(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML13066A158 | | | number = ML13066A158 |
| | issue date = 03/20/2013 | | | issue date = 03/20/2013 |
| | title = Acceptance Letter Regarding License Amendment Request 13-01, Application for Administrative Change and Corrections to the Technical Specifications (TAC No. MF1033) | | | title = Acceptance Letter Regarding License Amendment Request 13-01, Application for Administrative Change and Corrections to the Technical Specifications |
| | author name = Lamb J G | | | author name = Lamb J |
| | author affiliation = NRC/NRR/DORL/LPLI-2 | | | author affiliation = NRC/NRR/DORL/LPLI-2 |
| | addressee name = Walsh K | | | addressee name = Walsh K |
Line 9: |
Line 9: |
| | docket = 05000443 | | | docket = 05000443 |
| | license number = | | | license number = |
| | contact person = Lamb J G | | | contact person = Lamb J |
| | case reference number = TAC MF1033 | | | case reference number = TAC MF1033 |
| | document type = Letter, Acceptance Review Letter | | | document type = Letter, Acceptance Review Letter |
| | page count = 3 | | | page count = 3 |
| | project = TAC:MF1033 | | | project = TAC:MF1033 |
| | stage = Request | | | stage = Acceptance Review |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 March 20, 2013 Mr. Kevin Walsh, Site Vice President clo Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 SEABROOK STATION, UNIT NO.1-ACCEPTANCE LETTER REGARDING LICENSE AMENDMENT REQUEST 13-01, APPLICATION FOR ADMINISTRATIVE CHANGE AND CORRECTIONS TO THE TECHNICAL SPECIFICATIONS (TAC NO. MF1033) | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 20, 2013 Mr. Kevin Walsh, Site Vice President clo Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 |
| | |
| | ==SUBJECT:== |
| | SEABROOK STATION, UNIT NO.1-ACCEPTANCE LETTER REGARDING LICENSE AMENDMENT REQUEST 13-01, APPLICATION FOR ADMINISTRATIVE CHANGE AND CORRECTIONS TO THE TECHNICAL SPECIFICATIONS (TAC NO. MF1033) |
|
| |
|
| ==Dear Mr. Walsh:== | | ==Dear Mr. Walsh:== |
| By letter dated March 1, 2013 (Agencywide Documents Access and Management System Accession No. ML13070A01 0), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 13-01 for Seabrook Station, Unit 1 (Seabrook). | | By {{letter dated|date=March 1, 2013|text=letter dated March 1, 2013}} (Agencywide Documents Access and Management System Accession No. ML13070A010), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 13-01 for Seabrook Station, Unit 1 (Seabrook). The proposed change is to the Seabrook Technical Specification (TS). The proposed amendment will delete the TS Index and make corrections to TS 3.4.8, "Reactor Coolant System Specific Activity," and TS 6.8.1.a, "Core Operating limits Report." |
| The proposed change is to the Seabrook Technical Specification (TS). The proposed amendment will delete the TS Index and make corrections to TS 3.4.8, "Reactor Coolant System Specific Activity," and TS 6.8.1.a, "Core Operating limits Report." The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.90, an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. | | The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| Section 50.34 of 10 CFR addresses the content of technical information required. | | Consistent with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.90, an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. |
| The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. | | |
| K. Walsh -If you have any questions, please contact me at (301) 415-3100. | | K. Walsh |
| Iy, G. Lamb, Senior Project Manager nt Licensing Branch 1-2 ivision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv K. Walsh -If you have any questions, please contact me at (301) 415-3100. | | - 2 If you have any questions, please contact me at (301) 415-3100. |
| Sincerely, Ira! John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv DISTRIBUTION: | | Iy, |
