hydrauHcdatEfdoes not meet acceptance criteria: | |||
a~ | |||
Declare the pump iNOPERABLE., | |||
b ~ | |||
Inlti:ate a :CR. | |||
ST*Ep*** | |||
NO. | |||
7.1.3 7.1.18 7.1.20 7.1.22 7.1 ~26 Suction Temperature OifferentlalPressure Differenual Pressure Test Gauqe CE~42...V*2 Test G:8uge at1AF-11*HV.2 ERFISPoint TCE901..*::or Har~dheld Porom~t~(* | |||
Test Gauqe at 1AF-7 Calculated per NOTE 1 Calculated per NOTE 2 (C:orrected (liPcorr) psig | |||
{CodD psig 2: 15 psig N/A N/A Circle instrument used. | |||
50 to 54 inches water column is equivalent to 50 to 52 gpm IOST~1211 Rev. 16 Page 18 of 261 | |||
Attachm.ent 2* Performance Data Sheet3 of 3 Specific Volume (ft3/Ibm)For Saturated Liquid Water {ud Temperature Specific Volume Temperature l:s...peciflc VO~.unne 59 60 61 62 63 64 66 67 6*8 69 70 11 7*2 73 74 75 76 77 78 79 0:.016034 0..=016035 0.016036 0.0160:38 0.01603:9 (t016044 CL016046 0.01.60:48 O~01'6050 0.016052 0.016056' 0.01605$ | |||
0.016060 0.016062 0.016064 0.016061 0.Ot6069 0.016011 I | |||
80 I | |||
81 82 83 84 as 81 88 89 95 96 98 tOO 0.016074 0.016076 0.016079 0.016081 0..0=16097 12 OJJ*16.115 0.016125 0.016131 Rev. 16 103 105 109 111 11:2 113 1 | |||
116 117 1 | |||
119 120 0.0'16110 0.016174 0.016177 0.016189 0.016201 0.016209 Page19 of 26I | |||
~ Vibration Data Sheet 1 of 1 IN'STRUCTIONS: | |||
1. | |||
If pump vibration data is greaterthan the Acceptable Range but within the Alert Range: | |||
a. | |||
Prepare enE-man or MenlO to the Surveillance Testing Scheduling Coordinatordirecting the test frequency of the pumpto be doubled, b. | |||
Attach a copy of the E-mailor Memo to the test package. | |||
2. | |||
If pump vibration data meets the Required Action Criteria: | |||
B. | |||
b. | |||
Declare the pump INOPERABLE. | |||
Initiate a Condition Report (CR)v F | |||
s | |||
\\, | |||
Vibration ACCEPTANCE :CRITERIA | |||
.location IN/SEC Acceptable Range Alert Range Required Action Axial | |||
~ *J.1Q | |||
:s.0.285 | |||
:> O~285 to ~ 0.68.4 | |||
> O~68*4 Outboard | |||
~. 0.2325 | |||
> 0.232'5 to.s:O.558 | |||
> O~558 l~Gt~3 ) | |||
Horizontal Outboard | |||
*....,.".,.,:;">>,,.,~~,.* | |||
,.".~;-.,.. | |||
s O~2775 | |||
>ON2775 tos 0.666 | |||
> 0,666 Vertical | |||
/'0 | |||
.............~ | |||
Inboard I s O~265 | |||
*>O.2.i5Sto*s O~63.6 | |||
:> 0:.636 Hortzontat | |||
{DC( J Inboard Vertica' : | |||
I~G s O~315 | |||
> 0.315 to s 0.70 | |||
>0.'70 | |||
'*.. /;1:0 L~~::!~~.* | |||
,_~_~~,_"_"__~~~....*.. L __2~e ~o ~!~ | |||
M*. Valve Test Data Sheet 1 of 1 | |||
_um""'''''''''''''''h | |||
.",.:,u..... | |||
~ | |||
<_,,~.____ | |||
~.h_ | |||
PRETEST FAIL SAFE rosrrssr ALIGNMENT FULL STROKETEST TEST ALIGNMENT ACCEPTANCE y",,131TERIA (SEC) | |||
CODECR.tTERI.A Verification Stroke Time LIMlT1NGVALUE ofT"ravelby (SEC) | |||
I OPEN SHUT | |||
'Valve Pretest Ind Lights | |||
: Fail Safe Position Pusttes! | |||
Number Position I:Htt (lNIT) | |||
OPEN SHUT: Positlon Verified *Pos.iUon Pos lnit Vert loit Low High Low High OPEN SHUT 1AF-55 Open ffO !fJ l/Pt~fo 1&.1" NIA NtA Open | |||
}6=>. :u 14.25 19~28 14,34 19;40 25~15 23.00 1AF...74 Open Aio Aw bb61~~;P~ | |||
NlA NIA Open ~ :i) f5~48 20.94 14,84 20.07 27.31 23.00 | |||
-e, | |||
:0' Comments: | |||
.<<ovm<_'<<"=_ | .<<ovm<_'<<"=_ | ||
" *****.*._.vwm.*.....wm"hwu. | |||
.....wm"hwu. | *.VII' | ||
..,_O'<< | ...,...__*..a* *b*.*.* *.'.* | ||
....... | ~ | ||
__*_,.v.*.*..I'>.................................. | "A | ||
.................... | <<.:...:A.:.:..,_O'<< | ||
..........-._..-.-'w.....-vvY.y.,..w. | b | ||
.. | *:**v*.i( | ||
.......~ | |||
<N._ | |||
N N..~_ _J'.I'_.+-.-.__*_,.v.*.*..I'>.............................................................. | |||
..-._..-.-'w | |||
~ | |||
.....-vvY.y.,..w. | |||
~ | |||
~ | |||
...-;~-...x<<<<o:..-:<;;Xo<<~~__ | |||
. _~ | |||
cccccccee | |||
<.;..OC;"':O:':<_........-_<hV<hV<hV<hV h~AQ;y,;<<o;.y;;oc;.,.; | |||
.~.--"..No'N:N NN N~........:<< | |||
<<<<'i.<<-;-; | <<<<'i.<<-;-; | ||
-'- <N | |||
~" | |||
I Rev.16 I Page 21 0126 1 | :.:.-.~.w.r.*.*.* * | ||
Determine if the.stroke time exceeds the Limiting Value,1. | *** NU | ||
N:OTE:.If necessary | ~~.;.."j /vu'**u.* u.*.*.*.* | ||
L?ST~1211 I | |||
CR.identify1ng test findings for the first and second tests.(c)Send test results to Responsible Engineer (1ST)for evaluation and docurnentanonon the CR.IOST-1211 Page 22 | Rev. 16 I | ||
.':..->>...:***..:. | Page 21 0126 1 | ||
- Valve Retest Data S'heet Sheet 1 of 2 NOTE: | |||
..:n Posmon tntt: OPEN SHUT Position Pes lnit Verflnif Low High Low High OPEN i. | This entire Attachment is N/A ifno valve is retested due to exceeding the CodeCrttena. | ||
Determine if the. stroke time exceeds the Limiting Value, 1. | |||
If the stroke time exceeds the limlting Value, declare the valve inoperable and initiat.e* aCR~ (NIAifstroke time is less than the LirnltlnqValue) 2.. | |||
lfthe stroke time is. less than the Limiting Value.but outside the Code Onteria limits, perform the foUovving :Steps: | |||
8. | |||
If the cause is known to be mechanical failure~orifa retest cannot be performed expeditiously, declare the valve inoperable and inJUate a CR(Except PMTRs). | |||
b. | |||
If retestlng the valve is desired$ perform the following: | |||
N:OTE:. | |||
If necessary separatemarkedup sheets of this CST maybe used to documentnecessary manlpulatlons. | |||
sheetswould this procedure and noted in the comments Section of Attachment 7. | |||
(1) | |||
Determine wbich Ste:ps need to beperfcrrned up conditionstor testing the valve. Unit SeQ concurrence must be obtained and documented in the Comments section of Attachment 7> | |||
(2) | |||
Perform the Steps determlned in the previous Ste'p anddocument stroke times/valve positioning on Sheet2. | |||
(3) | |||
~f retest results are still outside the Code Crlteria~declare the valve inoperable and initiate aCR (except Prv1T), | |||
(4) 1fretestresults-are Within the Code Criteriay perform the.following: | |||
(a) | |||
Dec~are the valve operable. | |||
(b) | |||
Inltl~.tea CR. identify1ng test findings for the first and second tests. | |||
(c) | |||
Send test results to Responsible Engineer(1ST) for evaluation and docurnentanonon the CR. | |||
IOST-1211 Page 22 of26 I | |||
~ V,alveRetest Data Sheet Sheet2. of 2 (1) | |||
FUI out PRETEST ALIGNMENT t POSTT;EST ALIGNMENT, and ACCEPTANCE CRITERIA values for the velvets) being tested using the values in the initIal test Attachment, | |||
~~ | |||
~~::....;;..;.:.:y:w.':..->>...:***..:. | |||
J PRETEST POSTIEST ALIGNMENT ALIGNMENT ACCEPTANCECRJTERIA (SEC) | |||
(1) | |||
F.]J.~l.STROKETt=$T (1) ". | |||
<<-=<<-x-tt} | |||
I CO.9.E CRITERIA I | |||
Time | |||
~ | |||
(SE:C) | |||
OPf:N | |||
$HVT... | |||
LIMITfNG VALUE Pretest Posttest I | |||
*\\l'a'dve i!''''l:\\JlnUf..:n Posmon tntt: | |||
OPEN SHUT Position Pes lnit Verflnif Low High Low High OPEN i | |||
.StrUT | |||
~ | |||
I | |||
~ | |||
~ | |||
i | |||
~ | |||
~~11*. | |||
,,_.........:MW | ,,_.........:MW | ||
.........,_=t Rev.16 I Page 23 of | ... ~ | ||
T:hiS CST was performed as a: OST Compl.etedBy: | ......,_=t Rev. 16 I | ||
Page 23 of ~61 | |||
OS.1.. | *~ Certification and Review Sheet 1 of 2 PeriodicSurveillance Requirement: _~__ | ||
Bv: Initials Name (Print)Initials Name (Print)General Comments/Recomm:endation/Corrective ActionslExceptions: | Postmalrrtenance OperabHity Test: | ||
I ()$T-1211*L Rev.16 m mJ | Redundant SUbsystem Test: | ||
..... o | Mode: | ||
........ | PlantConottlons: | ||
__=l-L Date: | --~~~~~----------_.............-- | ||
Time: | T:hiS CST was performed as a: | ||
Time:...-Date: Pa.ges Used: | OST Compl.etedBy: | ||
Reviewed By: Unit SeQ ResponsibieEngin"eer (1ST)Reviewed By: ANn Date:----Date:----After receiving the final review signature, this OS:T becomes a a-A RECORD and should be submitted to | Date: | ||
ToDAt Time: | |||
tq~3(~) | |||
OS.1..P~.rfofrf1ed Bv: | |||
Initials Name (Print) | |||
Initials Name (Print) | |||
General Comments/Recomm:endation/Corrective ActionslExceptions: | |||
I()$T-1211* | |||
L Rev. 16 m | |||
mJ Page24 of 26I | |||
~ Certifications and Reviews Sheet 2 of 2-Step 7,1.11 Step 7~1.32 Step 7.2.1.c Step 7~2~1,p 1A..SA AF\\'V Pump Inoperable 1A-SA AFW Pump Operable-1A-SA and 1B-S-B AFWPump Inoperable 1A-SA-and 1B..SBAFW Pump Operable Time: | |||
fJ10t::. | |||
Date: 'Tc)J:r-ti | |||
~-~ | |||
.*. '~"oXA.....~v;o;,o;o;.~ | |||
:~"X'.xo;:<<........;~_"_~-o;,"XX..;- | |||
Time:_~__=l-L Date: | |||
~:IJ:fDfft=_ | |||
Time:tot5 | |||
__~ Date: ~Jilt Time: | |||
1,~;~.,5""...- | |||
Date: ~JcJtfl~t,~, | |||
Pa.ges Used: | |||
Atl~_~~_ | |||
CST Completed with NO EXCEPT10NS1EXCEPTIONS: | |||
Reviewed By: | |||
Unit SeQ ResponsibieEngin"eer (1ST) | |||
Reviewed By: | |||
ANn Date: ---- | |||
Date: ---- | |||
After receiving the final review signature, this OS:T becomes a a-A RECORD and should be submitted to DocumentServloes. | |||
IOST-1211 Revy16 | |||
General | R~.vtsion S~Jmmary General Revision 16 updates the procedure referenceto the new 1ST Program Plan, Des9ription o.fChanges | ||
*Page.Section | *Page. | ||
) | Section GhangeDescription Ail 3 | ||
6.Q.1.c 7.1.5 7+1.24 | 3 5 | ||
8 8 | |||
8 9 | |||
11 17 All 1~O+2 t~O.4 2~7.4 6+0~1.e~(1 ) | |||
6~O.1.b 6.Q.1.c 7.1.5 7+1.24 Updated revision level. | |||
Adde.d check valves 1AF-231 541 92, 11O~and 73. | |||
: Deleted, HNP-*lST-003, HNP 1ST Program Plan - 3rd tntervat, Changedacceptancecriterla per calc, (Also cbanqed on Atta'chme*nt2) | |||
Deleted "Parnat'strcke Added check valves 1AF-23, 54$ 92 1 110~ and 73. | |||
Added checkvalves 1AF~54,92~ and 73. | |||
Added check va'hte1AF-23$110 Added checkvalves 1AF*-23*~541 92, 110, and 73~ | |||
Rev. 16 Page 26 of 261 | |||
Appendix C Facility: | |||
HARRIS Job Performance Measure Worksheet Task No.: | |||
Form ES-C-1 Task | |||
==Title:== | |||
Given a Declared Emergency, JPM No.: | |||
2008 NRC RO-SRO A3 Determine the Dose Rate, Dose Limit, and the Number of People to Perform a Task. | |||
KJA | |||
==Reference:== | ==Reference:== | ||
2.3.4 (2.5/3.1) | |||
2.3.4 (2.5/3.1)Examinee: NRC Examiner: Facility Evaluator: | Examinee: | ||
Date: | NRC Examiner: | ||
Facility Evaluator: | |||
Date: | |||
Method of testing: | |||
Simulated Performance: | Simulated Performance: | ||
Actual Performance: | Actual Performance: | ||
X Classroom X Simulator Plant Perform in a location with the general references available or with electronic access to the references. | X Classroom X | ||
Simulator Plant Perform in a location with the general references available or with electronic access to the references. | |||
Initial Conditions: | READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied. | ||
Task Standard: | Initial Conditions: | ||
Calculator HARRIS08 NRC RO- | A large break LOCA has occurred. | ||
The ECCS is in cold leg recirculation. | |||
RHR Pump "8" is running. RHR Pump "A" showed evidence of gas binding and was stopped. | |||
A Site Area Emergency (SAE) is in effect. | |||
The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available. | |||
The general radiation level in the area is 16 R/hour The OSC estimates that the total task will take.75 man-hours. | |||
The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task. | |||
Task Standard: | |||
Number of people and stay times calculated within specified limits. | |||
Required Materials: | |||
Calculator HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 General | |||
==References:== | ==References:== | ||
PEP-330, RADIOLOGICAL CONSEQUENCES NGGM-PM-0002, RADIATION CONTROL AND PROTECTION MANUAL Initiating Cue: | |||
The site emergency workers listed in the table below are available. | |||
They will be utilized from lowest to highest accumulated TEDE dose. | |||
16 R/ | Using the minimum number of workers possible, DETERMINE: | ||
HARRIS08 NRC RO-SRO A3 Revision 2 | the total number of workers required to perform the task and the maximum stay time for each individual who will be utilized. | ||
= | Assume no dose in transit and round off to the nearest minute below the limit. | ||
= | Time Critical Task: | ||
= | NO Validation Time: | ||
Evaluation on | HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9 | ||
Appendix C Job Performance Measure Worksheet SIMULATOR SETUP N/A Form ES-C-1 HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 4 of 7 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with a check mark) | |||
START TIME: | |||
Performance Step: 1 Standard: | |||
Comment: | |||
Performance Step: 2 Standard: | |||
Comment: | |||
~ | |||
Performance Step: 3 Standard: | |||
Comment: | |||
Determine total estimated dose for the task. | |||
16 R/hour x.75 hours =12 Rem Determine the dose limit for site emergency workers Per PEP-330 - Attachment 1: 5 Rem Determine the number of people required Workers A, B, and C would have to be used (~) to reach the 12 Rem total estimated dose (4700 + 4450 + 4300 = 13.45) | |||
HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C | |||
~ | |||
Performance Step: 4 Standard: | |||
Comment: | |||
