(One intermediate revision by the same user not shown) |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:EXPERIENCE EXPERIENCE Both a good teacher-...and a bad teacher. | | {{#Wiki_filter:EXPERIENCE EXPERIENCE Both a good teacher...and a bad teacher. |
| Good-because the lesson you learn is seldom forgotten.
| | Goodbecause the lesson you learn is seldom forgotten. |
| Bad-because it gives you the test first, then teaches you the lesson.
| | Badbecause it gives you the test first, then teaches you the lesson. |
| | |
| Question Format Question Format NUREG 1021 shows four format models in Appendix B. | | Question Format Question Format NUREG 1021 shows four format models in Appendix B. |
| Turns out-the Two-Part Question Format is the one format that receives the least resistance during the review process. | | Turns outthe Two-Part Question Format is the one format that receives the least resistance during the review process. |
| The Two-Part Question Format does simply the process for developing plausible distracters. | | The Two-Part Question Format does simply the process for developing plausible distracters. |
| Plausible Distracters Plausible Distracters NUREG 1021 Appendix B Attachment 2 D. Implausible DistractersThe next two questions illustrate the concept of implausible distracters, which is another common psychometric deficiency that should be avoided on NRC examinations. | | |
| : 1. "Which of the following will c ause the RHR pumps to start during a design-basis LOCA? | | Plausible Distracters Plausible Distracters NUREG 1021 Appendix B Attachment 2 D. Implausible Distracters The next two questions illustrate the concept of implausible distracters, which is another common psychometric deficiency that should be avoided on NRC examinations. |
| : a. low drywell pressureb. high reactor water level | | : 1. |
| | Which of the following will cause the RHR pumps to start during a design-basis LOCA? |
| | : a. low drywell pressure |
| | : b. high reactor water level |
| : c. high drywell pressure | | : c. high drywell pressure |
| : d. MSIVs in the NOT OPEN position"Distracters "a," "b," and "d" are implausible, considering minimal knowledge of the plant response to a LOCA.2. "Which ONE of the following condi tions will NOT result in a shutdown of the standby gas treatment system (SBGTS)?a. manual shutdown | | : d. MSIVs in the NOT OPEN position Distracters a, b, and d are implausible, considering minimal knowledge of the plant response to a LOCA. |
| | : 2. |
| | Which ONE of the following conditions will NOT result in a shutdown of the standby gas treatment system (SBGTS)? |
| | : a. manual shutdown |
| : b. high-temperature (107 C, 225 F) charcoal bed | | : b. high-temperature (107 C, 225 F) charcoal bed |
| : c. high-temperature (82 C, 180 F) heater inletd. overloads in the local control panel"Distracter "a" is very implausible, and distracter "d" is subjective. The questio n is also written from a negative perspective. | | : c. high-temperature (82 C, 180 F) heater inlet |
| Plausible Distracters Plausible Distracters Upon further review, my interpretation of a plausible distracter is; If a minor change in the stem makes the distracter correct-it's PLAUSIBLE. | | : d. overloads in the local control panel Distracter a is very implausible, and distracter d is subjective. The question is also written from a negative perspective. |
| NOTE: If a distracter is chosen as the correct answer during validation-it's PLAUSIBLE. | | |
| | Plausible Distracters Plausible Distracters Upon further review, my interpretation of a plausible distracter is; If a minor change in the stem makes the distracter correctits PLAUSIBLE. |
| | NOTE: |
| | If a distracter is chosen as the correct answer during validationits PLAUSIBLE. |
| | |
| Do NOT teach in the stem. | | Do NOT teach in the stem. |
| Do NOT teach in the stem. | | Do NOT teach in the stem. |
| Save your teaching skills for the Plausibility Analysis.}} | | Save your teaching skills for the Plausibility Analysis.}} |
|
---|
Category:Conference/Symposium/Workshop Paper
MONTHYEARML16260A3552016-09-16016 September 2016 Notice of Closed Pre-decisional Enforcement Conference to Discuss Two Apparent Willful Violations Involving Failure to Conduct Roving Fire Watches and Inaccurate/Incomplete Hourly Fire Watch Records at Browns Ferry ML0822614732008-08-13013 August 2008 Hlt 0610 Lessons Learned 2016-09-16
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24320A1062024-11-20020 November 2024 Pre-Submittal Meeting Presentation, November 20, 2024, Pmns 20241350 ML24284A0042024-10-16016 October 2024 Application to Use Online Monitoring Methodology for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant Session Slides ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24184B9162024-07-10010 July 2024 U.S. NRC Meeting Slides for Meeting with Tennessee Valley Authority Regarding NRC Questions Regarding Scope of Nuclear Quality Assurance Program ML24149A1332024-05-29029 May 2024 Pre-Submittal Meeting for Proposed License Amendment Regarding Hydrologic Analysis Updates Public Portion Meeting Slides ML24113A0962024-04-22022 April 2024 RIPE Pre-Submittal Meeting Slides ML24078A2722024-04-10010 April 2024 Subsequent License Renewal Public Scoping Meeting ML24067A2832024-03-27027 March 2024 2023 Browns Ferry, Sequoyah and Watts Bar Annual Assessment Public Meeting Presentation Slides ML24032A2752024-02-0707 February 2024 Pre-Pre-Submittal Meeting for Proposed License Amendment Regarding Hydrologic Analysis Updates (Slides) ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML23130A0912023-05-11011 May 2023 TVA Browns Ferry Nuclear Plant Safety Pre-Application Public Meeting Slides 05/11/2023 ML23130A0332023-05-11011 May 2023 NRC Presentation Browns Ferry Subsequent License Renewal Pre-application Meeting, Environmental Overview ML23130A0922023-05-11011 May 2023 