| PUBLIC LPLI-2 RlF RidsNrrLAABaxter Resource RidsNRRDor1Lp11-2 Resource RidsOgcRP Resource RidsNrrPMSeabrook Resource RidsNrrDorlDpr Resource RidsRgn1 MailCenter Resource RidsAcrsAcnw | | %#~# |
| _MaiICTR Resource ADAMS Accession No: ML13066A158 | | G. Lamb, Senior Project Manager nt Licensing Branch 1-2 ivision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv |
| *via email OFFICE LPL 1-2/PM LPL 1-2/LA* LPL 1-2/BC LPL 1-2/PM NAME JLamb ABaxter w/comment MKhanna JLamb DATE 03/20/13 03/18/13 03/20/13 03/20/13 OFFICIAL RECORD COpy}} | | |
| | K. Walsh |
| | - 2 If you have any questions, please contact me at (301) 415-3100. |
| | Sincerely, Ira! |
| | John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv DISTRIBUTION: |
| | PUBLIC LPLI-2 RlF RidsNrrLAABaxter Resource RidsNRRDor1Lp11-2 Resource RidsOgcRP Resource RidsNrrPMSeabrook Resource RidsNrrDorlDpr Resource RidsRgn1 MailCenter Resource RidsAcrsAcnw _MaiICTR Resource ADAMS Accession No: ML13066A158 |
| | *via email OFFICE LPL 1-2/PM LPL1-2/LA* |
| | LPL1-2/BC LPL 1-2/PM NAME JLamb ABaxter w/comment MKhanna JLamb DATE 03/20/13 03/18/13 03/20/13 03/20/13 OFFICIAL RECORD COpy}} |
Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARIR 05000443/20244012024-12-12012 December 2024 Security Baseline Inspection Report 05000443/2024401 (Cover Letter Only) IR 05000443/20240032024-10-30030 October 2024 Integrated Inspection Report 05000443/2024003 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24303A0352024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent SBK-L-24064, 10 CFR 72.48 Report of Changes, Tests, and Experiments2024-08-0101 August 2024 10 CFR 72.48 Report of Changes, Tests, and Experiments L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 05000443/LER-2024-001, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 2024-09-25
[Table view] Category:Acceptance Review Letter
MONTHYEARML24115A2362024-03-28028 March 2024 Acceptance Review: Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML22341A0012022-12-0606 December 2022 Acceptance of Requested Licensing Action Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML21278A3092021-10-0606 October 2021 Acceptance of Requested Licensing Action Regarding Amendment to Revise 120-Volt AC Vital Instrument Panel Technical Specification Requirements ML20063J9792020-02-28028 February 2020 Acceptance of Requested Licensing Action Amendment Request to Revise Degraded Voltage Time Delay Setpoint ML16158A0182016-06-10010 June 2016 Acceptance of Requested Licensing Action Request to Extend Containment Leakage Test Frequency ML15195A0692015-07-27027 July 2015 Acceptance of Proposed Licensing Amendment Request Regarding the Addition of a Note to Technical Specification Surveillance Requirement 4.4.1.3.4 ML14245A2042014-09-0909 September 2014 Acceptance of Proposed Licensing Amendment Request Regarding Changes to Technical Specification 3.3.3.1, Radiation Monitoring for Plant Operations ML14245A1892014-09-0909 September 2014 Acceptance of Proposed Licensing Amendment Request Regarding the Increase to the Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement ML14232A6222014-09-0909 September 2014 Acceptance of Requested Licensing Amendment Request and Exemption Regarding Revised Reactor Coolant System Pressure-Temperature Limits ML14198A4202014-08-0808 August 2014 Acceptance of Requested Licensing Amendment Request Regarding Cyber Security Plan Implementation Schedule (Tac No. MF4447) ML14085A3622014-04-0101 April 2014 Acceptance Letter Regarding Request for Relief 3IR-6 from American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection Piping ML13262A3742013-11-22022 November 2013 Acceptance Letter Regarding License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology ML13098A1152013-04-11011 April 2013 Acceptance Letter Regarding License Amendment Request 