Page 5 of 7 PERFORMANCE INFORMATION Stay Time for Workers A: 4.7/16 x 60 minutes = 17 minutes B: 4.55/16 x 60 minutes = 17 minutes C: 4.30/16 x 60 minutes =16 minutes Form ES-C-1 Terminating Cue: | |||
STOP TIME: | |||
After the maximum stay time for the workers to be used is calculated: Evaluation on this JPM is complete. | |||
HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.: | |||
2008 NRC RO-SRO A3 Examinee's Name: | |||
Date Performed: | |||
Facility Evaluator: | |||
Number of Attempts: | |||
Time to Complete: | |||
Question Documentation: | Question Documentation: | ||
Question: Response | Question: | ||
SAT UNSAT Date: | |||
INITIATING CUE: | ===Response=== | ||
Result: | |||
Examiner's Signature: | |||
SAT UNSAT Date: | |||
HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Page 7 of 7 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS: | |||
INITIATING CUE: | |||
A large break LOCA has occurred. | |||
The ECCS is in cold leg recirculation. | |||
RHR Pump "B" is running. RHR Pump "A" showed evidence of gas binding and was stopped. | |||
A Site Area Emergency (SAE) is in effect. | |||
The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available. | |||
The general radiation level in the area is 16 R/hour The OSC estimates that the total task will take.75 man-hours. | |||
The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task. | |||
The site emergency workers listed in the table below are available. They will be utilized from lowest to highest accumulated TEDE dose. | |||
Using the minimum number of workers possible, DETERMINE: | |||
the total number of workers required to perform the task and the maximum stay time for each individual who will be utilized. | |||
Assume no dose in transit and round off to the nearest minute below the limit. | |||
Site Emergency Worker Accumulated TEDE Dose This Year A | |||
300 mr B | |||
450 mr C | |||
700 mr D | |||
800 mr E | |||
850 mr F | |||
1000 mr G | |||
1050 mr H | |||
1150 mr I | |||
1200 mr J | |||
1300 mr K | |||
1500 mr L | |||
1650 mr HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9 | |||
Appendix C Facility: | |||
Task | |||
==Title:== | |||
KIA | |||
==Reference:== | ==Reference:== | ||
Examinee: | |||
Job Performance Measure Worksheet HARRIS Task No.: | |||
Evaluate a Change in Conditions on JPM No.: | |||
an Existing EAL 2.4.41 (4.1) | |||
NRC Examiner: | |||
Form ES-C-1 345001H602 2008 NRC JPM SRO A4 Facility Evaluator: | |||
Date: | |||
Method of testing: This JPM can be performed in any setting with the required references available. | |||
Simulated Performance: | |||
Classroom READ TO THE EXAMINEE X | |||
Simulator Actual Performance: | |||
Plant x | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied. | |||
Initial Conditions: | |||
See Plant Conditions handout. | |||
Task Standard: | |||
Upgrade EAL to GE and correct PAR within required time. | |||
Required Materials: | |||
None General | |||
==References:== | |||
PEP-110, EMERGENCY CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS, Rev. 16 PEP-230, CONTROL ROOM OPERATIONS, Rev.14 PEP-310, NOTIFICATIONS AND COMMUNICATIONS, Rev. 21 Handouts: | |||
Initiating Cue: | |||
Time Critical Task: | |||
Attached Initial Conditions EAL Flowcharts PEP-110 PEP-310 EP/EAL Guidelines PEP-230, Attachment 1 - SITE EMERGENCY COORDINATOR You are the Site Emergency Coordinator. Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet. | |||
YES - 15 minutes to classify then 15 more minutes to make the PAR. | |||
HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Validation Time: | |||
10 minutes to classify, 12 minutes for PAR/Emergency Notification Form. | |||
HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision | |||
Appendix C (Denote Critical Steps with a ~) | |||
Start Time: | |||
Page 3 of 7 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 1 Standard: | |||
Evaluator Cue: | |||
. Comment: | |||
-Y Performance Step: 2 Standard: | |||
Evaluator Note: | |||
Comment: | |||
Evaluate changing conditions. | |||
Compares conditions against EAL Flowchart criteria. | |||
Provide Initial Conditions sheet (last page of JPM). | |||
Provide reference materials if not available in the JPM performance location. | |||
Classification Start Time Determine EAL. | |||
Upgrade to GE (2-1-4) required: | |||
RCS Breached Fuel Breached - DEI sample> 300 uCi/cc CNMT Jeopardized - Pressure> 3 PSIG | |||
* It may be necessary to cue the PAR performance. The facility normally splits the EAL and the PAR into two JPM's. | |||
* If the applicant incorrectly classifies then skip to the Evaluator Cue in Performance Step 3. | |||
Classification End Time/PAR Start Time HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision | |||
Appendix C | |||
~ | |||
Performance Step: 3 Page 4 of 7 PERFORMANCE INFORMATION Determine PAR (PEP-230, Attachment 1, Step 10). | |||
Form ES-C-1 Standard: | |||
Evaluator Cue: | |||
Comment: | |||
~ | |||
Hand write a paper copy of the Manual Notification Form in accordance with PEP-230, Attachment 1, Step 11.b. | Performance Step: 4 Standard: | ||
Evaluation on | Evaluator Note: | ||
Comment: | |||
Terminating Cue: | |||
Refers to PEP-110, Attachment 3: | |||
PROTECTIVE ACTION RECOMMENDATION: | |||
EVACUATE: 2 mile radius EVACUATE: Subzones A, B, L SHELTER: Subzones C, D, E, F, G, H, I, J, K, M, N The computer program is not available. Hand write a paper copy of the Manual Notification Form in accordance with PEP-230, Attachment 1, Step 11.b. | |||
Complete the ENF. | |||
Critical Elements: | |||
Block 4: GE Block 4 EAL: 2-1-4 Block 5 PAR: Evacuate 2 mile radius and Subzones A, B, L; Shelter Subzones C, D, E, F, G, H, I, J, K,M,N Block 6 Emergency Release: Is Occurring Block 9 Wind Direction from: 126 0 | |||
Block 10: DECLARATION; Current TIME; Current DATE Block 17: Applicant signature/Title/Current Time/ Current Date Provide form to Communicator An ENF KEY is attached, PAR Notification End Time After the ENF is handed to the communicator: Evaluation on this JPM is complete. | |||
HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision | |||
Appendix C Page 5 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.: | |||
2008 NRC JPM SRO A4 Examinee's Name: | |||
Date Performed: | |||
Facility Evaluator: | |||
Number of Attempts: | |||
Time to Complete: | |||
Question Documentation: | Question Documentation: | ||
Question: Response | Question: | ||
SAT UNSAT Date: | |||
===Response=== | |||
Result: | |||
Examiner's Signature: | |||
SAT UNSAT Date: | |||
: | HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision | ||
-"-010'AB,C,O;H,U<.L | |||
E | Appendix C INITIAL CONDITIONS: | ||
Page 6 of 7 JPM CUE SHEET See Plant Conditions handout. | |||
Form ES-C-1 INITIATING CUE: | |||
F,G | You are the Site Emergency Coordinator. | ||
Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet. | |||
HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision | |||
Appendix C Page 7 of 7 JPM CUE SHEET 2008 NRC JPM SRO A4 Plant Conditions Form ES-C-1 Increasing RCS leakage required a MANUAL Reactor Trip and Safety Injection The TDAFW Pump is cleared and tagged The RCS leak escalated to a large-break LOCA while the crew was performing PATH-1 Containment Spray actuated There is a RED CSF on INTEGRITY The EAL Network was entered at Point X A Site Area Emergency (SAE) is in effect with the RCS breached (EAL 2-1-3) and Containment jeopardized Outside temperature is 62 of Thunderstorms are moving into the area The wind is blowing at 12 MPH from 126 degrees Since the SAE declaration, the following has occurred: | |||
Plant computers are down which will require any additional notifications to be done using a manual notification form Off-site power was lost and EDG 1B failed while starting ECCS cold leg recirculation alignment on Train "A" was just completed Containment Pressure is 3.8 PSIG, lowering slowly Containment Area Radiation Monitors are in HIGH alarm, rising slowly Contalnrnent High Range Monitors are rising but not in alarm Plant Vent Stack #1 Monitor is rising slowly but not in alarm Charging Pump "A" Room Monitor went into HIGH alarm after cold leg recirculation was initiated Chemistry has analyzed a sample and reports an Iodine Dose Equivalent RCS concentration of 410 uCilcc HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision | |||
1- | tE~ | ||
~ - PROTECTIVE ACTION RECOMMENDATION PROCESS Sheet 1 of 2 No No Fuel Breach) | |||
No (Yes/ | |||
due to Res Breach) 2 MliileRadius :5Miles Downwind IPEP-110 Wiind IEvacuaie Shelter Direction Subzones | |||
:Subzooes | |||
~From -" | |||
34a~ -010' AB,C,O;H,U<.L E.F~G,J,M.N 011°-~ | |||
A1B,C,D,HJ.t'~L E"F"G,J,M.N cse--DIg-:: | |||
AB,C,o,tJ,Y~L.M E,F,G.H.N 080~ -, 101~ | |||
~B,C,D,J,I<."L,M E.F~G,.HJ,N 102(1 -, 124a AFB,C,D,r~l,U E"F"G,HJ.J,N 125~ -14& | |||
AB,C,D,KL,M.Nl E"F~G,HJ.J 147c.-, 191'~ | |||
AfB,C,D,E~K,LM.t4 F,G"H"I.,-J 192(1 -, 214<: | |||
A*B,C,D,E",K,l F,G"H"I,J"M,H 215t, -zse-A.B,C,D,E"K,l f,G"HJ"J~M,N 237 t \\ -, 2§9a A,,B,C,D,E.F,,K,l GI'H.tJ..M.N | |||
:260(1 - 32& | |||
A"B,C,D,F,G.HJ<,l E."I"J"M.N 327t,-347(1 A.B,C,D,H,K,L E"F"G.I,J,M.N Rev. 16 Wind Evacuat,e; She-Iter rnrecti00 Subzones Subzone'S | |||
{From 'tfj 3270 -010=' | |||
A,D,I< | |||
B"C"E,F,G"H,,1,,J,,L,M,N 0110 -05&' | |||
A,K B.C"D"E,f,G"H.I"J"L,~,4.N n57° -1?4~ | |||
A tUL 8 C"D~E F G_HL.LMN 1251;1-1'91= | |||
A,H"L C.D,E"F.G,H,I,J,KM.N I | |||
1920-214.: | |||
A,B C,D,E.F"G,H,tJ,K.LM.N 215Cl-259=' | |||
A,B.e D,E"F.G,HJ.J,K.L,MJ~ | |||
2600-2B1~ | |||
A,e B"D~E,F,G"H"LJ.,K,l,M,N 282c -3(14':' | |||
A,C,D B"E,f,G,.H"I"JJ<.LM,N 305(1-328~ | |||
A,D B"C,,E,F,G.,H,,I,,J,,K,LM.N Page 18 of 261 | |||
~ | |||
= - PROTECTIVE ACTION RECOMMENDATION PROCESS Sheet 2 of 2 Acceptable changes in initial PARS would include expanding evacuation but would not allow a change from evacuation of zones to sheltering of those zones. | |||
1. | |||
Indications that substantial core damage is imminent or has occurred include: | |||
a) | |||
Core damage> 1°A, melt. | |||
b) | |||
Core Exit Thermocouple readings ~ 2300° F. | |||
c) | |||
Core uncovered> 30 minutes. | |||
2. | |||
Indications that a significant loss of reactor coolant is imminent or has occurred include: | |||
a) | |||
Containment radiation reading> 10,000 RlHr without spray or> 4,000 R/Hr with spray. | |||
b) | |||
Containment hydrogen gas concentration> 1o.k>. | |||
c) | |||
Rapid vessel depressurization. | |||
d) | |||
A large break loss of coolant accident. | |||
3. | |||
Indications that containment failure (primary or S/G) is imminent or has occurred are indicated by: | |||
a) | |||
A release of radioactivity greater than the projected dose of either: | |||
1000 mRem TEDE at or beyond the site boundary. | |||
5000 mRem Thyroid CDE at or beyond the site boundary. | |||
Or a measured dose rate of either: | |||
>1000 mRem/hr at or beyond the site boundary. | |||
1-131 equivalent concentration> 3.9 E-6 IJCi/cc at or beyond the site boundary. | |||
b) | |||
Primary containment pressure can not be maintained below design basis pressure of 45 psig. | |||
c) | |||
Primary containment H2 gas concentration can not be maintained below combustible limit of 4% | |||
by volume. | |||
d) | |||
Faulted/Ruptured S/G with a relief valve open. | |||
4. | |||
Accidents which result in a direct release pathway to the environment will most likely be thyroid dose limiting. For a faulted and ruptured S/G, water level must be below the tube bundles (S/G Narrow Range < 25% normal containment conditions or < 40% adverse containment conditions) with a relief valve open before it is considered a direct release pathway to the environment. For circumstances involving a direct release pathway to the environment: | |||
a) | |||
Consider any Fuel Breach sufficient to warrant the determination that substantial core damage has occurred. | |||
b) | |||
Consider any RCS Breach sufficient to warrant the determination that a significant loss of reactor coolant has occurred. | |||
NOTE: A direct release is defined as a pathway from the containment to any environ-mentoutside the containment when containment or system isolation is required due to a safety injection signal, containment pressure greater than 3 psig, or a valid containment ventilation isolation signal and the pathway cannot be isolated from the Main Control Room. | |||
Containment monitors can provide indication of both core damage and RCS breach. Monitor readings used to quantify an amount of damage or coolant leakage should be complimented by other indications and engineering judgment. | |||
If a release is in progress: | |||
Perform dose assessment as soon as possible to determine if PAGs are exceeded and if additional Subzones require evacuation. | |||
Add any Subzones requiring evacuation as determined by dose assessment to the plant-based PARs. | |||
If no release is in progress: | |||
Perform dose projection on possible conditions as time permits to determine if PAGs could be exceeded. Consider adding any Subzones requiring "evacuation as determined by dose projection to the plant-based PARs. | |||
IPEP-110 Rev. 16 Page 19 of 261 | |||
- NUCLEAR POWER PLANT EMERGENCY NOTIFICATION FORMrz!::Of 1 | |||