NRC Browns Ferry Nuclear Plant, Units 1, 2, and 3, Subsequent License Renewal Application, Public Meeting Slides ML23130A0302023-05-10010 May 2023 TVA Presentation Browns Ferry Nuclear Plant Subsequent License Renewal License Application – Environmental Report ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23025A0472023-01-25025 January 2023 Pre-Submittal Meeting for Proposed License Amendment Request Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves - January 25, 2023 ML22285A1902022-10-13013 October 2022 October 13, 2022 Public Meeting on 5th Interval Alternative Planned Requests - Licensee Slides ML22277A6562022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October, 2022 (TVA Slides) ML22279A8992022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October 6, 2022-TVA Slides ML22264A2332022-09-22022 September 2022 Slides for Pre-Submittal Meeting for Request to Use a Later Edition of the ASME OM Code for the Fifth Inservice Testing (IST) 10-Year Interval ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21270A0322021-09-27027 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting September 27, 2021 ML21265A0422021-09-21021 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting 09/22/2021 ML21250A3012021-09-0707 September 2021 TVA Slides for September 7, 2021, Presubmittal Meeting to Discuss Planned Browns Ferry TSTF-505 License Amendment Request ML21152A1872021-06-0101 June 2021 TVA Slides for June 1, 2021, Presubmittal Meeting to Discuss Planned Control Bay Chiller Cross-Tie License Amendment Request ML21096A1002021-04-0606 April 2021 Annual Assessments ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20156A2812020-06-0808 June 2020 TVA Slides for June 8, 2020, ATRIUM-11 Presubmittal Meeting ML20112F5302020-04-21021 April 2020 TVA Nuclear Plants -2019 EOC Media Loop Slides for Automatic Play (Final) ML20092F5742020-04-0202 April 2020 TVA Slides for Browns Ferry 50.69 License Amendment Request Presubmittal Meeting ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML19120A3692019-04-30030 April 2019 Public Meeting Summary - Browns Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18158A2862018-06-0707 June 2018 May 30, 2018 Summary of Public Meeting with Browns Ferry Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML18059A1072018-03-16016 March 2018 Maximum Extended Load Line Limit Analysis Plus License Amendment Request ML17291A5212017-11-0808 November 2017 Maximum Extended Load Line Limit Analysis Plus License Amendment Request, Presentation Slides ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status ML17212A8432017-08-0101 August 2017 Meeting Slides for Pre-submittal Meeting with Tennessee Valley Authority on Unbalanced Voltage License Amendment Request for TVA Nuclear Plants ML17034A3322017-02-0303 February 2017 Presentation Slides for Public Meeting Regarding Browns Ferry Extended Power Uprate License Amendment Request Transmission System Update Supplements ML16356A0342017-01-0404 January 2017 Pre-app Meeting Mellla+ LAR Final ML16341A7422017-01-0404 January 2017 Presentation Slides for Browns Ferry Pre-application Meeting Regarding Mellla+ ML16279A2332016-10-0505 October 2016 Summary of Closed Pre-Decisional Enforcement Conference with Tennessee Valley Authority Regarding Browns Ferry Nuclear Plant ML16189A3482016-07-19019 July 2016 Presentation Slides for July 19, 2016, Public Meeting ML16200A2592016-07-19019 July 2016 July 19, 2016: NRC Public Meeting on Browns Ferry Nuclear Plant Extended Power Uprate License Amendment Request ML16153A1982016-06-0101 June 2016 2015 EOC Meeting Summary ML16028A0962016-02-0101 February 2016 Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal Logic, and Unit Priority Re-Trip Logic License Amendment Request ML16006A2882016-01-0606 January 2016 Significant Operational Experience: 7 Major Industry Events with Regulatory Implications ML15308A1002015-11-10010 November 2015 Public Meeting Presentation Slides Extended Power Uprate License Amendment Request NRC Public Meeting 2024-08-15
[Table view] |
Text
EXPERIENCE EXPERIENCE Both a good teacher...and a bad teacher.
Goodbecause the lesson you learn is seldom forgotten.
Badbecause it gives you the test first, then teaches you the lesson.
Question Format Question Format NUREG 1021 shows four format models in Appendix B.
Turns outthe Two-Part Question Format is the one format that receives the least resistance during the review process.
The Two-Part Question Format does simply the process for developing plausible distracters.
Plausible Distracters Plausible Distracters NUREG 1021 Appendix B Attachment 2 D. Implausible Distracters The next two questions illustrate the concept of implausible distracters, which is another common psychometric deficiency that should be avoided on NRC examinations.
- 1.
Which of the following will cause the RHR pumps to start during a design-basis LOCA?
- a. low drywell pressure
- b. high reactor water level
- c. high drywell pressure
- d. MSIVs in the NOT OPEN position Distracters a, b, and d are implausible, considering minimal knowledge of the plant response to a LOCA.
- 2.
Which ONE of the following conditions will NOT result in a shutdown of the standby gas treatment system (SBGTS)?
- a. manual shutdown
- b. high-temperature (107 C, 225 F) charcoal bed
- c. high-temperature (82 C, 180 F) heater inlet
- d. overloads in the local control panel Distracter a is very implausible, and distracter d is subjective. The question is also written from a negative perspective.
Plausible Distracters Plausible Distracters Upon further review, my interpretation of a plausible distracter is; If a minor change in the stem makes the distracter correctits PLAUSIBLE.
NOTE:
If a distracter is chosen as the correct answer during validationits PLAUSIBLE.
Do NOT teach in the stem.
Do NOT teach in the stem.
Save your teaching skills for the Plausibility Analysis.