13-02, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML13066A1582013-03-20020 March 2013 Acceptance Letter Regarding License Amendment Request 13-01, Application for Administrative Change and Corrections to the Technical Specifications ML1218400262012-08-0909 August 2012 Acceptance Letter Regarding Relief Request Related to the Use of an Alternative to the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML12178A6282012-06-29029 June 2012 Acceptance Letter Regarding License Amendment Request 12-03, Proposed Change to Cyber Security Plan Implementation Schedule Milestone 6 ML1212903022012-05-11011 May 2012 Acceptance Letter Regarding License Amendment Request 12-01, Proposed Changes to Emergency Action Levels Regarding Safety System Indications ML1135604092011-12-28028 December 2011 Acceptance Letter Regarding License Amendment Request 11-06, Application to Revise the Applicability of the Reactor Coolant System Pressure-Temperature Limits and the Cold Overpressure Protection Setpoints ML1134307882011-12-16016 December 2011 Acceptance Letter Regarding License Amendment Request 11-09, Removal of Locations in Technical Specification 3.3.3.5, Remote Shutdown System, Table 3.3-9 ML1125004162011-09-0707 September 2011 E-mail, Miller to Okeefe, Seabrook Relief Requests 2IR-17, 2IR-18, 2IR-19, and 2IR-20 Acceptance Review ML1121502302011-08-0303 August 2011 E-mail, Miller to Okeefe, Seabrook LAR 11-03 Acceptance Review ML1113804712011-05-18018 May 2011 E-mail, Miller to Okeefe, Seabrook LAR 11-01 Acceptance Review ML1106700172011-03-0808 March 2011 E-mail, Miller to O'Keefe, Seabrook LAR 10-06 Acceptance Review ML1021403082010-08-0202 August 2010 E-mail, Miller, to O'Keefe, Seabrook, Acceptance Review LAR 10-03 Containment Protective Devices ML1016605532010-06-15015 June 2010 E-mail, Miller, to O'Keefe, Seabrook Acceptance Review LAR 10-02 Ceeacs LCO ML1012702572010-05-0707 May 2010 E-mail, Miller, to O'Keefe, Seabrook, Acceptance Review, ASME Code Alternative, Alternate Depth Sizing Qualification ML0931001492009-11-0606 November 2009 Relief Request for Containment Building Spray Pump Flow Test ML0829400702008-10-20020 October 2008 E-mail, Acceptance Review for Relief Requests MD9781 and MD9783. 2024-03-28
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 20, 2013 Mr. Kevin Walsh, Site Vice President clo Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO.1-ACCEPTANCE LETTER REGARDING LICENSE AMENDMENT REQUEST 13-01, APPLICATION FOR ADMINISTRATIVE CHANGE AND CORRECTIONS TO THE TECHNICAL SPECIFICATIONS (TAC NO. MF1033)
Dear Mr. Walsh:
By letter dated March 1, 2013 (Agencywide Documents Access and Management System Accession No. ML13070A010), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 13-01 for Seabrook Station, Unit 1 (Seabrook). The proposed change is to the Seabrook Technical Specification (TS). The proposed amendment will delete the TS Index and make corrections to TS 3.4.8, "Reactor Coolant System Specific Activity," and TS 6.8.1.a, "Core Operating limits Report."
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.90, an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
K. Walsh
- 2 If you have any questions, please contact me at (301) 415-3100.
Iy,
%#~#
G. Lamb, Senior Project Manager nt Licensing Branch 1-2 ivision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv
K. Walsh
- 2 If you have any questions, please contact me at (301) 415-3100.
Sincerely, Ira!
John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLI-2 RlF RidsNrrLAABaxter Resource RidsNRRDor1Lp11-2 Resource RidsOgcRP Resource RidsNrrPMSeabrook Resource RidsNrrDorlDpr Resource RidsRgn1 MailCenter Resource RidsAcrsAcnw _MaiICTR Resource ADAMS Accession No: ML13066A158
- via email OFFICE LPL 1-2/PM LPL1-2/LA*
LPL1-2/BC LPL 1-2/PM NAME JLamb ABaxter w/comment MKhanna JLamb DATE 03/20/13 03/18/13 03/20/13 03/20/13 OFFICIAL RECORD COpy