: 1. I DRILL I§J ACTUAL EVENT MESSAGE # | |||
~ | |||
N Today 2.1 INITIAL | |||
@JFOLLOW-UPNOTIFICATION:TIME ow DATE__/__/__ | |||
AUTHENTICATION # | |||
: 3. SITE: | |||
HNP Confirmation Phone # (__) | |||
: 4. EMERGENCY | |||
~ UNUSUAL EVENT I§I ALERT 19 SITE AREA EMERGENCY GENERAL EMERGENCY CLASSIFICATION: | |||
BASED ON EAL # | |||
2 4 EAL DESCRIPTION: | |||
3 FPBs Breached/Jeopardized 19 Has Occurred I | |||
Is Occurring | |||
~None | |||
: 5. PROTECTIVE ACTION RECOMMENDATIONS: | |||
~ NONE IEVACUATE 2 mile radius and Subzones A,B,L ISHELTER Subzones C,D,E,F,G,H,I,J,K,M,N IQI CONSIDER THE USE OF KI (POTASSIUM IODIDE) IN ACCORDANCE WITH STATE PLANS AND POLICY. | |||
I§ OTHER | |||
: 6. EMERGENCY RELEASE: | |||
I Under evaluation Shutdown at Time Date _/__/_ | |||
Shutdown at Time Date _/__/_ | |||
Shutdown at Time Date _/__/_ | |||
ri\\INot applicable B Within normal operating I!j limits | |||
~ Improving I | |||
Stable Wind Direction* from 126 degrees Above normal operating limits 19 Degrading Wind Speed* | |||
12 mph | |||
(*Not Requiredfor Initial Notifications) | |||
Precipitation* | |||
Stability Class* ~ | |||
I§J 19 (QJ I§ lEI I§I | |||
: 10. I DECLARATION I§J TERMINATION Time Date | |||
/ | |||
/ | |||
(Enters Current Date and Time) | |||
: 11. AFFECTED UNIT(S): | |||
[J | |||
[I I6ill | |||
: 12. UNIT STATUS: | |||
I U1 _0_0/0 Power (Unaffected Unit(s) Status Not Required for Initial Notifications) | |||
~ U2 __% Power | |||
§ U3 __0/0 Power | |||
: 7. RELEASE SIGNIFICANCE: | |||
: 8. EVENT PROGNOSIS: | |||
: 9. METEOROLOGICAL DATA: | |||
: 13. REMARKS: | |||
FOLLOW-UP INFORMATION (Lines 14 through 16 Not Required for Initial Notifications) | |||
EMERGENCY RELEASE DATA. NOT REQUIRED IF LINE 6 A IS SELECTED. | |||
: 14. RELEASE CHARACTERIZATION: | |||
TYPE: ~ Elevated I§I Mixed 19 Ground UNITS: ~ Ci I§J Ci/sec 19 ~Ci/sec Estimated Release Duration Hours | |||
____ Date _/__/__Stop Time | |||
____ Date _/__/__Stop Time MAGNITUDE: | |||
Noble Gases: | |||
lodines: | |||
Particulates: | |||
Other: | |||
FORM: ~ Airborne Start Time Date _/__/__ | |||
I§J Liquid Start Time Date _/__/__ | |||
: 15. PROJECTION PARAMETERS: | |||
Projection period: | |||
Hours Adult Thyroid CDE (mrem) | |||
DISTANCE Projection performed: | |||
Time Date _/__/__ | |||
TEDE (mrem) | |||
: 16. PROJECTED DOSE: | |||
Site boundary 2 Miles 5 Miles 10 Miles Page 33 of 51 I Time Time Date_/__/__ | |||
Date | |||
/ | |||
/ | |||
I Rev. 21 (Sign and Date) | |||
Title-------- | |||
RECEIVED BY: | |||
IPEP-310 | |||
: 17. APPROVED BY: | |||
NOTIFIED BY:}} |
Latest revision as of 15:41, 14 January 2025
ML082200212 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 08/07/2008 |
From: | - No Known Affiliation |
To: | NRC/RGN-II |
References | |
50-400/08-301 | |
Download: ML082200212 (86) | |
Text
Final Submittal (Blue Paper)
Final Submittal (Blue Paper)
Ifl£e:LsaoB{50 /
Ope(ClT'f'l~ "Te5{ ~J.1I~
"Sllo ~3)3JUU?
FINAL JPMS ADMINISTRATIVE JPMs
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
HARRIS Task No.:
301144H601 Task
Title:
Determine the Cold, Xenon-free Boron Concentration Requirement for a Natural Circulation Cooldown JPM No.:
2008.NRC JPM RO/SRO A1-1 KIA
Reference:
2.1.25 (2.8/3.1)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Classroom READ TO THE EXAMINEE X
Simulator Actual Performance:
Plant X
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
INITIAL The unit tripped due to a loss of off-site power. All control rods CONDITIONS:
have inserted.
The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN.
The unit will be taken to Cold Shutdown.
PowerTrax is not available.
Current RCS Boron concentration is 1125 ppm.
Core Burnup is 130 EFPD.
RCS B-10 Atom Percent is 19.36 Temperature is 140°F.
Task Standard:
Calculations within specified range.
Required Materials:
Calculator General
References:
EPP-005, NATURAL CIRCULATION COOLDOWN OST-1036, SDM CALCULATION MODES 1-5 Curve Book Handouts:
EPP-005, Step 7 OST-1036 Curve Book (Ensure Curve A-X-22 is available and unmarked) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Initiating Cue:
Time Critical Task:
Validation Time:
USCG has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036.
Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration.
CRODS CCURVE
- CREQ,
- CRCS, CSDM MET
/
NOT MET (Circle one)
NO 15 minutes 2008 HARRIS NRC RO-SRO At-1 Rev 2 NUREG 1021, Revision 9
Appendix C (Denote Critical Steps with a ~)
Start Time:
Page 3 of 8 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 1 Standard:
Evaluator Cue:
Comment:
Performance Step: 2 Standard:
Evaluator Cue:
Comment:
Performance Step: 3 Standard:;.
Comment:
Reviews EPP-005, Step 7.
Determines OST-1036 applies.
Provide EPP-005, Step 7.
Locates/reviews OST-1036.
Determines OST-1036, Section 7.2 applies.
Provide OST-1036.
Record the following:
Core burn up from MCR Status board.
Temperature for which this SDM calculation is taking credit.
Latest available RCS boron sample.
From Initial Conditions, records:
130 EFPD 200°F, or less 1125 ppm 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9
Appendix C Page 4 of 8 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 4 Standard:
Evaluator Cue:
Comment:
Performance Step: 5 Standard:
Comment:
Performance Step: 6 Standard:
Comment:
Record the following:
RCS B-10 ATOM percent from MCR Status Board OR RWST B-10 Atom percent, IF following Core Reload.
Records 19.36 RCS 8-10 ATOM percent from cue sheet Check rod status as follows:
If all rods are inserted, record CRODS = 0 in Step 7.2.2.a and N/A Step 7.2.2.b.
Records 0 in 7.2.2.a and N/A's 7.2.2.b.
Determine Xenon free SDM boron concentration, CSDM, as follows:
- a. Record the following information:
Boron addition to compensate for stuck rods from or Step 7.2.2.a.
Enters O.
2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9
Appendix C Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 7 Standard:
Evaluator Cue:
Comment:
Performance Step: 8 Standard:
Comment:
~
Performance Step: 9 Standard:
Comment:
Determine Xenon free SOM boron concentration, CSOM, as follows:
- a. Record the following information:
Uncorrected required SOM boron concentration from curve A-X-22 (Use action level line on curve.)
Reads 2020 to 2040 ppm Determine required Xenon free SOM uncorrected boron concentration CREQ:
CREQ ~ CROOS + CCURVE CREQ=
CREQ = 2020 to 2040 ppm Determine Xenon free SOM corrected boron concentration, CSOM:
19.9/Arcs x CREQ Divides 19.9 by 19.36 and multiplies by CREQ:
19.9/19.36 (2020 to 2040 ppm) =
Records 2076 to 2097 ppm 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9
Appendix C Page 6 of 8 PERFORMANCE INFORMATION Form ES-C-1
~
Performance Step: 10 Standard:
Comment:
Terminating Cue:
Determine whether SDM requirements can be met by Xenon free SOM calculation:
Compare RCS boron concentration, CRCS, and Xenon free SOM corrected boron concentration, CSDM:
CRCS RCS boron sample from Step 7.2.1.
CSOM Xenon free SDM corrected boron concentration from Step 7.2.3.c.
If CRCS is less than or equal to CSDM, then continue with Step 7.2.5 to take credit for Xenon effects.
Determines current RCS boron concentration is <CSDM boron concentration.
When the candidate proceeds to Step 7.2.5: This JPM is complete.
Stop Time:
2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9
Appendix C Page 7 of 8 VERIFICATION QF COMPLETION Form ES-C-1 Job Performance Measure No.:
2008 NRC JPM RO/SRO A1-1 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:.
Question Documentation:
Question:
Response
Result:
Examiner's Signature:
SAT UNSAT Date:
2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9
Appendix C Page 8 of 8 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:
INITIATING CUE:
The unit tripped due to a loss of off-site power. All control rods have inserted.
The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN.
The unit will be taken to Cold Shutdown.
PowerTrax is not available.
Current RCS Boron concentration is 1125 ppm.
Core Burnup is 130 EFPD.
RCS B-10 Atom Percent is 19.36 Temperature is 140°F.
USCO has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036.
Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration.
CRODS CCURVE CREQ CRCS CSDM MET
/
NOT MET (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9
Appendix C Page 8 of 8 JPM CUE SHEET INITIAL CONDITIONS:
INITIATING CUE:
The unit tripped due to a toss of off-site power. All control rods have inserted.
The operating crew is performing EPP-005 7 NATURAL CIRCULATION COOLDOWN.
The unit will be taken to Cold Shutdown.
PowerTrax is not available.
Current ReS Boron concentration is 1125 ppm.
Core Burnup is 130 EFPD.
ReS B-10 Atom Percent is 19.36 Temperature is 140°F.
usee has directed you to perform step 7.aof EPP-005~
determine the corrected Xe-free cold shutdown boron concentration using OST-1036.
Record values on this cue sheet once it is determined if 8DM requirements are met by the current boron concentration.
CRODS C"'}
- ~:.
..,./
("'
) ()...,
/r"j.
r; I
...~
CCURVE (1.(),~.}O l/7(j(;2o I~O Bo<.fq)
CREQ
~c\\:3t)
( 9t)(~o,,\\nc} (9c.)((())
eRCS
\\ l L.~)
CSDM f) b '7(~ t (c, (90'7& +~ deft7)
MET I~~~V (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
HARRIS Task No.:
005016H101 Task
Title:
KIA
Reference:
Examinee:
Estimate Primary to Secondary Leak Rate 2.1.31 (4.2)
JPM No.:
2008 NRC RO ADM JPM A1-2 NRC Examiner:
Facility Evaluator:
Date:
Method of testing: This JPM should be performed on a frozen simulator.
Simulated Performance:
Classroom READ TO THE EXAMINEE Simulator Actual Performance:
X Plant X
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
The plant is at 100%
power.
A steam generator tube leak is in progress.
AOP-016 has been entered and actions are in progress.
OSI-PI is not available.
Chemistry sampling has not commenced.
Motivating air is isolated.
Task Standard:
Determines leak rate to be --25 gpd using Method 1 of AOP-016, Att. 1.
Required Materials:
None General
References:
AOP-016, Excessive Primary Plant Leakage, Rev 37 Curve Book Handouts:
Initiating Cue:
Time Critical Task:
Validation Time:
AOP-016, Attachment 1 The USCG has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage.
No 10 minutes HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet SIMULATOR SETUP Form ES-C-1 IC-19 imf RMS079 (REM-1TV-3534 CVPETS) to 6.00 E-7 uCi/ml.
NOTE: Must go to RUN for the malfunction to show.
Leave simulator in FREEZE once malfunction has appeared.
HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9
Appendix C (Denote Critical Steps with a ~)
Start Time:
Page 3'of 6 PERFORMANCE INFORMATION Form ES-C-1 '
Performance Step: 1 Standard:
Evaluator Cue:
Comment:
~
Performance Step: 2 Standard:
Comment:
~
Performance Step: 3 Standard:
Comment:
Obtain procedure.
Locates and reviews procedures.
Provide Curve Book and AOP-016, Att. 1, step 3 after the procedure is located.
ESTIMATE Primary-To-Secondary leak rate using ONE of the methods listed (no preferred method):
Method 1: Use Condenser Vacuum Pump Rad Monitor REM-3534 (Grid 2), Curve H-X-15A, Curve H-X-15B, or H-X-15C (Depending on status of motivating air)
Determines that Method 1 is required.
Operates RM-11 to obtain reading for REM-1TV-3534 (Grid 2).
Reads REM-1TV-3534 as 6.00 E-7 ~Ci/ml.
HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9
Appendix C
~
Performance Step: 4 Page 4 of 6 PERFORMANCE INFORMATION Determines which curve from Curve Book to use.
Form ES-C-1 Standard:
Comment:
~
Performance Step: 5 Standard:
Comment:
Terminating Cue:
Stop Time:
Uses Curve H-X-15C since motivating air is isolated.
Calculates Primary to Secondary leak rate.
Determines Primary to Secondary leak rate is between 22 gpd to 27 gpd).
+/- 2.5 gpd is margin of error based on reading data from graph When the primary to secondary leak rate has been determined and reported to the USCO: Evaluation on this JPM is complete.
HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9
Appendix C Page 5 of 6 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2008 NRC RO ADM JPM A1-2 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
Examiner's Signature:
SAT UNSAT Date:
HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9
Appendix C Page 6 of 6 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:
INITIATING CUE:
The plant is at 100
% power.
A steam generator tube leak is in progress.
AOP-016 has been entered and actions are in progress.
OSI-PI is not available.
Chemistry sampling has not commenced.
Motivating air is isolated.
The USCO has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage.
HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
HARRIS Task No.:
341010H302 Task
Title:
Perform Review of Daily Surveillance Requirements Log JPM No.:
2008 NRC SRO A1-2 KJA
Reference:
2.1.18 (3.0)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Classroom READ TO THE EXAMINEE X
Simulator Actual Performance:
Plant x
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
The plant is in Mode 2, waiting for management approval to proceed to Mode 1.
EDG "8" is synchronized to the grid for a post-maintenance test.
The Daily Surveillance Logs (OST-1021, Attachment 4) for 2100 have been completed.
ERFIS Pressurizer Pressures are unavailable.
Task Standard:
All errors and TS actions identified Required Materials:
Perform in a location with TS or electronic access to TS available.
General
References:
OST-1021, DAILY SURVEILLANCE REQUIREMENTS, DAILY INTERVAL, MODE 1 AND 2 Technical Specifications HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Handouts:
Initiating Cue:
Time Critical Task:
Validation Time:
Copy of a completed OST-1021, Attachment 4.
Delete all notes.
Substitute the following incorrect data:
Modify log readings on p.19 of OST-1021 so that the 1500 reading of 457 and 456 are low and together average < 2205.
Include 455 approximately 60 psig high so that the channel check is unsat.
Condensate Storage Tank Level (both channels) progressively lowering from 85% to 60% throughout the day (TS).
RCS Loop Flow Channel FI-424 progressively lowering from 100.21 to 98.13 throughout the day (TS).
EDG Room Temperature channel TDG6903B @ 121°F (should be circled)
You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021, logs. At the conclusion of your review, discuss any findings with me.
No 20 minutes HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9
Appendix C (Denote Critical Steps with a ~)
Start Time:
Page 3 of 7 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 1 Standard:
Evaluator Cue:
Evaluator Note:
Comment:
-v Performance Step: 2 Standard:
Comment:
Obtain completed log.
Reviews handout.
Provide handout for NRC SRO A1-2 after the Initial Conditions are reviewed and the Initiating Cue is provided.
- If necessary, after the applicant discusses each finding:
What action, if any, is required relative to this reading?
Only the incorrect items in the logs are identified in the JPM Steps.
Review OST-1021, Attachment 4 for approval.
Identifies that Pressurizer Pressure Channel 455. fails it's channel check.
HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9
Appendix C
'./
Performance Step: 3 Page 4 of 7 PERFORMANCE INFORMATION Review OST-1021, Attachment 4 for approval.
Form ES-C-1 Standard:
Evaluator Cue:
Comment:
'./
Performance Step: 4 Standard:
Comment:
'./
Performance Step: 5 Standard:
Comment:
Identifies that the Pressurizer Pressures should have the calculations completed.
Pressurizer pressure should be identified low out of spec based on performing calculation with only Channels 456 and 457.
SRO may send paperwork back to RO to do the calculations.
If so cue the SRO to perform the calculations.
Review OST-1021, Attachment 4 for approval.
Identifies one RCS Loop "B" Flow Channel (Sheet 5) is below Acceptance Criteria.
Reading should be circled. TS does not apply in Mode 2.
Review OST-1021, Attachment 4 for approval.
Condensate Storage Tank Level (Sheet 7) is below Acceptance Criteria.
Reading should be circled and entry into TS 3.7.1.3 Action a -
restore to operable or be in HSB within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, is required.
HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9
Appendix C
-Y Performance Step: 6 Page 5 of 7 PERFORMANCE INFORMATION Review OST-1021, Attachment 4 for approval.
Form ES-C-1 Standard:
Evaluator Cue:
Evaluator Note:
Comment:
Terminating Cue:
Stop Time:
Identifies Diesel Generator Room 261 temperature TDG6903B (Sheet 10) exceeds Acceptance Criteria.
Reading should be circled and investigative/corrective actions implemented.
If requested: EDG "B" has been running for 30 minutes.
Reading does not meet criteria for declaring equipment in the room inoperable.
After all findings have been reviewed: Evaluation on this JPM is complete.
HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9
Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2008 NRC SRO A1-2 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
Examiner's Signature:
SAT UNSAT Date:
HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9
Appendix C Page 7 of 7 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:
INITIATING CUE:
The plant is in Mode 2, waiting for management approval to proceed to Mode 1.
EDG "8" is synchronized to the grid tor.a post-maintenance test.
The Daily Surveillance Logs (OST-1021, Attachment 4) for 2100 have been completed.
ERFIS Pressurizer Pressures are unavailable.
You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021, Attachment 4 logs. At the conclusion of your review, discuss any findings with me.
HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9
4.5.1,1.a.11 a.z TECH SPEC... DailySurveillance Requirements Log Sheet 1 of 15 etA A PRESSURE CLA B PRESSURE CLA C PRESSURE Between 585 and 665 psig OPEN Eees ACCUMULATORS PI..927 Pl-929 PI... 931 PI-925 PI-923 PI-921 PARAMETER INSTRUMENT ACCEPTANCE CRITER!A MODE 1~ 2 AND 3 WITH ReS PRESSURE ABOVE1000 PSIG 0300 0900 1500 210q TECHSPEC a.s.1.1,8.1 14.5.1.1, b (partial)
PARAMETER ECCSA.CCUMULATORS CLA A LEVEL CLAB LEVEL CLA C LEVEL INSTRUMENT SampUng Not Sampling Not SampUng Not LI..920 Lt..922 Required per LI ~ 924 Ll-926*
Requiredper Ll..928 U
~. 930 Required per AU6 Att 6 Aft 6 ACCEPTANCE CRiTERIA MODE between 66 and96 ok Indicatedlevel viith less tha.~ 9(}k cumulativelevel increase(excludfng makeupfrom operable RWST) ~inye last satisfact()
sample 11 2 AND 3 WITH ReS PRESSUREABOVE 1000PSIG PreviousDays Level 0300 0900 1500 2100 TECHSPEC 4A.6,2,1.b 4.3.2.1.10 1 2c, Sa3 1 3b3~ 3c3~ 4c 1 5c, Bd,6g; 4,3.3.6.1a; 4J3.1.4 PARAMETER CNMTSUMP FLOW MONITORiNG SUMP LEAKRATE CNMTSUMPLEVEL CONTAINMENT PRESSURE PROGRAM ACCEPTANCE NO CHECKS CRITERIA ALARM PER OP..163 iNSTRUMENT ALB 1 ERF1S URE URE 9001 9002 N/A LeT LeT 7161A 7161B NfA PI 950 LESSTHAN 1.6 PSfG PI 953 N/A CHAN.
CHECK MODE 0300 0900 1500 2100
[6ST-1021 Rev. 66 Page17 of~OI
- Daily Surveillance Requirements Log Sheet 2 of 15 TECH SPEC 4.1.2.6.a.2; 4.5.4.a.1; 4.3.2.1.7b, se: 4.3.3.6.9 4.1.2.6.a.2~ a.3 PARAMETER RWST LEVEL BORICACID TANK INSTRUMENT L!..990 Ll...991 LI-992 LI..993 N/A LI-106 L1..161.158 TCS7240 ACCEPTANCE CHANNEL GREATERTHAN OR GREATER THAN GREATER THAN OR EQUAL TO 92°k>
OR EQUAL TO CRITERJA CHECK EQUAL TO 74%>
65 QF MODE 1.213) and.4 1.2,3 and 4 0300 C,iP C1C-,
(il.l 9,5 IC)-(~)
2? I gc:)
Ci~?
~
0900
/:.::'
'~
1500 2100
- h(')
V TECH SPEC 4.5,2.a 4.4.9.3 PARAMETER ECCSVALVEALIGNMENT PRZ SPRAY ~T INSTRUMENT 181..340 181-341 181-359 I 181-86 I 1$1-52 I 181-107 TJ-123 TI-454.1 ACCEPTANCE OPEN AND PULLEDTO SHUT AND PULLED TO LOCK WITH LESS THAN CRITERIA LOCK WiTH CONTROL CONTROL POWER OFF OR EQUAL POWER OFF TO 625°F MODE 1r 2, and 3 DURINGAUX SPRAY OPS 0300 Ai)
(\\41 rtJ r\\O
~~J dl~)
tJ /;~
(; ",
0900
:b
.~
th*
.:~
~~.
~
f.J If~
,~f~
1500 r-~\\)
r~;U
~
~1:)
~
~
If,JIA 2100 "k)
~O
'A-~O
{h0 itO ihQ "if (-)
)
l
~
lJ V
V V
TECH SPEC 4.4.3,1: 4.3.1.1.11: 4.3.3.6.5 PARAMETER PRESSURIZER LEVEL INSTRUMENT LI-460 LI-461.1 LI-459A.1 N/A ACCEPTANCE LESSTHAN OR CHANNEL CRITERIA EQUAL TO 90%
CHECK MODE 1} 2. and 3 1
0300
-(0 \\
(~/O
&; c
!r<J 0900 lor (t;;; C>
00
~l{~
1500 CbiJ (0(\\
(0 [)
(';A j
2100
(),rQ\\.
(0 (')
&(~)
{~~7 v
I08T-1021 Rev. 66 Page 18 of 40 I
-Daily Surveillance Requirements Log Sheet 3 of 15 TECH SPEC PARAMETER
~
4.2.5.1; 4.3,1.1.9, 10; 4.32.1,1d~ 3a3} 3c3, 5c t6d PRESSURIZER PRESSURE tNDEPENDENT CALCULATION VERIFICATION ACCEPTANCE COMPLETED COMPLETED CRITERIA MET ACCEPTANCE C-RtTERIA SEEBELOW N/A N/A NiA N/A CHANNEL CHECK MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE:
NOTE:
Calculations must be done with either the MCB IndicatorsOR ERFISlndlcsuons, NOT a combination.
If all operable channels ~re greater than or equal to the acceptance criteria, calculations are not required.
CALCULATIONS FOR PRESSURIZER PRESSURE PRESSURTzEFf>>~
PRESSURE
(# Operable Channels used Normally 3)
PRC0455 PI~455
+
+
=
~
PRC0457"~'
~~P-RC~O-4-5._.........,.....-~~
PI--457 P\\-456 0300:
0900:
+
PRC0457 PRC0456 PI~457 PI..456 1500:
.~,.,,~:Q:;too.+ Wy :;l~05 PRC0457 PRC0456 PI..457 PI-456
+
PRC0455 PI-455
+
=
PRC0455 Pl...455
(# Operable Channels used Normally 3)
Q-(# Operable Channels used Normally 3)
PRESSURIZER PRESSURE
= ~6~.5
- "***P"RESSURIZER PRESSURE PRC04~
PRC0456 PRC0455-PI-457 PI-456 Pl~455 2100:
+
+
(#Operable Channels used Normally 3)
- =
PRESSURIZER PRESSURE ACCEPTANCEGRITER1AFOR PRESSURIZER PRESSURE (must meet one of the following):
1.
Average of operable Mea indicator channels greater than or equal to 2205 psig.
2, Average of operable ERF1S points greaterthan or equal to 2202 psig.
3, If three MeB indicators are not available,then the lowest channel should be greater than or equal to 2220 psig+
4.
If three ERFIS points are not available, then the lowest channel should be greater than or equal to 2211 pSlg, IOST~1021 Rev. 66 Page 19 of 40 I
TECH $PEC PARAMETER.. Daily Surveillance Requirements Log Sheet 4 of 15 4,2.5.1 Res LOOPTAVG INSTRUMENT (MeB OR ERFlS)
ACCEPTANCE CRtTERIA TRC0412D TRC04220 TRC0432D CALCULATION TI~412D TI-422D TI..432D COMPLETED SEE BELOW NIA INDEPENDENT VERIFICATION COMPLETED NfA ACCEPTANCE CRITERIA MET N/A MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE:
Calculatlons must be done with either the Mea Indicators OR ERFIS lndicatlons, NOT a combination.
IfaU operable channels are less than or equal to the acceptance critena, calculations are not required..
CALCULATIONSF.OR ReS LOOP TAVG 0300:
TRC0412D TI~412D
+
+
=
-~..--
H~'TRC0432D TI~432D
(# Operable Channels used Normally3)
=
Res LOOP TAVG 0900:
+
+
=:
TRC0412.D TRC0422D TRC0432D TI...412D Tt-422D TI...432D
+
(# Operable
~--
Channels used ReS LOOP Normally 3)
TAVG 1500:
TRC0412D Tt-412D
+
TRC0422D Ti-422D
+
W""'r"R"C043W-TI~432D
(# Operable Channels used Normally3)
=
RCSLOOP TAVG 2100:
+
+
=
TRC0412D TRC04226""~
TRC0432D
--~-
11-412D Ttw422D TI-432D
(# Operable
- ~
Channelsused ReS LOOP Normally 3)
TAVG ACCI;PTANCE CRITERIA FOR ReS LOOpTAVG. (must meet one of the following):
1, Average of operable Mea indicator channels mustbe less than or equal to 592.5 QF.
2.
Average of operable ERF1S points less than or equal to 593.1 "F.
3.
If three Mea indicators are notavallable, then the highest channel should be less than or equal to 591,3>:>F.
4.
If three ERFIS points are not available, then the highest channel should be less than or equal to 592,3OF.
IOST~1021 Rev. 66 Page 20 of 40 I
,. DailySurveillance Requirements Log Sheet 50f 15 TECH SPEC 4,3.2.1 4.4.6.2.1.e PARAMETER Res PRESSURE FLANGE LEAKOFFTEMP OTliT OPllT PROTECTIONllT iNSTRUMENT PI-403.1 P1402,1 TI401 Ttw412C}
TI422C 2 TI..432C Tl..-412B)
TI..422B~
TI-4328 TJ....412A* TJ..422At Tl-432A ACCEPTANCE CRITERIA MODE 0300 0900 1500 2100 CHANNEL CHECK N/A CHANNELCHECK INSTRUCTION If ReS flow acceptance criteria isnot met, perform EST-70B, RCSFlowDetermination.
INSTRUMENT FRC0414 FI..414
~ 98.30/0 FRC0434 F(~434 4.4.6.2.1.d OST~1004 or OST~1204 2100 1500 0900 Tf?CH SPEC PARAMETER PARAMETER INSTRUMENT TeCH SPEC ACCEPTANCE CRITER~A ACCEPTANCE CRITER1A COMPLETED COMPLETED (Typicallyon NightShift)
MODE 1above 15%
Power 1~ 2~3~ and 4 0300 rOST-1021 Rev. 56 I
Page 210f 40 I M Daily Surveillance Requirements Log Sheet 6 of 15 TECH SPEC 4.4.1.t 4.3.1.1.12 PARAMETER*
Res LOOP FLOWS FRC0414 FRC0415 FRC0416 RCPA N/A FRC0424 FRC0425 FRC0426 Reps N/A INSTRUMENT FI-414 FI-415 F1..416 FI-424 Fl-425 FI-426 ACCEPTANCE POSITIVE INDICAT10N OF FLOW WITH CHANNEL POSITIVE INDICATION OF FLOW WITH CHANNEL CR1TERIA Rep RUNNING INDICATION CHECK Rep RUNNING lNDICATION CHECK MODE 112 1
1.2 1
0300
~()
,\\(~)
k)
A'O AD AtO MJ
(~0 (uD rIO
{
~b
~
~.
(:ti JiJ.
y........
~
r:J) y~
~
0900
~
~...
\\-
~:D
\\:.
1500
(~\\
~~
~
~ll
~~
f~~
("1.
r,l\\-
(&
(11 (j.
~
..~.:~.
~6J
~.()
lo to t\\1()
(~
rf()
r¥-J At£)
2100
( J
\\J
\\1 "J
~
V V
v v
TECH SPEC 4.4.1.1: 4.3.1.1.12 4.3.1.1.2a.2b. 5.6 PARAMETER Res LOOP FLOWS POWER INTERMEDIATE SOURCE RANGE RANGE RANGE INSTRUMENT FRC0434 FRC0435 FRC0436 RCPC N/A Nt-41, Nl-42 Nl..35 Nl-31 FI-434 FJ*435 FI-436 N143, NI-44 NI-36 NI-32 ACCEPTANCE POSITIVE INDICATION OF FLOW WITH CHANNEL CHANNEL CHECK CRITERIA Rep RUNNING iNDICATION CHECK MODE 1,2 1
1} 2 1 <<P-10). 2 2 <<P..6), 3.4.5 0300
(~()
A6"')
~
~iC) r\\£)
(~kL)
,'\\1 //)
rJ/A 0900
~~
~14
~~
~
~~.
~
~1/'1 N li~
f\\l fJ 1500
~~
(~)
~.
(~....
r~
\\J) f\\l if-\\
j\\J fA J+.
- ~~
\\.
2100
(~)
r-b rK)
~/r\\()
1-10
)to l~ Ifi t J 114-
'v v
\\J V
V v
TECH SPEC PARAMETER INSTRUMENT ACCEPTANCE CRITERIA MODE 0300 0900 1500 2100 IOST~1021 4.3.2.1.1e. 3a3. 3c31 4d, sc, 6d, 69 4.3.3.6.6 STEAM LINE PRESSURE Pl..474.1.
PI-484.1 Pi-494 Pl..475. PI-476 PI..485. PI486 PI-495. PI-496.1 CHANNEL CHECK t, 2. 3 and 4 Rev. 66 4.3.1.1.14 CHANNEL CHECK 1,2 Page 22 of 40 I
- DailySurveillance Requirements Log Sheet 7 of 15 TECH SPEC PARAMETER 4,3,1.1,13;4.3.1>1~ 14;4.3.2.1.se. ec, 10~t 4.3.3.6,7 SG LEVEL 4,7,1,3,1 CST LEVEL LI~901 081 S8 GREATERTHAN OR EQUAL-.TO 62%
LI-9010A.1 SA Ll~483f LI..484 LI..493l LI-494 LI~485~ L148j Lt:.,,495~ Lj...496 CHANNELCHECK 2100 1500 0900 0300 MOPE INSTRUMENT ACCEPTANCE CRITERIA TECH SPEC 4.7.1.3.2 PARAMETER.
ESWTOAFW INSTRUMENT 1SW..121 1SW++'124 18W..127 1SW...130 1SW-123 1SW+M126 1SW-129 1SW-132 ACCEPTANCE OPEN (only when supplying CRITERIA AFW pumps)
MODE 1t 2,- and3 0300
~)rpr'
.....*..............."'W.<<.>>;.;-;.,;.;,.;.X/Vo."",.,..NNA*I'.";.
0900 rJ If\\"
~X>>m-:-:->Jo>>>;'>>>
1500 tJltPr
)0
~~~/
-<<-~
- N>>>
- ':~;MYN>>~>>Y>>'
2100
~0/A
.,..,;.;.""-",,,.,,___K_
~:-:<<~<N.~
IOST-1021 Rev. 66
~age 23 of 40 I
.. Daily Surveillance Requirements Log Sheet 8 of 15 INSTRUCTIONS 1.
ERFIS is the preferred source for verifying CNTMT AVG TEMP.
2.
VerIfy TCV97540 computer point quality code is acceptable. If acceptable, record the ERFlS value for CNTMT AVG TEMP and verify Jessthan or equal to 120°F.
3.
If computer point TCV97540 is not available, verify both MeB indicators for CNTMT AVG TEMP less than or equal to 120 0 F.
TECH SPEC PARAMETER INSTRUMENT ACCEPTANCE CRITERiA MODE PLP-114 A EDG ELEC B EDG ELEC ROOM 261 ROOM 261 ALB 27/1..3 NO ALARM ~ 116 0 F) LOCAL TEMP IS NEEDED IF ALARM IS PRESENT WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS R'EQU1RED TO BE OPERABLE 4.6.1.5 N/A CNMT AVG TEMP TCV97540 TJ-7542 TI-7541 SA SB LESS THAN OR EQUAL TO 120°F
- 1. 2. 3. and 4 4.6.1.4 CONTAINMENT PRESSURE PDl*7680 PDI-7680 A SA B 58 GREATER THAN -1.0 JNWG PLP-114 CONTROL ROOM ENVELOPE 305 TI-7837 TI-7837 A1SA B188 LESS THAN OR EQUAL TO 85 QF WHENEVER THE EQUtPMENT IN AN AFFECTEDAREA IS REQUlRED TO BE OPERABLE 0300 0900 1500 2100
(\\UJ
\\/
'l f TECH SPEC PLp..114 ROD STEAM SA ELECT 5B ELECT 1A35SA.
PARAMETER FHB EMER EXHAREA CNTRL CAB PENET PENET AREA 305 TUNNEL AREA 261 AREA 261 1B35SB261 INSTRUMENT Tl..6537A1SA TI..65378158 ALB 23/3-5 ALB 23J2-11 ALB 2312-8 ALB 23/2..5 ACCEPTANCE LESS THAN OR EQUAL TO NO ALARM NO ALARM NO ALARM CRITERIA 104°F
<< 104°F)
<< 122°F)
(LESS THAN OR EQUAL TO 104°F)
WHENEVERTHE EQUIPMENT IN AN WHENEVER THE EQUIPMENT,IN AN AFFECTED AREA IS REQUIRED TO BE MODE AFFECTED AREA IS REQUIRED TO BE OPERABLE (LOCALTEMP MUST BE TAKEN IF ALARM IS PRESENT)
OPERABLE 0300 tv c(
ro
~'?
~6J kC)
A-o rro rJp:)
./
- .)
0900
{j-/d
(~() I
~
(&
~
\\tJ9.
(~
cL "-
1500
&'-1 rv
~l
'~.
<~~,
tA
'~J)
~~
. "",)
2100 (0"7 Cv cl
(~O k~:)
~:>
(ro
)}-6~)
\\J
'J V
\\t
'J IOST-1021 Rev. 66 Page 24 of 40 I
TECH SPEC - Daily Surveillance Requirements Log Sheet 9 of 15 PLp...114 PARAMETER CHILLER I AFW CCW PUMPS PIPE & VALVE
& HX AFW AREA 261 PUMPS 236 A..SA B-S8 1C-SAB CSIP ROOM CSI? ROOM C$1iP ROOM 236 236 236 SW BSTR B-SB PUMP 236 MECH & ELEC PENETAREA 236 INSTRUMENT ALB 23/2-6 ALB 23/1*6 ALB 23/2...7 ALB 23/1-7 ALB 23/1..5 ALB 23/1-4 ALB 23/1-11 ALB 23/2..9 ALB 23/2-10 ACCEPTANCE CRITERIA MODE 0300 0900 1500 2100 NO ALARM (LESS THAN OR EQUAL TO 104¢F)
WHENEVERTHE EQUiPMENT IN AN AFFECTEDAREA IS REQU1RED TO BE OPERABLE LOCAL TEMP MUST BE TAKEN IF ALARM lS PRESENT TECH SPEC I PLP..114 4.9.1*1 COMMITMENT CSAT&
WPB A*SA BwSB FUEL POOLS PARAMETER HVAC HVAC CS~ RHR 1 CS, RHR~
EQUIP RM EQUIPRM HVAC HVAC SPENT FP NEWFP SFPC SFP D 216 236 190 190 INSTRUMENT ALB 23/1-8 ALB 23/1 w9 ALB 23/1..10 ALB 23/4-17 ALB 23/5-17 ALB 23/4*18 ALB23/5..18 ACCEPTANCE NO ALARM (LESSTHAN OR EQUALTO 104 OF)
NO ALARM (GREATER THAN 23 FT)
CRITERIA WHENEVER THE EQUIPMENT IN AN AFFECTED MODE AREA 18REQUIRED TO BE OPERABLE WHEN IRRADIATED FUEL IS IN THE POOL (LOCAL TEMP MUST BE TAKEN IF ALARM IS (LOCAL LEVEL MUST BE TAKEN IF ALARM rs PRESENT)
PRESENT) 0300 d<)
{~)
({O
~
'-~~
'~~
')~
~dJ-
"-~J)~
~~
,.))
~'
l~
0900 V }I/~
~
1500
.~
b
.~-
.~
2100 (kJ r!P
)tto ko
~.J
\\/
v
'tJ IOST-1021 Rev. 56 Page 25 of 40 I
... Daily Surveillance Requirements Log Sheet 10 of 15 TECH SPECI COMMiTMENT PARAMETER INSTRUMENT ACCEPTANCE CRiTERIA MODE 0300 0900 1500 2100 TECH SPEC ESR97..00272 SPENT FUEL POOL HIGH TEMPERATURE ALARM ALB 23/4..16 NO ALARM ESR 95~00425 SPENTFUELPOOLHIGH TEMPERATURE ALARM ALB 23/4...15 ALB 2315~15 NOALARM PLP-114 ESR97-00272 NEW FUELPOOLHIGH TEMPERATUR~ALARM ALB 23/5...16 NOALARM PARAMETER INSTRUMENT ACCEPTANCE CRITERIA 0900 1500 2100 IOST-1021 ESWELECEQUJP ROOM261 ESW PUMP ROOM261 EDG ROOM: 261 TEV6588A TEV658~~
TEV6592A TEV6592B TDG6903A TDG6903f.3...
LESS THAN OR EQUAL LESSTHAN OR EQUALTO LESSTHAN OR EQUALTO TO 116$;)F122~F WHENEVER THE EQUIPfv1ENT IN AN AFFECTED AREAIS RE.QUIRED TO BE OPERABl.E Rev. 66 Page 26 of 40 I
.. Daily Surveillance Requirements Log Sheet 11 of 15 NOTE 1:
If a reservoir level computer point is bad, manual reservoir level determination can be performed per OPw163.
NOTE 2:
If a reservoir temperature computer point is bad, manual reservoir temperature readings can be performed per OP-163.
INSTRUCTION 1.
Due to a 3°F instrument inaccuracy associated with the permanently installed reservoir TSWs, if TSW9114ITSW9115 'indicate 291 °F J obtain local temperature readings per OP-163.
4.1.2.6b TECH SPEC 4.5.4.b 4.7.5 RWST AUX RSVR PARAMETER TEMP AUX RSVR LEVEL TEMP MAIN RSVR LEVEL MAIN RSVR TEMP lNSTRUMENT TCT7110 LSC8752A LSC87528 TSW9114 LSC8750A LSC8750B TSW9115
~40°F GREATER THAN OR GREATER THAN OR EQUAL ACCEPTANCE AND EQUAL TO 250 FT
- 94°F TO 215 FT s 94°F CRITERlA
< 125°F NOTE 1 NOTE 2 NOTE 1 NOTE 2 MODE 1 ~ 2) 3 and 4 0300 5~7. &.'
(9-5Jl i:
r?~SL~S(}
l{() t o.;.:;
9Jt\\~;S
- )17" (0 I 4&v6 0900 1500 t~~-7, 5
~SI\\5
/)5~ j 5<1 L(~t3~
l)r9. Sec, J,j l15 J
<7 LJS..,.....,
~ W
-:l
{
~...
~
2100 INSTRUCTION 1.
The ECCS leakage outside RABEES reading is only required every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Perform on Sunday, WednesdaYt and Friday (mark as N/A on other days).
2.
If any ECCS leakage outside RABEES is measured, record the cumulative leakrate on t along with the locations leaking.
TECH SPEC PLP-114 PARAMETER ECCS leakage outside RABEES INSTRUMENT N/A ACCEPTANCE LESS THAN 2 GPH (125 cc/min) cumulative CRITERIA MODE 1,2,3 and 4 0300 0900 1500 VJ/t\\
2100 IOST-1021 Rev. 66 Page 27 of 40 I
- Daily Surveillance Requirements Log Sheet 12 of15 NOTE 1:
Meteorological Channel check includes: (1) Initialing for a acceptable quality code if using ERFIS or verifying data quality is consistent with actual weather conditions if using a Personal Computer(PC) to access the meteorological tower, and (2)
Recording present values and verifying trend appears normal.
NOTE 1:
During calm wind conditions (approximately 2 mph or less) it is normal to see disagreement between the upper and lower wind direction indicators. At times the vanes may actually rotate in opposite directions.
NOTE 1:
The following shall be used for performing the daily channel check of the meteorological instrumentation channels:
On ERFIS observe the points for wind speed, wind direction, and differential temperature.
- . Using a PC, access the meteoroloqical tower and observe upper and lower wind speed, upper and lower wind directlon. and differential temperature (or stability class).
The meteorological instrumentation should only be considered inoperable if both of the above methods are unavailable.
NOTE 2:
MIMS Channel check should include, as a minimum, both a Self Test and an Audio Monitoring Test of all operable channels. Op wo182 contains guidance for resetting the CPU FAILED light if lit.
(Reference 2.6.4)
TECH SPEC PLP-114 PLP-114 METEOROLOGICAL MIMS PARAMETER LOWER WIND UPPERWIND LOWERWIND UPPER WIND A1R SPEED SPEED DIRECTION D1RECTION llT INSTRUMENT MMT1008 MMT1010 MMT1014 MMT1013 MMT1004 MMT1Q05 ALL CHANNELS ACCEPTANCE CHANNEL CHECK NOTE 1 CHANNEL CRITERIA Value Init Value Init Value Init Value Init Value Init Value Init CHECK NOTE 2 MODE AT ALL TlMES 1,2 0300 C\\t/&
M;~)
'f) 7 1)
S~f) 3~:;*21 Z-3 liJ f1/31 rh-J
\\ L.~,,~
1.(0 11..55" j,.-I,()
Af)
J.
'.7~
i "0"
~.'..
-s:
'J' 0900
~'},J~
'"11 jlL3<6
~
~{Z~ l2.
l~
(,<1/l3
~~
- -~Lgti
'J) -l,'7J
'~J2
.~
1500
~ll
~'
2100 IOST-1021 I
Page 28 of 40'1
- Daily Surveillance Requirements Log Sheet 13 of 15 LOCAL TEMPERATURES TECH SPEC PLp..114 PARAMETER SFP PUMP &
TANK AREA E-6 ROOMS 261 HX ROOM 236 A-SA B-SB lNSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESSTHAN OR EQUAL TO LESSTHAN OR EQUALTO 104.oF VERIFIED CRlTERIA 115.5 of WHENEVERTHE EQUIPMENT iN AN AFECTED MODE AT ALL TIMES t*:,':.:,-.:.::*::.*\\.:;>~~}~t~.: (;/}~:::::~:r.:::~*:**
AREA IS REQUIRED TO BE*OPERABLE 0100-0400 1.--7 S 0:?G7 t L{
& v-1
~.:)
&L/~ 7
)D
,)
I 1300..1600
~51\\"3 lait, ~ Lf t9??
~ (p
" c.( C:i r7~
l
'/
C!..-/
TECH SPEC PLP-114 EDG HVAC ROOM 280 EDG HVAC ROOM 292 DFOST BLDG PARAMETER A-SA B-58 A-SA B-SB 242 lNSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR EQUAL TO LESSTHAN OR EQUALTO LESS THAN OR EQUAL VERIFIED CRITERIA 118°F 122°F TO 122 QF MODE WHEN THE EQUIPMENT iN THE AFFECTEDAREA 18REQUlRED TO BE OPERABLE 0100..0400
~-?&( GI g::) D
- '7t;5t '*'7 ifIf>3
<>>. <./
(~QJ
~
~~7? \\,~5' 71L{td
") ~1 ~ "j 7l0~fo C:Ol, L(
~~Q 1300-1600
~.;}
IOST-1021 Rev. 66 Page 29 of 40 I
.. Daily Surveillance Requirements Log Sheet 14 of 15 LOCAL TEMPERATURES INSTRUCTION 1.
If battery room temperature is less than 71 of, perform Step 7.0.5.
TECH SPEC PLp..114 ELECT SW1TCHGEAR PARAMETER PENETRAT'ON ROOM286 SATIERY ROOM286 ACP 286 AREA 286 A..SA BwSB A-SA B-S8 A..SA I
B...SB INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR LESS THAN OR
~ 71°F AND
~ 85°F LESS THAN OR VERIF1ED CRITERIA EQUAL TO 104°F EQUAL TO gO°F EQUALTO gO°F WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS REQUIRED TO BE
/':.':",::,
MODE O:':':':::::::',\\,~:
OPERABLE y\\, C:j
'7~~1~ c1 "7ip ~ i?
l 0900-1200
&~;;)\\G.'
'~7[{ (to
~*-?0. ~
.-~] ~7 ~ '--7 l"~J 2100-2400 Q ci
-7 L(J~.
~t\\t _~3
~7<l,,
':-7~S
~ t:t "7~J
~ C}
"7'7 G
- 1;)
(0:--
~
\\
<:1 TECH SPEC PLpw114 AUX TRANSFER PANEL ROOM PIC ROOMS PARAMETER 286 286 A-SA B..SB 17 t 19 18 INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR EQUAL TO LESS THAN OR EQUAL TO CRITERJA 104°F 85°F MODE WHENEVER THE EQUIPMENT iN AN AFFEOTED AREA IS REQUIRED TO BE OPERABLE 0900...1200
--7~:)
~
~~-'1
'~'7
~1.
~),
"'}~, c.
"'7:5~ C)
(...
(-~
2100...2400
"'7 2..--
~ '~7
'-'7 2
'<2-
~~7.
£2
~7 Lo( t
~l
'(>,
~
'J VERiFIED TECH SPEC PLP-114 ARPROOM AH-15 VENTILATION PARAMETER PIC ROOM 305 305 ROOM INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR EQUAL TO LESS THAN OR VERIF1ED CRITERIA 85°F EQUAL TO 104°F WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS
':.'. :-:/.
MODE REQUIRED TO BE OPERABLE
~7 t. 0
{(i{a, ~
4,0 \\ (
~
0900-1200 r0 2100-2400
~7C) ~ ~6
(&~~ ~
'~7
&0
~
(~)
~
1OST-1021 Rev. 66 Page 30 of 40 I
- Daily Surveillance Requirements Log Sheet 15 of 15 NOTE 1:
These readings are only required on Sundays. These readings may be marked N/A on other days.
TECH SPEC 4.1.2.2.a VCTVALVE BAT BORJCACID EMER BORATION BORIC ACID PARAMETER GALLERY ROOM XFER PUMP VALVE RM XFER PUMP VALVE GALLERY ROOM INSTRUMENT LOCALTHERMOMETER ACCEPTANCE GREATER THAN OR EQUAL TO 65°F CR1TERIA MODE 1,2 and 3 1300-1600 rrJ lA-
---._~
(NOTE 1)
....__..-......---...------Y'O"+i'---.M........-.-....................,.-..........----------
TECH SPEC 4.1.2.2.a BAT TO CSt? SUCTION HEADER PfPE TEMPERATURE (IF ANY OF THESE INSTRUMENTS FAIL. INITIATE CORRECTIVEACTION AND NOTE IN COMMENTS PARAMETER SECTION. USE SECONDARY INSTRUMENTS TO SATISFY THE SURVEILLANCE REQUfREMENT)
HT-18753C I HT-18753C I HT-18753B I HT~18753B I HT..18753B I HT..18753B INSTRUMENT C2-1 C2-2 C1-9 C1-13 C2..3 C2-5 ACCEPTANCE CRiTERIA GREATER THAN OR EQUAL TO 65°F MODE 1,2 and 3 1300..1600
\\_*..*---------1-------
t
~ J 1
--~~.-_"'-~
I r. r~
(NOTE 1)
N
- .~.
I I
I TECH SPEC 4.1.2.2.8 BAT TO CSIP SUCTION HEADER PlPE TEMPERATURE (THESE ARE SECONDARY INSTRUMENTS. THESE SHOULD BE USED WHEN PRIMARY INSTRUMENTS PARAMETER FAll. (N/A IF NOT BE1NG USED.)
HT-18753CCI HT..18753CC I HT-18753BB I HT-18753BB 1
HT..187538B I HT-18753BB INSTRUMENT C2-1 C2...2 C1v9 C1-13 C2...3 C2-5 ACCEPTANCE CRITERIA GREATERTHAN OR EQUAL TO 65°F MODE 1,2 and 3 1300-1600 f~1 f) 1---*-----.1-I i.
1
-.~----;.""i (NOTE 1)
I IOST-1021 Rev,66 Page 31 of 40 I
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
HARRIS Task No.:
015004H201 Task
Title:
Perform the Quadrant Power Tilt Ratio Surveillance JPM No.:
2008 NRC RO A2 KIA
Reference:
2.2.12 (3.4)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method oftesting:
Simulated Performance:
Classroom READ TO THE EXAMINEE X
Simulator Actual Performance:
Plant x
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
The plant has been stabilized at 100%
power following a dropped rod in Control Bank "B" (M-6).
The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND"INDICATION SYSTEM.
No deficiency tags on PRNls.
Task Standard:
Calculations within required band.
Required Materials:
Calculator General
References:
OST-1039, CALCULATION OF QPTR, Revision 13 Handouts:
Initiating Cue:
Time Critical Task:
Validation Time:
OST-1039 Curve Book (Ensure F-X-8 included and unmarked)
The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.
For the purposes of the examination, there will be no independent verification of your work.
NO 12 minutes HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9
Appendix C (Denote Critical Steps with a ~)
Start Time:
Page 2 of 10 VERIFICATION OF COMPLETION Form ES-C-1 Performance Step: 1 Standard:
Evaluator Cue:
Evaluator Note:
Comment:
Performance Step: 2 Standard:
Evaluator Cue:
Comment:
Obtain procedure.
Reviews procedure.
Provide OST-1039.
A KEY is provided for your use on JPM Page 7.
Completes Prerequisites section:
Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication.
Verify the most recent Curve F-X-8 is used in the performance of this procedure.
Verify all prerequisites are met, then obtain Unit SCO permission to perform this OST.
Logs F-X-8 revision number (NRC Exam)
Initials/signs all blocks HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Page 30f 10 VERIFICATION OF COMPLETION Form ES-C-1 Performance Step: 3 Standard:
Comment:
Performance Step: 4 Standard:
Evaluator Cue:
Comment:
Performance Step: 5 Standard:
Comment:
If Quadrant Power Tilt Ratio Calculation Computer Program is used, perform Section 7.1, and N/A section 7.2.
If manual calculation of the Quadrant Power Tilt Ratio is used, perform Section 7.2, and N/A section 7.1.
Marks Section 7.1 N/A Proceeds to Section 7.2 Prior to reading the value of detector current, ensure the meter range/rate switch is in the 400 J,lAlSLOW position.
Verifies meter range/rate switches were in the 400 J,lAlSLOW position when the readings were taken.
Record on Attachment 2, in Column A, the upper and lower detector currents from all operable power range channels as read on the Nuclear Instrumentation Cabinet.
Transposes readings from PRNIS Readings Table onto.
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Page 4 of 10 VERIFICATION OF COMPLETION Form ES-C-1 Performance Step: 6 Standard:
Evaluator Cue:
Comment:
Performance Step: 7 Standard:
Comment:
Performance Step: 8 Standard:
Evaluator Note:
Comment:
Record on Attachment 2, in Column B, the 100 power normalized current for each channel. (Refer to Curve F-X-8)
Transposes TOP and BOTTOM 100 current values from the Curve Book provided.
Divide values in Column A by the respective normalized current in Column B and record the result in Column C as the Normalized Fraction.
Divides each Upper and Lower reading by the respective 100 normalized current value and records in Column C.
Calculate the average value for the upper and the lower Normalized Fractions by adding the Normalized Fraction in each section of Column C and divide by the number of operable NI channels. Record in Column D of Attachment 2.
Adds all Normalized Fractions for the same plane, divides by four and records result in Column D.
On the KEY, this value is shown at the bottom of Column C.
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Page 5 of 10 VERIFICATION OF COMPLETION Form ES-C-1
~
Performance Step: 9 Standard:
Evaluator Note:
Comment:
Performance Step: 10 Standard:
Evaluator Cue:
Comment:
~
Performance Step: 11 Standard:
Comment:
Using the formula and values from Attachment 2 calculate the Upper and Lower Ratios.
Divides the Maximum Normalized Fraction by the Average Normalized Fraction on each plane.
Determines both UPPER and LOWER ~ 1.029.
The applicant may inform the USCO as soon as any calculation is > 1.02. If so, acknowledge and direct applicant to complete.
Perform independent verification of all calculations made on.
Requests Independent Verifier.
If necessary, repeat Initiating Cue: For the purpose of this examination, there will be no independent verification of your work.
Candidate may choose to check calculations.
The upper ratio or the lower ratio, whichever is greater, is the quadrant power tilt ratio (QPTR). Record QPTR and verify QPTR is less than or equal to 1.02.
Records Maximum QPTR value 1.026 to 1.036 (N44 UPPER)
Acceptable band is +/- 50/0 (rounded to.005) around 1.031.
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Page 6 of 10 VERIFICATION OF COMPLETION Form ES-C-1
-v Performance Step: 12 Standard:
Evaluator Cue:
Comment:
Terminating Cue:
Complete applicable sections of Attachment 3, Certifications and Reviews and inform the Unit SCO when this test is completed.
Check marks Periodic Surveillance or notes AOP-001 in Comments section Plant Condition: 100 Power (may note dropped rod)
Mode 1 Today's Date Current Time OST Completed By: Applicant's name Initials/Name Indicate in General Comments Section and/or informs USCG that the limit is exceeded (-V)
Acknowledge any report.
After the USCO has been notified: Evaluation on this JPM is complete.
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Page 7 of 10 VERIFICATION OF COMPLETION KEY Form ES-C-1 A
B C
UPPER UPPER UPPER 100% POWER NORMALIZED UPPER DETECTOR NORMALIZED FRACTION DETECTOR CURRENT CURRENT (NOTE 1)
N-41 149.7 155.2
.965 N-42 177.9 175.6 1.013 N-43 202.0 200.0 1..010 N-44 165.5 159.5 1.038 SUM 4.026/4 =
1.0065 A
B C
LOWER LOWER LOWER 100%
POWER NORMALIZED LOWER DETECTOR NORMALIZED FRACTION DETECTOR CURRENT CURRENT (NOTE 1)
N-41 169.2 176.1
.961 N-42 202.6 202.2 1.002 N-43 221.1 221.2
.9995 N-44 197.5 192.3 1.027 SUM 3.99/4 =
.9975 Highest Upper (N-44) 1.038/1.0065 = 1.031 Highest Lower (N-44) 1.027/.9975 =1.0296 (1.03)
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Page 8 of 10 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2008 NRC RO A2 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
Examiner's Signature:
SAT UNSAT Date:
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Page 9 of 10 VERIFICATION OF COMPLETION HARRIS 2008 NRC RO JPM A2 Curve F-X-8 HANDOUT Revision Number: NRC Exam NIS Current Setpoint Table uA, 100% power Form ES-C-1 N41 N42 N43 N44 155.2 175.6 200.0 159.5 176.1 202.2 221.2 192.3 HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Page 10 of 10 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:
INITIATING CUE:
The plant has been stabilized at 100 power following a dropped rod in Control Bank "B" (M-6).
The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.
No deficiency tags on PRNls.
The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.
For the purposes of the examination, there will be no independent verification of your work.
PRNIS Readings N41 N42 N43 N44 149.7 177.9 202.0 165.5 169.2 202.6 221.1 197.5
- All values were taken,with the Range/Rate switch in 400 IJAiSlow position.
HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Facility:
HARRIS Job Performance Measure Worksheet Task No.:
Form ES-C-1 Task
Title:
Review the Completed OST for Auxiliary Feedwater Pump 1A-SA JPM No.:
2008 NRC SRO A2 KIA
Reference:
2.2.12 (3.4)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Classroom READ TO THE EXAMINEE X
Simulator Actual Performance:
Plant x
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
The unit is in Mode 1 at 100 power All major controllers are in AUTO No TS Action Statements are in effect OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4, has just been completed Task Standard:
All errors (4) identified Required Materials:
None General
References:
OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4 Handout:
Initiating Cue:
Completed OST-1211 with the errors incorporated.
You are the USCO. Completely review the procedure and note any problems in the
GENERAL COMMENT
S section of Attachment 6 -
Certification and Review. Discuss your review with me at the conclusion.
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Time Critical Task:
Validation Time:
No 12 minutes Job Performance Measure Worksheet Form ES-C-1 HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet SIMULATOR SETUP N/A Form ES-C-1 HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Page 4 of 8 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with a check mark)
START TIME:
Performance Step: 1 Standard:
Evaluator Cue:
Comment:
~
Performance Step: 2 Standard:
Evaluator Note:
Comment:
Review procedure Ensures proper conditions, signatures/initials, and may verify the current revision of the procedure Provide the completed OST-1211.
Review the completed OST (Page 16) - Identifies stopwatch is past calibration date This makes the OST invalid and/or any timed elements would have to be repeated.
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9
Appendix C
-v Performance Step: 3 Page 5 of 8 PERFORMANCE INFORMATION Review the completed OST Form ES-C-1 Standard:
Evaluator Note:
Comment:
-v Performance Step: 4 Standard:
Evaluator Note:
Comment:
-v Performance Step: 5 Standard:
Comment:
- , Sheet 1 (Page 17) - wrong Specific Volume used to determine ilPcorr.
l\\Pcorr still exceeds minimum requirement but is incorrect.
Review the completed OST
- (Page 20) - Outboard Horizontal Vibration reading is in the ALERT range but there is no documentation in accordance with Instructions 1.a and 1.b.
The pump would still be operable but this could prevent corrective action or the required increase in surveillance frequency.
Review the completed OST (Page 21) - 1AF-74 SHUT time exceeds CODE CRITERIA and, in accordance with Step 7.0.1, should have been retested immediately.
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Performance Step: 6 Page 6 of 8 PERFORMANCE INFORMATION Review the completed OST Form ES-C-1 Standard:
Comment:
Terminating Cue:
STOP TIME:
Returns the procedure unsigned or, if signed, with EXCEPTIONS circled and all errors identified in the
GENERAL COMMENT
S section.
When the procedure is returned: Evaluation on this JPM is complete.
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2008 NRC SRO A2 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
Examiner's Signature:
SAT UNSAT Date:
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9
Appendix C Page 8 of 8 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:
INITIATING CUE:
The unit is in Mode 1 at 100 power All major controllers are in AUTO No TS Action Statements are in effect OST-1211, AUXI LIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4,'
has just been completed You are the USCO. Completely review the procedure and note any problems in the
GENERAL COMMENT
S section of - Certification and Review. Discuss your review with me at the conclusion.
HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9
NUMBER:
C CO*NTINUOUS USE HARRIS NUCLEAR PLANT PLANT OPERATING MAN UAl VOLUME 3 PART 9 QPERAT10NS SU*RVEllLANCE TEST OST-1211 TITLE:
NOTE:
A*U:XILIARY FEEDWATER PUMP 1A.-SA OPERABILITY TEST QUARTERLYI*NTERVAL MOD:ES 1 -4 Thlsprccedure has been screened perPLP-1 00 Criteria and determined to be CASE Iii,
- additionalmanagementinvolveme*nt is required.
IOST-1211
.. *1 Rev, 16 Page 1 of 261
-Calibration Data Sheet Sheet 1 of 1 Cal Due Date o~ I o
N.A QT' 0 (JT" c
Rev. 16 Page 18 of261
A'ttaehm.ent 2 ~ Performance Data Sheet 1 of*3 Auxiliary PeecwaterPump 1A..SA NOTE1:Caiculate DifferentiaiPressure as foltows:
lb{)()
Step 7'. 1.21
< (iSIS Step 7~1.18
=
J514~d, psid Step 7.1.23*
L!==========:,=======
..::=.:..
.=====;======~
NOTE* 2:
Satisfactory Acceptance Criteria is.determlnedby u.sing the following
~.rH l~-HO and verifying the correcteodlfterenttatpressure ts \\tifit.hinthe
~t;:t;.
\\i.~ Iltj'~: la:
tlPcorr :::;
APind
- =
Uf
=:
7.1.24 Corrected DifferentIal Pressure tndlq.~ted Discharge Pressure minus Indicated sucuon Pressure SpeCific Volume (ftslfbm) for saturatedIiquidwater (u,)forsuction temperature recorded inStep7..*1.22. This number can be determined from Sheet3 of this Attachment or Standard Steam Tabtes~
I0$1-1211 r
w Rev. 16 Page 11 of 26,
Attachm.ent 2 ~ Performance Data Sheet 2 of 3 INSTRUC*TIONS 1.
If pump hydrauHcdatEfdoes not meet acceptance criteria:
a~
Declare the pump iNOPERABLE.,
b ~
Inlti:ate a :CR.
ST*Ep***
NO.
7.1.3 7.1.18 7.1.20 7.1.22 7.1 ~26 Suction Temperature OifferentlalPressure Differenual Pressure Test Gauqe CE~42...V*2 Test G:8uge at1AF-11*HV.2 ERFISPoint TCE901..*::or Har~dheld Porom~t~(*
Test Gauqe at 1AF-7 Calculated per NOTE 1 Calculated per NOTE 2 (C:orrected (liPcorr) psig
{CodD psig 2: 15 psig N/A N/A Circle instrument used.
50 to 54 inches water column is equivalent to 50 to 52 gpm IOST~1211 Rev. 16 Page 18 of 261
Attachm.ent 2* Performance Data Sheet3 of 3 Specific Volume (ft3/Ibm)For Saturated Liquid Water {ud Temperature Specific Volume Temperature l:s...peciflc VO~.unne 59 60 61 62 63 64 66 67 6*8 69 70 11 7*2 73 74 75 76 77 78 79 0:.016034 0..=016035 0.016036 0.0160:38 0.01603:9 (t016044 CL016046 0.01.60:48 O~01'6050 0.016052 0.016056' 0.01605$
0.016060 0.016062 0.016064 0.016061 0.Ot6069 0.016011 I
80 I
81 82 83 84 as 81 88 89 95 96 98 tOO 0.016074 0.016076 0.016079 0.016081 0..0=16097 12 OJJ*16.115 0.016125 0.016131 Rev. 16 103 105 109 111 11:2 113 1
116 117 1
119 120 0.0'16110 0.016174 0.016177 0.016189 0.016201 0.016209 Page19 of 26I
~ Vibration Data Sheet 1 of 1 IN'STRUCTIONS:
1.
If pump vibration data is greaterthan the Acceptable Range but within the Alert Range:
a.
Prepare enE-man or MenlO to the Surveillance Testing Scheduling Coordinatordirecting the test frequency of the pumpto be doubled, b.
Attach a copy of the E-mailor Memo to the test package.
2.
If pump vibration data meets the Required Action Criteria:
B.
b.
Declare the pump INOPERABLE.
Initiate a Condition Report (CR)v F
s
\\,
Vibration ACCEPTANCE :CRITERIA
.location IN/SEC Acceptable Range Alert Range Required Action Axial
~ *J.1Q
- s.0.285
- > O~285 to ~ 0.68.4
> O~68*4 Outboard
~. 0.2325
> 0.232'5 to.s:O.558
> O~558 l~Gt~3 )
Horizontal Outboard
- ....,.".,.,:;">>,,.,~~,.*
,.".~;-.,..
s O~2775
>ON2775 tos 0.666
> 0,666 Vertical
/'0
.............~
Inboard I s O~265
- >O.2.i5Sto*s O~63.6
- > 0:.636 Hortzontat
{DC( J Inboard Vertica' :
I~G s O~315
> 0.315 to s 0.70
>0.'70
'*.. /;1:0 L~~::!~~.*
,_~_~~,_"_"__~~~....*.. L __2~e ~o ~!~
M*. Valve Test Data Sheet 1 of 1
_um""''''''''''h
.",.:,u.....
~
<_,,~.____
~.h_
PRETEST FAIL SAFE rosrrssr ALIGNMENT FULL STROKETEST TEST ALIGNMENT ACCEPTANCE y",,131TERIA (SEC)
CODECR.tTERI.A Verification Stroke Time LIMlT1NGVALUE ofT"ravelby (SEC)
I OPEN SHUT
'Valve Pretest Ind Lights
- Fail Safe Position Pusttes!
Number Position I:Htt (lNIT)
OPEN SHUT: Positlon Verified *Pos.iUon Pos lnit Vert loit Low High Low High OPEN SHUT 1AF-55 Open ffO !fJ l/Pt~fo 1&.1" NIA NtA Open
}6=>. :u 14.25 19~28 14,34 19;40 25~15 23.00 1AF...74 Open Aio Aw bb61~~;P~
NlA NIA Open ~ :i) f5~48 20.94 14,84 20.07 27.31 23.00
-e,
- 0' Comments:
.<<ovm<_'<<"=_
" *****.*._.vwm.*.....wm"hwu.
- .VII'
...,...__*..a* *b*.*.* *.'.*
~
"A
<<.:...:A.:.:..,_O'<<
b
- v*.i(
.......~
<N._
N N..~_ _J'.I'_.+-.-.__*_,.v.*.*..I'>..............................................................
..-._..-.-'w
~
.....-vvY.y.,..w.
~
~
...-;~-...x<<<<o:..-:<;;Xo<<~~__
. _~
cccccccee
<.;..OC;"':O:':<_........-_<hV<hV<hV<hV h~AQ;y,;<<o;.y;;oc;.,.;
.~.--"..No'N:N NN N~........:<<
<<<<'i.<<-;-;
-'- <N
~"
- .:.-.~.w.r.*.*.* *
- NU
~~.;.."j /vu'**u.* u.*.*.*.*
L?ST~1211 I
Rev. 16 I
Page 21 0126 1
- Valve Retest Data S'heet Sheet 1 of 2 NOTE:
This entire Attachment is N/A ifno valve is retested due to exceeding the CodeCrttena.
Determine if the. stroke time exceeds the Limiting Value, 1.
If the stroke time exceeds the limlting Value, declare the valve inoperable and initiat.e* aCR~ (NIAifstroke time is less than the LirnltlnqValue) 2..
lfthe stroke time is. less than the Limiting Value.but outside the Code Onteria limits, perform the foUovving :Steps:
8.
If the cause is known to be mechanical failure~orifa retest cannot be performed expeditiously, declare the valve inoperable and inJUate a CR(Except PMTRs).
b.
If retestlng the valve is desired$ perform the following:
N:OTE:.
If necessary separatemarkedup sheets of this CST maybe used to documentnecessary manlpulatlons.
sheetswould this procedure and noted in the comments Section of Attachment 7.
(1)
Determine wbich Ste:ps need to beperfcrrned up conditionstor testing the valve. Unit SeQ concurrence must be obtained and documented in the Comments section of Attachment 7>
(2)
Perform the Steps determlned in the previous Ste'p anddocument stroke times/valve positioning on Sheet2.
(3)
~f retest results are still outside the Code Crlteria~declare the valve inoperable and initiate aCR (except Prv1T),
(4) 1fretestresults-are Within the Code Criteriay perform the.following:
(a)
Dec~are the valve operable.
(b)
Inltl~.tea CR. identify1ng test findings for the first and second tests.
(c)
Send test results to Responsible Engineer(1ST) for evaluation and docurnentanonon the CR.
IOST-1211 Page 22 of26 I
~ V,alveRetest Data Sheet Sheet2. of 2 (1)
FUI out PRETEST ALIGNMENT t POSTT;EST ALIGNMENT, and ACCEPTANCE CRITERIA values for the velvets) being tested using the values in the initIal test Attachment,
~~
~~::....;;..;.:.:y:w.':..->>...:***..:.
J PRETEST POSTIEST ALIGNMENT ALIGNMENT ACCEPTANCECRJTERIA (SEC)
(1)
F.]J.~l.STROKETt=$T (1) ".
<<-=<<-x-tt}
I CO.9.E CRITERIA I
Time
~
(SE:C)
OPf:N
$HVT...
LIMITfNG VALUE Pretest Posttest I
- \\l'a'dve i!'l:\\JlnUf..:n Posmon tntt:
OPEN SHUT Position Pes lnit Verflnif Low High Low High OPEN i
.StrUT
~
I
~
~
i
~
~~11*.
,,_.........:MW
... ~
......,_=t Rev. 16 I
Page 23 of ~61
- ~ Certification and Review Sheet 1 of 2 PeriodicSurveillance Requirement: _~__
Postmalrrtenance OperabHity Test:
Redundant SUbsystem Test:
Mode:
PlantConottlons:
--~~~~~----------_.............--
T:hiS CST was performed as a:
OST Compl.etedBy:
Date:
ToDAt Time:
tq~3(~)
OS.1..P~.rfofrf1ed Bv:
Initials Name (Print)
Initials Name (Print)
General Comments/Recomm:endation/Corrective ActionslExceptions:
I()$T-1211*
L Rev. 16 m
mJ Page24 of 26I
~ Certifications and Reviews Sheet 2 of 2-Step 7,1.11 Step 7~1.32 Step 7.2.1.c Step 7~2~1,p 1A..SA AF\\'V Pump Inoperable 1A-SA AFW Pump Operable-1A-SA and 1B-S-B AFWPump Inoperable 1A-SA-and 1B..SBAFW Pump Operable Time:
fJ10t::.
Date: 'Tc)J:r-ti
~-~
.*. '~"oXA.....~v;o;,o;o;.~
- ~"X'.xo;:<<........;~_"_~-o;,"XX..;-
Time:_~__=l-L Date:
~:IJ:fDfft=_
Time:tot5
__~ Date: ~Jilt Time:
1,~;~.,5""...-
Date: ~JcJtfl~t,~,
Pa.ges Used:
Atl~_~~_
CST Completed with NO EXCEPT10NS1EXCEPTIONS:
Reviewed By:
Unit SeQ ResponsibieEngin"eer (1ST)
Reviewed By:
ANn Date: ----
Date: ----
After receiving the final review signature, this OS:T becomes a a-A RECORD and should be submitted to DocumentServloes.
IOST-1211 Revy16
R~.vtsion S~Jmmary General Revision 16 updates the procedure referenceto the new 1ST Program Plan, Des9ription o.fChanges
- Page.
Section GhangeDescription Ail 3
3 5
8 8
8 9
11 17 All 1~O+2 t~O.4 2~7.4 6+0~1.e~(1 )
6~O.1.b 6.Q.1.c 7.1.5 7+1.24 Updated revision level.
Adde.d check valves 1AF-231 541 92, 11O~and 73.
- Deleted, HNP-*lST-003, HNP 1ST Program Plan - 3rd tntervat, Changedacceptancecriterla per calc, (Also cbanqed on Atta'chme*nt2)
Deleted "Parnat'strcke Added check valves 1AF-23, 54$ 92 1 110~ and 73.
Added checkvalves 1AF~54,92~ and 73.
Added check va'hte1AF-23$110 Added checkvalves 1AF*-23*~541 92, 110, and 73~
Rev. 16 Page 26 of 261
Appendix C Facility:
HARRIS Job Performance Measure Worksheet Task No.:
Form ES-C-1 Task
Title:
Given a Declared Emergency, JPM No.:
2008 NRC RO-SRO A3 Determine the Dose Rate, Dose Limit, and the Number of People to Perform a Task.
KJA
Reference:
2.3.4 (2.5/3.1)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Actual Performance:
X Classroom X
Simulator Plant Perform in a location with the general references available or with electronic access to the references.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
A large break LOCA has occurred.
The ECCS is in cold leg recirculation.
RHR Pump "8" is running. RHR Pump "A" showed evidence of gas binding and was stopped.
A Site Area Emergency (SAE) is in effect.
The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available.
The general radiation level in the area is 16 R/hour The OSC estimates that the total task will take.75 man-hours.
The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task.
Task Standard:
Number of people and stay times calculated within specified limits.
Required Materials:
Calculator HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 General
References:
PEP-330, RADIOLOGICAL CONSEQUENCES NGGM-PM-0002, RADIATION CONTROL AND PROTECTION MANUAL Initiating Cue:
The site emergency workers listed in the table below are available.
They will be utilized from lowest to highest accumulated TEDE dose.
Using the minimum number of workers possible, DETERMINE:
the total number of workers required to perform the task and the maximum stay time for each individual who will be utilized.
Assume no dose in transit and round off to the nearest minute below the limit.
Time Critical Task:
NO Validation Time:
HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet SIMULATOR SETUP N/A Form ES-C-1 HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9
Appendix C Page 4 of 7 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with a check mark)
START TIME:
Performance Step: 1 Standard:
Comment:
Performance Step: 2 Standard:
Comment:
~
Performance Step: 3 Standard:
Comment:
Determine total estimated dose for the task.
16 R/hour x.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> =12 Rem Determine the dose limit for site emergency workers Per PEP-330 - Attachment 1: 5 Rem Determine the number of people required Workers A, B, and C would have to be used (~) to reach the 12 Rem total estimated dose (4700 + 4450 + 4300 = 13.45)
HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9
Appendix C
~
Performance Step: 4 Standard:
Comment:
Page 5 of 7 PERFORMANCE INFORMATION Stay Time for Workers A: 4.7/16 x 60 minutes = 17 minutes B: 4.55/16 x 60 minutes = 17 minutes C: 4.30/16 x 60 minutes =16 minutes Form ES-C-1 Terminating Cue:
STOP TIME:
After the maximum stay time for the workers to be used is calculated: Evaluation on this JPM is complete.
HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9
Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2008 NRC RO-SRO A3 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
Examiner's Signature:
SAT UNSAT Date:
HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9
Appendix C Page 7 of 7 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:
INITIATING CUE:
A large break LOCA has occurred.
The ECCS is in cold leg recirculation.
RHR Pump "B" is running. RHR Pump "A" showed evidence of gas binding and was stopped.
A Site Area Emergency (SAE) is in effect.
The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available.
The general radiation level in the area is 16 R/hour The OSC estimates that the total task will take.75 man-hours.
The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task.
The site emergency workers listed in the table below are available. They will be utilized from lowest to highest accumulated TEDE dose.
Using the minimum number of workers possible, DETERMINE:
the total number of workers required to perform the task and the maximum stay time for each individual who will be utilized.
Assume no dose in transit and round off to the nearest minute below the limit.
Site Emergency Worker Accumulated TEDE Dose This Year A
300 mr B
450 mr C
700 mr D
800 mr E
850 mr F
1000 mr G
1050 mr H
1150 mr I
1200 mr J
1300 mr K
1500 mr L
1650 mr HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9
Appendix C Facility:
Task
Title:
KIA
Reference:
Examinee:
Job Performance Measure Worksheet HARRIS Task No.:
Evaluate a Change in Conditions on JPM No.:
an Existing EAL 2.4.41 (4.1)
NRC Examiner:
Form ES-C-1 345001H602 2008 NRC JPM SRO A4 Facility Evaluator:
Date:
Method of testing: This JPM can be performed in any setting with the required references available.
Simulated Performance:
Classroom READ TO THE EXAMINEE X
Simulator Actual Performance:
Plant x
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
See Plant Conditions handout.
Task Standard:
Upgrade EAL to GE and correct PAR within required time.
Required Materials:
None General
References:
PEP-110, EMERGENCY CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS, Rev. 16 PEP-230, CONTROL ROOM OPERATIONS, Rev.14 PEP-310, NOTIFICATIONS AND COMMUNICATIONS, Rev. 21 Handouts:
Initiating Cue:
Time Critical Task:
Attached Initial Conditions EAL Flowcharts PEP-110 PEP-310 EP/EAL Guidelines PEP-230, Attachment 1 - SITE EMERGENCY COORDINATOR You are the Site Emergency Coordinator. Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet.
YES - 15 minutes to classify then 15 more minutes to make the PAR.
HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision
Appendix C Job Performance Measure Worksheet Form ES-C-1 Validation Time:
10 minutes to classify, 12 minutes for PAR/Emergency Notification Form.
HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision
Appendix C (Denote Critical Steps with a ~)
Start Time:
Page 3 of 7 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 1 Standard:
Evaluator Cue:
. Comment:
-Y Performance Step: 2 Standard:
Evaluator Note:
Comment:
Evaluate changing conditions.
Compares conditions against EAL Flowchart criteria.
Provide Initial Conditions sheet (last page of JPM).
Provide reference materials if not available in the JPM performance location.
Classification Start Time Determine EAL.
Upgrade to GE (2-1-4) required:
RCS Breached Fuel Breached - DEI sample> 300 uCi/cc CNMT Jeopardized - Pressure> 3 PSIG
- It may be necessary to cue the PAR performance. The facility normally splits the EAL and the PAR into two JPM's.
- If the applicant incorrectly classifies then skip to the Evaluator Cue in Performance Step 3.
Classification End Time/PAR Start Time HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision
Appendix C
~
Performance Step: 3 Page 4 of 7 PERFORMANCE INFORMATION Determine PAR (PEP-230, Attachment 1, Step 10).
Form ES-C-1 Standard:
Evaluator Cue:
Comment:
~
Performance Step: 4 Standard:
Evaluator Note:
Comment:
Terminating Cue:
Refers to PEP-110, Attachment 3:
PROTECTIVE ACTION RECOMMENDATION:
EVACUATE: 2 mile radius EVACUATE: Subzones A, B, L SHELTER: Subzones C, D, E, F, G, H, I, J, K, M, N The computer program is not available. Hand write a paper copy of the Manual Notification Form in accordance with PEP-230, Attachment 1, Step 11.b.
Complete the ENF.
Critical Elements:
Block 4: GE Block 4 EAL: 2-1-4 Block 5 PAR: Evacuate 2 mile radius and Subzones A, B, L; Shelter Subzones C, D, E, F, G, H, I, J, K,M,N Block 6 Emergency Release: Is Occurring Block 9 Wind Direction from: 126 0
Block 10: DECLARATION; Current TIME; Current DATE Block 17: Applicant signature/Title/Current Time/ Current Date Provide form to Communicator An ENF KEY is attached, PAR Notification End Time After the ENF is handed to the communicator: Evaluation on this JPM is complete.
HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision
Appendix C Page 5 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2008 NRC JPM SRO A4 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
Examiner's Signature:
SAT UNSAT Date:
HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision
Appendix C INITIAL CONDITIONS:
Page 6 of 7 JPM CUE SHEET See Plant Conditions handout.
Form ES-C-1 INITIATING CUE:
You are the Site Emergency Coordinator.
Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet.
HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision
Appendix C Page 7 of 7 JPM CUE SHEET 2008 NRC JPM SRO A4 Plant Conditions Form ES-C-1 Increasing RCS leakage required a MANUAL Reactor Trip and Safety Injection The TDAFW Pump is cleared and tagged The RCS leak escalated to a large-break LOCA while the crew was performing PATH-1 Containment Spray actuated There is a RED CSF on INTEGRITY The EAL Network was entered at Point X A Site Area Emergency (SAE) is in effect with the RCS breached (EAL 2-1-3) and Containment jeopardized Outside temperature is 62 of Thunderstorms are moving into the area The wind is blowing at 12 MPH from 126 degrees Since the SAE declaration, the following has occurred:
Plant computers are down which will require any additional notifications to be done using a manual notification form Off-site power was lost and EDG 1B failed while starting ECCS cold leg recirculation alignment on Train "A" was just completed Containment Pressure is 3.8 PSIG, lowering slowly Containment Area Radiation Monitors are in HIGH alarm, rising slowly Contalnrnent High Range Monitors are rising but not in alarm Plant Vent Stack #1 Monitor is rising slowly but not in alarm Charging Pump "A" Room Monitor went into HIGH alarm after cold leg recirculation was initiated Chemistry has analyzed a sample and reports an Iodine Dose Equivalent RCS concentration of 410 uCilcc HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision
tE~
~ - PROTECTIVE ACTION RECOMMENDATION PROCESS Sheet 1 of 2 No No Fuel Breach)
No (Yes/
due to Res Breach) 2 MliileRadius :5Miles Downwind IPEP-110 Wiind IEvacuaie Shelter Direction Subzones
- Subzooes
~From -"
34a~ -010' AB,C,O;H,U<.L E.F~G,J,M.N 011°-~
A1B,C,D,HJ.t'~L E"F"G,J,M.N cse--DIg-::
AB,C,o,tJ,Y~L.M E,F,G.H.N 080~ -, 101~
~B,C,D,J,I<."L,M E.F~G,.HJ,N 102(1 -, 124a AFB,C,D,r~l,U E"F"G,HJ.J,N 125~ -14&
AB,C,D,KL,M.Nl E"F~G,HJ.J 147c.-, 191'~
AfB,C,D,E~K,LM.t4 F,G"H"I.,-J 192(1 -, 214<:
A*B,C,D,E",K,l F,G"H"I,J"M,H 215t, -zse-A.B,C,D,E"K,l f,G"HJ"J~M,N 237 t \\ -, 2§9a A,,B,C,D,E.F,,K,l GI'H.tJ..M.N
- 260(1 - 32&
A"B,C,D,F,G.HJ<,l E."I"J"M.N 327t,-347(1 A.B,C,D,H,K,L E"F"G.I,J,M.N Rev. 16 Wind Evacuat,e; She-Iter rnrecti00 Subzones Subzone'S
{From 'tfj 3270 -010='
A,D,I<
B"C"E,F,G"H,,1,,J,,L,M,N 0110 -05&'
A,K B.C"D"E,f,G"H.I"J"L,~,4.N n57° -1?4~
A tUL 8 C"D~E F G_HL.LMN 1251;1-1'91=
A,H"L C.D,E"F.G,H,I,J,KM.N I
1920-214.:
A,B C,D,E.F"G,H,tJ,K.LM.N 215Cl-259='
A,B.e D,E"F.G,HJ.J,K.L,MJ~
2600-2B1~
A,e B"D~E,F,G"H"LJ.,K,l,M,N 282c -3(14':'
A,C,D B"E,f,G,.H"I"JJ<.LM,N 305(1-328~
A,D B"C,,E,F,G.,H,,I,,J,,K,LM.N Page 18 of 261
~
= - PROTECTIVE ACTION RECOMMENDATION PROCESS Sheet 2 of 2 Acceptable changes in initial PARS would include expanding evacuation but would not allow a change from evacuation of zones to sheltering of those zones.
1.
Indications that substantial core damage is imminent or has occurred include:
a)
Core damage> 1°A, melt.
b)
Core Exit Thermocouple readings ~ 2300° F.
c)
Core uncovered> 30 minutes.
2.
Indications that a significant loss of reactor coolant is imminent or has occurred include:
a)
Containment radiation reading> 10,000 RlHr without spray or> 4,000 R/Hr with spray.
b)
Containment hydrogen gas concentration> 1o.k>.
c)
Rapid vessel depressurization.
d)
A large break loss of coolant accident.
3.
Indications that containment failure (primary or S/G) is imminent or has occurred are indicated by:
a)
A release of radioactivity greater than the projected dose of either:
1000 mRem TEDE at or beyond the site boundary.
5000 mRem Thyroid CDE at or beyond the site boundary.
Or a measured dose rate of either:
>1000 mRem/hr at or beyond the site boundary.
1-131 equivalent concentration> 3.9 E-6 IJCi/cc at or beyond the site boundary.
b)
Primary containment pressure can not be maintained below design basis pressure of 45 psig.
c)
Primary containment H2 gas concentration can not be maintained below combustible limit of 4%
by volume.
d)
Faulted/Ruptured S/G with a relief valve open.
4.
Accidents which result in a direct release pathway to the environment will most likely be thyroid dose limiting. For a faulted and ruptured S/G, water level must be below the tube bundles (S/G Narrow Range < 25% normal containment conditions or < 40% adverse containment conditions) with a relief valve open before it is considered a direct release pathway to the environment. For circumstances involving a direct release pathway to the environment:
a)
Consider any Fuel Breach sufficient to warrant the determination that substantial core damage has occurred.
b)
Consider any RCS Breach sufficient to warrant the determination that a significant loss of reactor coolant has occurred.
NOTE: A direct release is defined as a pathway from the containment to any environ-mentoutside the containment when containment or system isolation is required due to a safety injection signal, containment pressure greater than 3 psig, or a valid containment ventilation isolation signal and the pathway cannot be isolated from the Main Control Room.
Containment monitors can provide indication of both core damage and RCS breach. Monitor readings used to quantify an amount of damage or coolant leakage should be complimented by other indications and engineering judgment.
If a release is in progress:
Perform dose assessment as soon as possible to determine if PAGs are exceeded and if additional Subzones require evacuation.
Add any Subzones requiring evacuation as determined by dose assessment to the plant-based PARs.
If no release is in progress:
Perform dose projection on possible conditions as time permits to determine if PAGs could be exceeded. Consider adding any Subzones requiring "evacuation as determined by dose projection to the plant-based PARs.
IPEP-110 Rev. 16 Page 19 of 261
- NUCLEAR POWER PLANT EMERGENCY NOTIFICATION FORMrz!::Of 1
- 1. I DRILL I§J ACTUAL EVENT MESSAGE #
~
N Today 2.1 INITIAL
@JFOLLOW-UPNOTIFICATION:TIME ow DATE__/__/__
AUTHENTICATION #
- 3. SITE:
HNP Confirmation Phone # (__)
- 4. EMERGENCY
~ UNUSUAL EVENT I§I ALERT 19 SITE AREA EMERGENCY GENERAL EMERGENCY CLASSIFICATION:
BASED ON EAL #
2 4 EAL DESCRIPTION:
3 FPBs Breached/Jeopardized 19 Has Occurred I
Is Occurring
~None
- 5. PROTECTIVE ACTION RECOMMENDATIONS:
~ NONE IEVACUATE 2 mile radius and Subzones A,B,L ISHELTER Subzones C,D,E,F,G,H,I,J,K,M,N IQI CONSIDER THE USE OF KI (POTASSIUM IODIDE) IN ACCORDANCE WITH STATE PLANS AND POLICY.
I§ OTHER
- 6. EMERGENCY RELEASE:
I Under evaluation Shutdown at Time Date _/__/_
Shutdown at Time Date _/__/_
Shutdown at Time Date _/__/_
ri\\INot applicable B Within normal operating I!j limits
~ Improving I
Stable Wind Direction* from 126 degrees Above normal operating limits 19 Degrading Wind Speed*
12 mph
(*Not Requiredfor Initial Notifications)
Precipitation*
Stability Class* ~
I§J 19 (QJ I§ lEI I§I
- 10. I DECLARATION I§J TERMINATION Time Date
/
/
(Enters Current Date and Time)
- 11. AFFECTED UNIT(S):
[J
[I I6ill
- 12. UNIT STATUS:
I U1 _0_0/0 Power (Unaffected Unit(s) Status Not Required for Initial Notifications)
~ U2 __% Power
§ U3 __0/0 Power
- 7. RELEASE SIGNIFICANCE:
- 8. EVENT PROGNOSIS:
- 9. METEOROLOGICAL DATA:
- 13. REMARKS:
FOLLOW-UP INFORMATION (Lines 14 through 16 Not Required for Initial Notifications)
EMERGENCY RELEASE DATA. NOT REQUIRED IF LINE 6 A IS SELECTED.
- 14. RELEASE CHARACTERIZATION:
TYPE: ~ Elevated I§I Mixed 19 Ground UNITS: ~ Ci I§J Ci/sec 19 ~Ci/sec Estimated Release Duration Hours
____ Date _/__/__Stop Time
____ Date _/__/__Stop Time MAGNITUDE:
Noble Gases:
lodines:
Particulates:
Other:
FORM: ~ Airborne Start Time Date _/__/__
I§J Liquid Start Time Date _/__/__
- 15. PROJECTION PARAMETERS:
Projection period:
Hours Adult Thyroid CDE (mrem)
DISTANCE Projection performed:
Time Date _/__/__
TEDE (mrem)
- 16. PROJECTED DOSE:
Site boundary 2 Miles 5 Miles 10 Miles Page 33 of 51 I Time Time Date_/__/__
Date
/
/
I Rev. 21 (Sign and Date)
Title--------
RECEIVED BY:
IPEP-310
- 17. APPROVED BY:
NOTIFIED BY: